Risk Assesment-Construction Site

15
Page 1 Ref No: 001/RA/06 ACTIVITY RISK ASSESSMENT DATA SHEET Work activity: Location Designation: Signature: Date: 02/09/06 HSE Officer Mr. Gafoor Project Engine TASK HAZARD INITIAL RISK CONTROLS RESIDUAL RISK 1 3 2 4 1 1.2 Over Lad 3 3 5 1 People ifting lines tag lines fa 3 2 4 1 1.3.2 Check the tag before the work begins 2 2 3 1 Asset Assessmen t Team Installation of Propane Gas System Burj Dubai Development Mr. Shibu P Ste p No: Description of Task Step Hazard Description & Effect what might be harmed Severit y 1/2/3 Probabi lity Risk Level 1/2/3/4 Risk Control Measures (Preventive Action) Material Unloading to IGS store at Dubai Mall site 1.1 Fatality or Damage due to load drop from the Truck mounted Crane 1.1.1. Check to make sure all safety devices are working correctly 1.1.2 Lifting equipment must be certified; color- coded, rated to inside or outside load efficiently and calibrated. 1.2.3 Before attempting to lift the load check the load capacity of the Crain and load to be lift 1.3.1 The operator should be a competent personal 1.4Unauthorised person during the operation 1.4.1 Control unauthorised person from the unloading area the unloading activity should wear personal protective

Transcript of Risk Assesment-Construction Site

Sheet1Ref No: 001/RA/06ACTIVITY RISK ASSESSMENT DATA SHEETDATE:Work activity:LocationAssessment TeamDesignation:Signature: Date: 02/09/06Approved By:Installation of Propane Gas SystemBurj Dubai DevelopmentMr. Shibu PHSE OfficerMr. Gafoor AProject EngineerINITIAL RISKCONTROLSTASKHAZARDINITIAL RISKCONTROLSRESIDUAL RISKCORRECTIVE ACTIONStep No:Description of Task StepHazard Description & EffectWho or what might be harmed ?Severity 1/2/3Probability 1/2/3Risk Level 1/2/3/4/5Risk Control Measures (Preventive Action)1Material Unloading to IGS store at Dubai Mall site1.1 Fatality or Damage due to load drop from the Truck mounted Crane3241.1.1. Check to make sure all safety devices are working correctly 1.1.2 Lifting equipment must be certified; color- coded, rated to load capacity and checked before usage11.1.3 Ensure there no loose objects inside or outside load1.2 Over Lad3351.2.1 Load indictor must be working efficiently and calibrated.1People1.2.3 Before attempting to lift the load check the load capacity of the Crain and load to be lift1.3 Lifting lines tag lines failure3241.3.1 The operator should be a competent personal11.3.2 Check the tag before the work begins1.4Unauthorised person during the operation2231.4.1 Control unauthorised person from the unloading area1Asset1.4.2 Personal working along with the unloading activity should wear personal protective equipmnt properlyRef No: 001/RA/06ACTIVITY RISK ASSESSMENT DATA SHEETDATE:Work activity:LocationAssessment TeamDesignation:Signature: Date: 02/09/06Approved By:Installation of Propane Gas SystemBurj Dubai DevelopmentMr. Shibu PHSE OfficerMr.Gafoor AProject EngineerTASKHAZARDINITIAL RISKCONTROLLSRESIDUAL RISKCORRECTIVE ACTIONStep No:Description of Task StepHazard Description & EffectWho or what might be harmed ?Severity 1/2/3Probability 1/2/3Risk Level 1/2/3/4/5Risk Control Measures (Preventive Action)2Painting of the Pipe in the Store2.1 Injury to eyes while mixing paint and thinner2232.1.1 Check cap and locking mechanism for proper working and use suitable tools for opening .12.2 Injury to fingers, if caught by locking device of capPeople2232.2.1 Use personal protective equipment properly12.3 Fire3232.3.1 Paint is a flammable equipment so keep thepaint and thinner away from the ignition source13Shifting the pipe from the IGS store to work sport by pick up3.1 Vehicle collisionAsset2233.1.1 Park the vehile proper and convenient place to load 3.1.2 Check the wait of material to be shifted13.1.3 Obey the speed limits in side the site3.2 slipping or falling f the pipe3233.2.1 Hook on each side of the pipe13.3 Injury to the finger, hands or body part2233.3.1Check the sharp edges on the pipe13.3.2 Use proper personal protective equipment3.3.3 keep the shifted pipes in to pipe racks3.3.4 Use stopper in the rackRef No: 001/RA/06ACTIVITY RISK ASSESSMENT DATA SHEETDATE:Work activity:LocationAssessment TeamDesignation:Signature: Date: 02/09/06Approved By:Installation of Propane Gas SystemBurj Dubai DevelopmentMr. Shibu PHSE OfficerDATE:Mr. Shibu PHSE OfficerMr. Gafoor AProject EngineerTASKHAZARDINITIAL RISKCONTROLLSRESIDUAL RISKCORRECTIVE ACTIONStep No:Description of Task StepHazard Description & EffectWho or what might be harmed ?Severity 1/2/3Probability 1/2/3Risk Level 1/2/3/4/5Risk Control Measures (Preventive Action)4Fixing clevis hanger on the roof4.1 Inadequate scaffolding3354.1.1Check the scaffolding placed in firm and right place14.1.2 check the scaffolding visually4.1.3 Check the scaffolding inspection tag validity signaturePeople4.1.4 Use safety harness and hook in4.1.5 Do not push the scafolding by keeping a man in top5Drilling / Cutting5.1 Electrical shock, burns if cable is live3235.1.1 Make sure that power is switched off prior to inspection15.2 Tip and fall while working when cable are laying downAsset3235.2.1 Make sure that cables insulation are good.15.2.2 Make sure that cable are located properly to prevent tripping hazards.5.1.3 Do not operate with wet hands or standing on wet surface5.2.4 Hold the power tools firmly and carefully.Ref No: 001/RA/06ACTIVITY RISK ASSESSMENT DATA SHEETDATEWork activity:LocationAssessment TeamDesignation:Signature: Date: 02/09/06Approved By:Installation of Propane Gas SystemBurj Dubai DevelopmentMr. Shibu PHSE OfficerMr. Gafoor AProject EngineerTASKHAZARDINITIAL RISKCONTROLSRESIDUAL RISKCORRECTIVE ACTIONStep No:Description of Task StepHazard Description & EffectWho or what might be harmed ?Severity 1/2/3Probability 1/2/3Risk Lvel 1/2/3/4/5Risk Control Measures (Preventive Action)5.3Injuries to personnel with moving parts.2235.3.1 Only trained person should operate the power tools.15.3.2 Make sure all moving parts are properly guardedPeople5.3.3 Use PPE (safety glasses / goggles)6Fixing of the pipe on the clives hanger fitted on the roof by crane or manuel6.1 Fall off the load structure while removing crane3356.1.1 Review all safe procedure related to crane movement16.1.2 Competent personal should give the signal to the crane operator.6.2 Load drops due to striking against projectionsAsset3236.2.1 Make sure that all material loded in the crane are properly protected by falling16.2.2 Remove all obstruction from the lifting place6.3 Injury to fingers with pinch points or cut with sharp edge2236.3.1 use all personal protective equipment while lifting16.3.2 proper communication shall be providedRef No: 001/RA/06ACTIVITY RISK ASSESSMENT DATA SHEETDATE:Work activity:LocationAssessment TeamDesignation:Signature: Date: 02/09/06Approved ByInstallation of Propane Gas SystemBurj Dubai DevelopmentMr. Shibu PHSE OfficerMr. Gafoor AProject EngineerTASKHAZARDINITIAL RISKCONTROLSRESIDUAL RISKCORRECTIVE ACTIONStep No:Description of Task StepHazard Description & EffectWho or what might be harmed ?Severity 1/2/3Probability 1/2/3Risk Level 1/2/3/4/5Risk Control Measures (Preventive Action)7Welding & Grinding7.1 Damage to body parts2237.1.1 Use all personal protective equipment (welding gloves, face shield and proper clothing)1People324Follow the prmit proceduresPeople7.1.2 Flammable material will be removed from area where the welding is to be under taken7.2 Fire3247.2.1 If the removal of flammable materials is not practicable . Precautions are to be taken to reduce the risk of fire1Asset7.2.2 Fire extinguisher is immediately available in the area of any welding n operation7.2.3 Follow WPS procedure and welding to be carried out Qualified Welder only7.3 Electrocution3357.3.1 Welding return will be firmly connected to the welding is taking place. This will be carry out by means of well constructed earthing clamps only1Ref No: 001/RA/06ACTIVITY RISK ASSESSMENT DATA SHEETDATE:Work activity:LocationAssessment TeamDesignation:Signature: Date: 02/09/06Approved By:Instalation of Propane Gas SystemBurj Dubai DevelopmentMr. Shibu PHSE OfficerMr. Gafoor AProject EngineerTASKHAZARDINITIAL RISKCONTROLSRESIDUAL RISKCORRECTIVE ACTIONStep No:Description of Task StepHazard Description & EffectWho or what might be harmed ?Severity 1/2/3Probability 1/2/3Risk Level 1/2/3/4/5Risk Control Measures (Preventive Action)7.3.2Welding cables and cable joints will be maintained good conditionPeople7.4.1Grinders should be maintain good condition and inspected prior to use7.4 Weel burst of grinding mechine3247.4.2 Guard to be fitted to the grinders1Asset7.4.3 Change of abrasive wheel to be carried out by trained and authorized personal using proper disc spanner7.4.4 Grinding operation will be controlled in order to prevent the risk of injury to other personal from spark and metal splinters7.4.5 House keeping in the areas at grinding operation to be maintained to a high level

Page &P

Sheet2

Sheet3