Mod 461 WG Meeting 13th September 2013
Hayley Burden
2
Offtake Arrangements Document Review
OAD Section
Number Clauses
Containing Time
References Section A Scope & Classification 0 Section B Connection Facilities 0 Section C Safety & Emergency 0 Section D Measurements 0 Section E Telemetry 0 Section F Determination of Calorific Value 0 Section G Maintenance 0 Section H NTS Long Term Demand Forecasting 0 Section I NTS Operational Flows 17 Section J LDZ/LDZ Offtakes – Planning and Operational Flows
1
Section K LDZ System Entry Points 0 Section L Cost Recovery & Invoicing 0 Section M Information Flows 0 Section N General 0 OAD Appendices 0
3
Offtake Arrangement Document Review
Only Section I and J OAD contain time references
All of these references relate to the physical regime and were included on spreadsheet shared with the WG at the last meeting
The NG NTS recommendation was to retain these current times pending discussions with the industry parties whose processes are impacted by the OAD