Republic of Tunisia
Project to Build, Finance and Operate a
Deep Water Port in the Form of a
Concession
Zeineb Babbou M’rad
Ministry of Transport
Current Port Context
Current Port Context
••7 commercial seaports
7 commercial seaports
••Managed by OMMP, under the
Managed by OMMP, under the
supervision of the Ministry of
supervision of the Ministry of
Transport
Transport
••Gone through fundamental reform
sGone through fundamental reform
s
Commercial Seaports
Commercial Seaports
••Bizerte/M
enzel Bourgouiba Port
Bizerte/M
enzel Bourgouiba Port: specialized
: specialized
in oil transport
in oil transport
••Goulet
Goulet --Rades Port
Rades Port: passenger and cruise
: passenger and cruise
transport/transport of containers and
transport/transport of containers and
vehicles
vehicles
••Sousse Port
Sousse Port: transport of various
: transport of various
merchandise
merchandise
••Sfax Port
Sfax Port: multipurpose port
: multipurpose port
••Skhira Port
Skhira Port: oil transport
: oil transport
••Gabes Port
Gabes Port: industrial and chemical port
: industrial and chemical port
••Zarzis Port
Zarzis Port: oil and various merchandise
: oil and various merchandise
Major Reform
s have been Implemented in
Major Reform
s have been Implemented in
the Port Sector:
the Port Sector:
••Abolition of the Dockers
Abolition of the Dockers’’Guild
Guild
••Reorganization of port handling
Reorganization of port handling
••Gradual introduction of concession arrangements
Gradual introduction of concession arrangements
••Set up of the transport package: integrated
Set up of the transport package: integrated
electronic inform
ation exchange system in the
electronic inform
ation exchange system in the
transport chain
transport chain
Why this Project?
Why this Project?
••Highly Timely:
Highly Timely:
--The development of world trade, containerization
The development of world trade, containerization
--The projected growth in national traffic
The projected growth in national traffic
The free trade zone with the EU
The free trade zone with the EU
--The shortage of port infrastructure in the Mediterranean, espec
The shortage of port infrastructure in the Mediterranean, especially Central Mediterranean
ially Central Mediterranean
Tunisia
Tunisia’’ s strategic position at the heart of the Mediterranean
s strategic position at the heart of the Mediterranean
--Access to the transshipment market
Access to the transshipment market
••Enhancement of port services and logistics to international sta
Enhancement of port services and logistics to international standards to better serve the
ndards to better serve the
growth of the Tunisian economy
growth of the Tunisian economy
Deep W
ater Port Project: Key Objectives
Deep W
ater Port Project: Key Objectives
••Develop the port infrastructure capacity by building a new gener
Develop the port infrastructure capacity by building a new gener ation port
ation port
––Creating logistic activity zones that provide integrated transpo
Creating logistic activity zones that provide integrated transport services
rt services
––Promoting economic development
Promoting economic development
••Promoting private sector participation in infrastructure m
anagem
Promoting private sector participation in infrastructure m
anagement and
ent and
financing
financing
--Better service effectiveness
Better service effectiveness
••Further integrate Tunisia into the world economy: a regional pla
Further integrate Tunisia into the world economy: a regional platform
for
tform
for
international trade and services
international trade and services
••Attract foreign investors
Attract foreign investors
Deep W
ater Port Project: a Promising Market
Deep W
ater Port Project: a Promising Market
••Insufficient port capacity in the Central Mediterranean for
Insufficient port capacity in the Central Mediterranean for
container transshipment (5 to 10 m
illion TEU in 2015),
container transshipment (5 to 10 m
illion TEU in 2015),
starting 2008.
starting 2008.
••Possibility of capturing traffic of nearly 3 m
illion containers
Possibility of capturing traffic of nearly 3 m
illion containers
by 2020 (average assumption of the m
arket study)
by 2020 (average assumption of the m
arket study)
••Deviation of part of the national container and bulk carrier
Deviation of part of the national container and bulk carrier
merchandise traffic to Enfidha Port
merchandise traffic to Enfidha Port
The Entire Mediterranean: Needs from
The Entire Mediterranean: Needs from
2012
2012
Excédent
-Déficit
Demande
Offre
-10,0000
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
Central Mediterranean: Needs from
Central Mediterranean: Needs from
2008
2008
Excédent
-Déficit
Demande
Offre
-10,000
-5,0000
5,000
10,000
15,000
20,000
25,000
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
Container Traffic Estimate (Transshipment)
Container Traffic Estimate (Transshipment)
Estimate of the national container traffic deviated to Enfidha
Estimate of the national container traffic deviated to Enfidha
Port
Port
Estimate of the bulk carrier merchandise traffic deviated to
Estimate of the bulk carrier merchandise traffic deviated to
Enfidha Port
Enfidha Port
Deep W
ater Port Project: Why Enfidha?
Deep W
ater Port Project: Why Enfidha?
A deep water port location study conducted by Royal
A deep water port location study conducted by Royal
Haskoning
Haskoning ––
IDC on the economic, technical and
IDC on the economic, technical and
environmental aspects led to the selection of Enfidha out of
environmental aspects led to the selection of Enfidha out of
the 8 sites listed
the 8 sites listed
The Enfidha Site
The Enfidha Site
••Proximity of major sea routes
Proximity of major sea routes
••Good road, highway and rail service
Good road, highway and rail service
••Proximity of the future Enfidha
Proximity of the future Enfidha
international airport (under construction)
international airport (under construction)
••Close to Tunisia
Close to Tunisia’’ s m
ajor economic poles
s major economic poles
(Tunis, Sousse, Sfax)
(Tunis, Sousse, Sfax)
••Availability of major land reserves,
Availability of major land reserves,
especially allowing for the creation of a
especially allowing for the creation of a
vast logistic and economic activity zone
vast logistic and economic activity zone
••Proximity to Enfidha industrial zones
Proximity to Enfidha industrial zones
••Favorable natural conditions: for
Favorable natural conditions: for
construction and operation
construction and operation
Location of E
nfidha Port
Location of E
nfidha Port
Enfidha
Malta
Tunis
--Central
CentralMediterranean
Mediterranean
--Gulf
Gulfof
ofHammamet
Hammamet
--36
36ºº 10
10’’ N / 10
N / 10ºº 28
28’’ EE
--190
190 M
iles
Milesfrom M
alta
from M
alta
MajorShippingRoutes
1616
International Transshipment in the Mediterranean:
International Transshipment in the Mediterranean:
Current Traffic
Current Traffic
10,3
M EVP
7,8
M EVP
6,6
M EVP
Potential of the Enfidha Port
Potential of the Enfidha Port
Regional Site Plan
Regional Site Plan
Project Components:
Project Components:
••An 800
An 800-- m
eter long Northern pier
meter long Northern pier
••A 1 500
A 1 500-- m
eter long Southern pier
meter long Southern pier
••A 350
A 350-- m
eter wide and 2 300 m
eter
meter wide and 2 300 m
eter --long access channel,
long access channel,
-- 18 m
eters to the shore
18 m
eters to the shore
••A 900 m
eter principal turning circle, to the shore (
A 900 m
eter principal turning circle, to the shore (-- 18 m
)18 m
)
••A 500
A 500-- m
eter harbor basin, to the shore
meter harbor basin, to the shore --17 m
17 m
••About 200 hectare space for container term
inals, with a
About 200 hectare space for container term
inals, with a
total quay length of 3 600 m
eters, to the shore
total quay length of 3 600 m
eters, to the shore --17 m
17 m
••A 35 hectare m
ultipurpose term
inal with a total quay
A 35 hectare m
ultipurpose term
inal with a total quay
length of 14 00 m
eters, to the shore
length of 14 00 m
eters, to the shore --15 m
15 m
••A 200 m
eter long service quay, to the shore
A 200 m
eter long service quay, to the shore --6 m
.6 m
.
Modular Project to be Implemented in 3 Phases
PHASES OF IMPLEMENTATION OF THE
PHASES OF IMPLEMENTATION OF THE
PHASES OF IMPLEMENTATION OF THE
PHASES OF IMPLEMENTATION OF THE
PHASES OF IMPLEMENTATION OF THE
PHASES OF IMPLEMENTATION OF THE
PHASES OF IMPLEMENTATION OF THE
PHASES OF IMPLEMENTATION OF THE
CONTAINER TERMINAL
CONTAINER TERMINAL
CONTAINER TERMINAL
CONTAINER TERMINAL
CONTAINER TERMINAL
CONTAINER TERMINAL
CONTAINER TERMINAL
CONTAINER TERMINAL
FIRST
FIRST
FIRST
FIRST
FIRST
FIRST
FIRST
FIRST
SECOND
SECOND
SECOND
SECOND
SECOND
SECOND
SECOND
SECOND
THIRD
THIRD
THIRD
THIRD
THIRD
THIRD
THIRD
THIRD
2010
2010-- 2011
2011
2012
2012-- 2015
2015
2016
2016-- 2021
2021
2022
2022-- 2030
2030
Container
Container
Container
Container
Container
Container
Container
Container
traffic in
traffic in
traffic in
traffic in
traffic in
traffic in
traffic in
traffic in
TEU
TEU
TEU
TEU
TEU
TEU
TEU
TEU
0.8
0.8
2.5
2.5
3.6
3.6
5.6
5.6
Quay length
Quay length
800
800
1500
1500
2200
2200
3600
3600
Total area in
Total area in
Ha
Ha
44
44
82
82
121
121
198
198
Number of
Number of
hoists
hoists
7714
14
20
20
30
30
PHASES OF IMPLEMENTATION OF THE
PHASES OF IMPLEMENTATION OF THE
MULTIPURPOSE TERMINAL
MULTIPURPOSE TERMINAL
FIRST
FIRST
SECOND
SECOND
THIRD
THIRD
2010
2010-- 2011
2011
2012
2012-- 2015
2015
2016
2016-- 2021
2021
2022
2022-- 2030
2030
Merchandise
Merchandise
traffic (in
traffic (in
million tons)
million tons)
2.5
2.5
2.5
2.5
3.2
3.2
44
Quay length (in
Quay length (in
meters)
meters)
560
560
1120
1120
1120
1120
1400
1400
Total area (in
Total area (in
Ha)
Ha)
14
14
28
28
35
35
35
35
Investment Cost Estimate
Investment Cost Estimate
1400
1400
Total
Total
515
515
250
250
625
625
Cost (in EUR
Cost (in EUR
million)
million)
Phase 3
Phase 3
Phase 2
Phase 2
Phase 1
Phase 1
Concession: Im
plementation of the Project
Concession: Im
plementation of the Project
as a FULL BOT
as a FULL BOT
The Concessionaire:
The Concessionaire:
••Field surveys, detailed project engineering studies and environm
Field surveys, detailed project engineering studies and environmental impact
ental impact
assessment
assessment
••Construction of port protection works
Construction of port protection works
••Dredging of the access channel and the port basins to the requir
Dredging of the access channel and the port basins to the required depth (
ed depth (--
18 m
); the dredging volume for the project phases is estimated a
18 m
); the dredging volume for the project phases is estimated at 60
t 60
millions m3
millions m3
••Full construction of quay walls
Full construction of quay walls
••Construction of container term
inal and bulk carrier term
inal pla
Construction of container term
inal and bulk carrier term
inal platform
stform
s
••Supply and installation of handling and sundry equipment for the
Supply and installation of handling and sundry equipment for thecontainer
container
term
inal and the bulk carrier term
inal
term
inal and the bulk carrier term
inal
••Construction of a service quay and supply of equipment and m
arit
Construction of a service quay and supply of equipment and m
arit ime
ime
resources.
resources.
The Licensor:
The Licensor:
Extramural work necessary for the project to run smoothly:
Extramural work necessary for the project to run smoothly:
linking of the Port to Highway AR1,
linking of the Port to Highway AR1,
linkage to the railw
ay,
linkage to the railw
ay,
supply of the project with electricity, potable water, communica
supply of the project with electricity, potable water, communication systems,
tion systems,
etc.
etc.
Call for Competition to Select a
Call for Competition to Select a
Concessionaire
Concessionaire ––
the Process
the Process
Manifestation of interest
Manifestation of interest: December 2007
: December 2007 ––
January 2008
January 2008
Profile
Profile: companies or consortium with experience in the following
: companies or consortium with experience in the following
fields:
fields:
––Development and financing of container term
inal projects above E
Development and financing of container term
inal projects above EUR
UR
500 m
illion
500 m
illion
––Commissioning and operation of container term
inals with annual
Commissioning and operation of container term
inals with annual
individual capacity above 500 000 TEU
individual capacity above 500 000 TEU
––Operation of container term
inals portfolio with annual total cap
Operation of container term
inals portfolio with annual total capacity
acity
above 1 m
illion TEU.
above 1 m
illion TEU.
Land area reserved:
Land area reserved:
Port
Port
1200 Ha
1200 Ha
Logistics zone
Logistics zone
2800 Ha
2800 Ha