1 RF Technical Review Design Layout Alan Grant, STFC

description

RF Technical Review Design Layout. Alan Grant, STFC. Overview. RF Layout Coax distribution Coax supports Amplifiers Services Access & Egress AFC Access Clashes Summary. RF Layout. - PowerPoint PPT Presentation

Transcript of RF Technical Review Design Layout

Page 1: RF Technical Review Design Layout

1

RF Technical ReviewDesign Layout

Alan Grant, STFC

Page 2: RF Technical Review Design Layout

Overview

• RF Layout• Coax distribution• Coax supports• Amplifiers• Services• Access & Egress• AFC Access• Clashes• Summary

2

Page 3: RF Technical Review Design Layout

RF Layout• At the beginning of the year it was unclear whether we could

fit the RF system in the MICE hall due to the space constraints.

• Many systems already in place - shield wall, power supplies & racks, mezzanine floors, false floor support structures. All of which we have had to work around.

• A design requirement was also to maintain full access to AFC modules without the need to remove any of the RF system components when moving the AFC modules into the parked position.

• Obviously - produce a layout addressing all the requirements of the RF engineers to provide a full working system.

3

Page 4: RF Technical Review Design Layout

RF Layout – view behind shield wall

4

Page 5: RF Technical Review Design Layout

RF Layout – view from cooling channel side

5

Page 6: RF Technical Review Design Layout

4” Coax Distribution

6

Page 7: RF Technical Review Design Layout

4” Coax Distribution – Far Side

7

RF tuners. These represented by bellows units. Total travel 60mm

To ease installation will consider splitting coax’s at this point before cooling channel false floor

Page 8: RF Technical Review Design Layout

4” Coax Distribution – Far Side

8

Cooling channel false floor

Concrete Ramp, /access walkway

Coax support

Page 9: RF Technical Review Design Layout

4” Coax Distribution – Near Side

9

Coax length compensation to far side.

RF tuners. These represented by bellows units. Total travel 60mm

Page 10: RF Technical Review Design Layout

4” Coax Distribution – Near Side

10

Cover plates over coax for protection from accidental damage

Page 11: RF Technical Review Design Layout

4” Coax Distribution – Near Side

11

Very congested in this area. Will need to modify some steelwork.

Page 12: RF Technical Review Design Layout

Coax Supports

12

Rotation

VerticalLongitudinal

Horizontal

CLAMP

TEE SLOT RAILS

Page 13: RF Technical Review Design Layout

Coax Sections – Installation/Removal Concerns

13

~55mm required to clear mating flange

~35mm to clear copper coax tube

Currently rigid system ~ no flexible sections

Rely on adjustment in clamp system.

Need to speak with supplier to discuss installation options

Page 14: RF Technical Review Design Layout

Amplifiers

14

4616 Amplifiers

TH116 CERN Amplifier

TH116 Refurbished Amplifier

3” coax

Page 15: RF Technical Review Design Layout

TH116 Amplifiers - Refurbished

15

Hybrids

Dummy Loads

TH116 Refurbished Amplifier has 3 hybrids & 3 dummy loads

6” coax from amplifier

Page 16: RF Technical Review Design Layout

TH116 Amplifier - CERN

16

Dummy Loads

Hybrids

TH116 CERN Amplifier has 2 hybrids & 2 dummy loads

6” coax from amplifier

Page 17: RF Technical Review Design Layout

RF Delivery System behind wall

17

Page 18: RF Technical Review Design Layout

Services

18

4616 Services feed into bottom of amp

Water flow & return main pipe run

Water flow & return ‘T’s into main run for both 4616’s and TH116’s

Similar arrangement will be used for the dummy loads on the shield wall

Page 19: RF Technical Review Design Layout

Services

19

4616 services run under access platform

4616 access for commissioning

Page 20: RF Technical Review Design Layout

Access & Egress

20

Discussed access & egress with Fire Safety Officer. Agreed this arrangement would be acceptable.

Page 21: RF Technical Review Design Layout

AFC Access

21

AFC’s are moved out of the page on rolling platform into parked position to change absorbers.

Clear pathway is available but AFC module 2 is close.

Page 22: RF Technical Review Design Layout

AFC Module 2

22

This line is projected from edge of rolling platform

Page 23: RF Technical Review Design Layout

Clashes

23

Steelwork ClashPossible solution ?Remove small section and add another support leg.

Additional support leg

Page 24: RF Technical Review Design Layout

Clashes

24

Clash with steelwork, local relieve or rework required

Page 25: RF Technical Review Design Layout

RF waveguide clash with the false floor vertical support columns

25185

Clash with foot

Page 26: RF Technical Review Design Layout

Summary

• Firstly, we believe it is possible to fit the RF system within the MICE hall.

• There are some clashes with some steel work on both the cooling channel false floor and the parked position false floor – none of which are show stoppers but will need to be resolved.

• Installation will be tricky especially mating the coax lines with no appreciable bellows units or flexible coax’s in the current design. – currently relying on degrees of freedom in coax supports. Suppliers may have other suggestions to ease installation and removal of coax tubes.

• Will need to survey and check positions of components very closely during installation.

• Fire officer has been consulted and agreed that what is proposed causes no access problems or issues.

26