RAJYA KRISHI UTPADAN MANDI PARISHAD UTTAR...
Transcript of RAJYA KRISHI UTPADAN MANDI PARISHAD UTTAR...
2
Letter no- compcell /61/2013- Date- 26-08-2013
SORT TREM TENDER NOTICE
Sealed tenders are invited by office of UP Mandi Parishad from competent and eligible system
integrators for office Automation of UP Mandi Parishad.
The last date of bid submission is 16-09-2013 at 3.00 P.M. and the tender details can be seen at
our website www.upmandiparishad.in . The cost of tender document is Rs. 10,000/- (Non-
Refundable). The tender cost should be in the form of Bank Draft (nationalized bank only) in
favour of Senior Account Officer Rajya Krishi Utapadan Mandi Parishad, Uttar Pradesh payable
at Lucknow. The tender documents can be collected from Computer Section of Mandi Parishad.
Deputy Director (A/M)
Mandi Parishad-HQ
3
NOTICE DETAILS
Tender notice no. UPMANDI/COMP/23
Cost of tender document Rs. 10000/- in form of DD in name of Senior Account
Officer, Rajya Krishi Utpadan Mandi Parishad, UP
payable at Lucknow
EMD Amount 500000/-
Last Date ,Time and Place of submission of
technical & commercial bid
16-09-2013 14:00 Hrs at HO, UP Mandi Parishad,
Lucknow
Date, time and venue of technical bid opening 16-09-2013 14:00 Hrs at HO, UP Mandi Parishad,
Lucknow
Date, Time and venue of commercial bid opening 20-09-2013 14:00 Hrs at HO, UP Mandi Parishad,
Lucknow
Tender shall remain valid Till 06 months from the date of opening of technical bid
Name of the work Office Automation of UP Mandi Parishad
4
Definition:
� UP Mandi Parishad - Also referred as User
� COTS -Commercially off the shelf: The solution should be available Commercially Off-
The-Shelf (COTS). The software application should be readily deployable with or
without configuration to suit the customer’s specific process requirements and does
not involve developing the application from scratch. COTS software shall be
implementable or deployable and maintainable by any other competent agency other
than the manufacturer or agency which has developed the COTS software. Proposed
COTS software solution shall also be available with complete transparency including
operation manuals, help documents and source code.
� DD - Demand Draft
� GoUP - Government of Uttar Pradesh
� EMD - Earnest Money Deposit
� IT/ICT - Information and Communication Technologies
� RFP- Request for Proposal / Tender document / Bid document
� SLA -Service Level Agreement
� SP/SI - Service Provider. The terms Systems Integrator/ Implementation Partner /
Bidder / Vendor are also used interchangeably.
5
BIDDING PROCESS & CONDITIONS
1) To view- Tender Notice, Detailed Time Schedule and Tender Document kindly visit
website www.upmandiparishad.in
2) Technical & Commercial bid to be submitted as per following guidelines:
Envelope 1 : Technical Bid
EMD, Technical Bid.
This envelope will contain the EMD and Technical Proposal which shall be Sealed and super
scribed Technical Bid for “Office Automation of UP Mandi Parishad” prepared in
accordance with the requirements specified in this RFP and in the format prescribed.
The Technical Bid should be submitted as one hard copy and one non-rewritable CD
format. The words “Office Automation of UP Mandi Parishad” should be written on the CD. The Hard Copy shall be signed by the authorized signatory on all the pages before
being put along with the CD in the envelope and sealed. This envelope should not contain
any information about the pricing or the Commercial Proposal, in either explicit or implicit
form, in which case the bid will be rejected.
Envelope 2: Commercial Bid
The Commercial Bid shall be submitted in a sealed envelope as per the specifications in this
RFP and the forms prescribed.
The Commercial Bid shall be submitted in the form of a printed Hard Copy.
The Hard Copy shall be signed by the authorized signatory on all the pages before being
put in the envelope and sealed. The envelope should also be super scribed “Commercial
Bid – Office Automation of UP Mandi Parishad” at the top right hand corner and addressed to The THE DIRECTOR, UP Mandi Parishad at the address specified below.
Note: Unsigned Hard Copy of the Commercial Bid will lead to rejection of the bid.
Envelope 3
All the above two envelopes along with the bid covering letter should be put in envelope 3
which shall be properly sealed. The outside of the envelope must clearly indicate the name
of the project “Office Automation of UP Mandi Parishad” and addressed to THE
DIRECTOR, UP Mandi Parishad at the address specified. The package should also indicate
the last time and date for responding, the bidder’s name and address and the names of
primary and secondary contact persons, with their official email id.
The technical proposal and commercial proposals (together called the bid documents) along
with the outer envelope must be addressed to the following:
State Agricultural Produce Marketing Board, Uttar Pradesh
The Director, UP Mandi Parishad
Kisan Mandi Bhawan, Vibhuti Khand
Gomti Nagar,
Lucknow - 226010
Phone : 0522 - 2720383, 2720384, 2720405 Fax : 0522 - 2720382
6
The technical criteria for the SI and the OEM
1. The technical eligibility criteria is divided into two sections A. Eligibility criteria for the SI
B. Eligibility criteria for OEM of the proposed COTS and the proposed COTS
solution
2. The bids will be technically disqualified by UP Mandi Parishad in case of non-compliance
of these above A & B given criteria
The technical criteria for the SI
(All the self certificates to be signed by the Managing Director or above)
The bids will be rejected by UP Mandi Parishad in case of non-compliance of these
below given criteria.
1. Criteria related to Incorporation of the Firm, Legal entity:
a. The entity should have been operational in India for at least the last three financial years.(Certificate of incorporation /Firm registration certificate) .
b. The bidder must be a single legal entity and not be a proprietorship or
consortium of firms.(Self declaration)
2. Government Regulation
a. The company should not have been black listed (Self Declaration)
b. The company should have a Valid PAN number
c. The company should have a Valid Service tax number with proof of last year
service tax return
d. The company should have PF registration, attached last three month challans
as documentary proof.
3. Criteria related to financial viability. a. The total turnover of IT related works last three financial year ie 2010-11,
2011-12 & 2012-13 should be minimum Rs 12 crores. If audited balance
sheet of 2012-13 is not available CA certificate should be attached or self
certification of MD or above of company.
b. Company should be profitable in each of the last 3 financial years ie 2010-11,
2011-12 & 2012-13, submit documentary proof for same.
4. Active partnership agreement (MAF – Manufacturer’s Authorization Form) with
the COTS OEM to supply the licenses and to provide implementation services to
implement the solution in India.(MAF format as attached in the RFP document in
the Annexure). The MAF provided by the SI for the proposed COTS product has
to be the same as the product it intends to supply and implement at UP Mandi
Parishad
5. Bidders should have operational office in Lucknow. For those bidders not having office in Lucknow should submit a self declaration of opening an office in Lucknow
within one month’s time from award of the contract. (Self Declaration by
Managing director/company secretary of the company or Lease/regisrty
agreement is required)
6. Company should be an ISO 9001 2008 registered company in IT related
activities.(Certificate to be required)
7. Bidders belonging to the same group company or sister concern companies
cannot bid collectively.
8. Bidder must have provided IT solution to at atleast two Central Govt/ PSU/ State
Govt organization (PO to be attached) .
7
9. “No deviation” self certificate to be attached.
Technical criteria for the proposed COTS solution (Self certificates by the
OEM required to be submitted along with technical bid strictly in original
with seal & signature of Vice President and above of the organization.
Certificates should clearly mention the contact number, official email
address of the signatory)
The (OEM) of the COTS product should satisfy the following conditions.
1. OEM of the COTS product should have been offering its solution to Government
(State or Central) / Public Sector Units in India & must have “Gone live” at at
least 2 customers for more than 10 years.(Customer certificates required)
2. The COTS OEM’s average annual turnover for the last 3 financial year i.e. 2009-10, 2010-11 & 2011-2012 should be minimum INR 1500 crores from the
software sales and Consulting. (CA certificate to be submitted for the same)
3. The COTS OEM should have development centers in India also having at least
more than 2500 development programmers.(Self certificate required)
4. The COTS OEM should also have SLA based 24/7 x 365 days support center located in India with minimum 500 + support team.(Self Certificate required)
5. The COTS solution have been implemented and maintained by at least 7 System
Integrators in India.(Self Certificate with names of SI)
7. The COTS solution should also meet the following eligibility conditions (Self
Certficate required)
1. The COTS solution should have all the following functions as natively integrated
a. Financial Accounting and Costing
b. Sales Management
c. Customer Relationship Management
d. Inventory Management
e. Payroll and HR
f. Project Management
g. Integration Platform
h. File Management System.
2. The COTS solution should have all the given functions as natively integrated applications on a single interoperable open platform and not the integration
of multiple products and overlapping middle ware
3. The COTS Solution should support any of the Operating System- Microsoft
Windows, UNIX, Linux and the proposed integrated application should work
on any database. The product should be capable of running on any standard
RDBMS like – Sybase, Oracle , DB2 , MS SQL.
4. The COTS solution should provide wide range of security features such as Authentication, Single Sign-On (SSO), Authorization and Integrated User
management
5. The COTS solution should provide implementation, administration and
8
operational tool seamlessly integrated with the solution.
1. THE SCOPE OF WORK
Scope of work for the project is limited only to:
1) Automation of construction projects across all offices of construction related to UP
Mandi parishad using proposed COTS
2) Development of mobile application to capture real time information like images, geo
location at the construction site and integration of the same with the proposed COTS.
3) Generation of reports & dashboards for the monthly arrival data by consolidation of
data in proposed COTS from the existing MIS software.
4) Management and maintenance of UP Mandi Parishad Website and Message Board
with SMS gateway of 2 lac SMS pack
5) Data porting from the cut of date decided after the tender award date.
6) Supply of proposed solution licenses from reputed OEMs, to meet the requirements
of UP Mandi Parishad.
7) Configure the proposed COTS solution to automate the unique operational processes
of UP Mandi Parishad finance, construction, legal department.
8) Consolidation of MIS data in the proposed COTS solution from the existing MIS to
generate reports/ dashboards
9) Hosting of the proposed solution to support suggested users on a teir III data center
of required configuration.
10) Data Migration of the website, training and facilitating the adoption of the proposed
COTS solution by the users/employees of UP Mandi Parishad.
11) Providing Application management services post “Go live”
1. The scope of supply of proposed COTS (the solution specifications) and the scope of
services for implementation of the proposed COTS solution are defined by using all
the following areas in conjunction with each other
a. The processes of the organization
b. The geographical locations
c. The solution modules of the proposed COTS Solution
d. The solution features/capabilities
e. The solution users
f. The current applications to be replaced/ integrated
g. Integration requirements
h. The implementation phases, activities and approach
9
The organizational scope
The scope of implementation of the COTS solution and the scope of solution
capabilities/modules to be deployed will be required to cover the processes of the
following units/functions of UP Mandi Parishad
No. Functions/units of UP Mandi Parishad
1 HQ - Administration
2 HQ - Accounts & Finance
3 HQ – Construction
4 Deputy Director Construction (DDC)
5 Deputy Director Administration (DDA)
6 Mandi’s MIS Dashboard
7 Legal Department
8 Establishment Department - Payroll
DDC
Mandi’s will raise a requisition for the construction activities to the DDC. This request will be
in a manual format. The DDC will punch this request in the system with all the necessary
information into the proposed COTS solution and send the same to the Superintendent
Engineer(SE)
DDC also functions as a monitoring body of existing projects. UP Mandi Parishad also aims
to automate the project monitoring process by capturing the real time status of the project
using mobile platform and hand held devices. Capture images at the project location tagged
with geo location and uploading into the proposed COTS solution for the monitoring and
verification purpose. Mobility platform should be capable of handling offline/ online features
and also capable of handling popular mobile OS’s like Andriod, Blackberry, I OS etc.
DDC is also responsible for the award of contracts once an approval is received from the HQ
– Administration for a particular project.
SE:
SE will scrutinize the request received by the various DDC’s against the standard norms
and documentation. Based on the completeness and necessary approvals from the
stakeholders within DDA approved requisitions will be then forwarded the HQ –
Construction. Proposed COTS should be capable of handling workflows and authentications
at multiple levels within the departments. Strong document management system should
natively integrate with COTS solution.
Construction department at HQ:
10
Construction department will evaluate all the requests received from the SE. They will also
scrutinise the requisitions against the completeness of the necessary documentation &
formalities. In case of existing project the funds allocation history will be checked. Based on
the situation Construction department might seek clarifications from the SE and then
forward the requisition to the Accounts & Finance department
Accounts & Finance at the HQ:
Accounts& finance basically functions to allocate funds against the requisitions. Seek
clarifications from any department in case of gap in between budgeted vs actual. Ensure
that the funds are managed in lines with all the statutory requirements. Following functions
have to be met by the COTS solutions
1. Accounts & Finance
1. Budget – Financial Accounting
a. Software packages are available; their integration is to be done
b. Grant-in-aids receipts and expenditure (Plan, Non-Plan)
c. Generation of reports for submission to the Ministry in prescribed Formats
Monthly Expenditure Statement for Plan and Non-Plan based on financial
accounting
d. Storage of various documents/circulars for ready reference
2. The account module will have integration with all the departments for budget
provisioning. The accounts module will also have the integration with the all
revenue generation.
3. Masters
a. Account Head Definition
b. Account Grouping and Sub-Grouping
c. Bank Account Details
d. Vendor Details
4. Departmental Process
a. Budget Preparation, Distribution and Management System
b. Budget Classification
c. Department-wise estimated provision, revision for income and expenditure
d. Budget Appropriation between different budget heads through approval process
e. Administrative approval / dis-approval of works linked to budget availability
5. Reports
a. Cheque/ Cash Deposit Slips into Bank
b. Capture of Cheque Dis-honor cases, Remittance entry
6. Payment Management
a. Bill / Liability Entry
b. Payment Authorization
c. Payment Voucher (Full or Partial Amount)
11
d. Maintaining Check details, Check Printing
e. Recording of Check Issuance Details
f. Recording of Cheque Cancellation details
g. Security Deposit / Earnest Money Deposit Management
7. Reports
a. Cost Centered Accounting Reports
b. Ratio Analysis, Trend Analysis
c. Department-wise, Cost Center-wise Income / Expenditure reports
d. Generation of Deposit Slips
e. Security Deposit Register
f. Investment Register
g. Advance Register
h. Bill Register
i. Payment Register
j. Outstanding Bill Register
k. Reports on Receivables
l. Cash Book (Detailed & Summary)
m. Function-wise Expense Subsidiary Ledger
n. Journal Book
o. Ledger Book
p. Cheque Issue Register
q. Trial Balance, Income & Expenditure Statement
r. Balance Sheet
s. Bank Reconciliation Statement
t. Cheque Dis-honour Report
u. Analysis on unspent amount of previous years
v. All standard reports available as a part of proposed COTS
Administration department at the HQ
Administration department functions as an approval body to the requisitions raised by the
DDC for existing as well as new projects.
Monthly MIS data consolidation:
UP Mandi Parishad also aims to consolidate all the MIS data received from across 250
Mandis. Out of 250 Mandis, 25 Mandi’s use software to capture the daily MIS data.
Proposed COTS should be able to import data from the file generated by the MIS software
and create consolidated reports. Monthly reports and executive dashboards should be a
configured using proposed COTS.
Establishment department : Payroll scope:
Establishment department will be covered under this initiative to automate the process
and maintain data regarding the employee service book management and payroll
processing should also be considered under this scope. Broad level payroll scope will
cover the following aspects
12
� Pay Slip generation
� Calculation of Gross Salary and Deductions
� (Calculation Pay, Grade Pay, Special Pay/Personal Pay, Dearness
� Allowance, Dearness Allowance Arrears, House Rent Allowance,
� Travelling Allowance, DA on TA and other allowances)
� (Deductions on account of Prof. Tax, Income Tax, GPF
� Deductions of installments and interest on account of various advances given to the
employees towards purchase of bicycle, Scooter, Car, Computer, House Building
Advance etc.)
� Calculation of TDS, Income Tax, Form 16 and its form generation
� Generation of pay slips and various statements for payment of salary in the banks
� Generation of bills / reports for various remittances for bank payments
� Consolidation of log generated out of biometric attendance machine with the COTS
to calculate monthly attendance and calculate salary accordingly
� Maintaining the record and Generation of CPF slips.
� Various statements/reports generation e.g. list of employees on payroll, list of
employees on the basis of dues/recovery etc.
� Employees Service record keeping
The Location Scope
1. Since the operation of UP Mandi Parishad is spread across various locations in state of Uttar Pradesh, the implementation services will be spread across Head office,
DDA, DDC, DDE sample locations within lucknow district.
2. While the Project location will be at the UP Mandi Parishad, for the purpose of
development, testing etc.
3. The processes at different locations, the DDC’s, SE’s & Mandis would be from
Lucknow district after accessment, through cross section of sample units.
4. The training of the users of the proposed COTS from the different locations will be
conducted Common Training Centers at Mandi HO at Lucknow.
5. A snap shot of the likely occurrence of different activities at different locations, is provided in the following table
Activity HQ DDA DDC
Process Study � � �
Configuration �
Testing/Feedback � �
Data migration � � �
User Training � �
Go Live � � �
User Adoption � � �
Support & Maintenance �
The Solution modules
1. UP Mandi Parishad based on its understanding of the general features and
13
functional capabilities, has identified certain modules, which would constitute the
core back office transaction system. The bidders are free to propose the COTS
solution module based on their assessment of the operations and the capabilities
of the COTS solution.
2. The modules of the core back office transactional system will integrate the
following departmental activities:
a. Financial Accounting and Costing b. Revenue management system
c. Integration Platform
d. Business intelligence platform
e. Mobility platform
f. Project management
g. Establishment department (Payroll Calculation)
3. The COTS solution should have all the following functions as a natively integrated
Note: All the functions will not be utilized in this project neither are in current
scope of work but UP Mandi Parishad foresee to have all these modules &
features implemented in a phase wise approach in near future.
a. Financial Accounting and Costing
b. Revenue management system
c. Integration Platform
d. Business intelligence platform
e. Mobility platform
f. Project management
a. Establishment department (Payroll Calculation)
4. The COTS Solution should support -any of the Operating System- Microsoft
Windows, UNIX, Linux and the proposed integrated application should work on
any database. The product should be capable of running on any standard
Databases like –Oracle , DB2 , MS SQL, Sybase.
5. The COTS solution should provide implementation, administration and
operational tool seamlessly integrated with the solution.
Tentative users base
The COTS solution and the implementation services is expected to cover the following user
base of the organization.
Sr. No.
Department Users
1 HQ Admin 10
2 HQ Accounts and Finance 25
3 HQ Construction 10
4 DDC Construction 40
14
5 SE Administration 10
6 Legal 05
7 Project Monitoring 40 Mobile Users
8 Dashboard Users 5
9 Payroll 900
The Key activities and services
The scope of activities and services to be provided by the SI as part of the Project
are expected to be the following
1. Solution integration and implementation services
a. Business design based on the assessment of the operations of UP Mandi
Parishad and the current IT applications in use
b. Configuration / customization of the proposed COTS Solution
c. Data migration for each of the applications, functions into the proposed
COTS solution.
d. Formulation of cut over strategy and go live
e. Consolidation with other applications as required.
2. Project Management services
a. Deployment of a competent team of experts in the area of the proposed
COTS, specific functional areas and in project management
b. Scheduling the activities so as to complete the project to all the locations
and functional areas of UP Mandi Parishad within a span of nine to twelve
months of starting the project.
c. Deployment of resources to ensure that the project activities are carried out
as per plan.
d. Deployment of a project structure for effective monitoring, review and risk
mitigation
3. Project quality services
a. Deployment of experts with deep knowledge of the processes of the specific
industries and the solution modules, for review
b. Deployment of templates and standard accepting mechanisms for the
project deliverables
c. Use of natively integrated tool for managing project repository, and project
activities
4. Feedback, monitoring and adoption
a. UP Mandi parishad may use the services independent third party expertise to
assess, review and quality control of the project artifacts and deliverables
b. The SI will institutionalize mechanisms to adopt the feedback and ensure
quality of work, without affecting the project timelines
15
c. The SI will put together a structure and mechanism for ensuring that all the
key functional areas, users of each of the enterprises are consulted,
feedback adopted and key differences identified, so as to facilitate
standardization as well as user adoption.
5. Training and documentation
a. Training all the users
b. Preparation of user manuals
c. Documentation of processes
d. Training the key executives for monitoring the performance and using the
reports effectively
6. Support services
a. Facilitating user adoption
b. Continuous improvement and refinement of the processes, reports
c. Operations of help desk and refresher training.
d. Institutionalizing structures and processes for management of SLA, strategic
control
7. Technical services
a. Sizing the hardware based on the configuration and usage requirements &
suggesting the same in the technical proposal.
b. Provide support to the department to choose the right configuration &
hosting of the same whether in house or at SDC.
The support Services
1. Help desk operations - Initial Response Immediate telephonic response and
support for usage related and other minor problems. Dial-in support for
handling, minor bug fix.
2. Onsite support - On-site support for hand holding the users, database recovery and data synchronization after crash, performance tuning, bug fix, update for all
critical functions.
3. OEM support – Ensuring proposed COTS Solution OEM services for system
performance, performance tuning, upgrades etc.
4. Documentation - upgrade the Documentation system on any new releases and
provide any updates of technical and functional manuals
2. THE PROJECT PHASES AND PLANS
The SI is required to deploy a comprehensive Methodology for implementation of the
proposed COTS Solution at UP Mandi Parishad to ensure that the organization is able to
achieve the objectives of the project and able to harness the capabilities of the COTS
solution completely. The implementation methodology should aim for streamlining
implementations and deliver faster results to all the stakeholders of the project. At the
core of the project methodology is
•••• Proposed COTS solution implementation activities
16
•••• Post implementation support
•••• Implementation Approach and methodology
•••• Project plan and structure
The Proposed COTS solution implementation activities
1. The Core implementation Activities: The methodology shall be well-defined and
structured in approach. It should adhere to the globally accepted best practices of
COTS implementation and should cover the following broad phases or work elements
1) Preparation of the project 2) System Study/Business Process Design
3) Configuration/Customization
4) Testing & Acceptance 5) Data Migration
6) User and Technical training
7) Cut over and “Go Live”
8) Post implementation support(AMS)
2. Preparation phase: The project preparation will focus on creating the project charter, interfacing mechanisms, the training, the day to day action plan till the
completion of the next immediate stage, familiarization of the SI team with UP
mandi Parishad operations and the UP Mandi Parishad team with the action plan of
SI etc.
3. Preparation of business and template design: After carrying out system study,
detailed AS-IS & TO-BE documents shall be prepared during this stage .The
analysis of AS-IS and TO-BE business processes, gaps in relation to best practices
as per COTS system have to be identified. After carrying out analysis of the
business processes, gaps in relation to best practices as per COTS system have to
be identified.
4. Realization Phase: Based on the functionalities designed, SI shall be responsible for:
a. Identification: Based on the approved business design SI will undertake the system configuration and customization. After completion of configuration
/ customization to the product, System Integrator shall carry out a trial run
with UP Mandi Parishad data. If the need arises and the result is not up to
the expectation of UP Mandi Parishad management, further reconfiguration
will be done by the System Integrator in order to close any gap left in
meeting the desired objective. Finally approved/accepted solution will be
delivered as “System Configuration” document and the same should be
implemented at locations that are identified within the scope of this project.
b. Configuration: In order to minimize upgrade costs, UP Mandi Parishad
would like to use standard features of proposed COTS Solution and the
implementer is expected to make the necessary “Configuration” entries in
proposed COTS Solution to achieve the business needs. The configuration
includes small routines using User-exits and developing screen variants as
needed by the business by setting fields attributes - to hide, display and
make them mandatory fields.
c. Customization: UP Mandi Parishad intends to implement standard COTS
Solution functionality as far as practically possible and to adopt the business
17
processes of the standard proposed COTS Solution and the leading practices
available in the offered solution. However SI is required to undertake
customization that may be needed in line with the changed, improved or
specific business processes requirement prepared during Business design
phase of the implementation.
d. Development: In case the SI intends to develop any application as part of
the application to suite the requirements of UP Mandi Parishad, such a
development has to be restricted to minimum and has to be necessarily be
on the same platform as that proposed for the COTS application.
e. In cases where SI recommends that the Customization is needed through
software development, UP Mandi Parishad reserves the option to get Expert
help to resolve the Functionality gap. In case it is proved that the
functionality gap can be taken care through “Configuration” without resorting
to “Development Customization”, then Configuration would be preferred
option.
5. Testing & Acceptance: The SI shall provide standard functionality test suites for testing the modules. For software the SI shall prepare the test plan and shall get it
approved by UP Mandi Parishad. Test Data for different scenario (Test Cases) will
be prepared in consultation with the users concerned for testing the modules. The
pre-commissioning tests shall be carried out to assess the following but not limited
to:
a. Conformance to the functional requirements,
b. Performance of the system with reference to response time and accuracy,
c. User friendliness.
d. Simultaneously, the documentation will also be reviewed by the user to
ensure its accuracy and clarity.
6. System Testing: The System Integrator is required to prepare procedures detailing
the steps for conducting System Tests, which are accepted by UP Mandi Parishad.
The System Integrator shall after development and customization/configuration of
the proposed COTS Solution, conduct tests to demonstrate that the system meets
all the requirements (functional and technical) specifications as brought out in this
RFP and would be in accordance with the procedures detailed in approved To-Be
process document.
7. On the basis of these tests, a report would be submitted by the System Integrator
for review and approval by UP Mandi Parishad. The test results and response times
should be demonstrated by the SI during the testing phases (System, integration &
Stress and Load testing) at each UP Mandi Parishad location in an
environment/infrastructure as mutually agreed upon by UP Mandi Parishad and the
SI.
a. Developing a Test Plan to support Function Testing and System/ Integration
Testing and ensuring that the testing of the software is comprehensive and
auditable and preparing test cases for User Acceptance Testing (UAT).
b. Testing of the entire new system, as part of system integration testing. And
testing of the data conversion and migration to the new system, as part of
system integration testing. Integration testing shall be carried out to ensure
cross function modules are integrated and transaction data is flowing across
the modules accurately.
18
c. Developing acceptance test procedures to ensure conformance to the
required process operations response time, the integrity of the software after
installation, and to eliminate any operational bugs. This will include:
o Fine tuning of the software, ensuring all required related component
software are installed and any debugging required.
o At the satisfactory conclusion of these Acceptance Tests to the
satisfaction of UP Mandi Parishad, the commissioning/ implementation
of the software shall be considered to be complete for the respective
location.
8. Data Migration: Migration of data in the new system is responsibility of SI from the
cut off date after the date of tender allocation. UP Mandi Parishad along with SI will
jointly decide on what data will be migrated and UP Mandi Parishad will take the
responsibility of collecting and making the data available in digitized form as per
the format suggested by the SI. A detailed plan for data migration is expected from
system implementer during the initial stages of the project, which will include data
to be migrated, templates for upload of data and data
collection/digitization/migration timelines.
9. Most of the data migration required for starting the work from the cut of date
decided after the award of tender will be from the existing systems. However
wherever the data has to be captured from physical sources, that activity will be
facilitated by the SI and the actual work of data entry will be executed by UP Mandi
Parishad.
10. End-User Training - The purpose of end user training is to ensure that all end users are adequately prepared and able to perform their job functions at “usage ready”.
Training content will depend on the function performed by the end-user; therefore
several user profiles will be established.
11. Cut Over Strategy: The SI has to evolve & detail a comprehensive cut over strategy
including initial data take on, sequence of data take on, set up of support helpdesk,
helpdesk procedure to minimize business impact of cut over activities.
12. The SI is required to undertake the following to review readiness for “Go Live”:
a. Facilitate in setting up central help desk for any queries
b. Review the health, usage and performance of the system till it stabilizes
c. Ensuring resolution / Documentation of all issues raised during
implementation
d. Final configuration/ integration, volume and stress testing
e. Switch over to production environment.
13. Declaration of “Go Live” – the system will be declared “Go Live” when the following
tasks/activities are accomplished satisfactorily
a. Acceptance testing
b. Hardware recommendation
c. Data migration
d. Training
e. User creation / role identification
19
f. Help desk
14. Acceptance of “Go live” – the go live will be accepted only after successfully generating at least one balance sheet for the complete operations, for one financial
quarter or successfully using the system for three months after declaring go live,
whichever is longer.
15. User Adoption Support: The System Integrator shall provide User adoption support,
by deputing technical and functional consultants at the client site after
implementation of COTS Solution at that site. During the Implementation period
prior to “Go Live”, the System Integrator would support UP Mandi Parishad users in
using the system.
Post implementation support
1. After launching of the proposed COTS solution or making it “Go Live”, the SI will
provide user adoption and stabilization support for the implementation services for
3 months from the date of “Go Live” period. During this phase, the SI will take up
task related to bug fixing (if any) in customization made in the system by the SI,
maintain back-ups of the implemented system and coordinating with COTS Solution
OEM for any base COTS solution related issues. Some of the other activities in this
period will include but not limited to
a. Post “Go Live” Support Strategy
b. Hand holding the users
c. Post “Go Live” Monitoring
d. Post “Go Live” Review
e. Monitoring and fine tuning system response
The implementation Approach
1. Adoption of best practices & methodology: Process Improvement will be done to
enable UP Mandi Parishad to adopt some of the best practices embedded in the
proposed COTS Solution. The areas that can bring maximum benefits will be
identified by SI in close coordination with UP Mandi Parishad process owners. SI will
also bring in knowledge of the best practices adopted by other organization to the
UP Mandi Parishad implementation. Since process improvement is a part of overall
implementation plan, SI should recommend possible places of process
improvement, detailed in the plan.
2. SI is required to capture all the processes in practice at all the locations of UP Mandi Parishad at the time of implementation of the proposed COTS. Wherever
possible UP Mandi Parishad would like to adopt the best practices and standard
processes available with the proposed COTS solution, including Reports and Forms
to the extent possible.
3. The below list of objects developed or changes to standard objects shall be considered as “Configuration” and not as “Customization or development”. The SI
shall not expect or propose any additional charges for developing these objects. It
is expected that such efforts are part of the normal effort for implementation of the
proposed COTS solution
20
a. Use of COTS solution provided Customer/ User Exits to achieve specific
process requirements/ expectations
b. Configuration of Field selection and Screen Layouts
c. Definition and assignment of User Defined statuses for various objects
d. Definition of Authorization Controls and Assignment
e. Configuration of standard Workflows
f. Seamless integration across all COTS solution modules and engines or any
other third party solutions proposed to meet the requirements of UP Mandi
Parishad
g. Reports developed in the different functional area using Report Writer/
Report painter
h. Reports and Variants based on different solution modules/engines along with
specific reports.
i. Change to COTS standard reports/ information systems to define and enable
User Specific Variants
j. Change to COTS standard forms to incorporate standard texts and UP Mandi
Parishad logo and formatted to address the UP Mandi Parishad formats.
k. Conversion Programs developed for migrating Master Data and Open Data for
“usage ready” from existing applications.
4. Plan for customization/development – The SI should plan for following
developments as a part of the normal effort for implementing the COTS Solution.
5. Documentation: The SI shall ensure preparation of complete documentation of all
configuration settings, customized applications, other activities, steps / stages
involved in the implementation including the source code for the customized
product developed for UP Mandi Parishad. The SI shall prepare the business process
document, end-user manual and training document.
6. Solution Documentation - The System Integrator will provide detailed final system
documentation for reference of UP Mandi Parishad. System Integrator shall prepare
the final user manual incorporating all details of all menus and functionality
provided by the system.
7. Use of the native Project management tool - The SI will use the native project
management tool to record the entire activities of the project including but not
limited to:-
a. The business design documents with version control review comments
b. The minutes of the meeting
c. System documentation
d. Issue lists, resolutions
e. Training materials
21
The implementation Methodology
The methodology to be deployed by the SI to implement the COTS solution will have
different work elements and activities. All these activities and the work elements
should coherently focus on achieving the following key results
• Quality of the solution deployed
• Customer satisfaction while deploying and during usage
• Successful implementation in terms of completeness and timely
accomplishment of the outcome
1. Critical activities of Implementation: While there are different techniques and tools
available as a part of the methodology, the following are expected to be part of the
implementation methodology to be adopted by the SI
a. Workshops with different stake holders for capturing business requirements,
creating awareness of best practices, communicating the changes, building
consensus on process design, for signing off the deliverables etc. These need
to be organized at different intervals and in different places throughout the
duration of the projects as demanded by the context.
b. Stake holder consultation other than workshops, with those stake holders who will be identified by UP Mandi Parishad, for the purpose of critical inputs,
review, suggestions, process description etc.
c. Review sessions with different stake holders for signing off the deliverables,
walking through the deliverables for facilitating quick understanding
d. Documentation of proceeding – recording the developments, discussions,
deliverables, using standard methodology and native tools available with the
COTS solution
e. Work standards/practices for documentation, configuration, testing, data
migration etc
f. Training the different stake holders, on a continuous basis
2. Project Deliverables: There will be multiple deliverables expected to be delivered by
the SI during the course of the project. SI is free to propose any additional
deliverable, based on their experience of delivering similar projects, which can
enhance the quality of work. It is expected that the project will move from one
phase to the next only when the deliverables of that phase are accepted. Some of
the key deliverables which will signal the successful completion of each of the
phases will be
a. Project Preparation – project charter, project plan
b. Business Template - Business and Template Design Report
c. Realization – configuration, implementation, integration reports
d. Testing - Test Plan, Test Reports
e. Data Migration – Plan, templates, completion report
f. Training – Training materials / documents
g. Go Live – Cut over strategy document
3. Deliverables acceptance criteria
22
a. The acceptance criteria for each phase is the submission and acceptance of all
deliverables specified for that phase. The formal acceptance by UP Mandi
Parishad of the phase deliverables constitutes completion of the phase and
approval to launch the next phase and invoice UP Mandi Parishad for
payment.
b. Acceptance criteria for each deliverable will be established in accordance with the process described in the following paragraph prior to the beginning of
each phase.
c. SI should provide templates of proposed deliverables. At the onset of each
phase, SI will meet with UP Mandi Parishad Project Manager to review the
applicable templates, tailored to accommodate the needs of the project, and
agree on the scope, format, and content of each of the major deliverables for
that phase.
4. Project Standards: SI to provide Project Standards for various
activities/documentation. Following is a minimum list where standards have to be
set by the SI:
a. Test cases
b. Test scenarios
c. Business Process Design
d. Functional design specs,
e. Technical design specs
f. Transporting objects
g. Change control
h. Reporting defects
5. Project Success Criteria: The finished proposed COTS solution meets planned scope
and specifications
a. No issues pending at the end of support period
b. “on-line” transactions of all implemented modules – No backlog / offline
transaction data entry during the last month of support
c. The project is completed on time & All Users adopt the software according to
plan
23
Commercial terms & condition:
Note: only the bids those will qualify technically with accurate documentation will be
considered for commercial opening.
1) Estimated period to complete the project is as follows:
A) Implementation & Integration of the COTS solution : 6 Months
B) Application management services(AMS) : 18 months
2) The bidder is required to provide the price under separate headings, as given in the
format for commercial proposal:
Commercial table for Software Solution T1:
No. Service /Solution elements Base Price Tax With
tax
Total
price In
words
1. Proposed COTS License cost
2. Annual Maintenance Contract (AMC) for
License during the implementation and AMS
3. Implementation Services of COTS with
Operational Training to the Concern
Employees till go live
4. Application management services post Go-live
till the end of tenure of the project
5. Website Maintenance with respect to current
functionalities
6. Message board service for UP Mandi Parishad
for 400 users with current functionality
Commercial table for Hosting, Manpower
7. Required computing capacity for running
24
above proposed cots solution, website and
message board with 5 terabyte usable storage
on tier 3 data centre on hosting model for 24
months.
8. Project Manager( 1 no.)
9. Database Administrator ( 1 no.)
10. Website Programmer ( 1 no.)
11. Data Entry Operator ( 10 no.)
12. COTS Certification of two Employees on any
one COTS module selected
Total (To be considered for L1)
3) Prices to be quoted in INR. This is a fixed price project without any scope for
varying the price during the 24 months contract period. All above requirements in
table T1 ( item no 7 to 12 ) are for tenure of 24 months and would be paid quarterly
advance. No clauses for price fluctuations due to fluctuation of the Indian currency
against any of foreign currency will be accepted during the period of the contract. It
should be separately and clearly indicated how the local taxes will be applied for
selling these services by a registered entity in India to UP Mandi Parishad, Lucknow
4) For the purpose of costing, the bidders are requested to take the Head
Quarters as Kisan Bhavan, Lucknow. All the rates in the proposal should be valid for
6 months from the date of opening of the technical bid. The other locations of UP
Mandi Parishad where the project team may have to visit for the purpose of the
project are the training locations and the locations of the individual organization
entities listed in the RFP. The bidder is required to bear the cost of movement/stay
of its people from its office to the Project sites as well to the other project locations
within Lucknow during the project. The bidder is required to ensure that the costing
covers the accommodation, costs related to travel & food for the project team of the
bidder. Expenses for the senior executives of the bidder to attend the monthly
review meeting of the steering committee should be borne by the bidder.
All the communication costs between the project team at the project sites and the
company offices will be borne by the bidder. The costs incurred by the project team
of the bidder for travel to the other offices and project sites of UP Mandi Parishad, or
its customers, partner’s etc. for the purpose of the project will be borne by bidder.
The bidder is expected to price fully in the commercial proposal for all the services
being provided by it to UP Mandi Parishad. Any assumptions about possible future
recovery of the under-priced items shall be at the risk of the bidder.
25
5) The bidder should provide all prices, quantities as per the prescribed formats.
The bidder should not leave any field blank. In case the field is not applicable, bidder
must indicate “0” (zero) in all such fields.
6) If, during the Contract Period, there is any change in the applicable Laws in
India with respect to taxes and duties which increases or decreases the cost
incurred by the Bidder in performing the Services, then such payments, otherwise
payable to the Bidder under this Contract shall be increased or decreased
accordingly. Such increase or decrease in the contract shall be valid on the invoice
submitted on or after the date of such changes brought into force only.
7) UP Mandi Parishad reserves the right to ask the bidder to submit proof of
payment against any of the taxes, duties, levies indicated. Prices quoted in the bid
must be firm and final and shall not be subject to any change.
8) The Commercial bid should clearly indicate the price to be charged
without any qualifications whatsoever and should include all taxes, duties,
fees, levies, works contract tax and other charges as may be applicable in
relation to the activities proposed to be carried out. It is mandatory that such
charges wherever applicable/payable should be indicated separately as Breakdown
of Cost Components.
Payment Terms
����COTS License
Reference: Table T1 – Line item # 1 & 2
• Licenses of the proposed COTS + AMC of licenses for the proposed COTS: 50% on
Order and 50% after 15 days from delivery.
����Implementation phase:
Reference: Table T1 – Line item # 3
• 15% Project Preparation
• 40% Business design phase
• 40% Realization phase
• 5% - After the end of 1 month post “Go live” support
Note: All the above payments will be made on successful completion and sign off of
the below mentioned milestones.
26
Reference: Table T1 – Summary of Commercial offer
����Application Management Services phase:
Reference: Table T1 – Line item # 4
• Payment for Application management services post Golive will be made on a
quarterly advance basis.
���� Website Maintenance & Message board services.
• Payment would be done after raising the invoice within 7 days after delivery
����Hosting, Managed Services and Manpower Services :
• Payment would be done quarterly advance after submission of invoice by the SI
within 7 days for table T1 line item # 7,8,9,10,11,12
Payment Milestone definition & timelines for COTS implementation.
Below given is the detailed explanation of each milestone
Milestone 1: Project Preparation - Estimated period 1 month
• Defining Project goals and objectives
• Preparing the Project organization and standards
• Defining the implementation strategy
• Defining the overall Project schedule and implementation sequence
• Establishing the Project organization and committees
• Preparing the Project charter
• Identifying and Assigning resources for SI and UP Mandi Parishad
• Technical requirements planning for development servers and PCs for the
Project team.
• Prepare executive kick-off meeting and sign off document for Milestone 1.
Milestone 2: Business Design - Estimated period 2 months
• Define the Baseline scope Refine the overall Project schedule and
implementation sequence
• Develop System Environment - Install Development System
• Sizing documents of Quality and Production Server
27
• Define Business Organization Structure
• List gaps & developments identified
• Quality check business design phase
• Business Process Definition / Documentation and sign-off
Milestone 3: Realization – Estimated period 2 months
• Baseline Configuration and Confirmation
• Install Quality Assurance System
• Final Configuration and Integration Testing
• Technical System Management, Install Training Systems
• Establish Authorization Concept
• End User Documentation and Training Material
• Quality check Realization phase
• End User Training
• Installation and readiness of Production server
• Data Migration and Cut Over
• Sign off of the following documents as part of the realization phase completion:
1. Functional Specifications
2. Configuration Documents
3. User acceptance testing document
4. User Manuals sign off.
Milestone 4: Go Live Estimated period 1
• Production Support
• Post Go-Live Activities
• Establish internal help desk
Period of Validity of Bids
1. For the purpose of entering into a definitive contract for the project services for UP
Mandi Parishad, as proposed by the bidder, the proposals shall be valid for a period
of 12 months from the last date for submission of the proposals. A proposal valid for
a shorter period may be rejected as non-responsive.
2. On completion of the validity period, unless the bidder withdraws its proposal in
writing, it will be deemed to be valid until such time that the bidder formally (in
writing) withdraws his proposal.
28
3. In exceptional circumstances, at its discretion, UP Mandi parishad may solicit the
bidder's consent for an extension of the validity period. The request and the
responses thereto shall be made in writing by email.
4. On signing of the contract, the prices quoted in the commercial proposal for different
solution components will be valid for the period of the contract, executed between
the successful bidder and UP Mandi parishad.
Correction of errors
1. Bidders are advised to exercise adequate care in quoting the prices. No excuse for
corrections in the quoted price will be entertained after the proposals are opened. All
corrections, if any, should be performed before submission, failing which the figures
for such items may not be considered.
2. Arithmetic errors in proposals will be corrected as follows: In case of discrepancy
between the amounts mentioned in figures and in words, the amount in words shall
govern. The amount stated in the proposal form, adjusted in accordance with the
above procedure, shall be considered as binding, unless it causes the overall
proposal price to rise, in which case the overall proposal price shall govern.
Calculation of the value of the commercial proposal
1. The summation of the values provided in the Format for commercial response will be
the value of the commercial proposal of the particular bidder.
2. Each element in this Format is expected to be the summation of each of the tables
provided for breakup of the respective price elements
3. The values provided in the break up forms will be used for contracting purpose and
for addressing any changes to the scope of work during the period of contract.
4. Reconciliation between the tables, if there are discrepancies between them will be
done using the following method.
a. If any of the elements in the main response format higher than the
summation of the corresponding forms for break up, post commercial
evaluation, the lower value in the corresponding table will be used for
contracting.
29
b. If any of the element in response form is lower than the summation of the
breakup forms, post commercial evaluation the value provided in the
response form will be used for contracting and the bidder will be required to
readjust the price of different elements of the corresponding table, to reflect
the value provided in response form which was used in evaluating the value
of the bid.
Terms & conditions for awarding the contract
1. UP Mandi Parishad will award the Contract to the bidder whose proposal has been
determined to be the successful bidder. Successful bidders should qualify all the
technical criteria and should be the lowest one as per the commercial bid.
2. Prior to the expiration of the validity period, UP Mandi Parishad will notify through a
“Letter of Intent”, to the successful bidder in writing or by facsimile or email, that
their proposal has been accepted and under consideration for signing a contract.
3. The notification of award and issue of Letter of Intent will not constitute the
formation of the contract.
4. The successful bidder who has been issued with a letter of intent is expected to
furnish a Performance Bank Guarantee (PBG) for an amount which is 5% of the
contract value excluding taxes.
5. The contract between the successful bidder and UP Mandi Parishad will come into
force only upon the bidder and UP Mandi Parishad signing the contract with the
successful bidder.
6. If the successful bidder fails to furnish the Performance Bank Guarantee, within the
specified period and subject to specified conditions, UP Mandi Parishad has the right
to withdraw the notification of award and next qualified bidder shall be awarded the
project.
7. If the successful bidder tries to alter the Commercial Proposal or the Technical
Proposals, with something which were not part of the proposals and which are in
variance with the basic spirit and letters of the proposals, while signing the contract,
UP Mandi parishad has the right to withdraw the notification of award and the bidder
will forgo the EMD furnished during the bidding process.
30
8. If the successful bidder fails to get into a contract with UP Mandi Parishad as per the
Commercial Proposal and the Technical Proposal submitted against this RFP, and all
the commitments made during the evaluation process, UP Mandi Parishad has the
right to withdraw the notification of award and the bidder will forgo the EMD
furnished during the bidding process.
9. Failure of the successful bidder to agree with the Terms and Conditions of the RFP,
the terms as put forward by UP Mandi Parishad and/or the failure to present the
Performance Bank Guarantee within the stipulated period and/or non-fulfilment of
the condition of executing a contract by the successful bidder shall constitute
sufficient grounds for the annulment of the award, and forfeiture of EMD. In such an
event UP Mandi Parishad may award the contract to the next best value bidder or
call for new proposals
10. Expenses for the Contract-The incidental expenses of execution of agreement /
contract shall be borne by the successful bidder.
11. UP Mandi Parishad reserves the right to verify all statements, information and
documents submitted by the bidder in response to this RFP for the purpose of
prequalification. Any such verification or lack of such verification by UP Mandi
parishad shall not relieve the respondent of its obligations or liabilities hereunder nor
will it affect any rights of UP Mandi Parishad there under.
12. In case it is found during the evaluation of the responses or at any time during the
subsequent procurement process or before signing of the contract or after its
execution and during the period of project execution resulting out of the contract
thereof, that one or more of the pre-qualification conditions have not been met by
the respondent, or the respondent has made material misrepresentation or has
given any materially incorrect or false information, the respondent shall be
disqualified forthwith if not yet awarded the contract either by issue of the letter of
intent or entering into a contract.
13. In case of such termination and penal actions, UP Mandi Parishad shall reserve the
right to seek penalty to cover the cost of damages including the cost of
implementation and opportunity loss due to time spent on implementation.
14. Consequences of disqualification
If a bid or a proposal is disqualified, the bidder will not be eligible to participate
in the bidding process initiated by this RFP. If the proposal/bid is disqualified, it
will not be processed further and the same will be communicated to the bidder
31
through email/fax. No further correspondence from the bidder with the UP Mandi
parishad will be entertained. Documents submitted as a part of the proposal and
which have been opened at the time of disqualification will not be returned to the
bidder.If the disqualification is for the reasons of fraudulent or corrupt practice,
UP mandi parishad has the right to initiate action to black list the bidder.
Performance Bank Guarantee
1. The successful bidder shall at their own expenses deposit with UP Mandi Parishad,
along with agreement, an unconditional and irrevocable Performance Bank
Guarantee (PBG) to UP Mandi Parishad payable on demand, for the due performance
and fulfilment of the contract(s) by the bidder.
2. This Performance Bank Guarantee will be for an amount equivalent to 5% of value
of the contract(s). All incidental charges whatsoever such as premium, commission
etc. with respect to the performance bank guarantee shall be borne by the bidder.
3. The Performance Bank Guarantee shall be valid till 25 months from the date of work
order.
4. Subject to the terms and conditions in the Performance Bank Guarantee, at the end
of support and maintenance period, the Performance Bank Guarantee will lapse. The
Performance Bank Guarantee may be discharged/ returned by UP Mandi parishad
upon being satisfied that there has been due performance of the obligations of the
bidder under the contract. However, no interest shall be payable on the performance
bank guarantee.
5. Penalty clause: In the event of the bidder being unable to provide service to UP
Mandi Parishad in reasonable time, UP Mandi Parishad can invoke the PBG.
Notwithstanding and without prejudice to any rights whatsoever of UP Mandi
Parishad under the contract in the matter, the proceeds of the PBG shall be payable
to UP Mandi Parishad as compensation for any loss resulting from the bidder’s failure
to perform/comply with its obligations under the contract. UP Mandi Parishad shall
notify the bidder in writing of the exercise of its right to receive such compensation
within 30 days, indicating the contractual obligation(s) for which the bidder is in
default and giving hin 15 days time to explain his side of the case.
32
6. UP Mandi Parishad shall also be entitled to make recoveries from the bidder’s bills,
Performance Bank Guarantee, or from any other amount due to him, the equivalent
value of any payment made to him due to inadvertence, error, collusion,
misconstruction or misstatement.
Bid Acceptance,Complaints and Dispute Resolution
1. Director Mandi Parishad Rajya Krishi Utpadan Mandi Parishad, Lucknow reserves the
right to reject any or all the tenders without assigning any reason whatsoever. Rajya
Krishi Utpadan Mandi Parishad would not be under any obligation to give any
clarifications to those Bidders whose tenders have been rejected.
2. If any of the bidders have any complaints or reservations on the
bidding/procurement process, the evaluation etc. the competent authority to be
contacted for resolution will be The Principal Secretary Agricultural Marketing and
Agricultural Foreign trade .
3. The decision of the competent authority on the complaints or disputes will be final.
4. Cost of Resolution – Each party will bear the cost incurred by them for resolving the
issues.
5. All the disputes shall be subjects to the jurisdiction of Lucknow Court.
33
MAF Format (in original on the company letter head)
To, Date
THE DEPUTY DIRECTOR(A/M),
UP Mandi Parishad,
Lucknow,
Uttar Pradesh
Subject: Issue of the Manufacturer’s Authorisation Form (MAF)
Reference: Tender No Office Automation of UP Mandi Parishad
WHEREAS, We OEM name, having our registered office at
that our parent company,
official producer of the name of Software.
OEM name Ltd. has its production facilities at “address of the OEM”
This is to confirm that we hereby authorize “Bidders name” with their registered office at
,”address of the bidder” , to submit a bid in relation to the above Tender, the purpose of
which is to provide the Software listed below as per the terms of license agreement
We hereby extend our warranty with respect to our Software in accordance with terms of
our Standard License Agreement, offered by the above firm in reply to this Invitation for
Tender No: Office Automation of UP Mandi Parishad
Yours Sincerely,
For “OEM name”
Authorized Signatory Contact number:
Official email:
34
Format for Bank Guarantee (PBG) towards Performance Security
PERFORMANCE GUARANTEE
Ref. No. ______________________________ Bank Guarantee No _____
Dated _________________
To,
The Director
UP Mandi Parishad
Lucknow, UP
Dear Sir,
1. In consideration of UP Mandi Parishad having their offices at Lucknow, Uttar Pradesh
(hereinafter referred to as UP Mandi Parishad, which expression shall, unless repugnant
to the context or meaning thereof, include all its successors, administrators, executors
and assignees) after receipt of the LOI dated _______________ with
M/s__________________________ having its registered/head office at
______________________(hereinafter referred to as the 'CONTRACTOR') which
expression shall, unless repugnant to the context or meaning thereof include all its
successors, administrators, executors and assignees) and UP MANDI PARISHAD having
agreed that the CONTRACTOR shall furnish to UP MANDI PARISHAD a performance
guarantee for Indian Rupees .............. for the faithful performance of the entire CONTRACT.
2. We (name of the bank) ______________________________ registered under the laws of
_________ having head/registered office at __________________________ (hereinafter
referred to as "the Bank", which expression shall, unless repugnant to the context or
meaning thereof, include all its successors, administrators, executors and permitted
35
assignees) do hereby guarantee and undertake to pay immediately on first demand in
writing any /all moneys to the extent of 05% of the contract __________ (Indian
Rupees/)_____________________________ ) without any demur,
reservation, contest or protest and/or without any reference to the CONTRACTOR.
Any such demand made by UP MANDI PARISHAD on the Bank by serving a written
notice shall be conclusive and binding, without any proof, on the bank as regards the
amount due and payable, notwithstanding any dispute(s) pending before any Court,
Tribunal, Arbitrator or any other authority and/or any other matter or thing whatsoever, as
liability under these presents being absolute and unequivocal. We agree that the
guarantee herein contained shall be irrevocable and shall continue to be enforceable
until it is discharged by UP MANDI PARISHAD in writing. This guarantee shall not be
determined, discharged or affected by the liquidation, winding up, dissolution or
insolvency of the CONTRACTOR and shall remain valid, binding and operative against the
bank.
3. The Bank also agrees that UP MANDI PARISHAD at its option shall be entitled to
enforce this Guarantee against the Bank as a principal debtor, in the first instance,
without proceeding against the CONTRACTOR and notwithstanding any security or
other guarantee that UP MANDI PARISHAD may have in relation to the Contractor’s
liabilities.
4. The Bank further agrees that UP MANDI PARISHAD shall have the fullest liberty without
our consent and without affecting in any manner our obligations hereunder to vary any of
the terms and conditions of the said CONTRACT or to extend time of performance by
the said CONTRACTOR(s) from time to time or to postpone for any time or from time
to time exercise of any of the powers vested in UP MANDI PARISHAD against the said
CONTRACTOR(s) and to forbear or enforce any of the terms and conditions relating to the
said agreement and we shall not be relieved from our liability by reason of any such
variation, or extension being granted to the said CONTRACTOR(s) or for any forbearance,
act or omission on the part of UP MANDI PARISHAD or any indulgence by UP MANDI
PARISHAD to the said CONTRACTOR(s) or any such matter or thing whatsoever which
36
under the law relating to sureties would, but for this provision, have effect of so relieving us.
5. The Bank further agrees that the Guarantee herein contained shall remain in full force
during the period that is taken for the performance of the CONTRACT and all dues of
UP MANDI PARISHAD under or by virtue of this CONTRACT have been fully paid and its claim
satisfied or discharged or till UP MANDI PARISHAD discharges this guarantee in writing,
whichever is earlier.
6. This Guarantee shall not be discharged by any change in our constitution, in the
constitution of UP MANDI PARISHAD or that of the CONTRACTOR.
7. The Bank confirms that this guarantee has been issued with observance of appropriate laws
of the country of issue.
8. Notwithstanding anything contained herein above, our liability under this Guarantee is
limited to Indian Rs. (in figures) ______________ (Indian Rupees (in words)
____________________) and our guarantee shall remain in force
until______________________.(indicate the date of expiry of bank guarantee) Any claim
under this Guarantee must be received by us before the expiry of this Bank
Guarantee. If no such claim has been received by us by the said date, the rights of UP
MANDI PARISHAD under this Guarantee will cease. However, if such a claim has been
received by us within the said date, all the rights of UP MANDI PARISHAD under this
Guarantee shall be valid and shall not cease until we have satisfied that claim.
In witness whereof, the Bank through its authorized officer has set its hand and stamp on
this........ day of ........20___ at .....................
WITNESS NO. 1
-------------------------- -------------------------
(Signature) (Signature)
Full name and official Full name, designation and
Address (in legible letters) address (in legible letters)
With Bank stamp
Attorney as per power of
Attorney No.............
WITNESS NO. 2 Dated………….
--------------------------
(Signature)
Full name and official
Address (in legible letters)