Rising From Projects to Programs and Improve Accountability
Prepared by: Gopal Veeramachaneni Las Vegas Valley Water District
Session ID#: 15442
![Page 2: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/2.jpg)
Rising From Projects to Programs and Improve Accountability
Gopal Veeramachaneni, P.E.
![Page 3: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/3.jpg)
AGENDA
• Program/Project Management Rationale
• ProjectVIEW
• Field Mobility – Construction Inspection
• Utility Coordination
![Page 4: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/4.jpg)
Results of a J.D Frame Study of 438 project workers ….
J.D. FRAME STUDY
![Page 5: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/5.jpg)
On your last project, did you meet your budget target ?
Over Budget 55%
On Budget 27%
Under Budget
18%
J.D. FRAME STUDY
![Page 6: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/6.jpg)
On your last project, did you achieve the desired specifications?
Specs Not Met 29%
Met Specs 51%
Exceed Specs 20%
J.D. FRAME STUDY
![Page 7: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/7.jpg)
On your last project, did you achieve your schedule target?
Behind Schedule
69%
On Schedule 22%
Ahead of Schedule
9%
J.D. FRAME STUDY
![Page 8: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/8.jpg)
![Page 9: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/9.jpg)
Early Start
Actual Start
Late Start
Inadequate and misunderstood scope lead to delayed decisions, tasks, projects and programs
Decision
DECISIONS
![Page 10: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/10.jpg)
Project Managers
Give me information that I can use.
INFORMATION OVERLOAD !
Give me information that I can use.
INFORMATION CONTEXT
![Page 11: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/11.jpg)
Engineering Departm
ent
Operations D
epartment
Tick, Tock, Tick, Tock ………..
INFORMATION SILOS
![Page 12: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/12.jpg)
• Long Cycle Times
• Information Silos / Lack of Collaboration
• Duplicated efforts
• Absence of a means to generate Program level metrics
• Lack of a means to enforce accountability
• No means to achieve repeatable project success
Drivers For Change
![Page 13: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/13.jpg)
Project Managers
I need a ONE TOOL that combines all Project and Program Data !!!!!
The Solution
![Page 14: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/14.jpg)
20 %
80 %
Vendor Supported Best of Breed Applications for Line of Business Features and Functions
Internal Customization and Development to support District specific requirements
The Solution
![Page 15: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/15.jpg)
Project Ecosystem
Financials 11
P6 v7
Contract Manager 13
Payroll
Asset Management
FacilityVIEW
Project Controls Systems - Project Centric
- Easily Navigable
- Intuitive Interface
- Centralized Data Store
- Project Agility
- Repeatable Project
Success
![Page 16: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/16.jpg)
Project Initiation
Project Life Cycle
Plan and Scope Project
Design and Bid Project
Construct Project
Project Acceptance
and Warranty
![Page 17: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/17.jpg)
Engineering Operations
Schedule
Planning Design Construction
Operation
Executing
Initiating
Planning
Controlling
Closeout
Responsibility Matrix
![Page 18: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/18.jpg)
Inspection Reporting
Fiscal Controls
Schedules
Utility Coordination
Collaboration Engine
Document Automation
ProjectVIEW
ProjectVIEW
Rationale
- Project Centric - Easily Navigable - Intuitive Interface - Central Data Store - Project Agility - Repeatable Project Success
![Page 19: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/19.jpg)
Schedules
Program Level Schedule Rollups
![Page 20: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/20.jpg)
Summary of All Hosted Projects Knowledge
Store
![Page 21: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/21.jpg)
Schedules Program Schedule Data Drives Business Milestones
![Page 22: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/22.jpg)
Program Life C
ycle Gantt
Schedules
Workload Projection by Resource
![Page 23: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/23.jpg)
Schedules
Contextual “Project Portfolio” Milestones for Project Managers
![Page 24: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/24.jpg)
Bids Metrics On Contractor Bids
![Page 25: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/25.jpg)
Document Automation
Comprehensive Project Document Library
![Page 26: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/26.jpg)
Document Automation
![Page 27: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/27.jpg)
Document Automation
Assign E-Mails to Project Sub-Categories
Project E-Mail Capture
![Page 28: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/28.jpg)
Document Automation
![Page 29: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/29.jpg)
Board Agendas
Board Approved Agenda Items Related to a Project
![Page 30: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/30.jpg)
Field Captured Photos Auto-Synchronized
Field Automation
![Page 31: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/31.jpg)
Field Automation
Field Captured Construction Forms Auto-Synchronized
![Page 32: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/32.jpg)
Fiscal Controls
Category Cost Rollups
![Page 33: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/33.jpg)
Fiscal Controls
Program Level Rollups
![Page 34: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/34.jpg)
Fiscal Controls
E-Mail Based Approvals
![Page 35: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/35.jpg)
Fiscal Controls
Agreement Level Rollup with Invoice Level
granularity
![Page 36: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/36.jpg)
Fiscal Controls
Workgroup Position Individual
![Page 37: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/37.jpg)
Fiscal Controls
Project Progress Payments
![Page 38: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/38.jpg)
Fiscal Controls
Project Change Management
![Page 39: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/39.jpg)
Office Automation
![Page 40: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/40.jpg)
Office Automation
![Page 41: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/41.jpg)
Mobility Devices Such as iPad Supported
![Page 42: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/42.jpg)
Inspection Reporting
Fiscal Controls
Schedules
Construction Management
Collaboration Engine
Document Automation
ProjectVIEW
Collaboration Engine
Rationale
- Improved cycle times - Process knowledge capture - Efficient execution - Inherent communication - Context specific - Improved reliability
![Page 43: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/43.jpg)
Project Manager Initiates Review
Package
Contract Review Cycle
Content Creators Publish Drawings
& Specs
Reviewers Log Comments
Project Manager Responds to
Comments
Project Manager Directs Action
for Content Change
Collaboration Engine
![Page 44: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/44.jpg)
Project Manager
Content Creator
Division Manager
Team Leader
Staff
Collaboration Engine
![Page 45: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/45.jpg)
Collaboration Engine
![Page 46: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/46.jpg)
Review Drawings & Specifications
Collaboration Engine
![Page 47: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/47.jpg)
Respond to Comments
Project Manager Collaboration
Engine
![Page 48: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/48.jpg)
Monitor Actions on comments submitted
Project Reviewer
Collaboration Engine
![Page 49: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/49.jpg)
Project Manager/Consultant Response
Project Manager
Collaboration Engine
![Page 50: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/50.jpg)
Inspection Reporting
Fiscal Controls
Schedules
Construction Management
Collaboration Engine
Document Automation
ProjectVIEW
Inspection Reporting
Rationale
- Real-time Updates - Forms based Data Capture - Flexible Architecture - Remote Connectivity - Secure and Context Specific
![Page 51: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/51.jpg)
• Brought Automation to the Inspection Reporting Process
• Enabled Real-time Construction Monitoring
• Provided Robust Claims Management Support
• Provided a means to capture granular details of Inspections
Inspection Reporting
![Page 52: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/52.jpg)
Most District projects are located in areas without wireless coverage. Lack of consistent access to the Inspection data set. Data loss due to irregular connectivity.
Inspection Reporting
![Page 53: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/53.jpg)
Inspection Reporting
![Page 54: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/54.jpg)
Project List This area lists the project assigned to the logged on Inspector
Daily Report List This area lists the Daily Reports logged for the selected project.
Detail Window This area displays the details of the selected Daily Report.
Daily Report List UNSYNCHED DAILY REPORTS are shown in RED.
Inspection Reporting
![Page 55: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/55.jpg)
Inspection Reporting
![Page 56: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/56.jpg)
Inspection Reporting
![Page 57: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/57.jpg)
Inspection Reporting
GPS - Automated Vehicle Location
Benefits
- Dynamic field staff
monitoring.
- Intelligent Routing.
- Asset security
management.
- Fleet speed
management.
![Page 58: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/58.jpg)
Inspection Reporting
Fiscal Controls
Schedules
Utility Coordination
Collaboration Engine
Document Automation
ProjectVIEW
Utility Coordination
Rationale
- Shared Project data among Utilities and Agencies - Project Decisions based on current Community Wide Project Data - Early identification of Partnering Opportunities
![Page 59: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/59.jpg)
Utility Coordination
![Page 60: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/60.jpg)
CCPW
Pro
ject
Utility Coordination
![Page 61: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/61.jpg)
Utility Coordination
![Page 62: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/62.jpg)
Questions ?
![Page 63: Rising from projects to programs and improve accountability - Oracle Primavera Collaborate 14](https://reader033.fdocuments.in/reader033/viewer/2022042722/58a599611a28abaf3e8b57f9/html5/thumbnails/63.jpg)