Review of Offtake Arrangements Document. Mod 461 WG Meeting 13 th September 2013 Hayley Burden. Offtake Arrangements Document Review. Offtake Arrangement Document Review. Only Section I and J OAD contain time references - PowerPoint PPT Presentation

Transcript of Review of Offtake Arrangements Document

Page 1: Review of Offtake Arrangements Document

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

Review of Offtake Arrangements Document

Mod 461 WG Meeting 13th September 2013

Hayley Burden

Page 2: Review of Offtake Arrangements Document

2

Offtake Arrangements Document Review

OAD Section

Number Clauses

Containing Time

References Section A Scope & Classification 0 Section B Connection Facilities 0 Section C Safety & Emergency 0 Section D Measurements 0 Section E Telemetry 0 Section F Determination of Calorific Value 0 Section G Maintenance 0 Section H NTS Long Term Demand Forecasting 0 Section I NTS Operational Flows 17 Section J LDZ/LDZ Offtakes – Planning and Operational Flows

1

Section K LDZ System Entry Points 0 Section L Cost Recovery & Invoicing 0 Section M Information Flows 0 Section N General 0 OAD Appendices 0

Page 3: Review of Offtake Arrangements Document

3

Offtake Arrangement Document Review

Only Section I and J OAD contain time references

All of these references relate to the physical regime and were included on spreadsheet shared with the WG at the last meeting

The NG NTS recommendation was to retain these current times pending discussions with the industry parties whose processes are impacted by the OAD