Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E....

25
Restoration Strategies A-1 Flow Equalization Basin (FEB) Initial Operations Update Long-Term Plan Communications Meeting March 4, 2016 Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District

Transcript of Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E....

Page 1: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

Restoration Strategies

A-1 Flow Equalization Basin (FEB) Initial Operations Update

Long-Term Plan Communications MeetingMarch 4, 2016

Tracey Piccone, P.E.Chief Engineer, South Florida Water Management District

Page 2: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

A-1 FEB Project Location

2

Page 3: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

A-1 FEB Project Purpose

• Attenuate peak stormwater runoff flows, temporarily store stormwater runoff and improve delivery rates to STA-2 & STA-3/4 for enhanced operation and phosphorus removal

• Expand water storage south of Lake Okeechobee• Additional operational flexibility related to flood

protection and water supply operations• Help maintain minimum water levels and reduce

frequency of dryout within STA-2 and STA-3/4• Maintain existing levels of flood protection

– Not intended to increase level of flood protection

3

Page 4: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

A-1 FEB Quick Facts

• 15,000 acres x 4 feet maximum depth= 60,000 acre-feet of storage

• Stages will fluctuate between approximately 8.5 and 12.5 feet NAVD88(9.9 and 13.9 feet NGVD29 )

4

Page 5: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

A-1 FEB Structure Map

5

Page 6: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

A-1 FEB Initial Operating Stages

6

Page 7: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

• Study: Development of Operational Guidance for FEB and STA Regional Operational Plans

• Purpose is to develop tools and methodologies to be used to provide operational guidance for FEBs and STAs– Optimal weekly target flow rates and estimated gate openings

Linkage to Restoration Strategies Science Plan

A-1 FEB Inflow Spillway G-720

7

Page 8: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

G-721 FEB Inflow on January 28, 2016

8

Page 9: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

RubiconTM Solar-Powered Discharge Structures

9

Page 10: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

10

Page 11: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

11

Page 12: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

12

Page 13: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

13

Page 14: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

14

Page 15: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

15

Page 16: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

16

Page 17: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

17

Page 18: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

18

Page 19: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

19

Page 20: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

20

Page 21: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

21

Page 22: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

22

Page 23: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

23

Page 24: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

24

Page 25: Restoration Strategies A-1 Flow Equalization Basin (FEB ... · March 4, 2016. Tracey Piccone, P.E. Chief Engineer, South Florida Water Management District. A-1 FEB Project Location.

Questions?

25