REFORMS UNDERTAKEN BY MCGM

20
REFORMS UNDERTAKEN BY MCGM FOR GRANTING BUILDING PROPOSAL APPROVAL MAR 22, 2016 Development Plan Department

Transcript of REFORMS UNDERTAKEN BY MCGM

Page 1: REFORMS UNDERTAKEN BY MCGM

REFORMSUNDERTAKEN BYMCGM FOR GRANTING BUILDING PROPOSAL

APPROVAL

MAR 22, 2016

Development Plan Department

Page 2: REFORMS UNDERTAKEN BY MCGM

CONSTRUCTION PERMIT ATMCGMREFORMS UNDERTAKEN

Simplified, Reorganized, Standardizedbuilding proposal approval procedure by ,

• Issuing Circular u/No. CHE/DP/49/Gen.

dated 29. 12. 2015.

• Publishing the Building Permission Manualwith the hands of Hon’ble Chief minister,with the hands of Hon’ble Chief minister,Government Of Maharashtra, Shri. DevendraFadanvis on 02 /01 / 2016.

• Procedures / NOC / Steps reduced from 119 to 58 (52%)

(Circular & Manual are available on MCGM website.)

Web Link:

http://portal.mcgm.gov.in

Page 3: REFORMS UNDERTAKEN BY MCGM

Main Features of the Circular

• Internal service remarks within building /premises are outsourced to third partyconsultant.

• External services remarks such as Nalla,• External services remarks such as Nalla,Common Infrastructure only to be obtainedfromMCGM respective Departments.

• Now Handing over of reservations Buildable / Unbuildable only to Development Plan Department. Developer/ Owner need not approach to Estate & respective Ward Offices for the same.

Page 4: REFORMS UNDERTAKEN BY MCGM

Main Features of the Circular

• First Commencement Certificate will be issuedby Executive Engineer(B.P.) & further CC willbe approved & issued by Asstt.Engr(BP)

• All MCGM Departments will provide remarks• All MCGM Departments will provide remarksfor full development potential at once &without insisting layout/building proposalapprovals.

• Now Occupation Certificate & Building completion certificate will be issued simultaneously without insisting certificate u/s 270 A of MMC Act.

Page 5: REFORMS UNDERTAKEN BY MCGM

BUILDING PERMISSION MANUAL

Contents,

• Details to be submitted by Developers.

• Formats of Self Certification Remarks /NOC’s• Formats of Self Certification Remarks /NOC’sto be submitted by consultant/ owner/Architect to MCGM.

• Standard Formats for remarks/NOC to begiven by MCGMDepartments.

• Standard formats of report BuildingProposal Sections.

Page 6: REFORMS UNDERTAKEN BY MCGM

ACHIEVEMENT BYMCGM IN ONLINEAUTODCR APPROVAL SYSTEM.

• Building Proposal file( @ 1.70 lacs.) scanned & made available on MCGM website for public reference.

• DP 1967, DCR-1967, Circular, Notifications, SRDP-1991, DCR-1991 & DDP-2034 are SRDP-1991, DCR-1991 & DDP-2034 are made available on MCGM website.

• New proposals being accepted only online with online submission of requisite documents, from 15.05.2015.

• SMS & e-mail facilities at various stages of proposal introduced from 15.02.2016.

• Link address : http://portal.mcgm.gov.in

Page 7: REFORMS UNDERTAKEN BY MCGM

ACHIEVEMENT BYMCGM IN ONLINEAUTODCR APPROVAL SYSTEM.

�Digital signature introduced from15/02/2016 for Architects and LS.

�Online issuance of IOD/ Amended PlanApproval/ CC/OC/BCC from15/02/2016.

�Online payment gateway in singlewindow from 15/02/2016.

�Online automated Enrolment ofArchitects, License Surveyors.

Page 8: REFORMS UNDERTAKEN BY MCGM

ACHIEVEMENT BYMCGM IN ONLINEAUTODCR APPROVAL SYSTEM.

� Links of Airport Authority of India(AAI) and National Monument Authority (NMA) is hosted on MCGM website.

� Assistance for Architect / L.S. is made available for operating the AUTODCR application at all Building Proposal offices to resolve the teething problems.

Page 9: REFORMS UNDERTAKEN BY MCGM

FORVISION

� All formats in the manual are beingtransformed in HTML form which can bedownloaded, filled up offline andtransferred while filling online application.

� Integration of MCGM departments with� Integration of MCGM departments withBuilding Proposal offices for one windowapproval system before 31/06/2016.

� Online submission of Video clips,photograph of site during constructionphases of approval 31/03/2016.

Page 10: REFORMS UNDERTAKEN BY MCGM

FORVISION

� Online AE (Survey) Remarks to Architectsby 31/04/2016.

� Introduction of Digital signature ofDevelopers for Building proposal by15/04/2016.15/04/2016.

� Transfer of all building proposal files inAutoDCR application in phases (phase-I i.e.files after 13/07/2013 are uploaded.)

� De-mat of TDR Certificate and online TDRutilization process by 31/06/2015.

� Online issue of DP Remarks by 31/05/2016.

Page 11: REFORMS UNDERTAKEN BY MCGM

FORVISION

� Integration with External agencies from which remarks/ NOC are required for building proposal approvals.

� Integration with application of AAI and NMA with MCGM AutoDCR application by 31/03/2016.

Page 12: REFORMS UNDERTAKEN BY MCGM

INTEGRATION OFMCGM(AUTODCR)

WITH

AAI(NOCAS)SYSTEMAAI(NOCAS)SYSTEM

Page 13: REFORMS UNDERTAKEN BY MCGM

PROCESS FLOW DIAGRAM OF INTEGRATION

Applicant will Apply for Building Plan

Approval

AutoDCR Send the Request using Web Service to AAI NOCAS2 System for NOC Status (If Applicable)

NOCAS Send the Status of NOC to AutoDCR using Web Service (Auto Settled/In Process / Issued) with Permissible

Height and NOC Copy

(If Issued)

Auto DCR SystemAccept the Statusshows toApplicant andMCGM with NOCcopy (If Issued)

Page 14: REFORMS UNDERTAKEN BY MCGM

APPLICATION PROCESS

MCGM AutoDCR Application generate the XML file for every application which is failing in AAI Area including Application data, Geo Coordinate, Required File and Send to AAI NOCAS as Batch Process.

2

In MCGM AutoDCR Applicant will submit the form including AAI condition data ( Height Of building and GEO coordinate's of Plot Area.

1

Page 15: REFORMS UNDERTAKEN BY MCGM

RESPONSEPROCESS

AutoDCR Application Reads the Response XML file for every application and update the data against each Application. If NOCAS given in Response Auto Settled or Issued than NOC will be visible to Applicant as well as Department.

43 MCGM AutoDCR

application receive the Response in XML form AAI NOCAS application through Batch Process which is running on MCGM Server . (Response type : In Process, Auto type : In Process, Auto Settled, Issued)

5

Page 16: REFORMS UNDERTAKEN BY MCGM

RESPONSE PROCESS

5

Once User click on View NOC then it will open the AAI NOC copy which copy which is received in Response from AAI NOCAS Application

Page 17: REFORMS UNDERTAKEN BY MCGM

INTEGRATION OFMCGM(AUTODCR)

WITH

NMA(NOAPS)SYSTEMNMA(NOAPS)SYSTEM

Page 18: REFORMS UNDERTAKEN BY MCGM

PROCESS FLOW DIAGRAM OFINTEGRATION

Applicant will Apply for Building Plan Approval

AutoDCR Send theRequest usingWeb Service toNMA NOAPPSSystem for NOCStatus( If Applicable)

NOAPPS Send theStatus of NOC toAutoDCR usingWeb Service NOCCopy(If Issued)

Auto DCR SystemAccept the Statusshows toApplicant andMCGM with NOCcopy (If Issued)

On receipt ofToken no. plot co-ordinates will beposted throughmobile directly toNOAPPS.

Page 19: REFORMS UNDERTAKEN BY MCGM

APPLICATION PROCESS

MCGM AutoDCR Application send the data for every application which is failing in NMA influence Area to NMA (NOAPPS) in below Web Service.

2

Web Service: http://205.147.98.104/nma_application/api/validateapplicant/form_data

In MCGM AutoDCR Applicant will submit the form including NMA condition data ( Height of building, distance from Monuments etc.

1

( Service for Validation of the Applicant for using ISRO Mobile Application to traverse the site data.)

http://205.147.98.104/nma_application/api/validateapplicant/architect_registration

(Service used for sending Application data in NMA application and Sharing NOC or Status.)

Page 20: REFORMS UNDERTAKEN BY MCGM

Thank You!Thank You!