INDUSTRIAL RELOCATION SERVICESISTANBUL – MANCHESTER – MUMBAI
2015-2016www.BerrIndustry.com
The
art
of E
ngin
eeri
ng
BERR INDUSTRY, All Industrial Services provides a complete turn-key service for every stage of industrial and commercial plant relocation, from dismantlement and relocation plan development to match marking, heavy machinery moving, rigging, relocation, re-installation and start up.
With our vast experience and our utilization of the latest technologies, equipment and techniques, BERR can quickly, seamlessly and safely handle your relocation project from start to finish.
We have performed everything from the relocation and machinery moving of a few pieces of equipment to the relocation of an entire line of an industrial plant.
Our experienced service-engineers provide the following activities:
Planning, organization and supervision of entire relocation process Assistance and supervision of disassembly, transportation and reconstruction Implementation of upgrades, optimization strategies and other improvements Procurement and delivery of additional components and spare parts
PLANT ASSESSMENT
RELOCATION ENGINEERING SERVICES
The
art
of E
ngin
eeri
ng
Full Site Survey And Comprehensive InspectionTo Prepare Method Statements And Risk AssessmentsRelocation Management & PlanningHealth & Safety & Environment PlanningRelocation Works ReportingMatch Marking Of Mechanical, Electrical PartsDecommissioning / DismantlingPackaging Due To International StandartsLifting & Loading Operations and TransportingMaintenance & Equipment ModificationMechanical Installation & InsulationElectrical Installation & Insulation
SCOPE of WORKS
BERR, all industrial services provides a complete turn-key service for every stage of industrial and commercial plant relocation, from dismantlement and relocation plan development to match marking, heavy machinery moving, rigging, relocation, re-installation and start up.
SCOPE of RELOCATION SERVICES
3
Moving of the Factory
Major Parts Lifting and Loading Works
The
art
of E
ngin
eeri
ng
RE-LOCATION
Critical to the success of many projects is the ability to understand the importance of utility coordination and relocations. Over the years BERR has built a name in this aspect of engineering, by working on utility coordination from planning, design and into construction. BERR has the expertise to provide utility records research, utility facility field investigation and surveying; utility conflict identification and resolution with the client's proposed project design; utility relocation design for any and all public and private utility company facilities utilizing the design criteria/standards of the utility companies; and various CADD software implementations.
Areas of Expertise•Survey Utility Engineering – Designation, Locating & Surveys•Records Research•Agency Coordination•Utility Relocation Design•Conflict Analysis & Resolution
RELOCATION SERVICES
4
Relocation of the Machine Lines
Relocation of the Cooling Towers
The
art
of E
ngin
eeri
ng
S A M P L E
PROJECT OFFICE
5Gannt Diaphrgam, Time Schedule, Swot Analysis, Risk Assessment, Industrial Project Management and Planning Tools
DESIGN OFFICE SERVICES
The
art
of E
ngin
eeri
ng
PROJECT MANAGEMENT
We provide streamlined, cost-effective, state-of-the-art systems and processes and focus on the details to ensure our clients' projects are delivered on time and within budget.
The project manager will oversee the project during its implementation phase, and will monitor its progress on the basis of its action plan. The use of interim reports will keep you informed of the progress and status.
PROJECT MANAGEMENT SERVICES
6
The
art
of E
ngin
eeri
ng
PROJECT PLANNING
•CHARTS:Gantt charts provide a detailed visual on the progress of your tasks in comparison to what was planned. The resource allocation chart lets you know who is free, who is engaged and who is overloaded.
•PROJECT COORDINATIONS:The Coordinators gives you an easy way to get back to important posts. Feeds.
•TIMESHEETS:All working on a project can easily log their billable and non billable hours.
•DOCUMENT MANAGEMENT•COLLOBRATION •ONLINE PROJECT CHAT
PROJECT PLANNING SERVICES
BERR may also act as a main contractor and assume leadership and responsibility, including managing any communication with any subcontractors or OEMs. In practice, this is a sound process via which the BERR project manager is able to oversee all of the activities.
7
The
art
of E
ngin
eeri
ng
REALIZING
STEPS of RELOCATION
Relocation starts with a letter request that is prepared by Client. BERR, makes site survey and inspection firstly. As second step, BERR identifies the necessary tools and manpower requirements, in line with their customers needs, utilizing appropriate screening and matching methods to ensure that only suitably qualified personnel are recommended, in a timely fashion.
8
ASSESSMENT & SITE SURVEY WORKFORCE PLANNING
IDENTIFICATION THE TERMS & CONDITIONS
SERVICE AGREEMENT
WORK COMMENCEMENT
•Site Survey and Inspection
•Assessment Reporting
•Risk Analyzing
•Workforce Planning
•Equipment an Tools Planning
•Time Scheduling
•Estimated Conditions Reporting
•Project Draft Works
•Technical T&C
•Methode of Statements
•Tasks & Work Arrangement
•Maintenance & Refurbishment
•Equipment and Tools
•Financial T&C
•Progress Payments
•Penalties
The
art
of E
ngin
eeri
ng
RE-LOCATION
RELOCATION SERVICES
200 MVA Combined Cycle Power Plant Relocation Project. 2 x GE LM 6000 Gas Turbines and Auxiliaries.
•Disassembly
•Marking, Labelling
•Lifting
•Loading , Unloading
•Assembly , Erection
•Installation
•Settling, Alignment
•Installation
•Flushing, Pickling
•Commissioning and First Firing
The
art
of E
ngin
eeri
ng
RE-LOCATION
RELOCATION SERVICES
All Civil Works as to 200 MVA Combined Cycle Power Plant Relocation Project. 2 x GE LM 6000 Gas Turbines and Auxiliaries
•Excavation Works
•Compacting Works
•Foundation Works
•Infrastructure Works
•Concrete Structure Works
•Steel Structure Works
•Tank Farms
•Hydroulic Post Tensioning
•Pre-Stressing Works
The
art
of E
ngin
eeri
ng
POWER STATIONS
RELOCATION of THE POWER STATIONS
Gas Turbine and Auxiliary Equipment Relocation works. Air Inlet / Intake Filters, Generator Rooms, Lube Oil Skid, Fuel Feed Skids, Heaters & Filters, Fire Protecting ( Automatical Extinguisher ) Systems, Cooling Raidators, Exhaust Fans, Dampers, Stacks, Enclosure, MCC, Transformator, Compressors, Gas Reducing and Metering Units, WorkShop, etc.
The
art
of E
ngin
eeri
ng
POWER MACHINES
RELOCATION of THE POWER MACHINES
Balance of Plants, Auxiliaries, Common Units, Major Parts, Body Parts, Heavy Lifting, Packaging, Labelling, Marking, Lifting, Loading, Unloading, Foundation, Anchoring, Replacing, Relocated, Maintenance, Refurbishment, Removel, Dismantling, Disassembly…
The
art
of E
ngin
eeri
ng
POWER MACHINES
Natural Gas, Diesel and H.F.O. Fuel Fired Engine and Co-Generation Systems. Black Start and Stand By Generators. Engine Power Plant Equipment, Auxiliaries and Process Lines.Steam Turbines, Turbine Parts, Rotor, Casing, Blades, Pipes, Pipe Racks, Platforms, CatWays, Ladders, Steel Structures,…etc.
RELOCATION of THE POWER MACHINES
The
art
of E
ngin
eeri
ng
HEAVY DUTY PLANTS
Cement Plants, Concrete Plants, Chemical Factories, Pharmatucal Factories, Steel Constructions, Steel Supports, Steel Rooftops, Steel Structures, Steel Platforms, Stack & Chinmeys, Exhaust Lines, Producttion and Office Buildings, Containers, Treatment Systems, Enclosures, Prefabricated Factory Buildings, Mechanical Lines, Electrical Panels & Lines, Lightenings, …etc.
RELOCATION of THE HEAVY DUTY PLANTS
The
art
of E
ngin
eeri
ng
Steel Process, Rolling Mill Machines, Cooling Platforms, Gearboxes, Cooling Towers, Chillers, Furnances, Fans, Machine Lines, Chemical Processes, Process Lines, Machine Lines, Machine Tools, Steam Generators, Boilers, Flues Gas Heat Recovery Units, Heat Recovery Steam Generators, Distillation Units, Major Heavy Industrial Parts, Cranes, Platforms, Pump Rooms, Compressors Rooms.
HEAVY DUTY PLANTS
RELOCATION of THE HEAVY DUTY PLANTS
The
art
of E
ngin
eeri
ng
Machine and Machine Lines: Plastic Machines, Extruders, Mixers, Reactors, Silos, Filters, Siklons, Heaters, Process Pumps, Transfer and Feeding Pumps, Chemical Pumps, Chemical Tanks, Chemical Baths, Distillation Columns, Food Process, Food Machine Lines, Storage and Feeding Tanks, Process Cooling Systems, Filtering Units, Cable Machines, CNC Machines, Universal Machines, …
HEAVY DUTY PLANTS
RELOCATION of THE HEAVY DUTY PLANTS
The
art
of E
ngin
eeri
ng
B.O.P EQUIPMENT
BALANCE of PLANT EQUIPMENT
Exhaust Lines, Flue Gas Treatment Systems, Silencers, Mufflers, Spark Arrestors, DeSOx, DeNOx Systems, Heat Recovery Systems, Exhaust Fans, Stacks and Chimneys, Catalytic Convertors, Economizors, Condensers, Gas Seperators, Lube Oil Seperators, Fuel Oil Seperators, Clarification and Purification Systems, Water and Oil Treatment Units, Fuel Storage Units,
The
art
of E
ngin
eeri
ng
ELECTRICAL
ELECTRICAL EQUIPMENT
HV - MV – LV Electrical Equipment. Main Switch Panels, Electrical Panels, Transformators, SwitchGears, Circuit Breakers, Relays, Top Changers, Bushings, Insulators, Parafudrs, Cable Lines, Instrumentation and Control Units, Accumulators, PLC Units, … etc.
The
art
of E
ngin
eeri
ng
The
art
of E
ngin
eeri
ng CONTACT US
Adress:TR - Postane, Levent Sitesi, I6 No:7 34940 Tuzla, Istanbul, TurkeyUK - Kingston Upon Hull (England) United Kingdom
Telephones:Headquarters Pbx : +90 216 395 20 34 Support Center : +90 532 163 62 90 ( TR ) & +44 743 246 14 62 ( UK )
URL: http://www.berrindustry.com
E-Mail:General InformationUK ContactIndia ContactBusiness Development
Skype:Berr.Industry
SlideShare Link for all brochures and referances Go >>>
20
: [email protected] : [email protected] : [email protected] : [email protected]