1 36000 LEDs vs 26000 LEDs As per our discussion, request to change the requirement to 26000 LEDs.
26000+/- 5% lights will be in scope of concessionaire.
2 General ConcessionaireAgreement Kindly sharedraftagreementcopy.
3 11.10 Bill ofQuantity(BOQ)
NoofSurveillance camera125 Requestto providethelocationof
Cameraas the camerasneed
to be connectedonfiber.
Location sheet is attached.
4 9.4(Advertisement) ExclusiveRoWfor installing Smart
BillboardsontheIntelligent Poles
ExclusiveRoWonstreetlight poles
for installing advertisement
billboards (dualside back
litor non-lit)
The concessionaireshouldbe
allowedto placebillboardbasis
businessavailabilityandnos
should not be mandatedto
concessionaire.Also thebillboard
ofdual/singleside shall be
placed basis
businessavailability.
Exiting advertisement agreement details being shared and. Any further permission of advertisement to be given to anyone other than Concessionaire will be given if concessionaire capacity to meet out asked requirement has been exhausted.
5 9.4(Advertisement) MunicipalCorporation willnot
renewthe contractofexisting
agencies
Governmentshouldensure
terminationor expiryofall
advertisingcontractswithin
three
monthsofexecutionofprojectf
or bettermonetization.
Exiting advertisement agreement details being shared and. Any further permission of advertisement to be given to anyone other than Concessionaire will be given if concessionaire capacity to meet out asked requirement has been exhausted.
6 7.7(Optical Fiber ) JSCL willprovideRoW,freeofcost,
for laying incrementalfiber
The ROWprovidedontheroute
shouldbe exclusivefor
theentire contractperiod.
Any further permission of incremental fiber laying to the extent it is in the Scope of work of concessionaire to be given to anyone other than Concessionaire will be given if concessionaire’s Capacity to do the same has been exhausted.
7 9.3PublicWi-Fi Werequestto provideexclusive
andfreeRoWacrossstreetpoles&
Othermunicipalstreetfurnitu
re. Wi-Fi being
asharedmediumand each
connectaffect
QOS/Throughputofusers,
suggestednoofconcurrentus
ers shouldbe <=50.
Any further permission to put wifi APs to be given to anyone other than Concessionaire will only be given if concessionaire’s Capacity to do the same has been exhausted.
8 Other Support fromJSCL BuildingandPowerfor Command
Centre
Buildingfacility,Power,cablingand
furnitureetc..required to
builtcommandcentrewillbe
provided byJSCL.
Refer to point no 1 Of the clarification.
9 Intelligent PoleandHigh
Mast
ExclusiveROWto be providedfor
installationofIntelligent
poleand HighMast to
concessionaire.In
caseofanyrequestfromTeleco
m operator,the
concessionaire
shouldhavefirstrightofrefusal
.
Any further permission to install smart pole to anyone other than Concessionaire will be given if concessionaire’s Capacity to do the same has been exhausted.
10 LEDlightsScope Section
7.5.1Page41
The Concessionaireneed to make
operationalat least50%ofthe
LEDs inthefirst6 monthsand
remaining50%intheanother6
months
Concessionaireisallowedthe
entireimplementationperiod
for installing 100%lightsand
monetisation shall be
allowedas per phasewiseLED
implementation.
The Concessionaireneed to make operationalat least30%ofthe LEDs inthefirst6 monthsand remaining70%intheanother6 months.
11 LEDlightsScope Section
7.5.1Page42
->Concessionairewillliaisonwith
PowerDiscomsduring preandpost
implementationperiods ofthe
project…
->Concessionairewillobtainall
Necessaryapprovals,sanctions,
licensesinthenameof
Concessionairefor installationof
proposedequipment…
Aspartofthe concession
Agreement,itis
deemedthatall
necessarypermissionsofputt
ing
upthesaidinfrastructureinJS
CL limits
arealreadyobtained.
Accordingly,ifthereareanyissues/
problems,JSCL would actasa
singlewindowofclearancefor
the concessionaire
Agreed.
12 PublicWi-FiSection 7.6
Page43
Asa partofthis initiativefreeWi-Fi
need to be provided;Wi-Fishall be
freefor thefirst30Minutesper
Mobile subscriberper dayor 20MB
per dayandanaggregatelimitof
700MBper monthwhicheveris
achievedfirst.
The aggregatelimitshouldbe
restrictedto 600MBfor
the month.
Agreed
13 RevenueGeneration
Section 9 Page59
RevenueGeneration Allillegaltelecomsitesshouldbe
Removedandoperatorsshould
be askedto
comeontheseintelligent
poles.
JSCL will communicate with JMC to address this issue and expedite the removal of all illegal towers within the city.
14 RevenueGeneration
Section 9 Page59
RevenueGeneration Wifi-Concessionaireto havefirst
rightofrefusalto putAP within
100mradius ofintelligent street
polesandothermunicipal
furniture as partofthis
agreementto
improvewifiexperience(reduce
interference)andrevenue
generation
Any further permission to put wifi APs to another person than Concessionaire will be given if concessionaire’s Capacity to do the same has been exhausted.
15 RevenueGeneration
Section 9 Page59
RevenueGeneration Advertisement-Concessionaireto
havefirstrightofrefusalto putany
advertisementformwithin 100m radius
ofintelligent streetpoles
andothermunicipal furnitureas
partofthis agreementto avoidtoo much
densificationandimprove
revenuegeneration
Exiting advertisement agreement details being shared and. Any further permission of advertisement to be given to anyone other than Concessionaire will be given if concessionaire capacity to meet out asked requirement has been exhausted.
16 RevenueGeneration
Section 9 Page59
RevenueGeneration Fiber -On thesamerouteoffiber
laidbyconcessionaire,noother
partyshouldbe allowedto lay fiber to
avoidfrequentcutsandimprove
revenuegeneration
Any further permission of incremental fiber laying to the extent it is in the Scope of work of concessionaire to be given to anyone other than Concessionaire will be given if concessionaire’s Capacity to do the same has been exhausted.
17 Form2 Page153financial
bidformat
Sincethereis nograntgivenbythe
government,Bidderto provide only
therevenuegeneratedbythe
Concessionaireandthe%revenue
sharefor eachyear
Agreed.
18 7.5.1,pg 42 Concessionairewillobtainall
necessaryapprovals,sanctions,
licensesinthenameof
Concessionairefor
installationof proposed
equipmentpertainingto
theprojectfromthe concerned
competentauthorities and
maintainvalidityofthesameat
all timesduring
theprojectduration.
Wewould requestsinglewindow
clearancefor scopeofdeliverythru
Smart cityauthorities.
Agreed.
19 10,pg62 Alllicensesshouldbe inthename
ofJabalpur Smart CityLtd.
The licenceis providedinthename
ofconcessionaire.
At the time of handover ownership of all the licences purchased by the SI with respect to this tender will be be transferred to JSCL. And this Nomination change will be the responsibility of Concessionaire.
20 General Earthingfor all poles To be providedandmaintainedby
JSCL for theentireterm Agreed.
21 11.2.3.3 (1) Principleequipmentshouldbe
designed
onthebasisof`Lossless
SeriesReactancewith
Secondary Compensation’
technology (Auto-
transformer)
Thisis notreqdwith power
factor>0.90.To be removed.
Your understanding is correct.
22 Clause14.2.5Page118 SLAReportingsystem Thisshouldbe Element
Managementsystemfor eachtype
ofnode andnotenterprise
managementsystem.
Your understanding is correct.
23 Clause14.2.5Page118 EMSshouldbe integratedwith the
tollfreecall
center(establishedby
theConcessionaire)for site
fault reporting.
Toll freecall centerto be
Establishedbyauthority.
Concessionaireresponsibilityis only
upto maintainingSLA.
No change.
24 Clause3.2Page37 Anyconsortiumpartneror Single
Bidderor
GroupCompanyofsingle
Bidder/consortiumpartnershoul
d
havecompletedprojectsofPublic
Wi-Fiandrelated
networkinfrastructureprojectsin
India.
Anyconsortiumpartneror Single
Bidderor GroupCompanyofsingle
Bidder/consortiumpartneror
alliancevendorshouldhave
completedprojectsofPublicWi-Fi
andrelatednetworkinfrastructure
projectsinIndia.
Agreed.
25 Clause3.3Page37 Anyconsortiumpartneror Single
Bidderor
GroupCompanyofsingle
Bidder/consortiumpartnershoul
d havecompletedprojectsfor
outdoorCCTVinstallation
of100IPbaseddigitalcameras
with Central monitoring systemin
India
Anyconsortiumpartneror Single
Bidderor GroupCompanyofsingle
Bidder/consortiumpartneror
alliancevendorshouldhave
completedprojectsfor outdoor
CCTVinstallationof100IPbased
digitalcameraswith Central monitoring
systeminIndia
Agreed
26 Clause3.4Page37 Anyconsortiumpartneror Single
Bidderor
GroupCompanyofsingle
Bidder/consortiumpartnershoul
d havecompletedprojectsfor
implementationofSmart
LEDfor streetlightof1000Smart
LEDluminairesor higher inIndia.
Anyconsortiumpartneror Single
Bidderor GroupCompanyofsingle
Bidder/consortiumpartneror
alliancevendorshouldhave
completedprojectsfor
implementationofSmart LEDfor
streetlightof1000Smart LED
luminairesor higher inIndia.
Agreed.
27 Cl 7.5.3 Page43 GuaranteedEnergySaving What is themechanismfor
baselinecalculation for Energy Saving
onFeederPanel. Howis the
PowerFactor, LeakageandTheftto be
addressed ondaily basis for baseline
calculation.Requestto
providecompletedetailsfor baseline
calculation.
GIS mapping of the roads and poles, along with the fixture details on each pole will be provided. Other Pole specific information will be provided.
28 Page59:Clause9.1 ExclusiveRightofWay(RoW)
throughouttheConcession
period, freeofcost,for
telecomsite
deploymentontheIntelligent
Polesinstalledbyconcessionai
re andgeneraterevenueoutof
tenancy
Pleaseprovideexclusivityofthis
RoWacross the cityto ensure
monetizationoftheinvestmentis
betterandabilityto providea
betterrevenueshareto JSCL.
Requestyour confirmation.
Any further permission to the extent it is in the Scope of work of concessionaire to be given to anyone other than Concessionaire will be given if concessionaire’s Capacity to do the same has been exhausted. same has been exhausted.
29 Pg42 -Clause7.5.1 Concessionairewillliaisonwith
PowerDiscomsduring
preandpost
implementationperiods ofthe
projectfor addressingall the
electricitybilling issuessuchas
average
billing,metering,replacementof
defectivemeters,reductionor
increaseincontractdemandas
per theactualloads,powerfactor
incentivesetc.JSCL
willfacilitateall suchmeetings
WerequestJSCL to resolveall the
billing relatedissues with DISCOM
includingdefectivemetersetc.
beforehandover.During
Maintenance,Werecommend that
whosoeveris paying the Discombills,
has to assumethe
responsibilityofthesame.Incase
ofissuesintheDiscombills, Savingswill
be calculatedbased uponthe
consumption reported throughSmart
PenalMeter/ throughCCMS.
Agreed.
30 Clause7.5Page40 They willalso be responsiblefor
reviewingthebaseline for
energy saving throughLEDs
willbe latest
electricitybillavailablewith
the JSCL.
Mappingoflatestbillwith installed
wattageandoperationalhoursto be
mentionedalongwiththebill.
GIS mapping of the roads and poles, along with the fixture details on each pole will be provided. Other Pole specific information will be provided.
31 Annexure6 Page159 Pls provideroad categorywise
bifurcationofwattageandnumber
oflights.
GIS mapping of the roads and poles, along with the fixture details on each pole will be provided. Other Pole specific information will be provided.
32 Clause11.2.4Page71 RecommendedLevelsof
Illumination (as per BEE guidelines)
Whereverexiting lightsdoesn't
haverecommendedlux level,the
authorityshouldrecommend higher
lux levelandaccordingly baseline
shouldbe defined.
This is required to be covered in
the base line survey and to be
suggested accordingly.
33 Cl 7.5.1 Page42 Postsatisfactorycompletionof
installations,independentenerg
y auditor
willestablishthesavingson
thefeederpanelandsubmita
reportto JSCL
Plsletus knowmethodologyon
whichtheauditor shallcompute
energysavings.
Will be decided after the work has
been awarded to the successful
bidder.
34 Cl 11.2.3.3 Page68 Fixedcapacitor with appropriate
capacityshall be
introducedineach feederpanel
to alwaysmaintaina
powerfactorabove0.90
Weunderstandthatthereis no
need ofCapacitor bankas the
fixtureitselfisaskedfor PF>0.9.
Requestto delete.
Agreed.
35 Page69 point14 The metersprovidedbyauthority
shouldbe able to capturethe
detailed mentioned.
Agreed.
36 Page69 point15 It shouldhaveSinglePhasepower
socketfor
connectingutilitytools like
drillmachine etc.(capacity
1phase240Vac/5Ampsocket)
Thismaybe additional theftpoint.
Shouldbe deleted.
Agreed.
37 Page70 clause11.2.3.5 The softwareshallreceivetheself-
generateddatamessagefro
m individualFeederPillar
All therequestedalarmscannot be
selfgeneratedfromfeederpillar. Can be
simulated thruCentralised
managementsoftware.
SI needs to ensure the Necessary alarm generation.Specifications
provided are indicative, concessionaire
expected to quote the technical
components to meet the technical and
functional requirements of the project.
Concessionaire may use lower
technology currently but should be
able to scale up to meet the future
requirements with no additional cost to
JSCL.
38 Page71 clause11.2.3.6 The IEC standards shouldbe IEC/IS
Standards.
Agreed
39 7.1/Page33 If therearetotalof3 consortium
partneralong with
leadbidder (total4
members),theneach
consortiumpartnershould
contribute16%.
TurnoveroftheLeadMemberto
beconsideredfor it'swholly owned
subsidiaryincaseoftwosuch
partiesconsortium.
No Change.
40 Cl 7.5.3, Page-43 Afterreplacementofexisting street
lightwith energyefficiencyLED
streetlightminimum35%of
energysaving shouldbe
mandatory.
Ifsome oftheexisting streetlights
arenotinworkingcondition-1- How
energysaving can be evaluated?2-
HowSPwillsubmitit to JSCL
storeinworkingcondition?
3- What willbe theprocedureto
certifiedthata particularstreet
lightis notinworkingcondition?4-
Whowillborne the cost of
replacementofdefectivemeters?
This is required to be covered in
the base line survey and to be
suggested accordingly.
41 GenericQuery Intelligent Pole JSCL willinformallUSAL providers
thattheyneed to approachthe
concessionairefor obtainingright
ofwayfor deployingtelecomsites
infutureinJSCL area.
Any further permission laying to be given to anyone other than Concessionaire will only be given if concessionaire’s Capacity to do the same has been exhausted.
42 GenericQuery Smart Pole Concessionairewillhavethe
exclusiverightofway,freeofcost, for
telecomsite deploymentin
areaofJSCL anditshallleaseout
thesitesto telecomoperators
GIS mapping of the roads and poles, along with the fixture details on each pole will be provided. Other Pole specific information will be provided.
43 GenericQuery Wi-Fi ExclusiveROW,freeofcost,for
provisioningofWi-FiServicesto be
providedbytheAuthoritywith in
Municipallimits. Thisrightshall be
available for thedurationofthe
contract(15 Years).
Any further permission to Put WiFi APs to anyone other than Concessionaire will only be given if concessionaire’s Capacity to do the same has been exhausted.
44 GenericQuery AdvertisementRights Authorityshall provideexclusive
Advertisementrightsto the Bidder
to earn revenueoutof
advertisements,digitalsignage,
WIFI,SmallCell,ConventionalBill
Boardsetc.fromthesupply made for
this project.
Any further permission for advertisement to anyone other than Concessionaire will only be given if concessionaire’s Capacity to do the same has been exhausted.
45 GenericQuery Coordination Support Authorityshallcoordinatewith
othergovernmentaldepartmentsif
anyrequired for faster
implementationofthis Project.
Suchdelaysshall be excusedfrom
Biddersperformancewithoutany
penalty.
Necessary support will be extended. JSCL and Concessionaire will work in tandam to avoid the delays in the project.
46 GenericQuery Incasethereareoverheadcables
Exitingbetweenstreetlightsthe
samewillbe made undergroundby
Jabalpur MunicipalCorporation.
JSCL
47 11.7.3.4Firewall,Clause#3 Encryptedthroughput:minimum1
Gbps
Considering 100000connections
and2000tunnels , 1Gbps isgoing to
be veryhighandwould increase the
cost ofoverallSolution.Hence
werequestyouto changethis to
300Mbps.
No Change.
48 7.5/40 Concessionairesareexpectedto
carryout necessaryfieldsurveysto
verifythestatusofswitching
points,physicalinstallations,
geographicareacoveredandscope
oftheprojectdefinedsoas to fully
satisfythemselvesontheexisting
fieldconditionsandtheirscope. They
willalso be responsiblefor
reviewingthebaseline for energy
saving throughLEDs willbe latest
electricitybillavailablewith the JSCL.
The latestenergyauditreport
willalso need to be referredby
Concessionaireandsatisfy
themselvesonthescopeand
feasibilityoftheproject
implementationfor Feederpanel
andSmart LEDlight fixtures
Pl.sharetheelectricitybill
switchingpointwise& alsogivethe
number ofswitchingpoints
installedincityfor thesaid
quantityoffixtures
GIS mapping of the roads and
poles, along with the fixture details
on each pole will be provided.
Other Pole specific information will
be provided. However This is
required to be covered in the base
line survey and to be suggested
accordingly.
3 11.3.1.2 Page 72
Infrared Illuminators Since this is major cost item, the requirement should be reconsidered and deleted.
This clause stands deleted.
1 General
Energy Savings Any electricity theft forLED or otherwise in JSCL network shall be responsibility of JSCL only.
Any electricity theft for LED or otherwise in JSCL network shall be responsibility of JSCL only.
Concessionaire will be expected to
highlight the energy theft in the
daily report. JSCL will coordinate
with JMC and Other government
bodies to control the energy theft.
2 General
Energy Savings Any additional discount in EB bill due to installation of timer, power factor incentive etc in the electricity bill should foem part of energy savings.
Any additional discount in EB bill due to installation of timer, power factor incentive etc in the electricity bill should form part of energy savings.
After meeting the SLA Asked in this
RFP if any other additional discount
is offered for power saving that will
be considered as energy saving
defined in this RFP.
11.2.3.2 LED Luminaire/67
The Luminaire shall be equipped
with distortion free, clear, heat
resistant, toughened, UV stabilized
glass cover in the front fixed to the
die cast. Aluminum frame which
shall be fixed to the housing by
means of stainless steel screw.
We Request till the time IP66 is being maintained, an aluminum frame should not be made mandatory.
Agreed. But IP66 need to be strictly
followed.