RAMZAN MALIK

5
RAMZAN MALIK Dubai, UAE. GSM: +971 55 8832716 (Present) U.A.E. Driving License Holder 15 Years experience in Telecom Email: [email protected] Ramzanmalik.rk@gmail .co m OBJECTIVE: An engineering professional with over 15 Years of experience in the Telecom industry . Good exposure on installation, testing and operation. Possessing good techno commercial and administrative skills . Strong focus on 3G , UMTS, GSM, WCDMA, EDGE, GPRS, CDMA . Desires a position that will provide an opportunity to contribute substantially in business growth, efficiency and profitability. Skills & Abilities MANAGEMENT · Working as a PROJECT SUPERVISOR XAD TECHNOLOGIES (ETISALAT CONTRACTOR) GSM project initializing Ability to negotiate contract terms and conditions Established reports on expenditures incurred on projects. Integration of ERICSSON 3G/LTE/2G (RBS 6000 series) Supervision of installation of dual band GSM/WCDMA antenna and RRUs Expansion of sites using extra RSU Racks, fiber and trunk cables. Ericsson LTE RBS 6000 Installation and Integration

Transcript of RAMZAN MALIK

Page 1: RAMZAN MALIK

‍RAMZAN‍MALIKDubai, UAE.GSM: +971 55 8832716 (Present) U.A.E. Driving License Holder 15 Years experience in Telecom

Email: [email protected] Ramzanmalik.rk@gmail .com

OBJECTIVE:

An engineering professional with over 15 Years of experience in the Telecom industry . Good exposure on installation, testing and operation. Possessing good techno commercial and administrative skills . Strong focus on 3G , UMTS, GSM, WCDMA, EDGE, GPRS, CDMA .Desires a position that will provide an opportunity to contribute substantially in business growth, efficiency and profitability.

Skills‍&‍Abilities

MANAGEMENT‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍‍

· Working as a PROJECT‍SUPERVISOR XAD TECHNOLOGIES (ETISALAT CONTRACTOR)

GSM project initializing Ability to negotiate contract terms and conditions Established reports on expenditures incurred on projects. Integration of ERICSSON 3G/LTE/2G (RBS 6000 series) Supervision of installation of dual band GSM/WCDMA antenna and RRUs Expansion of sites using extra RSU Racks, fiber and trunk cables.

Ericsson LTE RBS 6000 Installation and Integration

COMMUNICATION

Good exposure on installation, testing and operation. Possessing good techno commercial and administrative skills . Strong focus on 3G , UMTS, GSM, WCDMA, EDGE, GPRS, CDMA .I am skilled person with strong background of Management. Having sound experience in the field of Operations especially in Telecom Operations with strong knowledge of different Applications which are used in Telecom sector and service industry. like, Tracer (used for task Management) ,CRM(Customer Relation Management), in retail industry.Worked on Etisalat ,Alcatel, Huweii and Zone during 206-H project.

Page 2: RAMZAN MALIK

Experience‍:

Working as a Project Coordinator/Controller XADTechnologies LLC UAE

(EtisalatProject FEB2015 to Till

Project Coordinator/Controller Leading the project team and coordinating the project matters related to projectContent.Implementing the agreed action plan to the agreed standards and deadlines.Ensuring the effective preparation and delivery of Uplifted FDHs.Responsible for the effective flow of information related to project between teamMembers and Etislat staff.Ongoing evaluation of project activity and reporting on project progress to theManagement.Submission of the final results of the uplifting project to the Etislat Management.Integration and commissioningof Ericsson RBS (6101,6102,6201,6201 & 6601)Complete installation of Ericsson equipment.Installation of RRU -B1,B3,B8 & B20

FCCI (Future Communication Company International), UAE- Feb 2012 TO FEB 2015

Working as Engineer‍for FLM‍,CM/PM(First Line Maintenance) for Du Project Responsible for maintenance and controlling of over 400 sites in DXB and Northern Emirates region .Thorough knowledge on Huawei software’s (LMT/web‍LCT) for networkAbility to handle Both‍CM (Corrective Maintenance) and PM (Preventive Maintenance) effectively.Thorough knowledge on Huawei software’s (LMT/LCT) for network configuration and fault localization.Alarm trouble shooting of 2G, 3G, 4G ,cabinets, BTS3900, BTS3900A,DBS3900Alarm trouble shooting of Huawei Microwave Link SD,HSB, FDAlarm trouble shooting of Antennas, RF cables for Huawei ProjectConduct VSWR, DTF and Return loss tests and clear the TX to RNC.Alarm trouble shooting of IBS and PAT for IBS Different type of connectors RJ45,RJ11,N Type Connectors , BNC.F.C, Din-MaleAbility to handle Both‍CM (Corrective Maintenance) and PM (Preventive Maintenance) effectively.Supervision of installation of dual band GSM/WCDMA antenna and RRUs Expansion of sites using extra RSU Racks, fiber and trunk cables. Patching Alarms & Verification on Site and Through NOC.

Page 2

Page 3: RAMZAN MALIK

Clearance of all external‍alarms and preparing site‍quality report.Planning and conducting Survey Reports, BTS and TXN Swap Activities.Accomplishing PAT‍and coordination with DT Engineer during Drive Test (DT). Response to Management e- mails and calls within time.Rectification of‍BTS3900 Huawei‍BTS/DBS,‍RTN620/RTN950

Etisalat, Dubai (UAE) - Mar 2011 To Feb 2012

Worked as Broadband TEAM‍LEAD for Etisalat GPON/Elife Dubai Project.

Configuration of internet modem (Aztech/Cisco/Gigaset/Linksys) and responsible for installation and laying of Ethernet cable for providing connectivity end to end.Fiber laying between FTTH , FTTX , FDH till customer end including fiber splicing and connector fixation.Transportation of Dangerous Goods TrainingSupervise Etisalat on demand OSP/ISP Operations in dubai region. Responsible for Quality of installation on both ends Joint closure / Etisalat Telephone room toCustomer locationsas per agreed standard.

FCCI (Future Communication Company International), UAE- Feb 2009 TO FEB 2011

Worked‍as‍TEAM‍SUPERVISOR‍in‍Huawei‍(Du)‍HSDPA‍Dubai‍Project.

Major‍responsibilities‍include:

Installation and Commission of Huawei BTS 3900 (Node B) of both Outdoor and indoor.Installation, Assemble and Commissioning of Huawei MW (0.3m, 0.6m, 1.2m, Hybrid) and indoor unit (RTN 620 & RTN680)as well.Alignment of 0.3m, 0.6m, 1.2m and 1+1 links.Assemble and Installation of RF (Tri Band, Dual Band) antennas with Triplexers & TMA accordingly RF design.Cut over (Swap) from 3G Nokia to Huawei 3G. Conduct cold and hot swap in IBS.Conduct VSWR, DTF and Return loss tests and clear the TX to RNC. Dismantling of RF and Nokia 3G cabinet.Installation of DDF and E1 patching.Installation of rectifier along with batteries. Power up RTN and Node B.Installation and Commission of Huawei BTS 3900 (Node B) of both Outdoor and indoor.Installation, Assemble and Commissioning of Huawei MW (0.3m, 0.6m, 1.2m, Hybrid) and indoor unit (RTN 620 & RTN610)as well.I am over 15 years of experience in providing best-in-class products and services making us the best choice for your In-Building DAS Project.We have turn-key experience in the lifecycle of in-building cellular reinforcement projects, including site survey, physical facility assessment, design, engineering, installation and testing.Alignment of 0.3m, 0.6m, 1.2m and 1+1 links.Commission and download the script of Node B.Conduct Pre‍PAT‍and‍PAT activities with customer.

Page 3

Page 4: RAMZAN MALIK

MOBILINK, Pakistan - April 2001 To Jan 2009Worked in Pakistan Mobile Company (MobiLink) as an EM and FLM Engineer .Troubleshooting on power systems with alarm rectifications.Coordination with NOC and other departments for fault resolution.Replacement of faulty power modules and preventive maintenance of related entities.Power cables laying and terminations with related electrical works. Replacement of breaker and surge arrestors.Maintained tools and equipment to ensure good working

Education Matric. (Science) Group. FA (Intermediate) D.A.E (Electrical)

·

Page 4