Transient Calculation Summary: Base
Transient Calculation Summary
sec0.100000Time Step 0.998Specific Gravity
6000Number of Time Steps m/s1,200.00Wave Speed (Global)
sec600.0Total Simulated Time m H2O-9.98Vapor Pressure11Number of Nodes 1Number of Report Paths
10Number of Pipes
Transient Initial Conditions Summary
Head (Initial atStop Node,Transient)
(m)
Stop NodeHead (Initial atStart Node,Transient)
(m)
Start NodeLabel
1,083.10J-11,089.30R-1P-1
1,059.10J-21,083.10J-1P-2
1,030.50J-31,059.10J-2P-3
1,009.40J-41,030.50J-3P-4
982.90J-51,009.40J-4P-5944.30J-6982.90J-5P-6
915.20J-7944.30J-6P-7
873.30J-8915.20J-7P-8
854.70J-9873.30J-8P-9
847.30D2A-1854.70J-9P-10
Extreme Pressures and Heads
Min. Head(m)
Max. Head(m)
Min. Pressure(m H2O)
Max. Pressure(m H2O)
Upsurge RatioEnd Point
1,089.321,089.320.320.321.000P-1:R-1
1,070.001,277.56-9.98197.1663.160P-1:J-1
1,070.001,277.56-9.98197.1663.160P-2:J-11,040.001,299.92-9.98249.4227.320P-2:J-2
1,040.001,299.92-9.98249.4227.320P-3:J-2
1,018.001,305.76-9.98277.21112.410P-3:J-3
1,018.001,305.76-9.98277.21112.410P-4:J-3
990.001,314.38-9.98313.7533.520P-4:J-4
990.001,314.38-9.98313.7533.520P-5:J-4
962.551,323.68-7.44352.9827.460P-5:J-5
962.551,323.68-7.44352.9827.460P-6:J-5
944.271,344.6224.22423.7817.500P-6:J-6
944.271,344.6224.22423.7817.500P-7:J-6
915.231,353.4423.18460.5219.870P-7:J-7
915.231,353.4423.18460.5219.870P-8:J-7
873.341,372.737.33505.7269.020P-8:J-8
873.341,372.737.33505.7269.020P-9:J-8
854.741,380.804.74529.74111.860P-9:J-9
854.741,380.804.74529.74111.860P-10:J-9
847.321,383.720.00535.330.000P-10:D2A-1
Page 1 of 127 Siemon Company Drive Suite 200 WWatertown, CT 06795 USA +1-203-755-1666
17/02/2016
Bentley HAMMER V8i (SELECTseries 5)[08.11.05.61]Bentley Systems, Inc. Haestad MethodsSolution CenterQ2.2m3.s-1.wtg