![Page 1: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/1.jpg)
Research Reactor Center 1513 Research Park DriveColumbia, MO 65211
University of Missouri-Columbia PHONE (5 73) 882 -42 11FAX (573) 882-6360WEBSrrE http://web.missouri.edu/-murrwww
February 25, 2009
ATTN: Document Control DeskDirector, Spent Fuel Project OfficeOffice of Nuclear Material Safety and SafeguardsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001
Subject: Quality Assurance Program Approval, No. 0108 Request for Renewal
Dear Sir or Madam:
Enclosed please find a request for renewal and amendment to the Quality AssuranceProgram Approval for Radioactive Material Packages, Approval No. 0108 issued to theUniversity of Missouri-Columbia. The primary purpose of this request is to update theprogram, where practical, to a more global quality systems approach, as outlined inRegulatory Guide 7.10, "Establishing Quality Assurance Programs for Packaging Used inTransport of Radioactive Material."
Also enclosed, per the recommendation in the guidance document, is a list of our currentimplementing procedures for this program.
I appreciate your attention to this request. If you have any questions, please contact me at573-882-5226 or via email at [email protected]
Sincerely,
John P. ErnstAssociate Director, Regulatory Assurance Group
jpe / Enclosures
xc:
Ralph Butler, Director, MURR
FIGHTING CANCER wITH ToMoRRow's TECHNOLOGY
![Page 2: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/2.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
UNIVERSITY OF MISSOURI-COLUMBIA
RESEARCH REACTOR FACILITY
SHIPPING QUALITY ASSURANCE PROGRAM
FOR TYPE B SHIPPING CASKS
1513 Research Park Drive
Columbia, MO 65211
(573) 882-4211
John Ernst ',7
Associate Director, Re ulatory Assurance
Ralph Butler • .Director
Date:
Date:
![Page 3: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/3.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4TABLE OF CONTENTS
CONTENTS
I. IN T R O D U C T IO N ...................................................................................................................... 3
II. Q U A LITY A SSU RA N CE ................................................................................................... 3
1.0 O R G A N IZA T IO N ................................................................................................ 3
2.0 QUALITY ASSURANCE PROGRAM ............................................................ ý. 5
3.0 PACKAGE DESIGN CONTROL ....................................................................... 6
4.0 PROCUREMENT DOCUMENT CONTROL ..................................................... 6
5.0 INSTRUCTIONS, PROCEDURES, AND DRAWINGS ..................................... 7
6.0 DOCUMENT CONTROL .................................................................................... 7
7.0 CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES .... 8
8.0 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, AND
C O M PO N EN T S ................................................................................................... 9
9.0 CONTROL OF SPECIAL PROCESSES .............................................................. 9
10.0 INSPECTION CONTROL ................................................................................... 9
11.0 MAINTENANCE TEST CONTROL ...................................................................... 10
12.0 CONTROL OF MEASURING AND TEST EQUIPMENT ............................... 10
13.0 HANDLING, STORAGE AND SHIPPING ........................................................ 11
14.0 INSPECTION, TEST, AND OPERATING STATUS ............................................ 11
15.0 NON-CONFORMING MATERIALS, PARTS, AND COMPONENTS ........... 11
16.0 CORRECTIVE ACTION .................................................................................. 11
17.0 QUALITY ASSURANCE RECORDS ............................................................... 12
18 .0 A U D IT S ................................................................................................................... 13
III. A P P E N D IC E S ....................................................................................................................... 13
APPENDIX A, QA PERSONNEL RESPONSIBILITIES .......................................... 14
APPENDIX B, REFERENCES .................................................................................... 17
APPENDIX C, ORGANIZATIONAL CHART .......................................................... 18
Page 2ofJ,6 13
![Page 4: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/4.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
I. INTRODUCTION
This document establishes a Shipping Quality Assurance (QA) Program for the University of
Missouri Research Reactor (MURR) in accordance with 10 CFR 71, Subpart H. The MURR
Shipping QA Program establishes requirements applicable to procurement, use, maintenance,
and repair of packaging used in transport of licensed material in excess of a Type A quantity.
The program includes the purchase, handling, shipping, storing, cleaning, assembly, inspection,
testing, operation, maintenance, repair and use of Type B shipping containers regulated by 10
CFR 71. The Shipping QA Program applies to those activities affecting the casks and their
components, which are significant to safety. Quality assurance comprises those planned and
systematic actions necessary to provide adequate confidence that a system or component will
perform satisfactorily in service. Shipping casks regulated by 10 CFR 71 will be released for
shipping only after they have satisfactorily met the requirements of the MURR Shipping QA
Program.
II. QUALITY ASSURANCE
1.0 ORGANIZATION
1.1 The Associate Director of the MURR Regulatory Assurance Group (RAG) is
responsible for the Shipping QA Program and shall assure the program complies
with 10 CFR 71, Packaging and Transportation of Radioactive Material. The
Associate Director (RAG) will have the following minimum qualifications:
Bachelors degree in Engineering or related field; five years experience with
radioactive materials shipping; and general knowledge of all aspects of research
reactor operation.
Page 3ofj V f2
![Page 5: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/5.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
1.2 The Associate Director (RAG) shall designate individuals, in writing, as Shipping
QA Supervisors who have the responsibility to ensure that all work in their
assigned area complies with 10 CFR 71, Subpart H-Quality Assurance. The
Associate Director (RAG) shall designate in writing Shipping QA Inspectors, who
have the responsibility to ensure that all requirements of Shipping QA procedures
have been performed and verified. The Shipping QA Supervisor and Shipping
QA Inspector positions may be collateral duties of the designated staff members.
1.3 All Shipping QA Supervisors, Inspectors, and Performers have the authority to
stop noncompliant or unsafe work. If a difference in opinion or a safety concern
occurs between a Shipping personnel concerning compliance with the Type B
Shipping QA Program, the work evolution involved shall be stopped and put in a
safe condition. The Associate Director (RAG) will resolve the issue.
1.4 MURR has divided the Shipping QA Program into three responsible groups:
Byproduct Materials Shipping, Spent Fuel/Fissile Material Shipping, and
Hazardous Waste Shipping. Each group has a Shipping QA Supervisor assigned
from their respective workgroups to ensure that work in that subject area meets
the requirements of the MURR Shipping QA Program.
1.5 Any participant in the program may, if trained, perform quality assurance and
shipping functions, but may not perform both functions on the same shipment or
evolution.
Page 4 of J V41-7
![Page 6: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/6.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
2.0 QUALITY ASSURANCE PROGRAM
The MURR Shipping QA Program establishes requirements applicable to procurement, use,
maintenance, and repair of packaging used in transport of licensed material in excess of a Type A
quantity.
2.1 Any action or procedure that could significantly affect the ability of any package
structure, system, or component to perform safely and as specified, falls within
the scope of the MURR Shipping Quality Assurance Program.
Activities important to safety must be conducted in appropriate environments,
using appropriate equipment and work instructions, including procedures and/or
checksheets, and be documented including the person or people responsible for
actions and verification of actions.
The Shipping QA Program will be applied in a graded approach to an extent
consistent with the importance to safety.
2.2 Because MURR does not design or manufacture Type B shipping casks, the
regulations in 10 CFR 71, Subpart D-Application for Package Approval, Subpart
E-Package Approval Standards and Subpart F-Package, Special Forms, and LSA-
III Tests are not applicable to the MURR Shipping QA Program.
2.3 All Shipping QA Supervisors and Shipping QA Inspectors will have their training
and experience documented by completion of appropriate training records. In
their assigned areas, each Shipping QA Supervisor shall ensure that all personnel
who perform work in accordance with their Shipping QA procedures are
adequately trained and qualified to perform this work.
Page 5of ), 13
![Page 7: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/7.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
3.0 PACKAGE DESIGN CONTROL
3.1 Because MURR is not a designer of packaging or a certificate holder, there are no
design activities requiring control.
4.0 PROCUREMENT DOCUMENT CONTROL
4.1 It is the responsibility of the appropriate Shipping QA Supervisor to ensure that
the certificate holder supplies documentation verifying the designated packaging
(model and serial number) was manufactured under the control of an NRC-
approved QA program, identifies the type of verification activities required during
use and maintenance, and designates other pertinent documentation to be
furnished with the packaging (for example, certificate of compliance, as-built
drawings, use and maintenance manuals, photographs). The procurement
agreement should include a statement regarding records the supplier must retain,
records the supplier must forward to the user, MURR access to sub-contractors,
and requirements for reporting of nonconformances.
4.2 Package procurement documents must be reviewed and approved prior to use of
the package(s) and, if changed, shall be subsequently reviewed and approved with
at least the same level of review applied to the original.
4.3 Prior to the purchase of replacement parts for Type B shipping casks,
procurement documents for all parts important to safety will be reviewed and the
review documented by the appropriate Shipping QA Supervisor to ensure that all
technical and QA requirements are included in purchase orders. When applicable,
purchase orders shall be placed with suppliers/manufacturers previously qualified
during fabrication of the packaging. For the purchase of replacement parts from
suppliers/manufacturers not previously identified as qualified sources, it is the
responsibility of the appropriate Shipping QA Supervisor to ensure that the
replacement parts meet requirements at least as stringent as the original criteria.
Page 6 of X,6 I1
![Page 8: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/8.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 45.0 INSTRUCTIONS, PROCEDURES, AND DRAWINGS
5.1 Administratively controlled, approved, written procedures shall be established for
the use, maintenance, repair and preparation for transport of all Type B
packaging.
5.2 The applicable QA Supervisor must approve procedures applicable to his or her
area of responsibility. Changes to these procedures must receive, at a minimum,
the same level of approval as the original.
5.3 These procedures will encompass performance steps for the activity and will
specify the level of qualification required to complete the steps. QA Program
Implementing Procedures will clearly identify hold steps which must be
performed with at least a performer and verifier present, and which must be
satisfactorily completed prior to continuing the evolution. Procedures applicable
to shipment must include a QA Inspector or QA Supervisor signature indicating
that the procedure is complete and the shipment approved for release.
6.0 DOCUMENT CONTROL
6.1 Shipping QA documents consist of operation, maintenance and inspection and test
procedures, manuals, instructions, and specifications used in the procurement,
use, maintenance, and repair of Type B shipping casks.
6.2 To ensure that revisions are appropriately reviewed and approved prior to use,
procedures, specifications, and manuals implementing this quality program must
participate in the MURR Document Control program.
6.3 Controlled copies of approved Shipping QA procedures will be made available to persons
responsible for using those documents.
6.4 In their assigned specialty, it is the responsibility of each QA Shipping
Supervisor: to ensure the accuracy of all Shipping QA documents; to ensure that
all personnel performing QA work are adequately trained and qualified to perform
Page 7 of V,6 /_
![Page 9: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/9.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4this work; and to ensure that all personnel performing QA work are aware of any
revisions to the procedures. It is the responsibility of each Shipping QA
Supervisor to ensure this training is completed and documented.
7.0 CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES
7.1 It is the responsibility of the appropriate Shipping QA Supervisor to ensure that
material, equipment, and services conform to the procurement documents. Source
surveillance, audits of records, inspection and examination of products on
delivery shall be performed as appropriate to ensure that the design and
fabrication of Type B packaging was performed under the control of NRC-
approved QA programs.
7.2 The appropriate Shipping QA Supervisor shall ensure that Type B packaging
procured by MURR is accompanied by appropriate documentation as identified in
the procurement documentation. All documents that are referenced in the
certificate of compliance, relate to the use and maintenance of the packaging, and
identify necessary actions to be taken prior to the delivery of licensed material to
a carrier for transport shall be present.
7.3 Contractors and suppliers are selected on the basis of references, past performance
to MURR, reputation and other investigation. Appropriate credentials, and
licenses if required by law, code or regulation, will be furnished and retained on
file.
7.4 No deviations from procurement documents are allowed without written request
by the vendor and documented approval by the Associate Director of the MURR
Regulatory Assurance Group (RAG) or his designated representative.
7.5 MURR shall establish procedures which ensure control and disposition of
nonconforming parts or packages and are adequate to prevent unintended use of
the nonconforming items.
Page 8 of V 1_3
![Page 10: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/10.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 48.0 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, AND
COMPONENTS
8.1 The appropriate Shipping QA Supervisor shall ensure that materials, parts, and
components used for repair of Type B packaging are adequately identified and
controlled to prevent use of incorrect or defective items. When replacement of
limited-life items is specified, the appropriate Shipping QA Supervisor shall
ensure that no materials, parts and components are used whose shelf life or
operation times have expired.
9.0 CONTROL OF SPECIAL PROCESSES
9.1 The appropriate Shipping QA Supervisor shall ensure that all major repairs or
inspections of Type B packaging requiring special processes such as welding or
nondestructive testing be performed in accordance with the following criteria: all
procedures, equipment, and personnel are qualified in accordance with applicable
codes, standards, and specifications; the operations are performed by qualified
personnel and accomplished in accordance with written process sheets with
recorded evidence of verification; and qualification records of procedures,
equipment, and personnel are established, filed, and kept current.
10.0 INSPECTION CONTROL
10.1 The appropriate Shipping QA Supervisor or Shipping QA Inspector will perform
a visual inspection per procedure of all Type B packaging upon receipt at MURR
to ensure compliance with procurement documents. These visual inspection
procedures should include inspection of surface conditions; weld and structural
integrity; the condition offlange faces or sealing areas, gaskets, seals, gauges,
rupture disks, valves and pressure relief devices; the condition of tie-down
members; labeling and marking; and leaktightness of the packaging. Any Type B
packaging that does not comply with the procurement specifications or fails the
receipt QA inspection will be in noncompliance and immediately reported to the
appropriate Shipping QA Supervisor and the Associate Director (RAG).
Page 9 of A (3
![Page 11: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/11.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 410.2 Procedures shall ensure adequate maintenance of Type B packaging. They shall
identify the items to be maintained, criteria for acceptability or replacement, the
path to resolution of nonconformances, the frequencies of inspection assigned to
each item.
10.3 The appropriate Shipping QA Supervisor shall establish checklists to ensure that
inspections are performed to verify that the following items have been complied
with prior to each use:
" Type B packages are properly assembled." All shipping papers are properly completed." Type B packages are conspicuously and durably marked as required by DOT
regulations.* Authorized individuals have signed the shipping paperwork prior to release
for shipment.
10.4 Procedural steps which require an independent QA inspection will be completed
by a Shipping QA Inspector or a Shipping QA Supervisor who is not performing
the activity being inspected.
11.0 MAINTENANCE TEST CONTROL
11.1 Maintenance tests must be controlled by procedures and ensure that qualified
individuals document and evaluate all maintenance tests.
12.0 CONTROL OF MEASURING AND TEST EQUIPMENT
12.1 The appropriate Shipping QA Supervisor shall ensure that measurement and test
equipment (gauges, fixtures, reference standards, and devices used to measure
product characteristics of Type B packages) will be calibrated, adjusted and
maintained at established intervals. Measurement and test equipment should be
labeled or tagged to indicate the planned date of its next calibration, and the
calibration records should be identified and traceable. Calibration shall be
traceable to nationally recognized standards; or, where nationally recognized
standards do not exist, provisions shall be established to document the basis for
calibration.
Page 10 of d' 13
![Page 12: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/12.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 412.2 Measurement and test equipment that fail calibration will be removed from
service, and tagged as out of calibration equipment until repaired or replaced.
13.0 HANDLING, STORAGE AND SHIPPING
13.1 In order to assure that cleaning, handling, storage and shipping are accomplished
in accordance with design requirements, MURR implements procedures
controlling these activities.
13.2 The cleaning, handling, storage, and shipping of Type B packaging will be
controlled to assure safety, minimize degradation, damage and/or loss.
14.0 INSPECTION, TEST, AND OPERATING STATUS
14.1 A tag, label, marking, a log entry or other documentation will indicate the status
of Type B shipping containers. The records will indicate when periodic
surveillance tests have been performed. No deviation from required inspection,
test or other critical operations are authorized without the approval of the
Associate Director (RAG).
15.0 NON-CONFORMING MATERIALS, PARTS, AND COMPONENTS
15.1 The appropriate Shipping QA Supervisor shall ensure that control of
nonconforming items for completed packaging, replacement parts or components
shall include the following principal elements:
(1) proper identification,
(2) segregation of nonconforming items,
(3) disposition of the items of nonconformance, and
(4) evaluation of the items of nonconformance.
16.0 CORRECTIVE ACTION
16.1 For activities important to safety concerning use, maintenance and repair of Type
B packages, any conditions adverse to quality (e.g., those resulting from failures,
Page 11 of,603
![Page 13: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/13.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4malfunctions, deficiencies, deviations and defective material and equipment) shall
be promptly identified and reported to appropriate levels of management by
means of the MURR facility-wide Corrective Action Program. This program
provides a formal means for documenting and tracking deficiencies as well as a
mechanism to trigger root cause analysis and implementation of corrective actions
in the case of a significant condition adverse to quality or recurring issue.
17.0 QUALITY ASSURANCE RECORDS
17.1 The appropriate Shipping QA Supervisor shall ensure the maintenance of QA
records that are to be retained for the lifetime of packaging. These records
include appropriate design and production-related records that are generated
throughout manufacturing and furnished with packaging; records demonstrating
evidence of operational capability; records verifying repair, replacement; and
audit plans, audit reports, corrective actions and records that are used as a baseline
for maintenance. Records showing evidence of delivery of packages to a carrier
and proof that all NRC and DOT requirements have been satisfied should also be
retained with their retention times identified.
17.2 The Associate Director (RAG) is responsible for the prompt replacement of a
record that is lost or damaged and for assessing and controlling records in
MURR's possession.
17.3 Records shall be maintained in storage locations that minimize the risk of
damage, and procedures will be in place to control the intake, retention and access
practices of the Records Management group.
Page 12 of %d 13
![Page 14: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/14.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
18.0 AUDITS
18.1 The Associate Director (RAG) shall ensure that audits are performed in
accordance with pre-established written procedures or checklists and are
conducted by qualified personnel not having direct responsibility in the areas
being audited. The audit shall verify compliance with all aspects of the Quality
Assurance program and determine the effectiveness of the program.
18.2 The procedures or checklists shall list activities to be audited and the frequency at
which each activity is to be audited. The frequency of audits should be based on
the importance of the activity to safety; however, each activity should be audited
at least once each year.
18.3 It is the responsibility of the appropriate Shipping QA Supervisor to ensure that
corrective actions resulting from audits are completed and documented on a
timely basis. Deficient areas shall be re-audited on a timely basis to verify
implementation of corrective action.
III. APPENDICES
A. QA Personnel Responsibilities
B. References
C. Shipping QA Organization Chart
Page 13 of ./ I 3
![Page 15: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/15.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
APPENDIX A, QA PERSONNEL RESPONSIBILITIES
Associate Director of the MURR Regulatory Assurance Group (RAG):
The Associate Director (RAG) is responsible for the development and implementation of the
MURR Shipping Quality Assurance Program.
Quality Assurance Supervisor-Hazardous Waste:
The QA Supervisor-Waste is responsible for Type B shipments of radioactive waste.
Quality Assurance Supervisor--Spent Fuel and/or Fissile Material:The QA Supervisor-Spent Fuel and/or Fissile Material is responsible for Type B shipments of
reactor spent fuel and/or fissile material.
Quality Assurance Supervisor-Byproduct Material:The QA Supervisor-Byproduct Material is responsible for the packaging and preparation for
shipment of all Type B shipments except for shipments of reactor spent fuel, fissile material and
hazardous waste.
Shipping QA Supervisors:Shipping QA Supervisors shall ensure that work in their assigned area meets the requirements of
the QA Program, and that individuals performing the work are appropriately trained and
qualified. They are also responsible for obtaining packages appropriate to their use and of
acceptable quality within their assigned areas.
For the purchase of replacement parts from suppliers/manufacturers not previously identified as
qualified sources, it is the responsibility of the appropriate Shipping QA Supervisor to ensure
that the replacement parts meet requirements at least as stringent as the original criteria.
Supervisors must approve replacement parts for use.
QA Supervisors must approve all procedures in their area of responsibility.
Page I of 2 Appendix A
![Page 16: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/16.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
APPENDIX A, QA PERSONNEL RESPONSIBILITIES (CONT.)
Prior to use and shipment of Type B shipping packages, it is the responsibility of the appropriate
Shipping QA Supervisor to ensure that MURR is registered with the NRC as an authorized user
of the package. The shipment shall be made in accordance with the conditions of the NRC
Certificate of Compliance.
For international shipments of Type B packaging, it is the responsibility of the appropriate
Shipping QA Supervisor to ensure that MURR is registered with the U. S. Certificate of
Competent Authority as an authorized user of the package. The shipment shall be made in
accordance with the conditions of the U. S. Certificate of Competent Authority.
Shipping QA Inspectors:Shipping QA Inspectors shall perform the required QA inspection and have the authority to stop
work not meeting the requirements of the QA Program.
Material Control Specialist:Material Control Specialists must be at least a Shipping QA Inspector. The Material Control
Specialist is an individual who is trained to the material control procedure and qualified to order,
receive and test incoming parts, and to handle disposition of nonconforming parts.
Page 2 of 2 Appendix A
![Page 17: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/17.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
APPENDIX B, REFERENCES
1. 10 CFR 71, "Packaging and Transportation of Radioactive Material"
2. Regulatory Guide 7.10 (Rev. 1), March 2005, "Establishing Quality Assurance Programs forPackaging Used in the Transport of Radioactive Material"
3. ANS - 15.8 (N402) - 1976, "Quality Assurance Program Requirements for Research Reactors"(Reaffirmed December 15, 1986)
Page I of 1 Appendix B
![Page 18: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/18.jpg)
MURR Type B Shipping QA ProgramPOL-14
Revision 4
APPENDIX C, ORGANIZATIONAL CHART
Shipping Quality Assurance ProgramOrganization
, QOA.,j.1eQtojr_.Material o ntrol
Specialist-. .. .. .. ... ,
Page I of I Appendix C
![Page 19: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/19.jpg)
Attachment 2MURR Request for Renewal of Type B QA Program No. 0108
Implementing Procedures
Program Section CFR Document Title Description Status
Number
ProgrammaticQA-SH-002 Sodium Iodide Spectral Analysis for Quality Control verification of contents and Approved
Excepted, Exempt, License-to-License, Type activities.A or Type B Radioactive Materials Shipments
1.1, Structure & 71.103 AP-SH-001 Administrative Procedure, Radioactive Provides requirements for filling the roles in ApprovedAuthority Materials Shipping the system (performer, inspector, verifier)
and definitions of commonly used terms.2.0, Quality Assurance 71.105 POL-14 Type B Shipping Quality Assurance Program Provides a high-level description of the Type Awaiting NRCProgram B Shipping Quality Assurance Program. approval3.0, Package Design 71.107 N/A N/A N/A N/AControl4.0, Procurement 71.109 QAB-SH-002 Type B Shipping Package Procurement Discusses requirements for the purchase, ApprovedDocument Control lease or borrowing of Type B containers.5.1, Quality Assurance 71.111, QAB-SH-005 Type B Shipping Quality Assurance Training Enumerates training requirements for ApprovedProgram Procedures, 71.121 participants in the Type B program10.2.5, Inspectors
FM-120 Individual Type B QA Training Certification Approved6.0, Document Control 71.113 AP-DC-100 Controlled Document Revisions Controls revisions to ensure that they are Approved
appropriately reviewed and approved priorto use.
6.0, Document Control 71.113 AP-DC-102 Document Control Establishes basic principles for document Approvedcontrol system, including provisions toensure that superseded/obsolete revisionsare not available for use.
7.0, Control of Purchased 71.115 QAB-SH-003 Type B Material Control Includes procurement document planning, ApprovedMaterial, Equipment, and selection of sources, bid evaluation,Services verification, and nonconformance handling.
Also includes measures for identification andtraceability of procured materials, controlledstorage, and removal from storage uponexpiration.
7.0, Control of Purchased 71.115 TBD Materials specification sheets for each part, Specifications for individual parts/services. In draft.Material, Equipment, and per QAB-SH-003, Type B Material Control Scheduled forServices completion by
4/15/09.
Page 1 of 5
![Page 20: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/20.jpg)
Attachment 2MURR Request for Renewal of Type B QA Program No. 0108
Program Section CFR Document Title Description StatusNumber
8.0, Identification and 71.117 QAB-SH-004 Vendor Qualification for Type B QA Program Qualification activities for suppliers of parts Approvedcontrol of materials, and services.parts and components9.0, Control of Special 71.119 N/AProcesses
FB-SH-120 Annual Inspection And Preventive Maintenance Describes routine annual inspection and ApprovedFor BMI-1 Shipping Cask preventive maintenance activities for the
BMI-1 shipping container.FB-SH-125 Biennial Inspection and Preventive Includes dye penetrant test, inspection of Approved,
Maintenance, BMI-1 Shipping Cask welds, test of pressure relief valve, and pendingcalibration of pressure gauge and committeethermocouples. review
scheduled for2/26/09
10.0, Internal Inspection 71.12 FB-SH-005 Type B Shipment of Spent Fuel Using the Contains, along with shipping information, ApprovedBMI-1 Shipping Cask procedure for receipt inspection for Type B
Packages
10.0, Internal Inspection 71.121 RP-HP-110 Survey and Decontamination of Returned Health Physics receipt inspection for Type B ApprovedShipping Containers Packages
BPB-SH-020 Receipt Inspection and Status Tagging for Type Procedure for receipt inspection of Type B Approved,B Packages Packages; also includes status log and pending
marking procedure. Includes criteria for committeeremoval from and return to service. review
scheduled for2/26/09
FM-129 Control Checksheet For Receipt Inspection Of Checksheet for BPB-SH-020 Approved,Type B Byproduct Material Shipping pendingContainers committee
reviewscheduled for2/26/09
FB-SH-120 Annual Inspection And Preventive Maintenance Describes routine annual inspection and ApprovedFor BMI-1 Shipping Cask preventive maintenance activities for the
BMI-1 Shipping Cask.
FB-SH-125 Biennial Inspection And Preventive Describes routine biennial inspection and Approved,Maintenance For BMI-1 Shipping Cask preventive maintenance activities for the pending
BMI-1 Shipping Cask. committeereviewscheduled for2/26/09
Page 2 of 5
![Page 21: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/21.jpg)
Attachment 2
MURR Request for Renewal of Type B QA Program No. 0108
Program Section CFR Document Title Description StatusN urnber
10.2.4, Maintenance 71.121 N/A N/A Includes maintenance inspections, with N/AInspection criteria for acceptability or replacement and
frequencies of inspectionFB-SH-200 O-Ring Fabrication For BMI-t Shipping Approved
ContainerBPB-SH-021 20 WC-1 All-thread Rod Replacement Rod replacement for MURR-owned 20WC-1 Approved,
packages. pendingcommittee reviewscheduled for2/26/09
FM-154 Control Checksheet for USA DOT 20 WC-1 Control Checksheet for BPB-SH-021 Approved,Overpack Rod Replacement pending
committee reviewscheduled for2/26/09
BPB-SH-022 Painting USA DOT 20WC-1 Overpack Describes the process for repainting the In draft;overpack. scheduled for
completion by4115 09.
11.4, Maintenance Tests 71.123 OP-HP-224 Spent Fuel Shipping Cask Air Sample ApprovedAnalysis
RP-HP-110 Survey and Decontamination of Returned Health Physics receipt inspection for Type B ApprovedShipping Containers Packages
12.0, Control of 71.125 FB-SH-130 Test and Calibration Procedure, BMI-1 Provides instruction for the calibration of the Approved,Measuring and Test Shipping Cask inner container, the thermometer and pendingEquipment thermocouple, meter stick, Sb-Be Source, committee
relief valve, and torque wrenches associated reviewwith the BMI-1 Shipping Cask. scheduled for
2/26/09
BPB-SH-023 Torque Wrench Calibration and Use In draft;scheduled forcompletion by
4/15/09.12.0, Control of 71.125 QA-RA-001 Effects of Out of Calibration Conditions Addresses actions to be taken when an out of CompleteMeasuring and Test calibration condition has been discovered.Equipment I
Page 3 of 5
![Page 22: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/22.jpg)
Attachment 2MURR Request for Renewal of Type B QA Program No. 0108
Program Section CFR Document Title Description StatusNumber
14.0, Inspection, test and 71.129 BPB-SH-020 Receipt Inspection and Status Tagging for Type Procedure for receipt inspection of Type B Approved,
operating status B Packages Packages; also includes status log and pendingmarking procedure. Includes criteria for committeeremoval from and return to service, review
scheduled for2/26/09
FM-129 Control Checksheet For Receipt Inspection Of Checksheet for BPB-SH-020 Approved,Type B Byproduct Material Shipping pendingContainers committee
reviewscheduled for2/26/09
15.0 Nonconforming 71.131 QAB-SH-003 Type B Material Control Identification, segregation, evaluation, and Approved
materials, Parts, or disposition of nonconforming parts andComponents materials.
BPB-SH-020 Receipt Inspection and Status Tagging for Type Identification, segregation, evaluation, and Approved,B Packages disposition of nonconforming packages. pending
committeereviewscheduled for2/26/09
FM-129 Control Checksheet For Receipt Inspection Of Checksheet for BPB-SH-020 Approved,Type B Byproduct Material Shipping pendingContainers committee
reviewscheduled for2/26/09
16.0, Corrective Action 71.133 AP-RR-001 Corrective Action Program Addresses tracking of corrective action items Approvedand identified deficiencies.
16.0, Corrective Action 71.133 AP-RR-002 Deviation From Procedure Procedure Deviations ApprovedFM-47 Deviation From Procedure Report Form for use with AP-RR-002 Approved
17.0, Quality Assurance 71.135 AP-DC-104 Records Management Also includes the Records Retention Approved
Records Authorization.18.0 Audits 71.137 GXP-ADM-048 MURR Quality Audit Program Establish comprehensive audit program Approved
Page 4 of 5
![Page 23: Research Reactor Center Columbia, MO3.1 Because MURR is not a designer of packaging or a certificate holder, there are no design activities requiring control. 4.0 PROCUREMENT DOCUMENT](https://reader034.fdocuments.in/reader034/viewer/2022042316/5f04f0c47e708231d4107787/html5/thumbnails/23.jpg)
Attachment 2MURR Request for Renewal of Type B QA Program No. 0108
Program Section CFR Document Title Description StatusNumber
ShippingGenerally covers applicable portions of 11.0, Test Control, and 13.1, Preservation
WMB-SH-005 Shipment of Type B Radioactive Waste Using Approved
Chem-Nuclear System 1-13G CaskQA-SH-002 Sodium Iodide Spectral Analysis for Approved
Excepted, Exempt, License-to-License, TypeA, or Type B Radioactive MaterialsShipments
FB-SH-005 Type B Shipment of Spent Fuel Using the ApprovedBMI-1 Shipping Cask
BPB-SH-008 Type B(U) F-327 Series Packaging of Type B Approved
Non-Waste Radioactive MaterialFM-75 Control Checksheet for Type B(U) F-327 Approved
Series Radioactive Materials ShipmentBPB-SH-005 DOT 6M Packaging of Type B Non-Waste Approved
Radioactive MaterialFM-74 Control Checksheet for Type B USA DOT 6M Approved
Radioactive Materials ShipmentBPB-SH-002 20WC-1 Packaging and Shipment of Type B Approved
Non-Waste Radioactive MaterialFM-35 Control Checksheet for Type B USA DOT Approved
20WC-1 Radioactive Materials Shipment
OP-HP-223 Spent Fuel Shipping Cask Water Sample ApprovedAnalysis
Page 5 of 5