  1. 1. Dixie Engineering Inc: Gary Wysocki President (Consulting) Refrigeration Design FACILITY Tropical Cheese Industries Perth Amboy, NJ (1989) --- Design/Installation of (2) Frick MCM Screw compressors (R-22) along with (1) BAC Ice building unit and Chester-Jensen Instant Chilling system for high volume cooling on (2) 300 Gallon Flash Vat Pasteurizers (cheese cultures). FACILITY Drake Bakeries Wayne, NJ (1991) --- Design/Installation addition of (1) 1000 ton Trane Centra-VAC Centrifugal Ammonia Compressor for the cooling of warmed chocolate which enrobed numerous snake cake products.
  2. 2. Refrigeration Design(continued2) FACILITY Whitlock Packaging Fort Gibson, OK (2003) --- Design & installation of (2) Dunham-Bush Freon systems (R-22) for the production cooling of Pepsis Mountain DEW Amp energy drink in order to saturate CO2 within solution. Design included all exchangers, valving, PLC logic control, EPR and BPR components.
  3. 3. Refrigeration Design(continued3) Dixie Engineering Inc (Consulting) --- Sewaren, NJ (2005-2013) 1. Jasper Products Joplin, MO Designed a 1650 HP FES ammonia system for the cooling and production of Soy Proteins and Soy Milks. Supplied mechanical and electrical scope of work, PIDs, BOMs, equipment rigging etc. 2. Sara Lee Inc Robinsville, SC Designed 800 HP FES ammonia system and BAC tower for spiral freezing of Pie dough.
  4. 4. 3. Water Lillie Foods Astoria, NY Designed PID for 130 ton Chiller system installation for storage cooler (Trane). Refrigeration Revamping/Modifications McCain-Ellios Foods Lodi, NJ (1994)--- Added WONDERWARE Control system platform (HMI)(In-Touch) to existing 1300 HP Mycom Ammonia screw compressor system. Changed out numerous level controls to 4-20ma, changed out Mycom liquid ammonia pumps with durable Hansen liquid supply/return pumps from intercoolers. Installed new (BPR) valving on Surge tanks.
  5. 5. Refrigeration Installations FACILITY Krauzsers Dairy Edison, NJ (1984) ---- Installation of (2) Frick MRI ammonia Piston Compressors and PID diagrams along with (2) Chester- Jensen single stage cascade Ice Builders for chilling process water. Krauzsers Dairy Edison, NJ (1985) ---- Installation of 60 x 40ft concrete floor with heated glycol system. Installation of (2) Interstage upright Frick Piston Ammonia Compressors and (1) Niagara NO-Frost sub-zero cooling unit for Dolly Madison Ice Cream storage.
  6. 6. Refrigeration Installations(Continued2) FACILITY Pillsbury Company/Haagen Dazs Woodbridge, NJ (1997) ---- Installation of (2) FES Ammonia Screw Booster Compressors and related piping for (2) 80 foot Ice Cream Cooling Tunnels and APV Votators.
  7. 7. OTHER: NOTE: Engineered and maintained the largest ammonia system in New Jersey (Haagen- Dazs facility) with 76,000lbs of Anhydrous Ammonia. Incident Commander for the entire facility in relation to township evacuations, and TCPA protocols. HAZMAT/SCBA Training Centrifugal Screw Compressor Design Environmental Code Compliance Member ASHRAE/SMACNA