TO: THROUGH: DATE: FROM: SUBJECT: PRESENTER: RECOMMENDATION: BUDGET IMPACT: PAST ACTION: NEXT ACTION: ATTACHMENTS: BACKGROUND: Agenda Item: CA-3 Regular Mtg.: 11/20114 MEMORANDUM City Commission Robert DiSpirito, City Manager November 13,2014 Jorge Quintas, City Engineer/Director ofPubllc Works Utilities Purchase of three 3C-Pac Blowers Paul Stanek, Assistant Director of Public Works & Utilities Motion to approve the purchase of three 3C-Pac Blowers from Universal Blower Pac, Inc. in the amount of $57,700. Funds are budgeted in the Water and Sewer Utility Fund (Acct.# 441-5265-535-4610). The Project Number is 528505. N/A N/A 1. Memo from Chuck Ankney, Purchasing Agent, November 12,2014. 2. Memo from Brian Antonian, Wastewater Plant Supervisor, October 27, 2014. 3. Quote from Universal Blower Pac dated November 12, 2014. The Wastewater Division operation requires the replacement of three blowers manufactured by Roots Blower Company (Roots). The blowers have been in service since 1990 and have reached the end of their useful life. The City has contracted with King Engineering for the creation of a Water/Wastewater Master Plan (Plan). That project is nearing conclusion. One of the recommendations of the Plan is to upgrade the Roots blowers with 3C-Pac blowers manufactured by Universal Blower Pac, Inc (Universal). The 3C-Pac blower is quieter and more efficient than the Roots

Transcript of Regular Mtg.: 11/20114 MEMORANDUM TO

Page 1: Regular Mtg.: 11/20114 MEMORANDUM TO

TO:

THROUGH:

DATE:

FROM:

SUBJECT:

PRESENTER:

RECOMMENDATION:

BUDGET IMPACT:

PAST ACTION:

NEXT ACTION:

ATTACHMENTS:

BACKGROUND:

Agenda Item: CA-3

Regular Mtg.: 11/20114

MEMORANDUM

City Commission

Robert DiSpirito, City Manager ~ November 13,2014

Jorge Quintas, City Engineer/Director ofPubllc Works oy~J\M'Nt"' Utilities

Purchase of three 3C-Pac Blowers

Paul Stanek, Assistant Director of Public Works & Utilities

Motion to approve the purchase of three 3C-Pac Blowers from Universal Blower Pac, Inc. in the amount of $57,700.

Funds are budgeted in the Water and Sewer Utility Fund (Acct.# 441-5265-535-4610). The Project Number is 528505.

N/A

N/A

1. Memo from Chuck Ankney, Purchasing Agent, November 12,2014.

2. Memo from Brian Antonian, Wastewater Plant Supervisor, October 27, 2014.

3. Quote from Universal Blower Pac dated November 12, 2014.

The Wastewater Division operation requires the replacement of three blowers manufactured by Roots Blower Company (Roots). The blowers have been in service since 1990 and have reached the end of their useful life. The City has contracted with King Engineering for the creation of a Water/Wastewater Master Plan (Plan). That project is nearing conclusion. One of the recommendations of the Plan is to upgrade the Roots blowers with 3C-Pac blowers manufactured by Universal Blower Pac, Inc (Universal). The 3C-Pac blower is quieter and more efficient than the Roots

Page 2: Regular Mtg.: 11/20114 MEMORANDUM TO

blowers. The sole authorized manufacturer representative of these blowers in the State of Florida is TSC Jacobs of Tampa, FL (TSC). Wastewater staff obtained a quote from Universal, through TSC, to supply the blowers to the Wastewater Division. The quoted cost was $57,700. City staff will install the blowers.

Funds for this work are budgeted in the Water and Sewer Capital Improvement Fund (Acct. # 441-5265-535-4610). The Project Number is 528505. Staff is requesting that the City Commission award a single source contract to Universal Blower Pac, Inc. as noted above.

Page 3: Regular Mtg.: 11/20114 MEMORANDUM TO

Department of Finance Interoffice Memorandum

TO: Rob DiSpirito, City Manager

THROUGH: Karen Feeney, Finance Director ~ 't=-FROM:

DATE:

RE:

Chuck Ankney, Purchasing Agent lfr' November 12, 2014

Purchase of Three Universal Blower Pac 3C-Pac Blowers

The Wastewater Division operation requires the replacement of three blowers manufactured by Roots Blower Company (Roots). The blowers have been in service since 1990 and have reached the end of their useful life. The City has contracted with King Engineering for the creation of a Water/Wastewater Master· Plan (Plan). That project is nearing conclusion. One of the recommendations of the Plan is to upgrade the Roots blowers with 3C-Pac blowers manufactured by Universal Blower Pac, Inc (Universal). The 3C-Pac blower is quieter and more efficient than the Roots blowers. The sole authorized manufacturer representative of these blowers in the State of Florida is TSC Jacobs of Tampa, FL (TSC). Wastewater staff obtained a quote from Universal, through TSC, to supply the blowers to the Wastewater Division. The quoted cost was $57,700. City staff will install the blowers.

Funds for this work are budgeted in the Water and Sewer Capital Improvement Fund (Acct.# 441-5265-535-4610). The Project Number is 528505. Staff is requesting that the City Commission award a single source contract to Universal Blower Pac, Inc. Furthermore, staff requests that this item be placed on the agenda for the City Commission meeting scheduled for Thursday, November 20,2014.

Please call me if you have any questions.

Page 4: Regular Mtg.: 11/20114 MEMORANDUM TO

DUN~DIN Home of Honeymoon Island

MEMORANDUM

TO: Chuck Ankney, Purchasing Agent

THRU: Paul Stanek, Assistant Public Works & Utilities Director.PS

FROM: Brian Antonian, Wastewater Plant Supervisor@

DATE: October 27, 2014

SUBJECT: Single Source Item-Purchase three new Universal Blower Pacs, Model3C-Pac.

The Wastewater Division has determined that it needs to replace three Roots blowers that have been in service since 1990 and have out lived their life expectancy. Though the Roots blowers have worked well, they are much louder than the Universal blowers. The current blowers have a level of 84 db. The new Universal blower quiet 3C-Pac has a lower level of 78 db which will benefit our neighbors by being quieter and will benefit the City by being more efficient. The new blower is housed in an insulated unit and will be a "drop in-plug in" unit which can be installed in-house. Lastly, these blowers are recommended as the replacement blowers in the "Draft" Water/Wastewater Master Plan. Universal Blower Pac, Inc. is the original Manufacturer of the 3C-Pac Blowers. TSC/Jacobs is the single source representative for the Universal Blower units. The cost of this project will be$ 57,700.00.

I am requesting that you prepare an agenda item for Commission approval. The funds have been budgeted in Acct# 441-5265-535-4610, project# 528505. If you have any questions please feel free to contact me.

Page 5: Regular Mtg.: 11/20114 MEMORANDUM TO

IVERSAL OWER PAC ;uc

November 12, 2014

Notes:

1. This proposal is for three, constant flow, Universal Blower Pac 3C-Pac blowers utilizing 40 HP motors.

2. The attached drawing is the standard layout. It does not denote project specific ancillary equipment that may be supplied. This configuration can be modified to meet dimensional constraints or other customer needs.

3. This compressor utilizes helical tri-lobe impellers to move air versus straight ·lobe impellers. It gradually releases air through its discharge port resulting in a balanced compression cycle with little noise and pulsation.

4. The unit will be configured for constant flow operation. If a VFD is utilized we can supply alternative configurations.

5. The unit will operate in a powder coated aluminum and galvannealed ac.oustical enclosure at a noise level <= 78 dBA at 1m in a free field.

6. Specifications and a sample AutoCAD drawing are available.

The pricing for these three units is $57,700, total including freight, startup.

We're assuming the customer is reusing existing controls. Be advised we need 120V power to our acoustical enclosure ventilation fans.

440 Park 32 West Drive I Noblesville, IN 46062-9252 I PH 317-773-7256 ·I FX 317-776-5086 website: www.universalblowerpac.com email: [email protected]

Page 6: Regular Mtg.: 11/20114 MEMORANDUM TO

•SlmpJifled .mointenf!Ut€:1! with easy access panels aiidauttH'ensioriing belts .. Quiet & Durable fiowder Coated Awu:stifilflifm;tosure reduces noise b'JI up td:l5dBA •Con,p.letely taS:f:omiza.ble •E:€1sY:i.nstolia.:fion with ·"Plug "n' Play" System

Page 7: Regular Mtg.: 11/20114 MEMORANDUM TO

-I.!J

~ -~

12

::J

S! ~ a.. "iii :c; c::: (I) .... ~ ·-0

Page 8: Regular Mtg.: 11/20114 MEMORANDUM TO

I

c

I

ITEM NO. DESCRIPTION QTY.

1 Inlet Alter/Silencer 1 2 UBP Blower 1 3 NEMA Motor 1 4 V-Belt Drive Assembly@ 1.4 Service Factor 1 5 3C2 Belt Guard w/ Easy Access Panel 1

6 3C2 Blower Base w/ Auto-Tension Motor Base 1 7 Heavy Duty Isolation Mount 4

8 3C2 Sub-Base 1 9 Discharge Expansion Joint 1 10 Compact Discharge Silencer 1 11 Spring Loaded PRY 1 12 Discharge Check Valve 1

13 3C2 Acoustical Enclosure 1 14 Inlet Filter Vacuum Gauge 1 15 Discharge Pressure Gauge 1 16 Discharge Thermometer 1

NOTE:

l. ITEMS 13-16 ARE OPTIONAL AND SHOWN ON NEXT SHEET. 2. SEE PROJECT-SPECIFIC SUBMITIAL FOR COMPONENT MODEL NUMBERS,

UNIT WEIGHT. AND OPTIONAL COMPONENTS NOT SHOWN HERE.

NOTE:

12

"£~-rEt! nl n j

DISCHARGEJ CONN. VARIES

I !;-. ~5/8"

3 1-7/8"

'ENING

37-1/4" f----- DISCHARGE

CONN.

·D

3 4

c=::)

---1 ·9-3/4" 32-114"

--- ---

c n ol '

-------

J7l 1. INSTALL AND OPERATE ACCORDING TO O&M MANUAL.

ALTERNATE 0 FOR ELECTRICA CONDUIT-

2. DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE.

c 1/

10

io J

lONO I ~Ell.

¢518" MOUNTING HOLE [TYP 4i

'

RIOVISIONS

Dt:SC~IPliCN

DRAWING C~i.:ATED

ENCLOSURE RE\.1SIONS

~ASE AND ENCLOS~RE ROVISIONS

DAlE APPROVED

9/7/:!lll(l 00

a/2<11201 1 " B/10/201"< 00

0

c

Page 9: Regular Mtg.: 11/20114 MEMORANDUM TO

~p;

c

'

ENCLOSURE NOTES:

1. CONSTRUCTED OF POWDER COATED ALUMINUM AND STEEL 2. UNED WITH 2" ACOUSTICAL FOAM 3. QTY 121 REMOVABLE PANELS (1 FRONT, 1 REAR) 4. QTY 3 LOCKING COMPRESSION LATCHES TOTAL 5. QTY 1 SUPPLEMENTARY ACCESS PANEL (LEFT SIDE) 6. QTY(1 ELECTRICAL EXHAUST FAN (-1A@ l/60/120V) 7. INTERNAL JUNCTION BOX PROVIDED FOR EXHAUST FAN AND OPTIONAL SWITCHES 8. CONDUIT OPENINGS PROVIDED FOR FAN AND BLOWER MOTOR

(INTERNAL WIRING TO FAN AND MOTOR JUNCTION BOXES BY OTHERS) 9. FORK SLOT COVERS PROVIDED FOR USE AFTER INSTALLATION 10. SEE PROJECT-SPECIFIC SUBMITTAL FOR OPTIONAL COMPONENTS

m m

62-5/8"

L,a_J

NOTE:

1. INSTALL AND OPERATE ACCORDING TO O&M MANUAL. 2. DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE.

L _j- DISCHARGE --1 CONN. VARIES

46"

lONE

12-3/8" DISCHARGE

CONN. -.--

I i

ROV~ONS

DESC~IPTICN

See Sheet!

AIR INLET

1111

I

DATE APPRCVEiJ

AIR EXHAUST

'~

03" MOTOR CONN.

¢718" FAN CONN.

f----f-13-1/8"

37-1/4" DISCHARGE

CONN.

0

c

Page 10: Regular Mtg.: 11/20114 MEMORANDUM TO

Application Summary

Design Site Pressure: 14.4 psia Operation: Constant, two duty, one standby Differential Pressure: 13.3 psig Design Temperature: 110 F Design Relative Humidity: 75%

Operating Points:

Design- 301 SCFM (360 ICFM, 22.4 lbs I min- dry air) @ 7.5 psig differential Average-Minimum-

440 Park 32 West Drive I Noblesville, IN 46062·9252 I PH 317-773-7256 I FX 317-776-5086 website: www.universalblowerpac.com email: [email protected]

Page 11: Regular Mtg.: 11/20114 MEMORANDUM TO

Operating Curve Temperature. Rise

2:50 {'f)

240 ', I II -l-r-+---+-+--1--l--l---+--+--,·---+---+--+-+----+--+---

230 ,, ' I .

' I I I I

22()

21()

200

Flow 2000 2500 3000 3500

Speed (Revolutions PerMinu!e) (;()()

!ICFMJ5.()0

400

300

200

100

Power Speed {Revol-utions Per Minu!e)

45.

40 (HPJ

35

30

i

I i I I ! I ' • I

' I • I

I I •cm

1

e"f3< .4 ~P I

/ """' I ' ' I ~PM=l!OOO ......r1 I I

I a.1 3.~ P~l

""' .

I l '

25 I I I ...... r-r I ' I 1 I I 1 ' ' I

20 l I ...... ""'I ' / I I I I '

15 v I I I ' I I I

' ' 2000 2:500 3000 3500

Speed (Revolutions P&rMinu!e)

Iff 11,......

I ! I I

4000

1 ~ I 1 I I

I I I I I I

I I I I

I ' I

I

40()0

440 Park 32 West Drive I Noblesville, IN 46062·9252 I PH 317·773·7256 I FX 317·776·5086 website: www.universalblowerpac.com email: [email protected]

Page 12: Regular Mtg.: 11/20114 MEMORANDUM TO

The Oris}nal Manufacturer

TSC Jacobs 11021 Countryway Blvd Tampa, FL 33626 Att: Todd Rubens, P.E.

RE: FET I Universal Blower Pac 3C-Pac Blowers

Dear Todd,

440 Park 32 West Drive Noblesville, IN 46060

October 22, 2014

Universal Blower Pac, Inc. ("UBP") engineers and manufactures blower systems for the water and wastewater treatment industries. This includes traditional lobe blowers, multi­stage centrifugal blowers, high efficiency screw blowers, and biogas systems. UBP has supplied over 10,000 blower systems in 4500 facilities worldwide over a 35 year history.

UBP is the owner of the 3C-Pac trademark and Universal Blower Pac trademark in connection with engineering services and manufacture/distribution of among other things, industrial blower systems, and noise attenuating enclosures. TSC Jacobs is UBP's exclusive representative for municipal products in the State of Florida.

Please contact me if you have any questions.

Cordially,

Andrew Placek, PE Lead WTP Sales Engineer Universal Blower Pac, Inc.

440 Park 32 West Drive 1 Noblesville, IN 46062·9252 I PH 317-773·n56 1 FX 317·776·5086 website: www.universalblowerpac.com email: aplacek®universalblowerpac.com