REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V...

11
REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 11.06.22 Presentation by: Mitja Kosec Project Manager Zagreb , 9 th November 2009 CHALLENGES OF THE AGENCY OF REPUBLIC OF SLOVENIA FOR THE MANAGEMENT OF PUBLIC RAILWAY INFRASTRUCTURE INVESTMENT

Transcript of REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V...

Page 1: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

REPUBLIKA SLOVENIJA

MINISTRSTVO ZA PROMET

DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V

JAVNO ŽELEZNIŠKO INFRASTRUKTURO

118.04.23

Presentation by: Mitja Kosec – Project Manager

Zagreb , 9th November 2009

CHALLENGES OF THE

AGENCY OF REPUBLIC OF SLOVENIA FOR THE MANAGEMENT OF PUBLIC RAILWAY

INFRASTRUCTURE INVESTMENT

Page 2: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

REPUBLIKA SLOVENIJA

MINISTRSTVO ZA PROMET

DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V

JAVNO ŽELEZNIŠKO INFRASTRUKTURO

218.04.23

DEVELOPMENT OF SLOVENIAN RAILWAY INFRASTRUCTURE

CORRIDORSV.th and X.th corridor

Lenght of railway lines

total: 1228 km single track lines: 330 km duble track lines: 898 km

Page 3: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

REPUBLIKA SLOVENIJA

MINISTRSTVO ZA PROMET

DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V

JAVNO ŽELEZNIŠKO INFRASTRUKTURO

318.04.23

THE GOALS WE WANT TO ACHIEVE • Abandoning of bottle-necks, completing of the missing sections and the construction of main lines;

• Connecting of the railway transport with air and maritime transport;

• Improvement of transport safety;

• Acceleration of the national economic development;

• Reduction of the negative impact on environment;

• Assuring of the allowed axle load min. D3 (225 kN/axle and 72 kN/m);

• Increasing of the maximal allowed line speed on main lines, which coincide with corridors V and X on 160 km/h or more and

• Assuring of the renovation of safety signalling devices and the up-to date remote control of traffic on main lines of public railway infrastructure.

Page 4: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

REPUBLIKA SLOVENIJA

MINISTRSTVO ZA PROMET

DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V

JAVNO ŽELEZNIŠKO INFRASTRUKTURO

418.04.23

ESTABLISHED: 1.8.2007

No. of Employees: 30

BUDGET IN 2009: 300 mio EUR

ADDRESS:Kopitarjeva ulica 52000 MARIBORSLOVENIJA

PHONE: +386 2 234 14 21

E-MAIL: [email protected]

Page 5: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

REPUBLIKA SLOVENIJA

MINISTRSTVO ZA PROMET

DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V

JAVNO ŽELEZNIŠKO INFRASTRUKTURO

518.04.23

RUNNING PROJECTS

•International projects (co-financed from European funds)The Republic of Slovenia is entitled to co-financing of projects by means of the European Union, namely with the aid of:

• Financial TEN-T funds, within this at present nine projects are implemented;

• ISPA 2000-2004, within this at present two projects are still implemented;• Cohesion fund 2004-2006, within this two projects are still implemented;

•Cohesion fund 2007-2013, within this four projects are running in the moment.  

•Domestic projects (financed by the means of the Republic of Slovenia)

Page 6: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

REPUBLIKA SLOVENIJA

MINISTRSTVO ZA PROMET

DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V

JAVNO ŽELEZNIŠKO INFRASTRUKTURO

618.04.23

TEN-T PROJECTS• Technical studies for the construction of the second track of the railway line Divača-Koper;• Plan for obtaining the building permit for the reconstruction and electrification of the existing railway line Pragersko – Hodoš;• Preparing of legal expertise and the feasibility study for the development of the railway infrastructure on the area of the Ljubljana junction; • Main solution of the airport Ljubljana including the railway line connection with Ljubljana and Kranj (new railway line connection Ljubljana-Jesenice); • Implementation of system GSM-R on Slovenian railway network; • Cross-border railway line Trieste-Divača: Study and the plan of the cross-border railway line Trieste-Divača-Ljubljana-Budapest-border with Ukraine; • Implementation of ERTMS system on the Vth railway corridor (Valencia-Budapest);• Preparing of the preliminary study for the construction of the new high capacity line / high speed line Divača-Ljubljana;• Preparing of the preliminary study for the construction of the new high capacity line / high speed line Ljubljana - Zidni Most.

Page 7: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

REPUBLIKA SLOVENIJA

MINISTRSTVO ZA PROMET

DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V

JAVNO ŽELEZNIŠKO INFRASTRUKTURO

718.04.23

Within the period of the Cohesion fund 2004-2006 two projects are implemented, namely:

1-Modernization of the railway line Pragersko-Ormož (A);

2-Remote control of electrical traction

Within the period of the Cohesion 2007-2013 the next projects are implemented:

1-New railway line connection Divača-Koper;

2-Reconstruction, electrification and upgrading of the line Pragersko-Hodoš;

3-Modernization of the existing railway line Divača-Koper;

4-Modernization of level crossings

Within the period of ISPA 2000-2004 two projects are in implementation, namely:

1-Modernisation of SS devices on the line Divača-Koper;

2-Modernisation of SS devices in the line Pragersko – Ormož

Page 8: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

REPUBLIKA SLOVENIJA

MINISTRSTVO ZA PROMET

DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V

JAVNO ŽELEZNIŠKO INFRASTRUKTURO

818.04.23

DOMESTIC PROJECTS

1-Preparing and management of projects;

2-Modernization of the railway line Grosuplje-Kočevje;

3-Abandoning of slow drives on the section of the line Košana-Gornja Ležeče;

4-Environment protection and noise barriers;

5-Protection of railway level crossings;

6-Updating of SS protection on the railway station Kamnik;

7-Modernization of SS and TC devices on the railway line Ormož-Murska Sobota

Page 9: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

REPUBLIKA SLOVENIJA

MINISTRSTVO ZA PROMET

DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V

JAVNO ŽELEZNIŠKO INFRASTRUKTURO

918.04.23

WE ARE DELIGHTED ABOUT THE CHALLENGES

Page 10: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

10

MINISTRSTVO ZA PROMETDIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE

INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO

18.04.23

THANK YOU FOR YOUR ATTENTION!

Presentation by: Mitja Kosec – Project Manager

Zagreb , 9th November 2009

Page 11: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation.

11

MINISTRSTVO ZA PROMETDIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE

INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO

18.04.23

QUESTIONS?

Presentation by: Mitja Kosec – Project Manager

Zagreb , 9th November 2009