FOUNDATION
COMPANY INCEPTION
Founded STRUCTWEL on 18th April 1967. A Highly Celebrated& an accomplished Engineer with fellowship of most of themajor institutions across the globe and Honors such as the‘Honorary Membership of ACI’.
He is the author of four books and has been bestowed with many awards and honors
Special Recognition Award for Leadership Role in the Concrete Industry in India by CANMET / ACI, 1994.
ACI, USA awarded ACI Honorary Membership, 2004. First Asian to receive this award.
RAMESH N. RAIKAR
1939 - 2008
Founder & Inspiration
Behind this ever growing company was a complete technocrat who believed in the philosophy of
Progress Through Knowledge.
STRUCTWEL GROUP OF COMPANIESORGANISATION PROFILE
04
STRUCTWEL Designers & Consultants Pvt. Ltd.
TASS (Technical & Scientific Sales)
STRUCTWEL Constructions Pvt. Ltd.
CSRL-STRUCTWEL Pvt. Ltd.
STRUCTWEL FZE
Pune
Dubai
Mumbai
Mumbai
Dubai INDIA
Mumbai
Nagpur
Bangalore
ORGANISATION PROFILE
STRUCTWEL HISTORY
05
Started its own In-house material Testing Laboratory
Achieved its R&Dstatus. This recognition has been renewed, till date uninterruptedly
1988
STRUCTWELbecame a private limited company
1978
Established an in-house mechanical and electrical division
Laboratories got NABL accreditation
2000
Got certified with ISO 9001
2004
2005
Shifted to its Corporate Officebuilding inNavi Mumbai
Ventured into the international markets and established STRUCTWEL FZE, Dubai
2007
Acquired TASS a laboratory equipment manufacturing & trading company
Acquired 50% shares of CSRL laboratories (now known as CSRL- STRUCTWEL Pvt. Ltd.) Pune
2007
Established EPC division under the flagship of STRUCTWEL Constructions Pvt. Ltd.
2011
Started Bangalore Office
Started Nagpur Lab
2016
2018
Affiliation with Construction Industry Development Council, New Delhi
Office Locations
ORGANISATION PROFILE
LOCATIONAL PRESENCE & TEAM STRENGTH
14
8
10
10
40
18Projects
Dubai
252 Total Staff
Lab
MEP
Structural Engineers
Architects
Support Staff
Mumbai Pune
Bangalore
Nagpur
Andhra Pradesh
BiharAssam
Goa
Gujarat
Himachal Pradesh
Karnataka
Kerala
Madhya Pradesh
Maharashtra
Punjab
Rajasthan
Tamil Nadu
Telangana
Tripura
Uttarakhand
Uttar Pradesh
West Bengal
Bangladesh
Sri Lanka
Sikkim
Maldives
Haryana
Project Locations
Master Planning
Architectural
Structural
Mechanical
Electrical & Instrumentation
Fire Detection & Protection
Heat, Ventilation & Air Conditioning
Public Health Engineering
SERVICES
Project Management Consultancy
Repairs & Restoration
Heritage Conservation
Research & Development
Quantity Surveying
Structural Health Assessment
Construction Material Testing
Geotechnical Testing
RECOGNITIONS
ACHIEVEMENTS & AWARDSAchievements & Awards - For “Wagh Mandir, at Morvi, Gujarat”
Design Awards 2015 – 1st Prize in the category
of “Conservation of Heritage”
IBC TrophyFirst Prize
Rehabilitation / Retrofitting of
Buildings
Best Consultant for Heritage Construction
from CIA World Construction Awards
2016
The Chief Minister of Maharashtra Shri Prithvi Raj Chouhan felicitating Chetan Raikar for the work on Replication of Ajanta Caves
Chetan R. Raikar greets the then Hon. President, Late Dr. APJ Abdul Kalam at New Delhi and proudly presents our R & D achievements
Chetan Raikar receiving IBC Award for ‘Excellence in Built Environment, 2015-2016’ by the Minister of Housing and Urban Affairs Shri Hardeep Singh Puri
S T R U C T W E L
Industrial
INDUSTRIAL• RIL refinery at Jamnagar, Gujarat is
one of the largest refineries in the world.
• Structwel was involved in conducting a structural audit for various plants of the refinery which include plants like R.T.F, CPP, OSBL, Hydrogen Plant,Polypropylene, Hydrotrester, Coker plant, Aromatics, Sulphur Plant, PP plant, Crude I & II and FCCU including PRU.
• Project Cost – NA
• Status – Completed in various phases starting from 2004
RELIANCE INDUSTRIES LTD.
ProjectStructural Audits
EstimateTendering
PMC during Execution
ClientReliance Industries Ltd..
LocationJamnagar, Gujarat
INDUSTRIAL• BPCL has a huge petrochemical plant
in Mumbai with numerous allied structures in the compound.
• Structwel was involved in conducting structural audits of 3 pump houses, 1 FCCU stack, Pipe racks,55 residential structures and 39 allied structures. Structwel also conducted Non-destructive testing of FCCU Control Room etc.
• Project Cost – NA
• Status – Completed in various phases from 2009-16
BHARAT PETROLEUM CORPORATION LTD.
ProjectStructural Audits
EstimateTendering
PMC during Execution
ClientBharat Petroleum corporation Ltd.
LocationMahul, Mumbai
INDUSTRIAL• Coromandel International Ltd. is a
Compound Fertiliser Factory in Chennai.
• The Fertiliser Plant is a G+6 storey RCC structure and the approximate total area of the structure is 42,000 sq. ft.
• Structwel was appointed to conduct Condition Health Assessment and structural design review of the Fertiilser Plant Complex at Ennore Plant site in Chennai.
• The scope also included carrying out certain Non-destructive Testing & Tendering.
• Project Cost – INR 4.5 Crores
• Status – Completed in 2015
COROMANDEL INTERNATIONAL
LIMITED
ProjectCondition Health Assessment
Structural Design Review Non-destructive Testing
Tendering
ClientCoromandel International Limited
LocationEnnore, Chennai
INDUSTRIAL• ACC is a cement plant with total of 40
allied structures.
• Structwel was engaged in conducting the structural audit of the entire plant which includes taller structures like pre-heater buildings, Silos & underground tunnels.
• The assignment also included the audit of housing colony which accommodates total of 238 structures.
• Project Cost – NA
• Status – Completed in 2007
ACC LIMITED
ProjectStructural Audits
EstimateTendering
PMC during Execution
ClientACC Limited
LocationLakheri, Rajasthan
INDUSTRIAL• This fertilizers plant has RCC & Steel
structures and is situated in Paradeep in Odisha.
• The plant houses total of 331 structures which include warehouses, plant building, storage tanks, chimneys & conveyors.
• Structwel was involved in conducting a structural audit; thereby, identifying distresses, proposing the required repairs, estimating the repairs cost and tendering.
• Project Cost – NA
• Status – 2012
INDIAN FARMERS FERTILISER COOPERATIVE
LIMITED
ProjectStructural Audits
EstimateTendering
PMC during Execution
ClientIndian Farmers Fertiliser
Cooperative Limited
LocationParadeep, Odisha
INDUSTRIAL• Bayer CropSceience India Ltd. includes
Crop science, Pharmaceuticals and Animal Health Business Unit.
• Structwel carried out Structural Audits of MPBD-I & II, DICO, ALCO, MICO & LICO-I, II & III, DIBO, ECO, ARCO, Rotary Kiln Foundation & Fire Water Tanks.
• Structwel also rendered its services for retrofitting of structures for capacity enhancement of Utility plant and ETP plant.
• Project Cost – NA
• Status – Completed in 2017
BAYER CROPSCIENCE LTD.
ProjectStructural Audits
EstimateTendering
PMC during Execution
ClientBayer CropScience Ltd
LocationVapi, Gujarat
INDUSTRIAL• Tata Power is a Thermal Power plant
having units from 1 to 8 situated at Trombay, Mumbai.
• Structwel’s services were engaged for carrying out Condition Assessment of RCC & Steel structures including Chimneys, Turbo Generator, Foundations, Plant Buildings, Steel structures hoisting conveyors with total length of around 4 km.
• The assignment was carried out on recurring basis for the time span from 1995 to 2014.
• Project Cost – NA
• Status – Completed in 2014
TATA POWER
ProjectCondition Assessment
EstimateTendering
PMC during Execution
ClientTata Power Ltd.
LocationTrombay, Mumbai
INDUSTRIAL• The Koyna Hydroelectric Project is the
largest completed hydroelectric power plant in India. It is a complex project with four dams including the largest dam on the Koyna River, Maharashtra.
• Structwel was hired to carry out Condition Assessment of Dam Foot Power House, Turbo Generator Foundation, Draft Tube Gate Structure, Intake Gate Structure near Penstock & Tail Race Tunnel.
• The assignment also included Non-destructive Testing & Proposal of Remedial Measures with block budgetary cost.
• Project Cost – NA
• Status –Completed in 2003
KOYNA NAGAR HYDRO ELECTRIC POWER
STATION
ProjectCondition Assessment
Non-destructive TestingRemedial Measures
ClientMaharashtra State Electricity
Transmission Company
LocationHumbarli, Maharashtra
S T R U C T W E L
Infrastructure
INFRASTRUCTURE• The domestic airport of Mumbai has
two terminals namely terminal 1A & 1B.
• Terminal 1A is a multi-storey structure housing the Basement, Departure, Arrival & Terrace at different levels. It also accommodates a canteen and Kingfisher office. It was constructed in late 90’s.
• Terminal 1B is a G+2 storeys structure with part of it as G+3. It was constructed in two phases. The RCC structure was built in the period of 1964-67. The pre-engineering building (PEB) structure was built in the period of 2004-06.
• Project Cost – INR 8 Crores
• Status – In progress
MUMBAI INTERNATIONAL
AIRPORT LTD.
ProjectStructural Audits
EstimateTendering
PMC during Execution
ClientMumbai International Airport Ltd.
LocationSantacruze, Mumbai
INFRASTRUCTURE• Reliance has set up these “Lolo” or
“Roro” jetties in Jamnagar India; which are used for loading & unloading of Sulphur, movement of ships and day to day handling of materials.
• It is one of the biggest set ups for petrochemical business in India.
• Structwel was appointed to conduct inspection of marine civil and steel structures.
• Project Cost – Not Available
• Status – Completed in 2014
RELIANCE JETTY
ProjectStructural Audits
EstimateTendering
PMC during Execution
ClientReliance Ports and Terminal Limited.
LocationJamnagar, Gujarat
INFRASTRUCTURE• This is a Thermal Power Plant of
Government of Karnataka situated at Raichur.
• Structwel was appointed to carry out Structural audit including Non-destructive testing of the Natural Draft Cooling Towers & Chimneys.
• The Cooling Tower is 130 m tall with diameter of 118 m at plinth level, 90 m at top level and 70 m at neck level.
• The chimney is 130 m tall with diameter of 9 m at bottom level and 4.5m at top level.
• Project Cost – INR 30 Crores
• Status – Structural Audit is completed
KARNATAKA POWER CORPORATION LTD.
ProjectStructural Audit
Non-Destructive Testing
ClientKarnataka Power Corporation Ltd.
LocationRaichur, Karnataka
INFRASTRUCTURE• Vashi & Belapur stations are Railway
stations cum commercial complexes situated on harbor railway line.
• The total built up area of Vashi Complex is 83,237 sq. m accommodating 6 towers of G+7 storeys.
• The total built up area of Belapur complex is 1,37,650 sq. m accommodating 10 towers of G+7 storeys.
• Structwel’s services were hired for conducting Structural Audits of building structures and Condition Assessment of Electrical and Fire Fighting network along with 37 lifts.
• Project Cost – INR 90 Crores
• Status – Structural Audits & BOQs are completed. Repairs are in progress.
VASHI & BELAPUR RAILWAY STATION
COMPLEXES
ProjectStructural Audit
Estimate Tendering
PMC during Execution
ClientCity and Industrial Development
Corporation of Maharashtra
LocationNavi Mumbai
INFRASTRUCTURE• The project covered around 17 km
concrete roads falling in the blocks E, G, GN, G text of Banda Kurla Complex.
• It also includes 5 bridges of the complex; which form important links to the city.
• The roads were constructed in 2010.
• Project Cost – INR 30 Crores
• Status – Structural Audits are completed. Repairs are in progress
MMRDA ROADS & BRIDGES
ProjectStructural Audit
Non-destructive TestingEstimate & Tender
ClientMumbai Metropolitan Region
Development Authority
LocationBKC, Mumbai
INFRASTRUCTURE• Bhandup Complex is one of the
largest water reservoirs in India and is MCGM’s important water treatment plant having allied structures in the compound including water storage and reservoirs.
• It has two compartments of 62,000 sq. m each.
• The assignment involved Structural Audits including Non-destructive testing and BOQ estimates of MBR (Middle Balancing Reservoir) having storage capacity of 286 MLD.
• Project Cost – INR 71 Crores
• Status – Repairs are in progress
WATER RESERVOIR OF BHANDUP COMPLEX
ProjectStructural Audit
Non-destructive TestingEstimate & Tender
PMC during execution
ClientMunicipal Corporation of Greater
Mumbai (WSP dept.)
LocationBhandpup, Mumbai
INFRASTRUCTURE• CIDCO ESR water tanks have a capacity
of ESR 0.8 MLD.
• The structures are 30.00 m tall. The shaft diameter of the tanks is 5.50 m and the thickness is 0.20m.
• CIDCO engaged Structwel for carrying out Structural Audits including Non-destructive testing of 26 ESRs, 15 GSRs, 2 MBRs & 10 Pump Houses at Panvel & Kalamboli nodes at various locations.
• Project Cost –INR 20 Crores
• Status – Completed in 2010
CIDCO ESR
ProjectStructural Audit
Estimate PMC during Execution
ClientCity and Industrial Development
Corporation of Maharashtra
LocationNavi Mumbai
INFRASTRUCTURE• Kolkata Metro, the first underground
Mass Rapid transit rail network of India, was commissioned partly in October, 1984 and finally in February, 1995.
• Construction of tunnels was done with ‘Cut and Cover’ method.
• The rail network from Dum Dum to Tollygunge is around 17 km with 17 stops.
• Structwel was hired to conduct Condition Assessment along with Non-destructive Testing.
• Project Cost – INR 250 Crores
• Status – Completed in 2012
KOLKATA METRO
ProjectVisual Inspection
Non-destructive TestingRepairs Methodology
ClientKolkata Metro Rail Corporation
LocationKolkata
S T R U C T W E L
Bridges
BRIDGES• Surat Municipal Corporation
appointed Structwel to conduct Structural Audit of 8 major bridges including fly overs and 27 minor bridges.
• It also included 4 major bridges on Tapi River.
• The assignment was first completed in 2007 and was again carried out in 2016.
• Project Cost – INR 58 Crores
• Status – Completed in 2017. Repairs are in progress.
SURAT BRIDGES
ProjectStructural Audits
EstimateTendering
PMC during Execution
ClientSurat Municipal Corporation
LocationSurat, Gujarat
BRIDGES• MCGM appointed Structwel to
conduct Structural Audit of bridges in Eastern Suburbs of MCGM.
• The project included total 66 bridges; out of which 18 bridges were of major category.
• The assignment included Non-destructive testing and preparation of cost estimates as well.
• Project Cost – INR 11.50 Crores
• Status – Audit and Estimated were completed in 2018. Repairs are in progress.
MCGM BRIDGES
ProjectStructural Audits
EstimateTendering
ClientMunicipal Corporation of Greater
Mumbai
LocationMumbai
BRIDGES• NHAI appointed Structwel to conduct
Structural Audit along with Non-destructive testing and preparation of estimates for bridges failing on National Highway 8A (new MH 27) connecting Gandhidham to Ahmedabad.
• The project included total of 47 bridges – 2 major, 9 minor, 31 culverts, 3 VUPs & 2 ROBs.
• Project Cost – INR 28 Lakhs
• Status – Completed in 2017
NHAI BRIDGES
ProjectStructural Audits
Estimate
ClientNational Highway Authority of India
LocationSamakhyali, Gujarat
BRIDGES• Structwel carried out Structural Audits
for 14 bridges in Sangli & Miraj region for Public Works Department.
• Out of these 14 bridges, 11 were major and 3 were minor bridges including culverts.
• Project Cost – INR 3.60 Crores
• Status – Completed in 2017
PWD BRIDGES
ProjectStructural Audits
Estimate
ClientPublic Works department,
Government of Maharashtra
LocationSangli & Miraj, Maharashtra
BRIDGES• Turbhe Flyover is an important link on
Mumbai-Pune Highway.
• It was partially commissioned in 1994 and was fully commissioned in 1994.
• The flyover consists of 59 spans; out of which 4 obligatory spans over the railway line are PSC girders and the rest of the 55 spans are RCC box girders.
• Structwel carried out the Structural Audit including Non-destructive Testing of all the components of the super structure including the girders, deck slab with bituminous wearing coat, crash guard, expansion joints and bearings.
• Project Cost – Phase 1 – INR 4.5 Crores
• Status –Completed in 2005
TURBHE BRIDGE
ProjectCondition survey
Non-destructive TestingAssessment of load bearing capacity
Repair Recommendation
ClientPublic Works department,
Government of Maharashtra
LocationTurbhe, Navi Mumbai
S T R U C T W E L
Hospitality
HOSPITALITY• Taj Coral Resort in Maldives has 18
twin villas at the water resort each villa is connected with a small jetty.
• These structures were hit by a great Tsunami in 2004 shattering them massively.
• Structwel was appointed to carry out structural audit of all the villas and allied structures to restore them to their original state.
• Project Cost – NA
• Status – Completed in 2008
TAJ COREL REEF RESORT
Project Visual Inspection
Condition AssessmentRepair Methodology
Structural Audit Report
ClientTaj Coral Reef Resort
LocationMaldives
COMMERCIAL• Structural Design of 10 L sq.ft. Five
Star Hotel at Delhi for Taj Group.
• The building is a 3 B + G + 10 storied RCC structure built with extremely challenging elevation.
• Part of this structure was designed in top-down concept, one of the very few structures executed with this concept in India
• Project Cost – INR 110 Crores
• Status – Completed in 2012
TAJ VIVANTA
Project
Structural designing
ClientIndian Hotels Company Ltd.
LocationDwarka, Delhi
HOSPITALITY• It is one of the best luxurious hotels in
Aurangabad. The structure of the hotel was facing problems of vibration and cracking.
• Hence, Structwel was appointed to conduct Structural Audit along with Non-destructive testing of the main lobby and the large cantilever canopy.
• Project Cost – NA
• Status – Completed in 2005
ITC RAMA INTERNATIONAL
ProjectStructural Audit
Non-destructive testing
ClientITC Group of Hotels
LocationAurangabad
HOSPITALITY• Taj Connemara is a 5 start luxury hotel
in Chennai, India.
• The entire property is built on a 4.2 acre land with total of 5 structures and 147 rooms which include 143 double rooms and 4 suits.
• Out of the 5 structures, 1 is a heritage structure.
• Structwel’s services were engaged for Structural Audit, preparation of estimates and tendering.
• Project Cost – INR 12 Crores
• Status – Completed in 2015
TAJ CONNEMARA
ProjectStructural Audi
Estimate & Tendering
ClientIndian Hotels Company Ltd.
LocationChennai, India
S T R U C T W E L
Fire Damage
FIRE DAMAGE• Sun Vaccum Formers Ltd., a
manufacturer of plastic components for Automotive sector, has one of its manufacturing units at Gurgaon in an area occupying around 43530.20 sq. ft.
• A major fire broke out in the unit in June 2015 charring the entire ground floor and the first floor of the factory; which were being used as raw material storage and godown.
• The fire also gutted the main production hall having a total height of around 20 m.
• Project Cost –INR 3 Crores
• Status – Completed in 2012
SUN VACUUM FORMERS LTD.
ProjectStructural Audit
Non-destructive TestingPMC during Repairs & Restoration
ClientSun Vacuum Formers Ltd.
LocationGurgaon, Delhi
FIRE DAMAGE• Beaumonde tower is an iconic
residential skyscraper comprising of 3 wings of 33 stories each.
• A massive fire broke out in the tower on the 33rd floor of B wing in June 2018.
• Structwel was appointed to conduct a Structural Audit to assess the damage, conduct the required Non-destructive tests and suggest repair methodology.
• Project Cost – Not Available
• Status – Completed in 2018
BEAUMONDE
ProjectStructural Audit
Non-destructive TestingPropose Repairs Methodology
ClientThe Building Committee of Beaumonde Tower B Wing
LocationWorli, Mumbai
FIRE DAMAGE• The Taj Mahal Palace is one of the
landmark heritage structures of Mumbai, with a rich history.
• The iconic hotel was subjected to the brutal terrorist attack on the 26/11/2008.
• Structwel did entire heritage conservation and structural retrofitting of the structure damaged due to fire and bomb blast.
• Project Cost – INR 600 Crores
• Status – Completed in 2010
TAJ PALACE HOTEL
ProjectRestoration of Taj Mahal Palace
Hotel after terrorist attack of 26/11
ClientThe Indian Hotels Co. Ltd.
LocationMumbai
FIRE DAMAGE• This international Conference Center
was constructed in 1956-58 with large entrance foyer, Auditorium in the middle and conference rooms of varying capacities at the back on a total area of around 20,000 sq. m.
• This famous structure accidently caught fire in February 1990 consuming the first few clusters of seating and the asbestos roofing.
• Structwel assumed the responsibility of the structural retrofitting of the auditorium to resurrect it back glory.
• Project Cost – INR 12 Crores
• Status – Completed in 1998
SHANMUKHANANDA AUDITORIUM
ProjectStructural Retrofitting of the fire
damaged auditorium
ClientShree Shanmukhananda Fine Arts
and Sangeetha Sabha
LocationMumbai
S T R U C T W E L
Earthquake
EARTHQUAKE• On 26th January 2001, a major
earthquake hit Gujarat having epicenter in Bhuj. The earthquake devastated mini structures all over Gujarat.
• Structwel was appointed by Health Department and Roads and Bridges Department of Government of Gujarat for carrying out Condition Assessment of the structures including Non-destructive testing and preparation of Cost estimate and tenders.
• Structwel audited around 2500 structures spanning in 9 districts of Gujarat. These structures included important structures like Circuit houses, Hospitals, Community Health Centers & Primary Health Center at Taluka & Village Levels.
• Project Cost – INR 75 Crores
• Status – Completed in 2009
BHUJ
ProjectStructural Audit
Non-destructive Testing Cost Estimates
Tendering
ClientHealth department and Roads and Bridges
department of Government of Gujarat
LocationBhuj, Gujarat
EARTHQUAKE• On 30th September 1993, Latur district
was hit by a massive earthquake leaving many load bearing structures constructed with stone masonry walls with Mangalore tile roofing & some of the RCC structures severely damaged.
• Structwel was appointed to carry out the Condition Assessment of the structures that were still standing; but were affected with major cracking and partial collapse etc.
• The project also included preparation of BOQs, Estimates and Tenders.
• Project Cost – NA
• Status – Completed in 1994
KILLARI LATUR
ProjectStructural Audit
Non-destructive Testing Cost Estimates
Tendering
ClientGovernment of Maharashtra
LocationLatur, Maharashtra
EARTHQUAKE• This 100 year old historic stone
masonry palace was under use by the state government until it was destroyed beyond repairs in the Gujarat Earthquake of 2001.
• The Palace occupies an area of approximately 2 Lakh Sq. ft. with a massive temple in its front courtyard. It has a height of up to 40’ and the temple Shikar top reaches beyond 150’.
• Structwel was appointed as an Architectural and Engineering Consultants for the Project with the mandate to restore and retrofit the entire structure.
• Project Cost – INR 24.61 Crores
• Status – Completed in 2014
WAGH MANDIR
ProjectArchitectural Conservation
Structural Restoration
ClientH. H. Maharani Saheb of Morvi
LocationMorvi, Gujarat
S T R U C T W E L
Buildings
BUILDING• This unique structure is a regional
head office of ICICI Bank in BKC, Mumbai. It is a G+11 storey RCC structure constructed around 15 years ago.
• The structure is divided in two blocks i.e. North Block and South Block.
• Structwel was appointed to carry out Condition Assessment of Terrace areas to make them leak-proof above CMD’s office including lawns.
• Project Cost – INR 3.5 Crores
• Status – Completed in 2013
ICICI BANK
ProjectCondition Assessment for Terrace
Waterproofing
ClientICICI Bank
LocationBKC, Mumbai
BUILDING• Hill Park Properties situated at
Malabar Hill, Mumbai, comprises of 5 RCC buildings of G+5 storeys. All these buildings were constructed in around 1948.
• The compound has Garages placed along the compound wall on front and right side of the plot. It also has a gymnasium room in one corner of the plot.
• Structwel carried out the Structural Audit of the buildings along with the Gymnasium, Badminton Court and the Garage Area.
• Project Cost – INR 4.5 Crores
• Status – Completed in 2002
HILL PARK CHS
ProjectStructural Audit
Proposal of repairs methodologyEstimate
PMC during Execution
ClientHill park CHS
LocationMalabar Hill, Mumbai
BUILDING• This iconic building is a corporate
office of HDFC, one of the leading private banks of India.
• Structwel was appointed to carry out Condition Assessment of Terrace areas to make them leak-proof above MD’s office including lawns.
• Project Cost – NA
• Status – Completed in 2017
HDFC BANK HOUSE
ProjectConsultancy for Waterproofing
PMC during executionCertifying the work on completion
ClientHDFC Bank Ltd.
LocationLower Parel, Mumbai
BUILDING• Raheja center is a multi-storied
commercial office complex at Nariman Point.
• Repairs majorly comprised of Corrosion, Poor upkeep, Leakages & up-gradation of service ducts and service passages.
• Project Cost – INR 7.5 Crores
• Status – Completed in 2006
RAHEJA CENTER
ProjectStructural Audit
Non-destructive testingCost Estimate
Tendering
ClientRaheja Center
LocationNariman Point, Mumbai
BUILDING• Bombay Scottish School (BSS),
popularly known as Scottish, is a private, co-educational day school located at Mahim West in Mumbai, India.
• Structwel was hired to prepare BOQ & Tender, finalization of the contractor and PMC during execution.
• Project Cost – INR 1.29 Crores
• Status – Completed in 2016
BOMBAY SCOTTISH SCHOOL
ProjectEstimateTender
PMC during Execution
ClientBombay Scottish
School
LocationMahim, Mumbai
BUILDING
• This renowned international school building is a RCC framed structure with G+7 storeys. It was constructed in 2013.
• The total area occupied by the structure is 1.30 L sq. ft.
• The structure is “S” in shape having classrooms and other utilities required.
• Gardens / lawns have been maintained over terraces above classrooms on west side of the structure on each floor starting from second floor.
• Project Cost – NA
• Status – Completed in 2015
DHIRUBHAI AMBANI INTERNATIONAL SCHOOL
ProjectStructural Audit
Non-destructive Testing
ClientDhirubhai Ambani International
School
LocationBKC, Mumbai
BUILDING• Total 26 Buildings with 52 wings and
1388 tenements were built under the Mass Housing Scheme at Sangli & Miraj as a part of Pradhan Mantri Awas Yojana.
• The buildings were constructed in the time span of 6 years starting from 2012 till 2018.
• SMKC appointed Structwel to conduct Structural Audit at pre-occupancy stage to confirm as built structures as specified.
• The assignment was carried out along with various Non-destructive testing and design review on sample basis.
• Project Cost – INR 24 Crores
• Status – Completed in 2018
MASS HOUSING SANGLI
ProjectStructural Audit
EstimationNon-Destructive Testing
ClientSangli Miraj Kupwad Municipal
Corporation (SMKC)
LocationSangli, Maharashtra
BUILDING• Indian Institute of Technology is a
prestigious institute for technical education in India.
• It also accommodated a convocation hall which is old auditorium building having RCC framed structure with RCC folded plate roof.
• Structwel was appointed to conduct certain N.D. Tests and Structural analysis of the roof.
• Project Cost – NA
• Status – Completed in 2008
CONVOCATION HALL, IIT
ProjectStructural Audit
Non-destructive Testing
ClientIndian Institute of Technology
Bombay
LocationPowai, Mumbai
BUILDING• CIDCO Bhavan is a G+7 storey
structure which serves as a Headquarters to City and Industrial Development Corporation of Maharashtra and is located in Belapur, Navi Mumbai.
• It is a RCC structure and was constructed in around 1982-83. It occupies total of 2,25,000 sq. ft. area.
• Structwel was appointed to conduct Structural Audit of the entire building with special emphasis on the externals of the building.
• Project Cost – INR 4 Crores
• Status – On going
CIDCO HEADOFFICE
ProjectStructural Audit
Non-destructive TestingPreparation of Cost Estimates
ClientCity and Industrial Development
Corporation of Maharashtra
LocationNavi Mumbai
BUILDING• This twin tower has two wings A & B.
Each wing is a G+13 storey RCC framed structure. Each floor has 4 flats except for the 13th floor which has two duplex flats.
• Structwel carried out the Structural Audit including Non-destructive testing and preparation of Cost Estimates along with Tendering.
• Project Cost – INR 1.51 Crores
• Status – Completed in 2014
SHAILESH TOWER CO-OP SOC. LTD.
ProjectStructural Audit
Non-destructive TestingAudit Report, Estimate & Tender
ClientShailesh towers CHS
LocationNerul, Navi Mumbai
BUILDING• St. Jude India Child Care Centre
provides a home away from home for children undergoing cancer treatment.
• They have constructed G+4 Storey RCC framed buildings having total built-up area of around 1351 sq. ft. to accommodate these children while they receive treatment in cities away from their homes.
• The structure is 49 years old and was not in use for some years.
• Structwel was appointed to conduct Structural audit of the structure with a view to transform the old residential structure to suit the new requirements.
• Project Cost – INR 5.8 Crores
• Status – Completed in 2016
ST. JUDE INDIA CHILD CARE CENTER
ProjectStructural Audit
EstimateSite PMC during Execution
ClientSt. Jude India Child care center
LocationMumbai
S T R U C T W E L
Heritage
HERITAGE• Restoration and Strengthening of this
structure over 200 year old constructed in Moghul style of architectural was conducted.
• The damages mainly to the wooden member were related age and neglect. The intricate interior details of the damage were viewed and detected by innovative use of endoscopy and endoscopic photographs.
• The structure was strengthened for adaptive use as a hotel
• Project Cost – INR 8 Crores
• Status – Completed in 2008
FALAKNUMA PALACE
ProjectRestoration and Adaptive of
Falaknuma Palace
ClientIndian Hotels Co. Ltd.
LocationHyderabad
HERITAGE• This Dargah and Mosque structure is a
classic of Islamic architecture. It is a Monument constructed mid-sea of the coast of Mumbai.
• The structure is being demolish and reconstructed in marble masonry, without brick, concrete or steel.
• Project Cost – INR 30 Crores
• Status – Ongoing
CST STATION
ProjectReconstruction of Haji Ali Dargah
ClientHaji Ali Trust
LocationMumbai
HERITAGE• Pune University Main building was
originally summer residence of Governor of Bombay, during the British Raj. The structure was built in 1864 and is a typical example of colonial architecture.
• This is a load bearing structure with composite masonry and comprises of huge articulately decorated meeting halls.
• Unique features are its grandeur and a tower block.
• The work on restoration including the interior furnishing is in final stages of execution.
• Project Cost – INR 20 Crores
• Status – Completed in 2018
PUNE UNIVERSITY
ProjectConservation of Pune University,
Main Building
ClientUniversity of Pune
LocationPune
HERITAGE• Carried out Structural Health
Assessment and Audit of the Palace Hotel
• The assignment was to identify the gravity and give revenant to marble cladding that was in danger of falling off.
• Project Cost –NA
• Status – Completed in 2017
UDAIPUR LAKE PALACE
ProjectHeath Assessment
ClientThe Indian Hotels Co. Ltd.
LocationUdaipur
HERITAGE• Rajbhavan is a Grade II B structure
located on the southernmost tip of Malabar hill and is enclosed by Arabian sea from three sides.
• The bunker below the lawns of Rajbhavan is an unique example of urban archeology. This 200 meter long underground tunnel was built in British Era which remained uncovered for nearly 6 decades. It was discovered in August 2016.
• The bunker has 13 rooms of different sizes. It opens with a 20 ft. tall gate.
• Structwel was hired to carry out structural strengthening of the bunker.
• Project Cost – INR 6 Crores
• Status – Completed in 2017
RAJBHAVAN BUNKER
ProjectStructural Strengthening &
waterproofing of the existing under ground tunnel
ClientPublic Works Department,
Government of Maharashtra
LocationMalabar Hills, Mumbai
S T R U C T W E L
Healthcare
HEALTHCARE• Asian Heart Hospital is a Cardiac Care
Hospital situated in BKC, Mumbai.
• This modern structure was facing the problem of major leakages from external sides of the structure.
• Structwel carried out Condition Assessment with the use of Infrared Thermography to detect the potential sources of leakages.
• The project also included offering Remedial Measures with Budgetary Cost.
• Project Cost – INR 1.5 Crores
• Status – Completed in 2005
ASIAN HEART HOSPITAL
ProjectStructural Audit of the External
Rendering of the Structure
ClientAsian Heart Institute and Research
Center
LocationBKC, Mumbai
HEALTHCARE• S.L. Raheja Fortis Hospital is situated
in Mahim, Mumbai. The hospital was constructed around 42 years ago.
• The total built area of the hospital is 2600 sq. m. It is a RCC framed structure having G+4 storeys which houses administrative office, Staff Canteen, Nurse Hostel etc. at different floors.
• Structwel was hired to carry out Structural Audit on the external faces of the building; along with the Preparation of Cost Estimate including tendering.
• Project Cost – INR 4 Crores
• Status – Completed in 2010
FORTIS HOSPITAL
ProjectVisual Inspections
Non-destructive testingRepair Methodology
ClientS. L. Raheja
LocationMahim, Mumbai
HEALTHCARE• Harkishandas hospital has two wings.
The Heritage Wing constructed in 2007 is a G+7 storey building and was built in 1927.
• The new tower of G+22 storeys is added more recently.
• Structwel was appointed to carry out Structural Audit of the Heritage Wing of the hospital including Kapol Niwas; along with carrying out Non-destructive testing.
• Project Cost –NA
• Status – Completed in 2007
HARKISHANDASHOSPITAL
ProjectStructural Assessment
Distress MappingNon-destructive Testing
Propose Repairs Methodology
ClientReliance Engineering Associates Pvt.
Ltd.
LocationGirgaon, Mumbai
HEALTHCARE• The structures of both the hospitals
are G+2 Storey Loadbearing heritage Structures with 6 wings each.
• Nowrosjee Wadia Maternity Hospital for children is a landmark heritage structure constructed in year 1926 having approximate built-up Area of 1,60,544.51 Sq. ft. It is a Load Bearing Structure.
• Project Cost – INR 30 Crores
• Status – Going on
NOWROJEE WADIA MATERNITY HOSPITAL & BAI JERABAI WADIA
CHILDREN HOSPITAL
ProjectVisual inspectionDistress Survey
Estimate PMC during Execution
ClientNowrojee Wadia Maternity Hospital &
Bai Jerabai Wadia Children Hospital
LocationParel, Mumbai
HEALTHCARE• King Edward Memorial Hospital,
popularly knows as KEM Hospital, is one of the oldest medical care providing institutes in Mumbai.
• It was founded in 1926.
• The campus hosts 34 structures; out of which 3 structures are of Heritage category; which include the main hospital building, Seth G.S. Medical College and the main boys hostel.
• Project Cost – INR 11.95 Crores
• Status – Completed in 2018
KEM HOSPITAL
ProjectStructural Audit
Non-destructive TestingEstimate
ClientMunicipal Corporation of Greater
Mumbai
LocationParel, Mumbai
HEALTHCARE• The structure is an RCC framed G+2
storied structure; wherein, the G+1 structure was constructed in 1983; and the second floor was added later in 2018.
• Total built up area of the structure is around 1, 39,288.2sq. ft.
• Project Cost –NA
• Status – Completed in 2018
HOMI BHABHA CANCER HOSPITAL
ProjectPre-commissioning Structural Audit
Reviewing structural analysis and calculations
Verification of geotechnical report
ClientSir Ratan Tata Trust
LocationVaranasi
THANK YOU