RFP-Data Centre Colocation Services

21
1 Data Centre Colocation Service Request for Proposal Version 1.5 Date: 8 May 2009 Hong Kong Internet Registration Corporation Limited Unit 2002-2005, 20/F ING Tower, 308 Des Voeux Road Central, Sheung Wan, Hong Kong. Tel.: +852 2319 1313 Fax: +852 2319 2626 Email: [email protected] Website: www.hkirc.hk

description

data center RFP

Transcript of RFP-Data Centre Colocation Services

  • 1

    Data Centre Colocation Service

    Request for Proposal

    Version 1.5 Date: 8 May 2009

    Hong Kong Internet Registration Corporation Limited

    Unit 2002-2005, 20/F ING Tower, 308 Des Voeux Road Central, Sheung Wan, Hong Kong.

    Tel.: +852 2319 1313 Fax: +852 2319 2626 Email: [email protected] Website: www.hkirc.hk

  • 2

    Table of Contents 1. Summary................................................................................................................3 2. Definitions..............................................................................................................3 3. About HKIRC ........................................................................................................3 4. Information Security ..............................................................................................4 5. Background of the Project .....................................................................................5

    5.1. Background ....................................................................................................5 5.2. Scope of Service ............................................................................................5

    5.2.1 Server Colocation Service......................................................................5 5.2.2 Implementation Services........................................................................8 5.2.3 Information Security ..............................................................................9

    5.3. Service Acceptance ........................................................................................9 5.4. Contractual Consideration .............................................................................9

    6. Limitation of Liability and Indemnity ...................................................................9 7. Project Schedule...................................................................................................11 8. Payment Schedule................................................................................................11 9. Elements of a Strong Proposal .............................................................................12 10. Service agreement negotiation and signature ..................................................12 11. HKIRC Contacts ..............................................................................................13 Appendix A HKDNR Information Security Policy and Guidelines: An Extract Relevant to Outsourcing ..............................................................................................14 Appendix B HKIRC Proposal Requirements ...........................................................18

    1.1 Proposal Deadline ..............................................................................................18 1.2 Proposal Content................................................................................................18 1.3 Cover Page .........................................................................................................19 1.4 Executive Summary...........................................................................................20 1.5 Conflict of Interest Declaration .........................................................................20 1.6 Company Background .......................................................................................20 1.7 Facilities standard and management practice related to colocation service ......21 1.8 Proposed Costs of Service .................................................................................21 1.9 Implementation Time Table ...............................................................................21 1.10 Support Arrangement and Services..................................................................21 1.11 Commercial and Payment Terms .....................................................................21

  • 3

    1. Summary HKIRC is going to commission an external Service Provider to provide Data Centre Colocation Service for the Company. The service shall provide four 42U rack space, power for all racks and environment, security protection as well as remote hand support for server support. It shall also include all services required for the implementation of the Project. The period of the contract will be 24 months.

    2. Definitions The following terms are defined as in this section unless otherwise specified.

    The Contractor means the company delivering the Project.

    HKIRC means Hong Kong Internet Registration Corporation Limited.

    HKDNR means Hong Kong Domain Name Registration Company Limited, a wholly-owned subsidiary of HKIRC, the company requesting the proposal for the Project.

    The Project means the Data Centre Colocation project with requirements stipulated in Section 5 of this document, the Background of the Project.

    remote hand means physical access to and operation of the equipment on the rack by qualified technical personnel of the Contractor under the direction of HKIRCs technical staff.

    RFP means this Request for Proposal

    3. About HKIRC Hong Kong Internet Registration Corporation Limited (HKIRC) is a non-profit-making and non-statutory corporation responsible for the administration of Internet domain names under '.hk' country-code top level domain. HKIRC provides registration services through its wholly-owned subsidiary, Hong Kong Domain Name Registration Company Limited (HKDNR), for domain names ending with '.com.hk', '.org.hk', '.gov.hk', '.edu.hk', '.net.hk', '.idv.hk', '..hk', '..hk', '..hk', '.

    .hk', '..hk', '..hk' and '.hk'.

  • 4

    HKIRC endeavours to be: Cost-conscious but not profit-orientated Customer-orientated Non-discriminatory Efficient and effective Proactive and forward-looking

    More information about HKIRC can be found at http://www.hkirc.hk.

    4. Information Security The company submitting the proposal (the company) shall acknowledge and agree that, if the company is selected as the Contractor, it shall be bounded by our Non-Disclosure Agreement (NDA) and Information Security Policy (highlights of the policies are illustrated in Appendix A). The company shall also comply with the obligations under the Personal Data (Privacy) Ordinance and any other obligations in relation to personal data.

    The company shall be provided with a set of NDA and Information Security Compliance Statement after HKIRC received the companys Express-of-Interest before the stipulated time. The NDA and the Information Security Compliance Statement shall be signed and returned to HKIRC attached with documents required by the Compliance Statement before the scheduled deadline. HKIRC will only consider proposals from companies which have signed both the NDA and the Information Security Compliance Statement.

    The proposal should be marked RESTRICTED at the centre-top of each page in black color. It must be encrypted if transmitted electronically.

    Each proposal will be reviewed under the terms of non-disclosure by the HKIRCs staff and Board of Directors of HKIRC.

  • 5

    5. Background of the Project

    5.1. Background

    Currently, all our production servers are co-located in a hosting service providers data centre. Current equipment occupies four 42U Racks. The hosting service provider is responsible for providing power conditioning (main and UPS), environmental control/protection (fire, flood, temperature, humidity etc.), and security and access control. In addition, the service provider also provides remote hand to physically access the servers if needed.

    5.2. Scope of Service The following defines the scope of service to be provided by the Contractor:-

    5.2.1 Server Colocation Service 1. Server Racks Requirements

    a. The Contractor shall provide four 42U racks, 600mm wide and at least 950mm in depth.

    b. All racks should be located on the same row, next to each other. If for any reason they need to be located in different rows, no less then two racks should be located on the same row next to each other.

    c. In case where racks are located in different rows, the Contractor shall provide capacity for inter-rack networking

    d. All racks shall have lockable perforated doors at the back and the front e. Partition shelves should be available if required f. Cabling to each rack should either be fed through using either under

    floor (in a raised floor facility) or ceiling cable tray or trunking g. Power & data cabling should be in separate tray or trunking

    2. Power Supply Requirements a. Duel power feed is required for each rack. b. Each power feed should not come from the same phase c. Each power feed should be fed from independent breaker d. Each power feed should provide at least twenty 13A sockets e. All power feed must be protected from brownout, spike & surge by

  • 6

    Uninterrupted Power Supply, with capacity to supply stable power up to 30 minutes after power failure

    f. The Data Centre power should be backed up by a Power Generator, which should be in service within 30 minutes of any power failure.

    g. Power Generator should have fuel supply for at least 7-day continuous operation.

    h. The Contractor shall supply three racks with at least 1.5KVA and one rack with 3KVA

    3. Environmental Control/Protection:- a. The Data Centre facility shall be protected by gas based fire

    suppression system with pre-active dry pipe water fire suppression system.

    b. Fire detection system shall be in place. E.g. smoke and/or heat detector c. Water leakage detection system shall be in place to detect possible

    water damage due to leakage or flooding d. Temperature, humidity and static control shall be in place. Temperature

    shall be kept between 15 and 20 degree Celsius. Humidity shall be between 40% and 60% to avoid static electricity. Anti-static flooring should be used to prevent excess static build up.

    e. Air Conditioning system should provide 24x7 cooling and humidity control with redundancy in case of break down.

    4. Security and Access Control a. 24-hour Security monitoring shall be in place. CCTV monitoring and

    recording on common access area and entrances should be provided. All access doors of entrances shall have a security lock with access control system to record and control access.

    b. All entries and accesses to the Data Centre shall be logged and can be reviewed by HKIRC

    c. All equipment delivery and removal from the Data Centre shall be recorded

    d. Data Centre shall provide Access Control only allowing authorized person to access secured areas.

    5. Network and Communication Facilities a. The facility should provide easy access for any major telecom

    company to provide data communication infrastructure for HKIRC

  • 7

    b. Shareable Internet access shall be provided by the facility. 100Mb/s sharable bandwidth should be provided within the facility and 10Mb/s bandwidth for local access (within Hong Kong, preferable with HKIX connection) and 5Mb/s bandwidth for International. Optional temporary expandable bandwidth for International access is desirable.

    c. The Contractors network infrastructure shall have process, procedure and capacity to mitigate Denial-of-Service (DoS) or Distributed Denial-of-Service (DDoS) attacks originated outside of the facility. Suitable technology/technique, e.g. Routing blackhole should be pre-configured and employed to limit or stop such attack. In case of such attack targeting HKIRC/HKDNR, the Contractor shall be able to provide temporary burstable bandwidth to cater for such attack, should it be required.

    d. The Contractor shall be able to provide and manage multi-home, WAN access e.g. router with BGP and AS Number with different telecom supplier.

    e. Network performance reports/tools shall be available for monitoring the shared network.

    f. Data Centre shall provide a direct fax/data line access to the racks.

    6. Miscellaneous a. The facility shall provide on site remote hand for physical access to

    the HKIRC equipment, eg. Power cycle equipment, remove/insert CD or other media, report on status of equipment (warning lights & status light), report on physical state of equipment etc.

    b. The Contractor shall have proven process and procedure for tracking issues and requests from HKIRC.

    c. Location of the Data Centre facility should be easily accessible by public transports and should not be located near HKIRC office, ideally in the Kowloon area.

    d. The Contractor shall be subject to HKIRC Security Audit as and when required by HKIRC or HKIRC external auditor.

    7. Service Levels The Contractor shall guarantee the following service levels in addition to the above Technical Requirements: a. Data Centre uptime of 99.98% per year. A service is deemed failed if

    any of the following conditions is not met:

  • 8

    Power: Nominal Out Voltage 230V with less then 5% distortion at full load. Frequency for 50 Hz nominal +/- 3Hz

    Network: Internal network within datacenter, response time

  • 9

    Documentation for the processes and procedures like NOC Support procedures, Incident Report procedures, Incident Handling Process etc.

    5.2.3 Information Security The Contractor shall follow HKDNR Information Security Policy and Guidelines

    set out by HKDNR on personal and co-operation data security. Contractors Information Security Policy is subject to HKIRC review if needed.

    5.3. Service Acceptance The overall project acceptance can be broken down into acceptances at various levels:-

    1. Delivery, setup of racks 2. Services provided like optional relocation services 3. Functionality of the integrated system like networks, NOC operation 4. Performance of monitoring system & reporting system 5. Quality of service provided

    Under this acceptance framework, the vendor should fulfill the scope of services described in section 5.2.1. In addition, interested vendors may provide additional acceptance criteria and the related plan in detail in their proposals.

    5.4. Contractual Consideration

    Although the contract period is 24 month, HKIRC will start the new contract re-tendering process at month 21. In case the re-tendering process did not complete at the end of the current contract, HKIRC reserves the right to extend the current contracts for another 3 months, with the same terms and conditions. Also, if for any reason the contract is to be terminated before the completion of the contract period, the initiating party should give a 3-month notice in advance of the early termination date.

    6. Limitation of Liability and Indemnity The company submitting the proposal agrees that if the company becomes the

  • 10

    Contractor of the Project, it shall indemnify HKIRC and HKDNR against any claim, demand, loss, damage, cost, expense or liability which the company may suffer from.

  • 11

    7. Project Schedule

    Project schedule Tasks To be Completed

    by Remark

    1 Publish RFP 8/5/2009

    2 Express of interest 15/5/2009

    3

    Sign NDA and InfoSec

    Compliance Statement with all

    interested vendors

    29/5/2009

    4 Deadline for vendors to submit

    proposal and quotation

    29/5/2009,

    5:30pm

    5 Selection of vendor by panel 19/6/2009

    6 Conclude final decision and

    appoint the vendor 2/7/2009

    7 Prepare service agreement

    contract 4/7/2009

    8

    Sign service agreement

    contract with the appointed

    vendor

    9/7/2009

    9 Service implementation 8/8/2009 If relocation needed

    10 Service commencement 9/7/2009

    8/8/2009

    If relocation needed

    8. Payment Schedule The following payment schedule is recommended but interested vendors may propose their own in their proposals.

    Milestone/Acceptance Expected duration

    Payment

    1 (a) Completion of Service Implementation 4 weeks One time setup charge

  • 12

    2 (a) Start of Colocation Service 24 month Monthly charge

    TOTAL 24 month & 4 weeks

    100%

    9. Elements of a Strong Proposal All submitted proposal must following the format as stated in Appendix B - HKIRC Proposal Requirements. Successful vendor is the one who submitted a clearly worded proposal that shows the following attributes:

    a persuasive section on the company background international recognize certification for IT facility management & IT Security

    Management a strong and flexible product meeting HKIRC requirements with minimum

    customization high level of interaction between HKIRC and the vendor excellent fit with the capabilities and facilities of HKIRC strong company and project management team

    Proposals are evaluated based on major criteria as follows (the percentages given are the weighting)

    Company Background (10%) Quality of facilities (30%) Facility management competency (20%) Understanding of our requirements (10%) Knowledge and advices on projects (10%) Proposed cost of the project and its flexibility (20%)

    10. Service agreement negotiation and signature The service agreement will be drawn up between the selected vendor and HKDNR, the wholly-owned subsidiary of HKIRC. HKIRC welcomes the vendors proposal on a suitable service agreement for the project.

    The service agreement must be signed by both parties within three weeks from the project award date. If the agreement is not signed within the said period, HKIRC will

  • 13

    start the negotiation with the next qualified vendor on the selection list.

    11. HKIRC Contacts

    HKIRC Contacts information

    Contacts

    Hong Kong Internet Registration Corporation Limited Unit 2002-2005, 20/F ING Tower, 308 Des Voeux Road Central, Sheung Wan, Hong Kong

    +852 23191313 telephone +852 23192626 fax http://www.hkirc.hk

    If you are not sure about the appropriate person to call, the receptionist can help you.

    IT Manager Ben Lee +852 23193811 [email protected]

    Project Manager Benjamin Choy +852 23193819 [email protected]

    CEO Jonathan Shea +852 23193821 [email protected]

  • 14

    Appendix A HKDNR Information Security Policy and

    Guidelines: An Extract Relevant to Outsourcing

    This document provides an extract of the HKDNR Information Security Policy and Guidelines with the purposes of (a) introducing various measures and controls to be executed by HKDNR regarding outsourcing and (b) setting the expectation of any potential contractors that their participation and conformance in these measures and controls are essential contractual obligations.

    The original Policy and Guidelines applies to HKDNRs employees, contractors and third party users. However, a potential contractor may interpret the clauses up to their roles and responsibilities only. Nonetheless, the keyword contractors hereby refers to all relevant staff members of the contractor and those of any other subcontractors under the contractors purview.

    Herein, HKDNR would also set the expectation of any potential contractors that upon their express-of-interest to the project, they shall be required in the subsequent stages (a) to sign off a non-disclosure agreement (NDA) on all information to be provided and (b) to sign off a Compliance Statement where compliance requirements are specified in more details.

    (A) Extract from the HKDNR Information Security Policy In the following, the organization means Hong Kong Domain Name Registration Company Limited, the company requesting the proposal for the Project.

    8. Human resources security 8.1 Security objective: To ensure that employees, contractors and third party users understand their responsibilities, and are suitable for the roles they are considered for, and to reduce the risk of theft, fraud or misuse of facilities.

    8.1.1 Security roles and responsibilities of employees, contractors and third party users shall be defined and documented in accordance with the organizations information security policy.

    8.1.2 Background verification checks on all candidates for employment, contractors,

  • 15

    and third party users shall be carried out in accordance with relevant laws, regulations and ethics, and proportional to the business requirements, the classification of the information to be accessed, and the perceived risks.

    8.1.3 As part of their contractual obligations, employees, contractors and third party users shall agree and sign the terms and conditions of their employment contract, which shall state their and the organizations responsibilities for information security.

    8.2 During employment Security objective: To ensure that all employees, contractors and third party users are aware of information security threats and concerns, their responsibilities and liabilities, and are equipped to support organizational security policy in the course of their normal work, and to reduce the risk of human error.

    8.2.1 Management shall require employees, contractors and third party users to apply security measures in accordance with established policies and procedures of the organization.

    8.2.2 All employees of the organization and, where relevant, contractors and third party users shall receive appropriate awareness training and regular updates on organizational policies and procedures, as relevant to their job functions.

    8.3 Termination or change of employment Security objective: To ensure that employees, contractors and third party users exit an organization or change employment in an orderly manner.

    8.3.2 All employees, contractors and third party users shall return all of the organizations assets in their possession upon termination of their employment, contract or agreement.

    8.3.3 The access rights of all employees, contractors and third party users to information and information processing facilities shall either be removed upon termination of their employment, contract or agreement, or adjusted upon change.

    12. Information systems acquisition, development and maintenance 12.5.5 Outsourced software development shall be supervised and monitored by the organization

  • 16

    13. Information security incident management 13.1 Reporting information security events and weaknesses Security objective: To ensure information security events and weaknesses associated with information systems are communicated in a manner allowing timely corrective action.

    13.1.2 All employees, contractors and third party users of information systems and services shall be required to note and report any observed or suspected security weaknesses in systems or services.

    (B) Extract from the HKDNR Information Security Guidelines 6. ORGANIZING INFORMATION SECURITY 6.2 EXTERNAL PARTIES 6.2.1 Identification of Risks Related to External Parties The risks to the organizations information and information processing facilities from business processes involving external parties should be identified and appropriate controls implemented before granting the access.

    6.2.3 Addressing Security in Third Party Agreements Agreements with third parties involving accessing, processing, communicating or managing the organizations information or information processing facilities, or adding products or services to information processing facilities should cover all relevant security requirements.

    7. ASSET MANAGMENT 7.1.3 Acceptable Use of Assets Rules for the acceptable use of information and assets associated with information processing facilities shall be identified, documented, and implemented.

    8. HUMAN RESOURCE SECURITY 8.1.1 Roles and Responsibilities Security roles and responsibilities of employees, contractors and third party users shall be defined and documented in accordance with the organizations information security policy.

    8.1.2 Screening Background verification checks on all candidates for employment, contractors, and

  • 17

    third party users shall be conducted in accordance with relevant laws, regulations and ethics, and proportional to the business requirements, the classification of the information to be accessed, and the perceived risks.

    8.1.3 Terms and Conditions of Employment As part of their contractual obligation, employees, contractors and third party users shall agree and sign the terms and conditions of their employment contract, which shall state their and the organizations responsibilities for information security.

    8.2.1 Management Responsibilities Management shall require employees, contractors and third party users to apply security measures in accordance with established policies and procedures of the organization.

    12. Information systems acquisition, development and maintenance 12.5.5 Outsourced Software Development Outsourced software development shall be supervised and monitored by the organization.

  • 18

    Appendix B HKIRC Proposal Requirements

    1.1 Proposal Deadline All proposals must reach HKIRC as stated in Section 7, Project Schedule, item no. 4.

    1.2 Proposal Content The proposal should contain the following:

    Cover Page Executive Summary Conflict of Interest Declaration Company Background

    o Financial Situation o Track Records o Organization and management team o Project team with credentials o Company credentials o Staff credentials

    Facilities standard and management practice related to colocation service Knowledge and Advices on Projects

    o Understanding of our requirements o Colocation experience o Certification in the future

    Deliverable Services & Facilities Proposed Cost of Services and Payment Schedule Implementation Time Table Support Arrangement and Services Commercial and Payment Terms. e.g. Compensation for delay.

  • 19

    1.3 Cover Page Prepare a non-confidential cover page with the following information in the order given. Cover Page

    Project Title

    Data Centre Colocation Service project Project Manager Name: Title:

    Mailing

    address:

    Phone:

    Proposal requirements

    Submission deadline Please refer to Section 7 - Project Schedule, item no. 4 for the proposal submission deadline.

    Delivery address Hong Kong Internet Registration Corporation Limited Unit 2002-2005, 20/F ING Tower, 308 Des Voeux Road Central, Sheung Wan, Hong Kong

    Hard copies 2 copies of the full proposal are required.

    Electronic copy Electronic copy, if available, on disk or by email to [email protected] and [email protected] ; also cc [email protected] and [email protected]. This is not a substitute for the physical copies mentioned above.

    Proposal format Specified in this document

    Page count 30 pages or fewer. Stapled. Do not bind.

    Font Electronically published or typed. Times New Roman 12 point font.

  • 20

    Fax:

    Email:

    Company Contact person:

    Title:

    Company

    name:

    Mailing

    address:

    Phone:

    Fax:

    Email:

    Website:

    1.4 Executive Summary The executive summary provides a brief synopsis of the commercial and technical solution the vendor proposed for the project. This summary must be non-confidential. It should fit on a single page.

    The executive summary should be constructed to reflect the merits of the proposal and its feasibility. It should also clearly specify the projects goals and resource requirements. It should include:

    Rationale for pursuing the project, the technology needed and the present state of the relevant technology.

    Brief description of the vendors financial situation. Brief description of the vendors facilities and experience on colocation

    services

    1.5 Conflict of Interest Declaration Declare any conflict of interest in relation to the Data Centre Colocation Service project and the .hk ccTLD registry HKIRC.

    1.6 Company Background The vendor must describe its company background. Major activities, financial situation, organizational structure, management team and achievements in software development or service outsourcing of the company should be elaborated. Tracked records are preferred.

  • 21

    1.7 Facilities standard and management practice related to ???? colocation service

    The vendor should describe the companys strengths in colocation facilities management and how they will be applied to the project. Track records are preferred.

    List the key technical and management personnel in the proposal. Provide a summary of the qualifications and role of each key member.

    1.8 Proposed Costs of Service Such costs include:

    Fixed setup cost Labour unit costs for additional requirements. They are typically quoted in

    unit man day. Quoted in normal working hour, non-working hour and in emergency.

    Equipment that is permanently placed or purchased for HKIRC, if any. Subsequent support or maintenance service. Other direct costs including services, materials, supplies, postage, etc.

    1.9 Implementation Time Table The vendor should present in this section the implementation schedule of the project. The schedule should be realistic and achievable by the vendor.

    1.10 Support Arrangement and Services The vendor must provide support to the database and storage system enhancement project with respect to the preparation, implementation, monitoring and review of the new framework. The vendor must describe the support arrangement and services. E.g. availability, local/remote, time to on/off site support, etc.

    1.11 Commercial and Payment Terms The vendor should describe the commercial and payment terms of the services e.g. compensation for the delay of the project.