SLPoneslp.com/wp-content/uploads/2015/01/WestStarbrochure.pdfPioneer Rd uas Rd e 3 Malaysia T u a s...

9
A PERFECT SPACE TO MEET YOUR BUSINESS NEEDS SLP INTERNATIONAL

Transcript of SLPoneslp.com/wp-content/uploads/2015/01/WestStarbrochure.pdfPioneer Rd uas Rd e 3 Malaysia T u a s...

A PERFECT SPACE TO MEET YOUR BUSINESS NEEDS

SLP INTERNATIONAL

01

Artist’s ImpressionSLP INTERNATIONAL

Evolve your business with the new and upcoming industrial space. West Star offers unprecedented flexibility and success where you’ll enjoy excellent connectivity. Let your business revolve close to the land and sea facilities and turn this accessibility into abundant opportunities. This B2 ramp-up industrial building is designed to facilitate efficient movement of equipment and goods. With functional design and space, West Star is ideal for most industries.

A PERFECT SPACE TO MEET YOUR BUSINESS NEEDS

Artist’s Impression

Artist’s Impression

03

SLP INTERNATIONAL

Jurong Port & Upcoming Tuas

Mega Port

Strategically located at the gateway of the thriving industrial hub, West Star is easily accessible to major expressways such as AYE and PIE. It is also situated just minutes away from the upcoming Tuas West Road and Tuas Crescent Road MRT stations.

PRIME LOCATION:

Tuas West Road MRT (u/c)

5 MINS DRIVE

Tuas Mega Port (u/c)

14 MINS DRIVE

Raffles Country Club

9 MINS DRIVE

Joo Koon MRT

12 MINS DRIVE

Jurong Gateway / Commercial Hub

21 MINS DRIVE

Tuas Checkpoint

10 MINS DRIVE

Jurong Port

18 MINS DRIVE

Pan Island Expressway (PIE)

12 MINS DRIVE

Jurong Point / Boon Lay MRT

18 MINS DRIVE

Retail & Amenities

Raffl es Country Club

Raffl es Marina

MRT Stations

Ayer Rajah Expressway (AYE)

9 MINS DRIVE

Expressway

05

Tuas

Sou

th B

lvd

Tuas

So

uth

Blv

d

Tuas Cres

Ben

oi R

dB

eno

i Rd

UPPER JURONG RD

International Rd

Juro

ng

Island

Hig

hw

ay

Jalan Boon Lay

Juro

ng West

Ave

Pioneer Rd North

UPPER JURONG RDRaffles Golf Club

JurongHill Park

JurongIsland

Tuas

Sou

th A

ve 3

Tuas W

est Rd

Pioneer Rd

Juro

ng

Pier Rd

Tuas South Ave 3

Tuas

Sou

th

Ave

9

Pio

nee

r Rd

No

rth

PAN

ISLAND EXPRESSWAY

PAN ISLAND EXPRESSWAY

Tuas South Ave 14

Tuas South Ave 12

Tuas South Ave 10

Tuas South Ave 8

Tuas South Ave 6

Tuas South Ave 11

Second Link

Tuas

Wes

t Dr

Tuas

Sou

th A

ve 5

Tuas South Ave 2

Benoi Sector

Shipyard RdPioneer Sector 2

Pioneer S

ector 1

Pasir Laba Rd

Tua

s So

uth

Blv

d

Jln Ahmad Ibrahim

AYER RAJAH EXPRESSWAY

AYER RAJAH EXPRESSWAY Jln Ahmad Ibrahim

Jurong Island Highway

Tuas South Ave 13

Pioneer Rd

Tuas R

d

Tuas

Sou

th A

ve 3

Malaysia

Tuas South Ave 4

SinopecLubricantS’poreCompany

Tuas Biomedical Park II

Tuas Biomedical Park I

Abbott ManufacturingSingapore

CIBA Vision

Hyflux Membrane Manufacturing

Keppel FELS Tuas South Yard

Shell Houdini

Sembcorp Marine Integrated Shipyard

Tuas Port(u/c)

Hyflux DesalinationPlant (u/c)

Kimberly ClarkAsia Pacific

Offshore Marine Centre

Tuas Power Station

WyethPharmaceuticals

Pfizer GlobalManufacturing

Singapore TechnologyMarine (St Marine)

MitsubishiChemical Infonics

TuasAmenity

Centre

Keppel Shipyard

TuasNaval Base

GlaxoSmithKline

PanasonicAsia Pacific

CleanTechPark

3M Innovation

F&N

Asia Pacific

Breweries

Sony Precision Engineering

Centre

S’poreEpson Ind

Circuit @ Tuas

Raffles Marina

Tuas Checkpoint & Fire Post

To Iskandar, Malaysia

Tuas Bus Terminal

Mead Johnson (u/c)

KeppelShipyardBenoi

KeppelFELS Crescent Yard

Jurong Shipyard

ExxonMobil

ExxonMobil

SingaporeRefiningCompany

SembcorpMarine

SingaporeDiscoveryCentre

TractorsSingapore

Keppel Logistics

PUB Jurong Water Reclamation Plant

NanyangTechnological

University(NTU)

JurongPoint

Tuas LinkU/CTuas LinkU/C

Gul CircuitU/C

Joo Koon

Boon LayPioneer

Tuas Cres U/C

Tuas West Rd

U/C

New

Via

duct U/C

New Viaduct U/C

Tuas

S

outh

Ave

1

Tuas

Sou

th A

ve 5

Tuas Bay Close

Tuas

Sou

th A

ve 7

Tuas

Ba

y D

rive

SLP INTERNATIONAL

• 20/40 Footer Accessibility• Wide Ramp Width of 9m• Wide Driveway of 10m• Multiple Roller Shutters for ease of Loading/Unloading at Doorstep• High 6m Floor-to-Floor Height• Heavy Floor Loading of up to 15kN/m2

• Plenty of Lorry Parking Lots at Doorstep

UNIQUE FEATURES:

High 6m Floor-to-Floor

Height

Heavy Floor Loading

Loading/Unloading @ Doorstep

Plenty of Lorry Parking Lots @ DoorstepArtist’s Impression

Artist’s Impression

07

SLP INTERNATIONAL

Type B1 Type B2Type A1

1ST STOREY PLAN

2ND STOREY PLAN

3RD STOREY PLAN

Type A1 Type A2 Staff Canteen

Type B1 Type B2

09

Plans not drawn to scaleSLP INTERNATIONAL

Type C1a Type C2 Type C3a Type C4

4TH STOREY PLAN

4TH STOREY MEZZANINE PLAN

Type C1a Type C2 Type C3a

Type C1 Type C2 Type C3

5TH STOREY PLAN

6TH STOREY PLAN

Type C1 Type C3

11

SLP INTERNATIONAL

Type D1

7TH STOREY PLAN

8TH STOREY PLAN

Type D2

Structure Floor-to-Floor Height:1st storey to 7th storey 6 metres approximately8th storey 6-8 metres approximately

Electrical:60 Ampere (3 Phase) c/w Tap –off Box to production units #01-05 to #01-48 at 1st storey150 Ampere (3 Phase) c/w Tap –off Box to production units #01-01, #01-02 at 1st storey60 Ampere (3 Phase) c/w Tap –off Box to production units #02-01 to #02-22 at 2nd storey and #03-01 to #03-23 at 3rd storey300 Ampere (3 Phase) c/w Tap –off Box to production units #04-01, #04-03, #04-05 at 4th storey, #05-01 to #05-03 at 5thstorey and #06-01, #06-03 at 6th storey150 Ampere (3 Phase) c/w Tap –off Box to production units #04-02, #04-04, #04-06 and #04-07 at 4th storey and #05-04 at 5th storey and #06-02, #06-04 at 6th storey700 Ampere (3 Phase) c/w Tap –off Box to production units #07-01, #08-01 at 7th to 8th storey300 Ampere (3 Phase) c/w Tap-off Box to temporary staff canteen

The purchasers have to provide their own distribution board for their outgoing power inclusive of AC use, exit and emergency lighting.

Functional Specifi cations:

S/No. Storey Units

1 1st & 8th 15kN/m2

2 2nd to 7th 12.5kN/m2

Floor Loading:

Disclaimer: The information contained herein is subject to change as may be approved by the authorities and cannot form part of an offer or contract. While every reasonable care had been taken to prepare this information, the developer or its agent cannot be held responsible for any inaccuracy. Illustrations shown are artist’s impressions and serve only as an approximate idea of the project. All artist’s impressions and plans are subject to any amendments as may be approved by the relevant authorities. All statements are believed to be correct but are not to be regarded as statement or representation of facts. The Sales and Purchase Agreement embodies all the terms and conditions between the Developer and the Purchaser and supercedes and cancels in all respects of all previous presentations, warranties, promises, inducements or statement of intention, whether written or oral made by the Developer and/or Developer’s agent which are not embodied in the Sale and Purchase Agreement.

13

SLP INTERNATIONAL

Developer : BH-ZACD (Tuas Bay) Development Pte LtdBuilding Plan No. : A0743-13656-2013-BP01 dated 4 March 2014Expected T.O.P Date : 31 March 2018Tenure : 30 years leasehold wef 7 August 2013Legal Description : Lot 2853A PT MK07 at Tuas Bay CloseExpected Date of Legal Completion : 31 March 2021

ENQUIRIES: 9227 0525 or visit www.weststar.com.sg

MARKETED BY:JOINTLY DEVELOPED BY:

SLP INTERNATIONAL