Revolutionize Material and Production Planning
with
Advanced Planner
Deborah Vermillion, CPIM, CIRM
CISTECH Inc.www.cistech.net
What is Advanced Planner?• Advanced Planner is an alternative to XA MPSP, MRP and CRP• Windows based fast MRP that helps you to do interactive planning• Allows you to visualize load on the facilities (work centers). AVP
uses color coded graphs and charts that makes it easier to manage the master schedule process. This includes material and capacity testing
• Helps you to take appropriate decisions such as offloading, outsourcing, level loading etc to meet the on time delivery of your customer orders
• You can also estimate the labor requirements to support your plant schedules
• Generates suggested supplies( both MOs and POs), supply exceptions, detailed operation start times and shipment delivery dates
How does AVP do this?
• Planning information is downloaded from the AS400 creating an Access database on the PC
• Planning run is done on the PC eliminating job conflicts on the 400 and decreasing processing time. This allows for “more” planning runs. Quicker response time!!!
Product Structures•part attributes•Standard and workorder bills•Standard and workorder routings
AV
P E
ngi
ne
Demand•Forecasts•customer orders •Replenishment policy
Supply•inventory on hand•shop orders and allocations•Outside operations•purchase orders
Plant Structures•Workcenters•Labor
Procurement Plan•purchase order releases•expedite; defer; cancel
Production Plan•manufacturing order releases•load vs. capacity•workcenter schedules
Shipping Plan•customer promise dates
AVP- Input Output
AVP/MRP Similarities
• Both use all the planning modifiers in the Item Balance/Plan record• Both use the MRP Execution Options for re-scheduling, auto-release, etc.• Both use the MRP Horizon Dates• Both have direct or indirect interface to Mapics Forecast module• Both use the Manufactured due date from the customer orders for planning
AVP vs. MRP
• An MRP generation is performed by a BOM explosion and netting routine usually overnight
• With Advanced Planner NO AS400 MRP generation is ever necessary
• MRP has multi-planning warehouse capabilities• 6.1 Provides multi-warehouse planning
• MRP/CRP uses Mapics calendars • AVP has its own calendar within the database.
This calendar holds hours of operation per day.
• MRP has no easy “what if” capability short of a new MRP generation
• AVP has powerful “what if” capability directly with the AVP access database on the PC
AVP vs. MRP
AVP vs. MRP cont’d
• MRP interfaces with MPSP• AVP has its own Master Schedule Routine
• MRP uses Lead Time to calculate start date• AVP uses backward scheduling and the times in
the routing to calculate start date
• MPSP uses the greater of Customer Order or Forecast
• AVP nets the CO’s against the Forecast and plans with the CO’s and Net Forecast
• MRP assumes infinite capacity• AVP plans the work load in each work center for
capacity review prior to accepting the plan
AVP vs. MRP cont’d
• MRP provides a warning if a planned order quantity exceeds the Maximum
• AVP uses the Maximum to create multiple orders due on the same day for the Max quantity (or less)
• MRP plans an order to be due the same day as the requirement
• AVP plans an order to be due the day before the requirement
AVP vs. MRP cont’d
Forecast can be consumed in four ways:
– Individual Item: The sales of each item consume the item forecast– An item and its parents: If many possible finished product
configurations exist, made from a small number of components, you can forecast at the component level rather than the finished product level. The sales of the item and any parent consume the item forecast
– Planning bill Family: Identify an item as a planning bill item and enter shippable forecasts for the item (% based on qty per in Planning Bill. Forecast is consumed by end item and matching configurations in the Bill of Material
– Product Family: Does not use a Planning Bill. The ‘Base’ Item is forecasted. Customer Order Demand for items within the Product Family consume the ‘Base’ Item’s forecast. (introduced at AVP 6.1)
AVP extras: Forecast Consumption
Forecast Consumption
This is the forecast consumption chart
within AVP
AVP Extras
Config.ini settings to:– Calculate run time by flow or batch method– Uses RM Quantity (at the time of the RM
transaction) or Operation Quantity Completed (from Labor Reporting) to calculate balance due
– Can define horizon length values 1-999 days
AVP Extras
You can optionally update either or both
– The promise date on the customer order– The manufacturing due date on the customer
order
Questions?
Advanced Planner Process
• Downloading Data to the Engine– Pulls BOM, Route,
Item, Item process, Item plan, Forecast, CO’s and/or Manual Requirements
– Creates flat files that are pulled in to create access database
• Generating the Plan– Forecast Consumption– Nets the Requirements
against on hand & on order (Load Project) using Access Database
• Builds product structure network using the BOM and Routing
• Plans Orders (PO, MO & Schedules)
Advanced Planner Process
• Manipulate the Plan– View Load to Capacity Chart
– View items on Load
– Level Load both Material and Capacity
– Time phased view
– Drill down/up
– Perform “what-if” planning
Advanced Planner Process
Load To Capacity and Time phased load : Identify overload problem
Orders that can be Orders that can be offloaded-Yellowoffloaded-Yellow
Planned Orders- Planned Orders- GreenGreen
New Colors at AVP New Colors at AVP 6.1:6.1:
Firm Planned- PinkFirm Planned- Pink
Released- Light Released- Light OrangeOrange
Load To Capacity Chart
Red – W/C is overloadedYellow – W/C has past due backlogBlue – Overload within one time period that can be corrected by re-scheduling, offloading, etc.Green – Plan is within capacity constraints
Routing Facilities
Process Hours; Setup hours;
Capacity hours
As decisions are taken you get instant feedback
Order waterfall view:Identify what is needed when and the Critical chain
Advanced Planner Process
• Upload to Mapics Files– Loads info into the MRP planning work files:
• Requirements-unconsumed forecast and generated demand
• Planned Orders-all supply orders, including open, firm planned and planned
• Demand Ref-Demand information• Reschedule Activity-rescheduling actions
Advanced Planner Process
• What happens?– Reschedules open MO’s/PO’s/Rep
schedules according to set up– Updates the CO dates if specified in the
upload options– Updates work center file in the MO/REP
operations as specified during offloading– Loads the MRP planning files– Creates the Order Review file– Prints MRP reports as specified
Planning Execution
Once plan is saved
– Execute plan using OBPM
OR– Green Screen Order review and release
OR– Repetitive
Execute Plan using OBPM
Green Screen Execution
MRP Requirements inquiry
Questions?
AVP 6.1 New Functionality
• Planning Multiple warehouses in one planning run• Saving the Schedules to database on the client machine• Support for SQL server and Oracle databases• Time phased Labor loads• Job-step information in the waterfall• Automatic offload from one facility to other by batch size• Which customer orders to be pushed out• Adjusting the operation start times of intermediate
operations thru Modifying the delay times• Demand Prioritization• Ability to handle negative on hand balances.
Waterfall with Job step information
Estimating the Labor Requirement
Which Orders to push out
New Commands show New Commands show the potential order list the potential order list that will be delayed that will be delayed based upon the current based upon the current schedule.schedule.
Global Records not limited to within the Global Records not limited to within the Facility. “Which Customer Orders..” lists only Facility. “Which Customer Orders..” lists only Customer Orders where Demand Suggested Customer Orders where Demand Suggested Date > Demand Due Date. Customer Orders Date > Demand Due Date. Customer Orders pushed out will be displayed from the “List of pushed out will be displayed from the “List of Customer Orders..” Customer Orders..”
Generated from within the Generated from within the Facility. Lists supply orders Facility. Lists supply orders where Supply Due Date > where Supply Due Date > Supply Suggested DatedSupply Suggested Dated
AVP Benefits
• Improves capacity usage—maximize factory productivity
• Increases revenue—the ability to consistently provide more accurate dates and deliver on time will attract more business
• Streamlines purchasing an item that has an m-plan or s-plan order (outsourcing)
AVP Benefits
• Expediting costs are lowered due to improved planning
• Improves internal processing coordination—running your planning process quickly and more frequently will
• Catch changes and allow you to alert the shop floor and suppliers quicker
AVP Summary
• Alternative to traditional MPSP/MRP/CRP• Tight integration for quick implementation• Quick ROI from improved capacity planning• Improved Capacity usage• Decreased Lead time and inventory• Decreased costs