RDR: Goals and Scope

26
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS

description

RDR: Goals and Scope. ILC Design/Cost WBS. Barry Barish Fermilab RDR Meeting 13-Feb-06. Global Design Effort. The Mission of the GDE - PowerPoint PPT Presentation

Transcript of RDR: Goals and Scope

Page 1: RDR:  Goals and Scope

13-Feb-06

RDR: Goals and Scope

Barry BarishFermilab

RDR Meeting13-Feb-06

ILC Design/Cost WBS

Page 2: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 2

13-Feb-06

Global Design Effort

– The Mission of the GDE • Produce a design for the ILC that includes a

detailed design concept, performance assessments, reliable international costing, an industrialization plan , siting analysis, as well as detector concepts and scope.

• Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.)

Page 3: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 3

13-Feb-06

The GDE after Six Months

• How have we done?– We are on track – BCD produced by end of 2005

as promised. It will provide a sound basis for entering into a reference design effort, globally coordinate R&D program, begin industrialization, determine costs, etc. next year

• What’s Next?– Undertaking Design/Cost effort toward Reference

Design Report (RDR)– Assessing present R&D program to begin to

provide global guidance in the future.

Page 4: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 4

13-Feb-06

from my Snowmass Plenary Talk

Page 5: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 5

13-Feb-06

ICFA FALC

FALC Resource Board

ILCSC

GDEDirectorate

GDEExecutive Committee

GlobalR&D Program

RDR Design Matrix

GDER & D Board

GDEChange Control Board

GDEDesign Cost Board

GDE RDR / R&D Organization

Page 6: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 6

13-Feb-06

ICFA FALC

FALC Resource Board

ILCSC

GDEDirectorate

GDEExecutive Committee

GlobalR&D Program

RDR Design Matrix

GDER & D Board

GDEChange Control Board

GDEDesign Cost Board

GDE RDR / R&D Organization

Reporting

resourcestechnical

Page 7: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 7

13-Feb-06

ICFA FALC

FALC Resource Board

ILCSC

GDEDirectorate

GDEExecutive Committee

GlobalR&D Program

RDR Design Matrix

GDER & D Board

GDEChange Control Board

GDEDesign Cost Board

GDE RDR / R&D Organization

GDE

Page 8: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 8

13-Feb-06

ICFA FALC

FALC Resource Board

ILCSC

GDEDirectorate

GDEExecutive Committee

GlobalR&D Program

RDR Design Matrix

GDER & D Board

GDEChange Control Board

GDEDesign Cost Board

GDE RDR / R&D Organization

ILCDesignEffort

ILCR&D

Program

Page 9: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 9

13-Feb-06

GDE Structure and Organization

• Executive Committee for Baseline Configuration– GDE Director

• Barish

– Regional Directors • Dugan – Americas • Foster – Europe• Takasaki – Asia

– Accelerator Leaders• Yokoya - Asia• Raubenheimer - Americas• Walker - Europe

• Responsible for overall decisions and guidance of the GDE Program

GDEExecutiveCommittee

Page 10: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 10

13-Feb-06

GDE Structure and Organization

• GDE Groups– Design / Cost Engineers

• Shidara – Asia

• Bialowons – Europe

• Garbincius – Americas

– Siting, Civil Construction and Infrastructure• Baldy - Europe

• Enomoto – Asia

• Kuchler – Amercas

– Physics / Detectors (WWS chairs)• Brau - Americas

• Richard - Europe

• Yamamoto - Asia

– Accelerator Experts (44 GDE members)

Page 11: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 11

13-Feb-06

GDE Organizational Evolution for RDR

• Selected additions to the GDE following the BCD completion having needed skills in design, engineering, costing, etc

• Change Control Board– The baseline will be put under configuration control and a

Board with a single chair will be created with needed expertise.

• Design / Cost Board– A GDE Board with single chair will be established to

coordinate the reference design effort, including coordinating the overall model for implementing the baseline ILC, coordinating the design tasks, costing, etc.

• R&D Board– A GDE Board will be created to evaluate, prioritize and

coordinate the R&D program in support of the baseline and alternatives with a single chair

Page 12: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 12

13-Feb-06

Change Control Board (CCB) Nobu Toge (chair)

• The Change Control Board is responsible for maintaining the baseline configuration as defined in the Baseline Configuration Document. The first action of the CCB will be to finalize the BCD and put it under configuration control. In addition to maintaining the baseline, the CCB will assess R&D projects defined in the BCD that potentially can lead to improvements over the baseline in cost or performance. The CCB will define what needs to be demonstrated in these R&D projects, in order to be considered for a CCB action to replace the baseline.

• The CCB will work with the GDE EC to formalize levels for taking change control actions. Major changes in the baseline defined as changing costs by more than $100M or make significant changes in performance, schedule or risk will be recommended to the Director and GDE EC for final approval. For all other changes, the CCB will be the final authority.

Page 13: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 13

13-Feb-06

Change Control Board (CCB) Nobu Toge (chair)

Tom Markiewicz US

Shekhar Mishra US

Warren Funk US

Kiyoshi Kubo Asia

Masao Kuriki Asia

Carlo Pagani EU

Grahame Blair EU

Daniel Schulte EU

Page 14: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 14

13-Feb-06

CCB and the RDR

• The document defining the ILC configuration details at any given time is the BCD. It will evolve through change control actions.

• The RDR will have a different audience, goals and structure. The configuration descriptions in the RDR must be completely consistent with those in the BCD. (Some narrative from the BCD may be appropriate for the RDR, but this is not required).

• The RDR will emphasize the overall design and performance, project issues (costing , siting, etc.) and especially costing.

Page 15: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 15

13-Feb-06

Design Cost Board (DCB) Peter Garbincius (chair)

• The Design / Cost Board will be responsible for assessing and providing guidance for the overall RDR design effort program. The DCB initial goals will be to propose the overall structure and content for the RDR document to be developed by the end of 2006. It also will provide early guidance required to enable the design / cost effort to get fully underway by the time of the Bangalore GDE meeting.

• The DCB will set goals and milestones for producing the RDR, conduct design reviews and provide guidance and assessments of the RDR effort. The DCB will report to the Director and EC regularly as the design / cost effort progresses, reporting on early evaluations of costs, problems and changes needed in the BCD, etc.

Page 16: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 16

13-Feb-06

Design Cost Board (DCB) Peter Garbincius (chair)

Nan Phinney US

Ewan Paterson US

Robert Kephart US

Atsushi Enomoto Asia

Tetsuo Shidara Asia

Nobuhiro Terunuma Asia

Wilhelm Bialowons EU

Jean-Pier Delahaye EU

Alex Mueller EU

Page 17: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 17

13-Feb-06

DCB Board and the RDR

• The DCB is responsible for determining outline of the RDR document

• The DCB is responsible for developing the WBS, the schedules and milestones to achieve the RDR

• The DCB will be responsible to review the progress and results of the design / cost effort for the RDR

Page 18: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 18

13-Feb-06

The Design and Cost Guidance

• The Accelerator Leaders• Yokoya - Asia

• Raubenheimer - Americas

• Walker – Europe

Provide guidance to the RDR team on acclerator design

• The Design / Cost Leaders• Shidara – Asia

• Bialowons – Europe

• Garbincius – Americas

Provide guidance to the RDR team on costing effort

Page 19: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 19

13-Feb-06

Parametric Approach• Parametric approach to design

– machine parameters : a space to optimize the machine

– Trial parameter space, being evaluated by subsystems

– machine design : incorporate change without redesign; incorporates value engineering, trade studies at each step to minimize costs

Page 20: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 20

13-Feb-06

Global R&D Board (RDB) Bill Willis (chair)

• The Global R&D Board will be responsible for assessing and providing guidance for the overall R&D program.  The RDB will suggest priorities for the research facilities and R&D supporting the baseline, the R&D on alternatives to the baseline and selective R&D that could further the field in the longer term.  The mission will also include global assessments and recommended priorities for the detector R&D program and evaluate the balance between accelerator and detector R&D.

• The RDB will develop a proposal driven program, structured in the sense of defined goals, and milestones, and resources evaluated on a common basis to allow comparison across different regions and national funding systems.  It will conduct reviews and identify gaps in coverage of topics, resource or technical issues, duplications, and other concerns..

Page 21: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 21

13-Feb-06

Global R&D Board (RDB) Bill Willis (chair)

Padamsee US

Himel US

Wolski US

Hayano Asia

Higo Asia

Elsen EU

Lilje EU

Garvey EU

Damerell EU

Page 22: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 22

13-Feb-06

Approach to ILC R&D Program

• Proposal-driven R&D in support of the baseline design. – Technical developments, demonstration experiments,

industrialization, etc.

• Proposal-driven R&D in support of alternatives to the baseline– Proposals for potential improvements to the baseline,

resources required, time scale, etc.

• Develop a prioritized DETECTOR R&D program aimed at technical developments needed to reach combined design performance goals

Page 23: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 23

13-Feb-06

GDE Organization for Snowmass

•W

G1

LE

T b

dy

n.

•W

G2

Ma

in L

ina

c

•W

G3

a S

ou

rces

•W

G3

b D

R

•W

G4

BD

S

•W

G5

Ca

vity• GG1 Parameters• GG2 Instrumentation• GG3 Operations & Reliability• GG4 Cost & Engineering• GG5 Conventional Facilities• GG6 Physics Options

Technical sub-systemWorking Groups

Global Group

Provide input

Page 24: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 24

13-Feb-06

Technical Systems  

Vacuum systems

Magnet systems

Cryomodule

Cavity Package

RF Power

Instrumentation

Dumps and Collimators

Accelerator Physics

Global SystemsCommissioning, Operations & Reliability

Control System

Cryogenics

CF&S

Installation

Area Systems

e- e+ damping RTML main BDSsource source rings linac

Cost Roll-ups

Page 25: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 25

13-Feb-06

GDE Groups

GDE Groups

Design / Cost Engineering

Name Telephone Email

Wilhelm Bialowons +49 40 8998 (9) 3859 (Cell) Send Email

Peter Garbincius + 1 630 840 3693 Send Email

Tetsuo Shidara +81 29-864-1171 ext. 5685 Send Email

Siting, Civil Construction and Infrastructure

Name Telephone Email

Jean-Luc Baldy + 41 22 767 33 02 Send Email

Atsushi Enomoto +81-29-864 5688 Send Email

Vic Kuchler +1 630-840-3643 Send Email

Physics / Detectors

Name Telephone Email

Jim Brau +1 541 346-4766 Send Email

Francois Richard +33 164468463 Send Email

Hitoshi Yamamoto +81 22 795 6724 Send Email

see GDE webpages for all RDR contacts

Page 26: RDR:  Goals and Scope

GDE RDR Meeting - Fermilab 26

13-Feb-06

From Baseline to a RDR

Jan July Dec

2006

Freeze ConfigurationOrganize for RDR

Bangalore

Review Design/Cost Methodology

Review InitialDesign / Cost Review Final

Design / CostRDR Document

Design and Costing ReleaseRDR

Frascati Vancouver Valencia