RIBA plan of work

27

description

 

Transcript of RIBA plan of work

Page 1: RIBA plan of work
Page 2: RIBA plan of work

RIBA Royal Institute of British Architecture

Page 3: RIBA plan of work

Introduction

Formed in 1834.

Various plans are proposed by the charter

Purpose of the charter is to promote and facilitate the knowledge related to construction sector.

Page 4: RIBA plan of work

Used by internationally recognized contracting firms to coordinate and plan the project process.

Recent past,2002 charter was in use.

Later on2007 and currently revised 2013 is been used.

Page 5: RIBA plan of work

Usage

Crucial for proper project management.

Taken place under several stages of 11.

1) Inception2) Feasibility3) Outline Proposals4) Scheme Design5) Detail Design6) Production Information

7) Bill of Quantities8) Tender Action9) Project Planning10)Operation On Site11)Completion

Page 6: RIBA plan of work

Our case study

Amawathura Asapuwa in malabe.5 storey building with a pagoda on the roof top.

Page 7: RIBA plan of work

InceptionStarting point of the entire project.Client initiates the project having a rough idea in

his mind.

Page 8: RIBA plan of work

Amawathura building was the idea of the board of the temple.

More space for people was a necessity.

Page 9: RIBA plan of work

FeasibilityDone under mainly 04 categories. Economic Financial Technical Environmental

Page 10: RIBA plan of work

Most of the client conducts the feasibility study.

An economic review to know the value for money of the project is essential.

Page 11: RIBA plan of work

For the selected building ,board took the support of a consultant to do the feasibility study.

Decision between floor area vs cost was taken.

Finally a viable project was chosen within the budget, to facilitate the required space.

Page 12: RIBA plan of work

QS does the realistic first estimates of the entire project.

Cube method, as the preliminary estimating method was used.

Page 13: RIBA plan of work

Outline proposals

Sketches for the project are provided.

Architects play major role.

Several designs are made.

Page 14: RIBA plan of work

5 storey building with a pagoda on roof top was designed.

The pagoda is a cavity in which people can worship and do rituals.

All the structural elements and other finishes are decided.

Page 15: RIBA plan of work

Scheme design

Brief is completed at this stage.

Selected design is critically examined.

Former sketches are drawn in a proper format.

Page 16: RIBA plan of work

Detail design

Specific numbers are taken for the plan.Final decision are taken.

Page 17: RIBA plan of work

For the site number of steps per Flight height, width of pillars and other

structures type of lift

Page 18: RIBA plan of work

Production information

Final working drawings are prepared.Use as document on site.QS prepare specification.Quotations are made.

Page 19: RIBA plan of work

Bill of Quantities

All the procurement details are included.For the Amawathura building, BOQ was

prepared by ICC.

Page 20: RIBA plan of work

Tender actionSuitable contractor was chosen.Prominence was given to quality rather than

lowest bid.

Page 21: RIBA plan of work

Project planningSub contractors are chosen preferably.Mclloid Was selected for the Amawathura site.

Page 22: RIBA plan of work

A loop hole in planning was seen.Capacity was increased in the midway of

the project.

Page 23: RIBA plan of work

Operation on site Physical investigation is required.Quality must be checked.QS prepares payment details.

Page 24: RIBA plan of work

Completion and feedback

The building is get to be finished.So comments on this stage cannot be made.

Page 25: RIBA plan of work

Conclusion

RIBA was not practiced well, due to the changes of plan in the midway.

However need to check the actual progress after the completion.

Page 26: RIBA plan of work

Recommendation

Proper planning helps to get a quality work done.

Page 27: RIBA plan of work