Restoration of Power System after Blackout and Synchro-Check Relays Setting in Transmission System ŽANETA ELESCHOVÁ, ANTON BELÁŇ, MAREK PÍPA, ATTILA KMENT Department of Power Engineering Slovak University of Technology Ilkovičova 3, 812 19 Bratislava SLOVAK REPUBLIC [email protected] http://www.kee.fei.stuba.sk Abstract: - Connection of power lines in transmission system is activated after defined conditions are met in the setting of synchro-check relays; namely ∆V – difference in voltage amplitudes, ∆f – frequency difference, and ∆α – difference in phase angles. The aim of this contribution was experimental verification of the connection condition focused on transient phenomena course on connected line, the transient stability of generators, and the analysis of their influence on power system. As the past critical situations (state of an imminent blackout threat) in transmission system has shown, inability to connect line into the power system because the connection conditions are not met (blocking of a power switch) could have severe negative influence on the continual operation of the power network. Setting of synchro-check relays as connection conditions can influence also the process of electric power system restoration after collapse. Thus, this paper discusses also the actual state of synchro-check relays setting in transmission system. Key-Words: - Transmission system, Connection of power line, Voltage phase shifts, Synchro-check relay. 1 Introduction Blackout, resp. splitting of the power system is serious situation in the operation of power systems. Restoration of its operation can be realized in two basic ways: restoration of the network by handing in of voltage from other systems abroad, or by the restoration of domestic power plants. In the second way of power system restoration are progressively established larger islands around the power plants, which are then interconnected into single network. Reconnection of the islands is realized by the connection of particular transmission line. However, before the connection of the line, conditions of the power lines connection must be met. Our contribution deals with one of those conditions – the difference in voltage phase angles on connected bus bars of substations. Severe phase shift could occur during the splitting of the network, and so our paper analyzes influence of the voltage phase shift value on the transient phenomena after connection of the transmission line, mainly considering dynamic stability of individual generators in the connected islands. This paper is summing up the results of simulation experiments of island reconnection after splitting of power system with various voltage phase shifts at power substations, where the connection to an island is realized. We can define the conditions of power lines connection, i.e. synchro-check relays setting or verification of their correct setting, mainly considering preservation of generators’ dynamic stability. Currently, the threshold value for circuit connection of lines is set on the 30-degree level (voltage phase shift as one of the conditions of circuit connection of lines). Experiments have been realized for 3 values of phase shift: 10°, about 30°, and about 60°. Results that are stated: curves of power, voltage and revolutions of particular generators, curves of current (RMS value) and power flow on line connecting the island, curves of voltage (RMS value) in power substations, where the connection of islands is realized. The experiments should demonstrate particularly the influence of island connection with various conditions of individual generators’ stability. Simulations have verified: Connection of the island with 420 MW capacity (3 generators in HPP (hydro power plant), one in IGCC (integrated gasification combined cycle) and one in NPP (nuclear power plant)) and the WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment ISSN: 1790-5060 172 Issue 3, Volume 5, July 2010

Transcript of Restoration of Power System after Blackout and Synchro...

  • Restoration of Power System after Blackout and Synchro-Check Relays Setting in Transmission System

    ŽANETA ELESCHOVÁ, ANTON BELÁŇ, MAREK PÍPA, ATTILA KMENT

    Department of Power Engineering Slovak University of Technology Ilkovičova 3, 812 19 Bratislava

    SLOVAK REPUBLIC [email protected] http://www.kee.fei.stuba.sk

    Abstract: - Connection of power lines in transmission system is activated after defined conditions are met in the setting of synchro-check relays; namely ∆V – difference in voltage amplitudes, ∆f – frequency difference, and ∆α – difference in phase angles. The aim of this contribution was experimental verification of the connection condition focused on transient phenomena course on connected line, the transient stability of generators, and the analysis of their influence on power system. As the past critical situations (state of an imminent blackout threat) in transmission system has shown, inability to connect line into the power system because the connection conditions are not met (blocking of a power switch) could have severe negative influence on the continual operation of the power network. Setting of synchro-check relays as connection conditions can influence also the process of electric power system restoration after collapse. Thus, this paper discusses also the actual state of synchro-check relays setting in transmission system. Key-Words: - Transmission system, Connection of power line, Voltage phase shifts, Synchro-check relay. 1 Introduction Blackout, resp. splitting of the power system is serious situation in the operation of power systems. Restoration of its operation can be realized in two basic ways: restoration of the network by handing in of voltage from other systems abroad, or by the restoration of domestic power plants.

    In the second way of power system restoration are progressively established larger islands around the power plants, which are then interconnected into single network. Reconnection of the islands is realized by the connection of particular transmission line. However, before the connection of the line, conditions of the power lines connection must be met.

    Our contribution deals with one of those conditions – the difference in voltage phase angles on connected bus bars of substations. Severe phase shift could occur during the splitting of the network, and so our paper analyzes influence of the voltage phase shift value on the transient phenomena after connection of the transmission line, mainly considering dynamic stability of individual generators in the connected islands.

    This paper is summing up the results of simulation experiments of island reconnection after splitting of power system with various voltage phase shifts at power substations, where the connection to

    an island is realized. We can define the conditions of power lines connection, i.e. synchro-check relays setting or verification of their correct setting, mainly considering preservation of generators’ dynamic stability.

    Currently, the threshold value for circuit connection of lines is set on the 30-degree level (voltage phase shift as one of the conditions of circuit connection of lines).

    Experiments have been realized for 3 values of phase shift: 10°, about 30°, and about 60°.

    Results that are stated: • curves of power, voltage and revolutions of

    particular generators, • curves of current (RMS value) and power flow

    on line connecting the island, • curves of voltage (RMS value) in power

    substations, where the connection of islands is realized.

    The experiments should demonstrate particularly the influence of island connection with various conditions of individual generators’ stability.

    Simulations have verified: • Connection of the island with 420 MW capacity

    (3 generators in HPP (hydro power plant), one in IGCC (integrated gasification combined cycle) and one in NPP (nuclear power plant)) and the

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 172 Issue 3, Volume 5, July 2010

  • island with single 110 MW generator in TPP (thermal power plant).

    • Connection of two same (small) islands with 100 MW capacity (1 generator in TPP (thermal power plant)). The line connecting of islands was relatively long.

    2 Simulation Experiments of Island Reconnection after Splitting of Power System Transient event during the islands connection (course of voltage in substations, or “swinging” of generators) is positively correlated with voltage phase shift in power substations.

    Simulations proved that even with phase shift 60° are generators capable to maintain its stability. Realized simulations verified one of the conditions of power line connection, i.e. voltage phase shift during the connection of islands in power system (during the restoration of power system operation) mainly considering preservation of generators’ dynamic stability.

    Considering the results, we can conclude that actual threshold value of voltage phase shift set on synchro-checks (30° for circuit connection of lines) is satisfactory for the restoration of power system operation during connection of the island considering preservation of generators’ dynamic stability. 2.1 Connection of the island with 420 MW capacity and the island with single 110 MW generator In simulation experiments was connecting of the island with 420 MW capacity (3 generators in HPP (hydro power plant), one in IGCC (integrated gasification combined cycle) and one in NPP (nuclear power plant)) and the island with single 110 MW generator in TPP (thermal power plant) with various conditions (various values of voltage phase shift). 2.1.1 The 1st experiment Voltage in substations before power line connection: Sub1 235,7 kV ∠-6,4° Sub2 229,3 kV ∠-2,9° at the end of line 230,1 kV ∠-2,9° voltage phase shifts: 3,5° Results of the simulation for this relatively small difference in voltage phase shifts did not demonstrate

    any problems with maintaining dynamic stability of individual generators. Generators in all types of power plants can cope with the transient phenomena. Not even the connected 220 kV power line faced any current surge.

    0 10 20 30 40 50105

    110

    115

    120

    Pg

    [MW

    ]

    t [s]

    0 10 20 30 40 5015.74

    15.76

    15.78

    15.8

    Vt [

    kV]

    t [s]

    0 10 20 30 40 5038

    40

    42

    44

    Qg

    [MV

    ar]

    0 10 20 30 40 5049.99

    50

    50.01

    50.02

    f [H

    z]

    Fig. 1 Generator in NPP

    0 10 20 30 40 5095

    100

    105

    Pg

    [MW

    ]

    t [s]

    0 10 20 30 40 5010.5

    10.51

    10.52

    Vt [

    kV]

    t [s]

    0 10 20 30 40 50-17

    -16

    -15

    Qg

    [MV

    ar]

    0 10 20 30 40 5049.98

    50

    50.02

    f [H

    z]

    Fig. 2 Generator in IGCC

    0 10 20 30 40 5070

    72

    74

    76

    Pg

    [MW

    ]

    t [s]

    0 10 20 30 40 5015.74

    15.76

    15.78

    Vt [

    kV]

    t [s]

    0 10 20 30 40 5014.5

    15

    15.5

    16

    Qg

    [MV

    ar]

    0 10 20 30 40 5049.98

    50

    50.02

    f [H

    z]

    Fig. 3 Generator in HPP

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 173 Issue 3, Volume 5, July 2010

  • 0 10 20 30 40 5060

    80

    100

    120

    Pg [

    MW

    ]

    t [s]

    0 10 20 30 40 5013.6

    13.7

    13.8

    13.9

    Vt [k

    V]

    t [s]

    0 10 20 30 40 500

    5

    10

    15

    Qg [

    MV

    ar]

    0 10 20 30 40 5049.9

    50

    50.1

    50.2

    f [H

    z]

    Fig. 4 Generator in TPP

    0 50 100 150 200-20

    0

    20

    t [s]

    P [

    MW

    ]

    0 50 100 150 200-40

    -20

    0

    t [s]

    Q [

    MV

    ar]

    0 10 20 30 40 500

    0.2

    0.4

    t [s]

    I [p

    .u.]

    Fig. 5 Power flow on line

    0 5 10 15 20 25 30 35 40 45231

    231.5

    232

    232.5

    233

    233.5

    234

    234.5

    235

    235.5

    236

    t [s]

    V [

    kV]

    Fig.6 Voltage in substation 1

    0 5 10 15 20 25 30 35 40 45229.2

    229.4

    229.6

    229.8

    230

    230.2

    230.4

    t [s]

    V [

    kV]

    Fig. 7 Voltage in substation 2

    2.1.2 The 2nd experiment Voltage in substations before power line connection: Sub1 235,7 kV ∠23,6° Sub2 229,3 kV ∠-2,9° at the end of line 230,1 kV ∠-2,9° voltage phase shifts: 26,5°

    Difference in voltage phase angles in this

    simulation resembles the value set in currently used synchro-checks. Not even for this large voltage phase shift occurred any problem involving dynamic stability on the examined generators. However, generator swinging is more important than in previous example.

    0 10 20 30 40 5080

    100

    120

    140

    Pg [

    MW

    ]

    t [s]

    0 10 20 30 40 5015.6

    15.8

    16

    Vt [k

    V]

    t [s]

    0 10 20 30 40 5030

    40

    50

    60Q

    g [

    MV

    ar]

    0 10 20 30 40 5049.9

    50

    50.1

    f [H

    z]

    Fig. 8 Generator in NPP

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 174 Issue 3, Volume 5, July 2010

  • When we are evaluating correct setting of synchro-checks, we can state that current value 30° is not too high, because even with this high difference in voltage phase angles would be the connection of the islands (after splitting of the power system) successful (as the generators would not fell out of synchronism) and that is the prerequisite for a successful restoration of transmission power system using the local sources.

    0 10 20 30 40 5080

    85

    90

    95

    100

    105110

    Pg

    [MW

    ]

    t [s]

    0 10 20 30 40 5010.4

    10.45

    10.5

    10.55

    Vt [

    kV]

    t [s]

    0 10 20 30 40 50-20

    -18

    -16

    -14

    -12

    -10-8

    Qg

    [MV

    ar]

    0 10 20 30 40 5049.95

    50

    50.05

    50.1f [

    Hz]

    Fig. 9 Generator in IGCC

    0 10 20 30 40 5060

    80

    100

    Pg [

    MW

    ]

    t [s]

    0 10 20 30 40 5015.6

    15.7

    15.8

    15.9

    Vt [k

    V]

    t [s]

    0 10 20 30 40 5010

    15

    20

    Qg [

    MV

    ar]

    0 10 20 30 40 5049.9

    50

    50.1

    50.2

    f [H

    z]

    Fig. 10 Generator in HPP

    0 5 10 15 20 25 30 35 40 45 500

    50

    100

    150

    200

    Pg [

    MW

    ]

    t [s]

    0 5 10 15 20 25 30 35 40 45 5013

    13.5

    14

    Vt [k

    V]

    t [s]

    0 5 10 15 20 25 30 35 40 45 50-10

    0

    10

    20

    30

    Qg [

    MV

    ar]

    0 5 10 15 20 25 30 35 40 45 5049

    50

    51

    f [H

    z]

    Fig. 11 Generator in TPP

    0 10 20 30 40 50-200

    0

    200

    t [s]

    P [

    MW

    ]

    0 10 20 30 40 50-50

    0

    50

    t [s]

    Q [

    MV

    ar]

    0 10 20 30 40 500

    1

    2

    t [s]

    I [p

    .u.]

    Fig. 12 Power flow on line

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 175 Issue 3, Volume 5, July 2010

  • 0 10 20 30 40 50222

    224

    226

    228

    230

    232

    234

    236

    t [s]

    V [

    kV]

    Fig. 13 Voltage in substation 1

    0 10 20 30 40 50224

    225

    226

    227

    228

    229

    230

    231

    t [s]

    V [k

    V]

    Fig. 14 Voltage in substation 2

    2.1.3 The 3rd Experiment Voltage in substations before power line connection: Sub1 235,7 kV ∠23,6° Sub2 229,3 kV ∠-32,8° at the end of line 230,1 kV ∠-32,8° voltage phase shifts: 56,4°

    The third experiment was conducted for value of

    voltage phase shift above the current setting of synchro-checks.

    The test verified that even for such high values of voltage phase shift are generators able to sustain their dynamic stability and that the setting of synchro-checks could be even higher. Remaining question is, if this setting could be considered as condition of circuit connection of lines in normal operating state of power system, resp. if it is technically possible to change setting of the synchro-checks remotely according to the actual situation.

    0 10 20 30 40 5060

    80

    100

    120

    140

    160180

    Pg

    [MW

    ]

    t [s]

    0 10 20 30 40 5015.215.4

    15.6

    15.8

    16

    16.2

    16.4

    Vt [

    kV]

    t [s]

    0 10 20 30 40 5020

    30

    40

    50

    60

    7080

    Qg

    [MV

    ar]

    0 10 20 30 40 5049.9

    49.95

    50

    50.05

    50.1

    50.1550.2

    f [H

    z]

    Fig. 15 Generator in NPP

    0 10 20 30 40 5060

    80

    100

    120P

    g [M

    W]

    t [s]

    0 10 20 30 40 5010.2

    10.4

    10.6

    10.8

    Vt [

    kV]

    t [s]

    0 10 20 30 40 50-40

    -20

    0

    20

    Qg

    [MV

    ar]

    0 10 20 30 40 5049.9

    50

    50.1

    50.2

    f [H

    z]

    Fig. 16 Generator in IGCC

    0 10 20 30 40 5050

    60

    70

    80

    90

    Pg [

    MW

    ]

    t [s]

    0 10 20 30 40 5015.215.4

    15.6

    15.8

    16

    16.2

    16.4

    Vt [k

    V]

    t [s]

    0 10 20 30 40 5010

    15

    20

    25

    30Q

    g [

    MV

    ar]

    0 10 20 30 40 5049.8549.9

    49.95

    50

    50.05

    50.1

    50.15

    f [H

    z]

    Fig. 17 Generator in HPP

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 176 Issue 3, Volume 5, July 2010

  • 0 10 20 30 40 50-100

    0

    100

    200

    300

    Pg

    [MW

    ]

    t [s]

    0 10 20 30 40 5010

    12

    14

    16

    Vt [

    kV]

    t [s]

    0 10 20 30 40 500

    20

    40

    60

    80

    Qg

    [MV

    ar]

    0 10 20 30 40 5048

    49

    50

    51

    f [H

    z]

    Fig. 18 Generator in TPP

    0 50 100 150 200-200

    0

    200

    t [s]

    P [

    MW

    ]

    0 50 100 150 200-200

    0

    200

    t [s]

    Q [

    MV

    ar]

    0 10 20 30 40 500

    2

    4

    t [s]

    I [p

    .u.]

    Fig. 19 Power flow on line

    0 5 10 15 20 25 30 35 40 45200

    205

    210

    215

    220

    225

    230

    235

    240

    t [s]

    V [

    kV]

    Fig. 20 Voltage in substation 1

    0 5 10 15 20 25 30 35 40 45210

    215

    220

    225

    230

    235

    t [s]

    V [

    kV]

    Fig. 21 Voltage in substation 2

    2.2 Connection of two same (small) islands with 100 MW capacity

    In simulation experiments was connecting of two same (small) islands with 100 MW capacity (1 generator in TPP (thermal power plant)) with various conditions (various values of voltage phase shift). The line connecting of islands was relatively long. 2.2.1 The 1st experiment Voltage in substations before power line connection: Sub1 235,7 kV ∠-6,4° Sub2 237,5 kV ∠-14,3° at the end of line 238 kV ∠-14,3° voltage phase shifts: 7,9°

    0 10 20 30 40 5085

    90

    95

    100

    105

    110115

    Pg

    [MW

    ]

    t [s]

    0 10 20 30 40 5013.6

    13.7

    13.8

    13.9

    Vt [

    kV]

    t [s]

    0 10 20 30 40 5014

    15

    16

    17

    18

    1920

    Qg

    [MV

    ar]

    0 10 20 30 40 5049.9

    50

    50.1

    50.2

    f [H

    z]

    Fig. 22 The 1st generator

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 177 Issue 3, Volume 5, July 2010

  • 0 10 20 30 40 5080

    90

    100

    110

    120

    Pg

    [MW

    ]

    t [s]

    0 10 20 30 40 5013.7

    13.8

    13.9

    14

    Vt [

    kV]

    t [s]

    0 10 20 30 40 50-3

    -2

    -1

    0

    1

    Qg

    [MV

    ar]

    0 10 20 30 40 5049.9

    49.95

    50

    50.05

    f [H

    z]

    Fig. 23 The 2nd generator

    0 10 20 30 40 50-20

    0

    20

    t [s]

    P [

    MW

    ]

    0 10 20 30 40 50-15

    -10

    -5

    t [s]

    Q [

    MV

    ar]

    0 10 20 30 40 500

    0.1

    0.2

    t [s]

    I [p

    .u.]

    Fig. 24 Power flow on line

    0 10 20 30 40 50233

    234

    235

    236

    237

    238

    239

    240

    t [s]

    V [

    kV]

    Fig.25 Voltage in substation 1

    0 10 20 30 40 50233

    234

    235

    236

    237

    238

    239

    t [s]

    V [

    kV

    ]

    Fig. 26 Voltage in substation 2

    2.2.2 The 2nd experiment Voltage in substations before power line connection: Sub1 235,7 kV ∠13,6° Sub2 237,5 kV ∠-14,3° at the end of line 238 kV ∠-14,3° voltage phase shifts: 27,9°

    0 10 20 30 40 500

    20406080

    100120140160

    Pg [

    MW

    ]

    t [s]0 10 20 30 40 50

    0510152025303540

    Qg [

    MV

    ar]

    0 10 20 30 40 500

    5

    10

    15

    Vt [k

    V]

    t [s]0 10 20 30 40 50

    0

    20

    40

    60

    f [H

    z]

    Fig. 27 The 1st generator

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 178 Issue 3, Volume 5, July 2010

  • 0 10 20 30 40 500

    50

    100

    150

    200

    Pg [

    MW

    ]

    t [s]

    0 10 20 30 40 500

    5

    10

    15

    Vt [k

    V]

    t [s]

    0 10 20 30 40 50-5

    0

    5

    10

    15

    Qg [

    MV

    ar]

    0 10 20 30 40 500

    20

    40

    60

    f [H

    z]

    Fig. 28 The 2ndt generator

    0 10 20 30 40 50-100

    0

    100

    t [s]

    P [

    MW

    ]

    0 10 20 30 40 50-50

    0

    50

    t [s]

    Q [

    MV

    ar]

    0 10 20 30 40 500

    0.5

    1

    t [s]

    I [p

    .u.]

    Fig. 29 Power flow on line

    0 5 10 15 20 25 30 35 40 45220

    225

    230

    235

    240

    245

    t [s]

    V [

    kV]

    Fig. 30 Voltage in substation 1

    0 5 10 15 20 25 30 35 40 45220

    225

    230

    235

    240

    245

    t [s]

    V [

    kV]

    Fig. 31 Voltage in substation 2 2.2.3 The 3rd Experiment Voltage in substations before power line connection: Sub1 235,7 kV ∠43,6° Sub2 237,5 kV ∠-14,3° at the end of line 238 kV ∠-14,3° voltage phase shifts: 57,9°

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 179 Issue 3, Volume 5, July 2010

  • 0 10 20 30 40 500

    50

    100

    150

    200

    Pg [

    MW

    ]

    t [s]

    0 10 20 30 40 500

    5

    10

    15

    Vt [k

    V]

    t [s]

    0 10 20 30 40 50-20

    0

    20

    40

    60

    Qg [

    MV

    ar]

    0 10 20 30 40 500

    20

    40

    60

    f [H

    z]

    Fig. 32 The 1st generator

    0 10 20 30 40 500

    100

    200

    300

    Pg [

    MW

    ]

    t [s]

    0 10 20 30 40 500

    10

    20

    Vt [

    kV]

    t [s]

    0 10 20 30 40 50-50

    0

    50

    100

    Qg [

    MV

    ar]

    0 10 20 30 40 500

    50

    100

    f [H

    z]

    Fig. 33 The 2nd generator

    0 10 20 30 40 50 60 70-200

    0

    200

    t [s]

    P [

    MW

    ]

    0 10 20 30 40 50 60 70-50

    0

    50

    t [s]

    Q [

    MV

    ar]

    0 10 20 30 40 500

    1

    2

    t [s]

    I [p

    .u.]

    Fig. 34 Power flow on line

    0 10 20 30 40 50200

    210

    220

    230

    240

    250

    260

    t [s]

    V [

    kV

    ]

    Fig. 35 Voltage in substation 1

    0 5 10 15 20 25 30 35 40 45190

    200

    210

    220

    230

    240

    250

    260

    t [s]

    V [

    kV

    ]

    Fig. 36 Voltage in substation 2 3 Conclusion Realized simulations verified one of the conditions of power line connection, i.e. voltage phase shift during the connection of islands in power system (during the restoration of power system operation) mainly considering preservation of generators’ dynamic stability.

    Considering the results, we can conclude that actual threshold value of voltage phase shift set on synchro-checks (30° for circuit connection of lines) is satisfactory for the restoration of power system operation during connection of the island considering preservation of generators’ dynamic stability.

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 180 Issue 3, Volume 5, July 2010

  • In normal operation of power system to set the threshold value of power lines – maximal voltage phase shift can be chosen as criterion – maximal value of steady-state current on power line after the transient event fades away.

    In accordance with criterion “n-1” is the value set as 60% of allow current Iallow. For the 400 kV power line with Iallow = 2000 A it is about 1200 A.

    Criterion was chosen due to the following reasons:

    • transmission power lines are not protected by current protections, and so current surge after power line connection would not cause its disconnection.

    • course of impedance is out of the scope of distance protections protecting the line.

    Simulation results of the power lines connection are showing that in the case of parallel synchro-checks setting to 30°, the steady-state current in the lines of transmission system eventually would exceed 60% Iallow after the fading of transient event. With the knowledge of real steady-states in transmission system of Slovak Republic is safe to establish that voltage phase shifts in transmission system are significantly lower than 30°. Thus it is safe to assume, that during standard (failure-free) operation should

    not occur any problem with circuit connection of power lines. References: [1] KUNDUR, P.: Power System Stability and Control. USA, EPRI 1994. [2] ANDERSON, P.M., FOUAD, A.A.: Power System Control and Stability. USA, IEEE Press 1994. [3] JANÍČEK, F., CHLADNÝ, V., BELÁŇ, A., ELESCHOVÁ, Ž.: Digitálne ochrany v elektrizačnej sústave. Vydavateľstvo STU, Bratislava 2004. s. 360 ISBN 80 227 2135 2 [4] KHERADMANDI, M., EHSAN, M.: Dynamic analysis of transmission line connection in restoration of interconnected power systems. Electrical and Computer Engineering, 2004. Canadian Conference on Volume 3, Issue , 2-5 May 2004 Page(s): 1621 - 1624 Vol.3 [5] www.ucte.org [6] www.sespas.sk

    Acknowledge This work was supported by the Slovak Research and Development Agency under the contract No. APVV-0337-07.

    WSEAS TRANSACTIONS on POWER SYSTEMS Zaneta Eleschova, Anton Belan, Marek Pipa, Attila Kment

    ISSN: 1790-5060 181 Issue 3, Volume 5, July 2010