Introduction to Steel Structure Introduction to Steel Structure Warehouse for Norwegian ProjectWarehouse for Norwegian Project
I General view
II Steel structure
III Bolts
IV Roof and wall panel
V Packing
VI Project cases
CONTENTSCONTENTS
I General view
I General view1. Our steel structure warehouses are customer-oriented. With complete cost-calculating and designing system, we can provide applicable building systems to our customers and meet their every demands.
2. Decisive factors for the total cost of steel structure industrial building: The local weather condition, the purpose of the building, the customers’ requirements etc. will greatly influence the quantity of steel structure, the selection of wall and roof panel, and the layout of the building and any other decisive factors of total cost.
3. Technical info we considered In our cost calculation and designing, we’ve considered the wind load: 0.8kN/m2, snow load: 1.5kN/m2.
II Steel structure
1. Primary structure
2. Secondary structure
3. Roof and wall purlin
4. Gutter
The steel structure we proposed for the 621 m2 warehouse is of portal frame. Its primary steel structure includes steel column and steel girder.
1. Primary structure
1. Primary structureSteel for main frame will be Q 345B (high-strength low alloy steel). They will be applied with anti-rust paint, double-layered primer paint, double
layered finish paint. The specification of steel will be as follows:
Chemical Property
Physical Property
1. Primary structure
A sample of primary steel structure
2. Secondary structure
Secondary steel structure of the 621 m2 warehouse mainly includes tie bar, diagonal braces and purlin brace. These structures are mainly for strengthening the primary structure.
2. Secondary structure
Chemical Property
Physical Property
Steel for secondary steel structure will be Q235B(carbon constructional steel) . The specifications are as follow:
2. Secondary structure
Tie bar
2. Secondary structure
Diagonal brace for wall structure
2. Secondary structure
Sample design of diagonal brace for roof structure
2. Secondary structure
Roof brace connection with frame web
Wall brace connection with frame web
2. Secondary structure
Purlin brace
2. Secondary structure
Sample design of roof purlin brace
3. Roof and wall purlin
Roof and wall purlin for the warehouse will be fully galvanized.
Technical data for galvanized steel panel, which will be further cold-rolled as roof and wall purlin
3. Roof and wall purlin
Roof purlin we proposed for the warehouse will be Z-section. External wall purlin will be C-section.
Z-section roof purlin
3. Roof and wall purlin
C-section wall purlin
4. Gutter
Gutter of the warehouse will be made of 0.8mm color steel panel.
Gutter
III Bolts
1. Common bolt
2. Foundation bolt
3. High-strength bolt
1. Common bolt
We will use M12 common bolt for fixing purlin and purlinbraces with roof and wall girders.
All the common bolts will be galvanized.
2. Foundation bolt We will use M24 foundation bolt for fixing column with foundation.
The foundation bolts are made of Φ 25 steel bar.
Foundation bolt
3. High-strength bolt
M20 high-strength bolt will be used to fix girder with columns, girder with girder and tie bar with column.
All the common bolts will be 20MnTiB.
IV Roof and wall panel
IV. Roof and wall panel Roof panel we proposed for the 621 m2 warehouse will be 100mm corrugated PU sandwich panel. Wall panel will be 100mm PU sandwich panel.
PU sandwich wall panel
IV. Roof and wall panel
roof panel
Corrugated PU sandwich roof panel
IV. Roof and wall panel
V Packing
V Packing
We will pack the steel structure and other materials with steel pallet. There are wheels on one end of the pallet. Thus it will be easier to load and unload.
Steel pallet with wheels on one end
V Packing
We will pack the steel structure and other materials with steel pallet. There is wheel on one end of the pallet. Thus it will beeasier to load and unload.
Loading with steel pallet
V Packing
For bolts and small accessories of the structure and doors, we will put them in the wooden box and prepare a detailed list for them. Thus these items will not be missed or mixed.
Wooden box for putting bolts and accessories
VI Project cases
SYP Special Glass Co., Ltd.SYP Special Glass Co., Ltd.
VI Project cases
VI Project cases
Merchants Logistics Branch
HandelsveemHandelsveem
VI Project cases
B.V.
VI Project cases
720 Strap Steel Mill
VI Project cases
HUF
BaowanBaowan International Logistics CenterInternational Logistics Center
VI Project cases
Tahiti Warehouse ProjectTahiti Warehouse Project
Building area: 1650 m2Building area: 1650 m2
VI Project cases
Mauritius warehouse Mauritius warehouse Building area: 1000 m2Building area: 1000 m2
VI Project cases
Note: WeNote: We’’ve sent to Mauritius 23 ve sent to Mauritius 23 steel structure warehouses and steel structure warehouses and workshops since 2007 and will start a workshops since 2007 and will start a new warehouse project of 621 m2 at new warehouse project of 621 m2 at the beginning of 2010. the beginning of 2010.
Mauritius warehouse projectMauritius warehouse projectBuilding area: 1907 m2Building area: 1907 m2
VI Project cases
Warehouse in RomaniaWarehouse in RomaniaBuilding area: 2600 m2Building area: 2600 m2
VI Project cases