Page 1 CHAPTER NO. 15 SHEET PILING 1 Unless otherwise stated, the rate includes handling of materials with in 3 c 2 Rates for all finished works include the removal of surplus debris, unused m and by products. 3 For handling of all types of materials for shortleads including carriage upt (90 M) nothing is to be paid as extra. Where handling and carriage involves lead beyond 3 Chains, (90 M) carriage for whole of the distance should be pa The above notes are to be referred to all items of the chapter. DESCRIPTION OF ITEM NO 1: Cutting ransome and larson pile Detail Unit Rate (British System) per Qty Rate Per Unit (Rs.) Assumed for 1.25 cut Labour Blacksmith 0.25 No 170.00 P. Day Total Sundries 10 Percent Total Contractor's Profit & Over 20 Percent Total Item Rates Labour Rate Per Cut Rs. 56.10 44.88 Say 1.25

Transcript of Rate analsis Chapter No. 15 (Sheet Pilling)

Page 1: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 1

CHAPTER NO. 15

SHEET PILING

1 Unless otherwise stated, the rate includes handling of materials with in 3 chains (90M).2 Rates for all finished works include the removal of surplus debris, unused material

and by products.3 For handling of all types of materials for shortleads including carriage upto 3 Chains,

(90 M) nothing is to be paid as extra. Where handling and carriage involves an extralead beyond 3 Chains, (90 M) carriage for whole of the distance should be paid.

The above notes are to be referred to all items of the chapter.

DESCRIPTION OF ITEM NO 1: Cutting ransome and larson piles.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.25 cut

Labour

Blacksmith 0.25 No 170.00 P. Day 42.50

Total 42.50 Sundries 10 Percent 4.25 Total 46.75

Contractor's Profit & Overhea 20 Percent 9.35 Total 56.10

Item Rates

Labour Rate Per Cut Rs. 56.10 44.88 Say 44.90 1.25

Page 2: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 2

DESCRIPTION OF ITEM NO 2: Cutting universal Piles.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.25 cut

Labour

Blacksmith 0.37 No 170.00 P. Day 62.90

Total 62.90 Sundries 10 Percent 6.29 Total 69.19

Contractor's Profit & Overhea 20 Percent 13.84 Total 83.03

Item Rates

Labour Rate Per Cut Rs. 83.03 66.42 Say 66.40 1.25

Page 3: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 3

DESCRIPTION OF ITEM NO 3: Driving steel piles 25' to 30' (7.5 to 9 M).

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Sft

Labour

Skilled Cooly 4.25 Nos 160.00 P. Day 680.00 Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00

Total 960.00 Sundries 10 Percent 96.00 Total 1,056.00

Contractor's Profit & Overhea 20 Percent 211.20 Total rate for 125 Sft 1,267.20

Item Rates

Labour Rate Per 100 Sft Rs. ### 1013.76 Say 1,013.75 1.25

Labour Rate Per Sqm Rs. 109.08 Say 109.10

Page 4: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 4

DESCRIPTION OF ITEM NO 4: Driving steel piles more than 15' (4.5 M) andless than 25' (7.5 M).

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Sft

Labour

Skilled Cooly 4.00 Nos 160.00 P. Day 640.00 Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00

Total 920.00 Sundries 10 Percent 92.00 Total 1,012.00

Contractor's Profit & Overhea 20 Percent 202.40 Total rate for 125 Sft 1,214.40

Item Rates

Labour Rate Per 100 Sft Rs. ### 971.52 Say 971.50 1.25

Labour Rate Per SqmRs. 104.53 Say 104.55

Page 5: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 5

DESCRIPTION OF ITEM NO 5: Driving steel piles 15' (4.5 M) and under.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Sft

Labour

Skilled Cooly 2.50 Nos 160.00 P. Day 400.00 Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00

Total 680.00 Sundries 10 Percent 68.00 Total 748.00

Contractor's Profit & Overhea 20 Percent 149.60 Total rate for 125 Sft 897.60

Item Rates

Labour Rate Per 100 Sft Rs. 897.60 718.08 Say 718.10 1.25

Labour Rate Per SqmRs. 77.27 Say 77.25

Page 6: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 6

DESCRIPTION OF ITEM NO 6: Dolleying piles.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.25 No.

Labour

Dolly man (Skilled Cooly) 0.20 No 160.00 P. Day 32.00 Unskilled Cooly 0.20 No 140.00 P. Day 28.00

Total 60.00 Sundries 10 Percent 6.00 Total 66.00

Contractor's Profit & Overhea 20 Percent 13.20 Total 79.20

Item Rates

Labour Rate for Each Rs. 79.20 63.36 Say 63.35 1.25

Page 7: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 7

DESCRIPTION OF ITEM NO 7: Drilling holes in piles by hand.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 12 Holes

Labour

Blacksmith 0.33 No 170.00 P. Day 56.10

Total 56.10 Sundries 10 Percent 5.61 Total 61.71

Contractor's Profit & Overhea 20 Percent 12.34 Total 74.05

Item Rates

Labour Rate for Each Rs. 74.05 6.17 Say 6.15 12

Page 8: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 8

DESCRIPTION OF ITEM NO 8: Raising and lowering machine.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.5 Feet

Labour

Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 4.00 Nos 160.00 P. Day 640.00 Unskilled Cooly 2.00 Nos 140.00 P. Day 280.00

Total 1,090.00 Sundries 10 Percent 109.00 Total 1,199.00

Contractor's Profit & Overhea 20 Percent 239.80 Total 1,438.80

Item Rates

Labour Rate Per Foot Rs. ### 959.20 Say 959.20 1.5

Labour Rate Per Rm Rs. 3146.18 Say 3,146.20

Page 9: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 9

DESCRIPTION OF ITEM NO 9: Turning machine 90°.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.25 Jobs

Labour

Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 3.00 Nos 160.00 P. Day 480.00 Unskilled Cooly 5.00 Nos 140.00 P. Day 700.00

Total 1,350.00 Sundries 10 Percent 135.00 Total 1,485.00

Contractor's Profit & Overhea 20 Percent 297.00 Total 1,782.00

Item Rates

Labour Rate Per Job Rs. ### 1425.60 Say 1,425.60 1.25

Page 10: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 10

DESCRIPTION OF ITEM NO 10: Turning machine 135°.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.25 Jobs

Labour

Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 5.00 Nos 160.00 P. Day 800.00 Unskilled Cooly 5.00 Nos 140.00 P. Day 700.00

Total 1,670.00 Sundries 10 Percent 167.00 Total 1,837.00

Contractor's Profit & Overhea 20 Percent 367.40 Total 2,204.40

Item Rates

Labour Rate Per Job Rs. ### 1763.52 Say 1,763.50 1.25

Page 11: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 11

DESCRIPTION OF ITEM NO 11: Turning machine 180°.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.25 Jobs

Labour

Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 7.00 Nos 160.00 P. Day 1,120.00 Unskilled Cooly 7.00 Nos 140.00 P. Day 980.00

Total 2,270.00 Sundries 10 Percent 227.00 Total 2,497.00

Contractor's Profit & Overhea 20 Percent 499.40 Total 2,996.40

Item Rates

Labour Rate Per Job Rs. ### 2397.12 Say 2,397.10 1.25

Page 12: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 12

DESCRIPTION OF ITEM NO 12: Traveling machine (Light).

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.25 Chain

Labour

Fitter 1.25 Nos 170.00 P. Day 212.50 Skilled Cooly 8.00 Nos 160.00 P. Day 1,280.00 Unskilled Cooly 8.50 Nos 140.00 P. Day 1,190.00

Total 2,682.50 Sundries 10 Percent 268.25 Total 2,950.75

Contractor's Profit & Overhea 20 Percent 590.15 Total 3,540.90

Item Rates

Labour Rate Per Chain Rs. ### 2832.72 Say 2,832.70 1.25

Labour Rate Per 30 Meter Rs. 2832.72 Say 2,832.70

Page 13: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 13

DESCRIPTION OF ITEM NO 13: Loading and unloading piles.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.25 Ton

Labour

Unskilled Cooly 0.37 No 140.00 P. Day 51.80

Total 51.80 Sundries 10 Percent 5.18 Total 56.98

Contractor's Profit & Overhea 20 Percent 11.40 Total 68.38

Item Rates

Labour Rate Per Ton Rs. 68.38 54.70 Say 54.70 1.25

Labour Rate Per Tonne Rs. 53.84 Say 53.85

Page 14: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 14

DESCRIPTION OF ITEM NO 14: Dismantling piling machine.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.5 No.

Labour

Foreman 3.00 Nos 170.00 P. Day 510.00 Fitter 18.00 Nos 170.00 P. Day 3,060.00 Skilled Cooly 12.00 Nos 160.00 P. Day 1,920.00 Unskilled Cooly 9.50 Nos 140.00 P. Day 1,330.00

Total 6,820.00 Sundries 10 Percent 682.00 Total 7,502.00

Contractor's Profit & Overhea 20 Percent 1,500.40 Total 9,002.40

Item Rates

Labour Rate for Each Rs. ### 6001.60 Say 6,001.60 1.5

Page 15: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 15

DESCRIPTION OF ITEM NO 15: Erecting pilling machine.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.3 No.

Labour

Foreman 3.00 Nos 170.00 P. Day 510.00 Fitter 18.00 Nos 170.00 P. Day 3,060.00 Skilled Cooly 12.00 Nos 160.00 P. Day 1,920.00 Unskilled Cooly 9.50 Nos 140.00 P. Day 1,330.00

Total 6,820.00 Sundries 10 Percent 682.00 Total 7,502.00

Contractor's Profit & Overhea 20 Percent 1,500.40 Total 9,002.40

Item Rates

Labour Rate for Each Rs. ### 6924.92 Say 6,924.90 1.3

Page 16: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 16

DESCRIPTION OF ITEM NO 16: Carriage of pile machine under differentcondition.

Detail Unit Rate (British System) per Cut

Qty RatePer Unit (Rs.) Amount (Rs.)

Assumed for 1.25 Chain

Labour

Fitter 1.00 No 170.00 P. Day 170.00 Skilled Cooly 2.50 Nos 160.00 P. Day 400.00 Unskilled Cooly 3.75 Nos 140.00 P. Day 525.00

Total 1,095.00 Sundries 10 Percent 109.50 Total 1,204.50

Contractor's Profit & Overhea 20 Percent 240.90 Total 1,445.40

Item RatesLabour Rate Per Chain Rs. ### 1156.32 Say 1,156.30

1.25

Labour Rate Per 30 Meter Rs. 1156.32 Say 1,156.30

Page 17: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 17

Amount (Rs.)

Page 18: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 18

Amount (Rs.)

Page 19: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 19

Amount (Rs.)

Page 20: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 20

Amount (Rs.)

Page 21: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 21

Amount (Rs.)

Page 22: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 22

Amount (Rs.)

Page 23: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 23

Amount (Rs.)

Page 24: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 24

Amount (Rs.)

Page 25: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 25

Amount (Rs.)

Page 26: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 26

Amount (Rs.)

Page 27: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 27

Amount (Rs.)

Page 28: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 28

Amount (Rs.)

Page 29: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 29

Amount (Rs.)

Page 30: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 30

Amount (Rs.)

Page 31: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 31

Amount (Rs.)

Page 32: Rate analsis Chapter No. 15 (Sheet Pilling)

Page 32

Amount (Rs.)