Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded Cost Cost ge above Completion costing more (Rs.) (Rs.) Ibelow than Rs. 1 SOR Crore value April NIL NIL NIL NIL NIL NIL NIL NIL May 1 Construction of Roadbed, Major and Minor 162.33Cr. 186.12 Cr. 14.65% = MIs Larsen Toubro, ECC Division 3rd 24 months + Bridges and Track Linking (Excluding Supply floor Transmission line Railway, 6months ( Defect of Rails, Thick Web switches and Line PSC Electrification Business Unit, Mount liability period) Sleeper), S & T and OHE & General Poonamali Road, Manapakkam, Chennai- Electrical work in connection with 3rd line 600089 between Panskura- Kharagpur (45 Km) on Kharagpur Division of South Eastern Railway in West bengal State, India. June NIL NIL NIL NIL NIL NIL NIL NIL July NIL NIL NIL NIL NIL NIL NIL NIL August NIL NIL NIL NIL NIL NIL NIL NIL September NIL NIL NIL NIL NIL NIL NIL NIL October NIL NIL NIL NIL NIL NIL NIL NIL November NIL NIL NIL NIL NIL NIL NIL NIL December NIL NIL NIL NIL NIL NIL NIL NIL January'10 1 Design, Supply, Erection, Testing & 8.16 Cr. 7.94Cr. 5.63% RVNUKOUEUPSI/OT/09/01N M/s.PSC Engineers Pvt. Ltd. 18 months + 180 Commissioning Of 132/27 Kv, 2 X 30142 (below) 01-11/2241 Dt.28-01-2010 IT Building(3rd Floor),Benfish,31, days (Defect MVA, Traction-Sub-Station , with an G.N.Block, Sector -V, Salt Lake City, liability period) additional bay and replacement of one Kolkata 700091. existing 13/20MVA capacity, modification of 132KV incomming and out going 25KV Power Supply, TSS feeding post, with other associated works at Balichak Sub-Station, along with modification of opposite gantry in connection with 3rd line between Panskura- Kharagpur under Kharagpur Division Of South Eastern Railway in the State of West IRpnn~1 . February'10 NIL NIL NIL NIL NIL NIL NIL NIL March'10 NIL NIL NIL NIL NIL NIL NIL NIL Aoril'10 NIL NIL NIL NIL NIL NIL NIL NIL ~ RVNL

Transcript of Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of...

Page 1: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Rail Vikas Nigam limitedKolkata

Details of tenders/contracts awarded upto June'2012

Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time ofawarded Cost Cost ge above Completion

costing more (Rs.) (Rs.) Ibelowthan Rs. 1 SORCrore value

April NIL NIL NIL NIL NIL NIL NIL NILMay 1 Construction of Roadbed, Major and Minor 162.33Cr. 186.12 Cr. 14.65% = MIs Larsen Toubro, ECC Division 3rd 24 months +

Bridges and Track Linking (Excluding Supply floor Transmission line Railway, 6months ( Defectof Rails, Thick Web switches and Line PSC Electrification Business Unit, Mount liability period)Sleeper), S & T and OHE & General Poonamali Road, Manapakkam, Chennai-Electrical work in connection with 3rd line 600089between Panskura- Kharagpur (45 Km) onKharagpur Division of South Eastern Railwayin West bengal State, India.

June NIL NIL NIL NIL NIL NIL NIL NILJuly NIL NIL NIL NIL NIL NIL NIL NILAugust NIL NIL NIL NIL NIL NIL NIL NILSeptember NIL NIL NIL NIL NIL NIL NIL NILOctober NIL NIL NIL NIL NIL NIL NIL NILNovember NIL NIL NIL NIL NIL NIL NIL NILDecember NIL NIL NIL NIL NIL NIL NIL NILJanuary'10 1 Design, Supply, Erection, Testing & 8.16 Cr. 7.94Cr. 5.63% RVNUKOUEUPSI/OT/09/01N M/s.PSC Engineers Pvt. Ltd. 18 months + 180

Commissioning Of 132/27 Kv, 2 X 30142 (below) 01-11/2241 Dt.28-01-2010 IT Building(3rd Floor),Benfish,31, days (DefectMVA, Traction-Sub-Station , with an G.N.Block, Sector -V, Salt Lake City, liability period)additional bay and replacement of one Kolkata 700091.existing 13/20MVA capacity, modification of132KV incomming and out going 25KVPower Supply, TSS feeding post, with otherassociated works at Balichak Sub-Station,along with modification of opposite gantry inconnection with 3rd line between Panskura-Kharagpur under Kharagpur Division OfSouth Eastern Railway in the State of WestIRpnn~1 .

February'10 NIL NIL NIL NIL NIL NIL NIL NILMarch'10 NIL NIL NIL NIL NIL NIL NIL NILAoril'10 NIL NIL NIL NIL NIL NIL NIL NIL

~

RVNL

Page 2: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time ofawarded Cost Cost· ge above Completion

costing more (Rs.) (Rs.) /belowthan Rs. 1 SORCrore value

May'10 1 Construction of Road bed, Major and Minor 56.93 Cr. 65.47 Cr. 14.99% No. RVNUKOU2009/PST- MIs Premco Rail Engineers Limited, 18 months +Bridges and Track Linking (Excluding Supply (Above) MOU/Tender (Part-I)/3204 dt. B-304, City Centre Block-DC, Sector - I, 6months ( Defectof Rails, Thick Web Switches and Line PSC 05.05.2010 Salt Lake City, Kolkata - 700064. liability period)Sleeper), S&T and OHE & General Electricalwork in connection with construction of 3rd

line between Posoita - Manoharpur (11.6Km)on Chakradharpur Division of South Eastern

Railway in Jharkhand State, India"

June'10 1 Construction of Road bed, Major and Minor 56.49 Cr. 56.96Cr. 0.826% No. RVNUKOU2010/RGA- MIs KEC International Ltd. 18 months + 180Bridges and Track Linking (Excluding Supply (Above) TMZlRoadbed/KEC/3423 MIs Asia Communication & Electronics days (Defectof Rails, Thick Web Switches and Line PSC 0129.06.2010 Sdn. Bhd. & MIs Unique Builders (JV) liability period)Sleeper), S&T and OHE & General Electrical O/c KEC International Limited,1 st Floor,work in connection with construction of 3rd Building No.9A, DLF Cyberline between Rajgoda - Tamluk Doubling City, Phase - III,(13.5 Km) Phase -II of Panskura - Haldia Gurgaon - 122002. Haryana (India)Doubling in Kharagpur Division of South

Eastern Railway in West Bengal State, India

July 1 Construction of structural Shed with Gantry, 87.54 Cr. 84.21 Cr. 3.80% No. RVNUKOU2010IDLCI MIs SIMPLEX INFRASTRUCTURES 12 months fromAdministrative and othr Buildings along with (Below) SIMPLEx/3608 dt. 26.07.2010 LIMITED. Simplex House, 27, the date of issueancillary works (Civil, tele Communication, Shakespear Sarani, Kolkata - 700017. of LOA.

Illumination and electrification) in connection,with setting up of Diesel Loco Component

factory for manufacturing and subassembling of EMD Locos, etc. of DAnkuni

of Eastern Railway in the State of WestBenaal INDIA.

Auaust NIL NIL NIL NIL NIL NIL NIL NILSeptember 2 Construction of new line between Dankuni- 147.48 Cr. 89.70 Cr. 3.76% No. RVNUKOUDKAE - F. MIs totem Infrastructure Limited - MIs 30 month + 6

furfura Sharif via Jangaloara (20 km) in (Below) Sharif New LinelTotem - Premco Rail Engineers Limited (JV) months (DefectHowrah Division of Eastern Railway in the Premco/4404 dt. 20.09.2010 6, Totem House, Dwarkapuri Colony, Liability period)state of West Bengal, INDIA. Punjagutta, Hyderabad - 500082.

Design, Supply, Erection, Testing & 9.105 Cr. 8.65 Cr. 4.997% RVNUKOUGOL-MOUITSSNol M/s.G.E.T. Power Pvt. Ltd. 18 months + 180Commissioning Of 132/27 Kv, 2 X 30142 (below) II 0124.09.2010 153, Developed Plot, Electrical and days (DefectMVA, Traction-Sub-Station , Feeding Post Electronic Industrial Estate, Perungudi, liability period)with othre associate works at Goelkera - Chennai - 600096.Psoita section under ChakradharpurDivision of South Eastern Railway in theState of Jharkhand.

October NIL NIL NIL NIL NIL NIL NIL NILNovember NIL NIL NIL NIL NIL NIL NIL NIL

\ ~ot '

I

RVNL

Page 3: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time ofawarded Cost Cost ge above Completion

costing more (Rs.) (Rs.) Ibelowthan Rs. 1 SORCrore value

December 2 Package - I : "Construction of viaduct 206.30 Cr. 181.14Cr. 12.19% No. RVNUKOUMETRO/JOKA- Simplex Infrastructure Limited 30 month from theincluding related works for 4.748 km length Below BBD BAGITENDER/2/BEC File Simplex House, 27, Shakespear Sarani, date of issue ofexcluding station areas from CH (-)1250 to Vol-1/PACKAGE-1 dt, Kolkata - 700017. LOA.

CH 4128.00 between Joka to Behala 28.12.2010Chowrasta including depot approach at Joka,in Joka-BBD BAG corridor of Kolkata Metro

Railwav Line."Package - II : "Construction of viaduct 206.50 Cr. 184.72 Cr. 10.54% No. RVNUKOUMETRO/JOKA-

including related works for 4.762 km length Below BBD BAGITENDER/2/BEC Fileexcluding station areas from CH 4128.00 to Vol-1/PACKAGE-11 dt,CH 9700.00 between Behala Chowrasta to 28.12.2010.

Mominpur in Joka-BBD BAG corridor ofKolkata Metro Railway Line."

Januarv'11 NIL NIL NIL NIL NIL NIL NIL NILFebruary'11 2 Execution of Desing & Construction of PSC 223 Cr. 199.87 Cr. 10.37% No. RVNUKOUNOA-BARA- MIs CCCL - SAM India (JV) 30 month + 6

viaduct, Embankment and stations including (Below) DAKS/METROITENDER/(R)/1 Khivraj Complex, #2, 8th Floor, months (DefectE&M works in connection with extension of dt04.02.2011 480, Anna Salai, Nandanam, Liability period)Metro Railway line Naopara (excluding) - Chennai - 600035.

Baranagar - Dakshineswar of Kolkata Metro.

Construction of Roadbed, Major and Minor 171.02 Cr. 113.54 Cr. 6.59% No. RVNUKOUTMZ- MIs JMC - GPT - Vijaywargi - Bright 24 month + 6Bridges, Track Linking (Excluding Supply of above BYSNJMC-GPT-Vijaywargi- Power, A- months (DefectRails and Line PSC Sleepers), S & T and Bright Power/161 dt. 104, Shapath - 4, Opp. Karnavati Club, Liability period)OHE & General Electrical work in connection 25.02.2011 S.G. Road, Ahmedabad - 380-051with Doubling between Tamluk (JunctionCabin) - Basulya Sutahata (24.4 Km) inKharagpur Division of South Eastern Railwayin State of West Bengal, India.

March'11 2 Carrying out Detailed Design consultancy & 7.62Cr. 7.16 Cr. 6.04% No. RVNUKOUROB- MIs Consulting Engineering Services 30 months + 6Construction Supervision for the proposed 4- (Below) BWN/DDC & CS/5502 dt. India Pvt Ltd. CES Centre, months (Defectlane Cable stayed road over bridge over 02.03.2011 OM - 3 & 4, Sector - V, Saltlake City, Liability period)Barddhaman yard in lieu of existing 2-lane Kolkata - 700091.ROB Bridge No.-231 of Eastern Railway inthe State of West Bengal, India.

Project Management Consultancy for 2.96Cr. 2.74Cr. 8% (below) No. RVNUKOUGOL- M/s SNC-LAVALIN Infrastructure Pvt Ltd. 34 monthsConstruction of Road bed, Major and Minor MOU/PMC/Price Bid/Pt 1115780 (Formerly MIs Span Consultants Pvt Ltd.)Bridges, Track Linking, Tunnel, S&T and dt, 31.03.2011 Mindmill Corporate Tower, 4th & 5thOHE, TSS & General Electrical works in Floors, Plot No. 24A,connection with construction of 3rd line Sector 16A, Film City,between Goelkera - Manoharpur (27.50 Km) Noida (UP) - 201301on Chakradharpur Division of South EasternRailwav in Jharkhand State lndia"

April'11 NIL NIL NIL NIL NIL NIL NIL NILMav'11 NIL NIL NIL NIL NIL NIL. . NIL NIL

\

I~---------------------------------

RVNL

Page 4: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time ofawarded Cost Cost ge above Completion

costing more (Rs.) (Rs.) Ibelowthan Rs. 1 SORCrore value

June'11 1 Project Management Consultancy for 1.19 Cr. 1.41 Cr. 18.48% NO. RVNUKOUDKAE- MIs S. N. Bhobe & Associates Pvt. Ltd. 30 months + 6Construction of Road bed, Major and Minor Above F.Sharif/PMC/2010/1 dt. Unit No. - 10, Banking Complex No - II, months (DefectBridges, Track Linking (Excluding supply of 01.06.2011 Plot NO.9 & 10, Sector -19A, Vashi, Navi Liability period)Rails and PSC Sleepers) S&T and OHE & Mumbai - 400705, IndiaGeneral Electrical works in connection withnew line between Dankuni - Furfura Sharif(20 km) on Howrah Division of EasternRailway in the State of West Benaal India"

July'11 1 Construction of sheds, Structures, Porta 86Cr. 98Cr. 14% No. MIs Premco - Vardhman (JV) Axis 15 months + 6Blocks, Water Supply Arrangement, (Above) RVNUKOUDMU/HLZl2/913 dt. Multi Complex, CF-9,3rd months (DefectSewerage, Drainage, Roads, Track, S&T, 2007.2011 Floor, Rajarhat New Liability period)Power Supply Arrangement, General Town, Kolkata - 700156Electrical Works and Supply, Erection &Commissioning 0 fMachinery & Plant inconnection with setting up of DMU Factory ofSouth Eastern Railwavin Haldia West

Auaust'11 NIL NIL NIL NIL NIL NIL NIL NILSeptember'11 1 Construction of Road bed, Major and Minor 103 Cr. 135.27Cr. 30.8% NO. RVNUKOUGOL-PST 3rd MIs. Unity- Triveni - BCPL (JV), 24 months + 6

Bridges, Tunnel and Track Linking (Above) Iine/UTBJV 11517 dt. 1252, Pushpanjali Apartments, months (Defect(Excluding Supply of Rails, Thick Web 12.09.2011 Old Prabhadevi Road, Liability period)Switches and Line PSC Sleeper) and OHE & Prabhadevi,General Electrical work in connection with Mumbai - 400025.construction of 3rd line between Goelkera -Posoita (15.9 Km) on ChakradharpurDivision of South Eastern Railway in theIState of Jharkhand. India

October'11 240.56 Cr. 233.6 Cr. 2.89% RVNUKOUMETRO(ANV1 )/113 MIs. Afcons Infrastructure Ltd. Afcons 30 months +12PACKAGE-ANV1: "CONSTRUCTION OF (below) 8 dated 21.10.2011 House, months (DefectVIADUCT INCLUDING RELATED WORKS 16, Shah Industrial Estate, Liability period)FOR 5.75 KM LENGTH EXCLUDING Veera Desai Road, Post Box No.11978,STATION AREAS FROM CH. -247.00 TO Azad Nagar, P.O. Andheri (W),CH. 6400.00 BETWEEN KAVI SUBHASH Mumbai - 400053(NEW GARIA) TO VIP Bazar, IN Ph. - 022-6719-1000NEWGARIA-AIRPORT CORRIDOR OF Fax - 022-2673-0047KOLKATA METRO RAILWAY LINE".

PACKAGE- ANV2: "CONSTRUCTION OF 220.47 Cr. 224.97 Cr. 2.05% RVNUKOUMETRO(ANV2)/113 MIs. Gammon India Limited, Gammon 30 months +12VIADUCT INCLUDING RELATED WORKS (above) 9 dated 21.10.2011 House, months (DefectFOR 5.27 KM LENGTH EXCLUDING Veer Savarkar Marg, Liability period)STATION AREAS FROM CH. 6400.00 TO Prabha Devi,CH. 12570.00 BETWEEN VIP BAZAR TO Mumbai - 400 025,

NICCO PARK, IN NEWGARIA-AIRPORT Phone: 91226114000

CORRIDOR OF·KOLKATA METRO FAX : 022-2430-0221

RAILWAY LINE".\

~ ~

1 _

RVNL

Page 5: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of

awarded Cost Cost ge above Completion

costing more (Rs.) (Rs.) Ibelowthan Rs. 1 SORCrore value

215.89 Cr. 212.54 Cr. RVNUKOUMETRO(ANV3)/114 MIs. Afcons Infrastructure Ltd. Afcons 30 months +12PACKAGE- ANV3: "CONSTRUCTION OF o dated 21.10.2011 House, months (DefectVIADUCT INCLUDING RELATED WORKS 16, Shah Industrial Estate, Liability period)FOR 5.16 KM LENGTH EXCLUDING Veera Desai Road, Post Box No.11978,STATION AREAS FROM CH. 12570.00 TO Azad Nagar, P.O. Andheri (W),

I CH. 18630.00 BETWEEN NICCO PARK TO Mumbai - 400053CBD-1, IN NEWGARIA-AIRPORT Ph. - 022-6719-1000CORRIDOR OF KOLKATA METRO Fax - 022-2673-0047RAILWAY LINE".

PACKAGE- ANV4: "CONSTRUCTION OF 225.84 Cr. 199.1 Cr. 11.84 RVNUKOUMETRO(ANV4)/114 MIs. Larsen & Toubro Limited. TCTC 30 months +12

VIADUCT INCLUDING RELATED WORKS (below) 1 dated 21.10.2011 Building, Mount Poonamallee Road, months (Defect

FOR 5.40 KM LENGTH EXCLUDING Manapakkam,Chennai-600089 Liability period)

STATION AREAS FROM CH. 18630.00 TOCH. 25102.00 BETWEEN CBD-1 TORABINDRA TIRTHA, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA

4 METRO RAILWAY LINE".

November'11 NIL NIL NIL NIL NIL NIL NIL NILDecember'11 NIL NIL NIL NIL NIL NIL NIL NILJanuarv'12 NIL NIL NIL NIL NIL NIL NIL NILFebruary'12 Construction of 4-Lane Cable Stayed Road 105.61 Cr. 110.88 Cr. 4.99% RVNUKOUROB-BWN/GPT- MIs GPT-RANHILL (JV), 25 months + 6

Over Bridge over Barddhaman Yard in lieu of Above RANHILU1/3012 dt. "Jeewansaatya" DD-6, months (Defectexisting 2-Lane ROB Bridge No.213 of 20.02.2012 Sector-I, Salt Lake City, Liability period)Eastern Railway in the State of West Bengal, Kolkata - 700064.India.

March'12 NIL NIL NIL NIL NIL NIL NIL NILApril'12 JMS-1:- Construction of Joka, Thakurpukur, 167.76 Cr. 200.91 Cr. 19.76% RVNUKOUJOKA- Simplex Infrastructure Limited 24 months +12

Sakher Bazar and Behala Chowrasta Above MAJERHAT/JMS1/096 Simplex House, 27, Shakespear Sarani, months (DefectStations including all related works Dt.14.04.2012 Kolkata - 700017. Liability period)(architectuire, electrical & Mechanical (E&M),HVAC, Fire detection and Fire suppressionsystem and public health engineering works)in Joka-BBD Bag corridor of Kolkata MetroRailway Line.

2

JMS-2:- Construction of Behala Bazar, 138.65 Cr. 162.66Cr 17.31% RVNUKOUJOKA- Gammon India Limited 24 months +12Taratala and Majerhat Stations including all Above MAJERHAT/JMS2/097 Gammon House, Veer Savarkar Marg., months (Defectrelated works (architectuire, electrical & Dt.14.04.2012 Prabha Devi. Liability period)Mechanical (E&M), HVAC, Fire detection Mumbai-400 025.and Fire suppression system and publichealth engineering works} in Joka-BBD Bagcorridor of Kolkata Metro Railway Line.

\ 1\ -\ y1 __ ----------

RVNL

Page 6: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

~~

Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time ofawarded Cost Cost ge above Completion

costing more (Rs.) (Rs.) Ibelowthan Rs. 1 SORCrore value

May'12 Design and construction of power supply & 43.44 Cr. 42.09 Cr. 3.12% RVNUKOUEUNEW-METRO Isolux Ingenieria, SA 24 months +6distribution, traction electrififcation, 750 VDC (below) LlNE(NOA - DAKE Section)Nol 12th floor, Building No - 10, Tower - C, months (Defectthird rail and SCADA system for a total II dt. 22.05.2012 DLF Cyber City Sector - 25, Phase - II Liability period)

1 length of 4.465 km (approx) from Noapara Gurgaon - 122002, Hariyana.(ex) - Baranagar - Dakshineswar station inconnection with the extension of existingMetro corridor kolkata.

June'12 NIL NIL NIL NIL NIL NIL NIL NIL

I1 _

RVNL

Page 7: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender awarded

costing more than Rs. 1

Crore value

Name of the Work & Location Estimated Cost (Rs.)

Tendered Cost (Rs.)

Percentage above

/below SOR

LOA No. Agency Name Time of Completion

April NIL NIL NIL NIL NIL NIL NIL NILMay 1 Construction of Roadbed, Major and Minor

Bridges and Track Linking (Excluding Supply of Rails, Thick Web switches and Line PSC Sleeper), S & T and OHE & General Electrical work in connection with 3rd line between Panskura- Kharagpur (45 Km) on Kharagpur Division of South Eastern Railway in West bengal State, India.

162.33Cr. 186.12 Cr. 14.65% = M/s Larsen Toubro, ECC Division 3rd floor Transmission line Railway, Electrification Business Unit, Mount Poonamali Road, Manapakkam, Chennai-600089

24 months + 6months ( Defect liability period )

June NIL NIL NIL NIL NIL NIL NIL NILJuly NIL NIL NIL NIL NIL NIL NIL NILAugust NIL NIL NIL NIL NIL NIL NIL NILSeptember NIL NIL NIL NIL NIL NIL NIL NILOctober NIL NIL NIL NIL NIL NIL NIL NILNovember NIL NIL NIL NIL NIL NIL NIL NILDecember NIL NIL NIL NIL NIL NIL NIL NILJanuary'10 1 Design, Supply, Erection, Testing &

Commissioning Of 132/27 Kv, 2 X 30/42 MVA, Traction-Sub-Station , with an additional bay and replacement of one existing 13/20MVA capacity, modification of 132KV incomming and out going 25KV Power Supply, TSS feeding post, with other associated works at Balichak Sub-Station, along with modification of opposite gantry in connection with 3rd line between Panskura-Kharagpur under Kharagpur Division Of South Eastern Railway in the State of West Bengal.

8.16 Cr. 7.94 Cr. 5.63% (below)

RVNL/KOL/EL/PSI/OT/09/01/Vol-11/2241 Dt.28-01-2010

M/s.PSC Engineers Pvt. Ltd. IT Building(3rd Floor),Benfish,31, G.N.Block, Sector -V, Salt Lake City, Kolkata 700091.

18 months + 180 days (Defect

liability period)

February'10 NIL NIL NIL NIL NIL NIL NIL NILMarch'10 NIL NIL NIL NIL NIL NIL NIL NILApril'10 NIL NIL NIL NIL NIL NIL NIL NIL

Details of tenders/contracts awarded upto September'2012

Rail Vikas Nigam LimitedKolkata

RVNL

Page 8: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender awarded

costing more than Rs. 1

Crore value

Name of the Work & Location Estimated Cost (Rs.)

Tendered Cost (Rs.)

Percentage above

/below SOR

LOA No. Agency Name Time of Completion

May'10 1 Construction of Road bed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails, Thick Web Switches and Line PSC Sleeper), S&T and OHE & General Electrical work in connection with construction of 3rd

line between Posoita - Manoharpur (11.6Km) on Chakradharpur Division of South Eastern

Railway in Jharkhand State, India”

56.93 Cr. 65.47 Cr. 14.99% (Above)

No. RVNL/KOL/2009/PST-MOU/Tender (Part-I)/3204 dt. 05.05.2010

M/s Premco Rail Engineers Limited, B-304, City Centre Block-DC, Sector - I,

Salt Lake City, Kolkata - 700064.

18 months + 6months ( Defect liability period )

June'10 1 Construction of Road bed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails, Thick Web Switches and Line PSC Sleeper), S&T and OHE & General Electrical work in connection with construction of 3rd line between Rajgoda - Tamluk Doubling (13.5 Km) Phase –II of Panskura – Haldia Doubling in Kharagpur Division of South

Eastern Railway in West Bengal State, India

56.49 Cr. 56.96Cr. 0.826% (Above)

No. RVNL/KOL/2010/RGA-TMZ/Roadbed/KEC/3423 Dt.29.06.2010

M/s KEC International Ltd. M/s Asia Communication & Electronics Sdn. Bhd. & M/s Unique Builders (JV)

O/c KEC International Limited,1st Floor, Building No.9A, DLF Cyber

City, Phase - III, Gurgaon - 122002. Haryana (India)

18 months + 180 days (Defect

liability period)

July 1 Construction of structural Shed with Gantry, Administrative and othr Buildings along with ancillary works (Civil, tele Communication,

Illumination and electrification) in connection with setting up of Diesel Loco Component

factory for manufacturing and sub assembling of EMD Locos, etc. of DAnkuni

of Eastern Railway in the State of West Bengal, INDIA.

87.54 Cr. 84.21 Cr. 3.80% (Below)

No. RVNL/KOL/2010/DLC/ SIMPLEX/3608 dt. 26.07.2010

M/s SIMPLEX INFRASTRUCTURES LIMITED. Simplex House, 27, Shakespear Sarani, Kolkata - 700017.

12 months from the date of issue

of LOA.

August NIL NIL NIL NIL NIL NIL NIL NILConstruction of new line between Dankuni- furfura Sharif via Jangaloara (20 km) in Howrah Division of Eastern Railway in the state of West Bengal, INDIA.

147.48 Cr. 89.70 Cr. 3.76% (Below)

No. RVNL/KOL/DKAE - F. Sharif New Line/Totem -

Premco/4404 dt. 20.09.2010

M/s totem Infrastructure Limited - M/s Premco Rail Engineers Limited (JV) 6, Totem House, Dwarkapuri Colony,

Punjagutta, Hyderabad - 500082.

30 month + 6 months (Defect Liability period)

Design, Supply, Erection, Testing & Commissioning Of 132/27 Kv, 2 X 30/42 MVA, Traction-Sub-Station , Feeding Post with othre associate works at Goelkera - Psoita section under Chakradharpur Division of South Eastern Railway in the State of Jharkhand.

9.105 Cr. 8.65 Cr. 4.997% (below)

RVNL/KOL/GOL-MOU/TSS/Vol-II Dt.24.09.2010

M/s.G.E.T. Power Pvt. Ltd. 153, Developed Plot, Electrical and Electronic Industrial Estate, Perungudi, Chennai - 600096.

18 months + 180 days (Defect

liability period)

October NIL NIL NIL NIL NIL NIL NIL NILNovember NIL NIL NIL NIL NIL NIL NIL NIL

2September RVNL

Page 9: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender awarded

costing more than Rs. 1

Crore value

Name of the Work & Location Estimated Cost (Rs.)

Tendered Cost (Rs.)

Percentage above

/below SOR

LOA No. Agency Name Time of Completion

Package - I : "Construction of viaduct including related works for 4.748 km length excluding station areas from CH (-)1250 to

CH 4128.00 between Joka to Behala Chowrasta including depot approach at

Joka, in Joka-BBD BAG corridor of Kolkata Metro Railway Line."

206.30 Cr. 181.14Cr. 12.19% Below

No. RVNL/KOL/METRO/JOKA-BBD BAG/TENDER/2/BEC File Vol-1/PACKAGE-I dt. 28.12.2010.

Package - II : "Construction of viaduct including related works for 4.762 km length excluding station areas from CH 4128.00 to CH 9700.00 between Behala Chowrasta to

Mominpur in Joka-BBD BAG corridor of Kolkata Metro Railway Line."

206.50 Cr. 184.72 Cr. 10.54% Below

No. RVNL/KOL/METRO/JOKA-BBD BAG/TENDER/2/BEC File Vol-1/PACKAGE-II dt. 28.12.2010.

January'11 NIL NIL NIL NIL NIL NIL NIL NILFebruary'11 Execution of Desing & Construction of PSC

viaduct, Embankment and stations including E&M works in connection with extension of Metro Railway line Naopara (excluding) -

Baranagar - Dakshineswar of Kolkata Metro.

223 Cr. 199.87 Cr. 10.37% (Below)

No. RVNL/KOL/NOA-BARA-DAKS/METRO/TENDER/(R)/1 dt.04.02.2011

M/s CCCL - SAM India (JV) Khivraj Complex, #2, 8th Floor, 480, Anna Salai, Nandanam, Chennai - 600035.

30 month + 6 months (Defect Liability period)

Construction of Roadbed, Major and Minor Bridges, Track Linking (Excluding Supply of Rails and Line PSC Sleepers), S & T and OHE & General Electrical work in connection with Doubling between Tamluk (Junction Cabin) - Basulya Sutahata (24.4 Km) in Kharagpur Division of South Eastern Railway in State of West Bengal, India.

171.02 Cr. 113.54 Cr. 6.59% above

No. RVNL/KOL/TMZ-BYSA/JMC-GPT-Vijaywargi-Bright Power/161 dt. 25.02.2011

M/s JMC - GPT - Vijaywargi - Bright Power, A - 104, Shapath - 4, Opp. Karnavati Club, S.G. Road, Ahmedabad - 380-051

24 month + 6 months (Defect Liability period)

March'11 Carrying out Detailed Design consultancy & Construction Supervision for the proposed 4-lane Cable stayed road over bridge over Barddhaman yard in lieu of existing 2-lane ROB Bridge No.-231 of Eastern Railway in the State of West Bengal, India.

7.62 Cr. 7.16 Cr. 6.04% (Below)

No. RVNL/KOL/ROB-BWN/DDC & CS/5502 dt. 02.03.2011

M/s Consulting Engineering Services India Pvt. Ltd. CES Centre, DM - 3 & 4, Sector - V, Saltlake City, Kolkata - 700091.

30 months + 6 months (Defect Liability period)

Project Management Consultancy for Construction of Road bed, Major and Minor Bridges, Track Linking, Tunnel, S&T and OHE, TSS & General Electrical works in connection with construction of 3rd line between Goelkera - Manoharpur (27.50 Km) on Chakradharpur Division of South Eastern Railway in Jharkhand State, India”

2.96 Cr. 2.74 Cr. 8% (below) No. RVNL/KOL/GOL-MOU/PMC/Price Bid/Pt.II/5780 dt. 31.03.2011

M/s SNC-LAVALIN Infrastructure Pvt. Ltd. (Formerly M/s Span Consultants Pvt. Ltd.) Mindmill Corporate Tower, 4th & 5th Floors, Plot No. 24A, Sector 16A, Film City, Noida (UP) - 201301

34 months

April'11 NIL NIL NIL NIL NIL NIL NIL NILMay'11 NIL NIL NIL NIL NIL NIL NIL NIL

December 2 30 month from the date of issue of

LOA.

Simplex Infrastructure Limited Simplex House, 27, Shakespear Sarani,

Kolkata - 700017.

2

2 RVNL

Page 10: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender awarded

costing more than Rs. 1

Crore value

Name of the Work & Location Estimated Cost (Rs.)

Tendered Cost (Rs.)

Percentage above

/below SOR

LOA No. Agency Name Time of Completion

June'11 1 Project Management Consultancy for Construction of Road bed, Major and Minor Bridges, Track Linking (Excluding supply of Rails and PSC Sleepers) S&T and OHE & General Electrical works in connection with new line between Dankuni - Furfura Sharif (20 km) on Howrah Division of Eastern Railway in the State of West Bengal, India”

1.19 Cr. 1.41 Cr. 18.48% Above

NO. RVNL/KOL/DKAE-F.Sharif/PMC/2010/1 dt.

01.06.2011

M/s S. N. Bhobe & Associates Pvt. Ltd. Unit No. - 10, Banking Complex No - II, Plot No. 9 & 10, Sector -19A, Vashi, Navi Mumbai - 400705, India

30 months + 6 months (Defect Liability period)

July'11 1 Construction of sheds, Structures, Porta Blocks, Water Supply Arrangement, Sewerage, Drainage, Roads, Track, S&T, Power Supply Arrangement, General Electrical Works and Supply, Erection & Commissioning o fMachinery & Plant in connection with setting up of DMU Factory of South Eastern Railwayin Haldia, West

86 Cr. 98 Cr. 14% (Above)

No. RVNL/KOL/DMU/HLZ/2/913 dt.

20.07.2011

M/s Premco - Vardhman (JV) Axis Multi Complex, CF-9,3rd Floor, Rajarhat New Town, Kolkata - 700156

15 months + 6 months (Defect Liability period)

August'11 NIL NIL NIL NIL NIL NIL NIL NILSeptember'11 1 Construction of Road bed, Major and Minor

Bridges, Tunnel and Track Linking (Excluding Supply of Rails, Thick Web Switches and Line PSC Sleeper) and OHE & General Electrical work in connection with construction of 3rd line between Goelkera - Posoita (15.9 Km) on Chakradharpur Division of South Eastern Railway in the State of Jharkhand, India.

103 Cr. 135.27Cr. 30.8% (Above)

NO. RVNL/KOL/GOL-PST 3rd line/UTBJV/1517 dt.

12.09.2011

M/s. Unity–Triveni - BCPL (JV),1252, Pushpanjali Apartments,Old Prabhadevi Road,Prabhadevi,Mumbai – 400025.

24 months + 6 months (Defect Liability period)

PACKAGE-ANV1: “CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.75 KM LENGTH EXCLUDING STATION AREAS FROM CH. -247.00 TO CH. 6400.00 BETWEEN KAVI SUBHASH (NEW GARIA) TO VIP Bazar, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE”.

240.56 Cr. 233.6 Cr. 2.89% (below)

RVNL/KOL/METRO(ANV1)/1138 dated 21.10.2011

M/s. Afcons Infrastructure Ltd. Afcons House,16, Shah Industrial Estate,Veera Desai Road, Post Box No.11978,Azad Nagar, P.O. Andheri (W),Mumbai – 400053Ph. – 022-6719-1000Fax – 022-2673-0047

30 months +12 months (Defect Liability period)

PACKAGE- ANV2: “CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.27 KM LENGTH EXCLUDING STATION AREAS FROM CH. 6400.00 TO CH. 12570.00 BETWEEN VIP BAZAR TO NICCO PARK, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE”.

220.47 Cr. 224.97 Cr. 2.05% (above)

RVNL/KOL/METRO(ANV2)/1139 dated 21.10.2011

M/s. Gammon India Limited, Gammon House,Veer Savarkar Marg,Prabha Devi,Mumbai – 400 025,Phone : 91226114000 FAX : 022-2430-0221

30 months +12 months (Defect Liability period)

October'11 RVNL

Page 11: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender awarded

costing more than Rs. 1

Crore value

Name of the Work & Location Estimated Cost (Rs.)

Tendered Cost (Rs.)

Percentage above

/below SOR

LOA No. Agency Name Time of Completion

PACKAGE- ANV3: “CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.16 KM LENGTH EXCLUDING STATION AREAS FROM CH. 12570.00 TO CH. 18630.00 BETWEEN NICCO PARK TO CBD-1, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE”.

215.89 Cr. 212.54 Cr. RVNL/KOL/METRO(ANV3)/1140 dated 21.10.2011

M/s. Afcons Infrastructure Ltd. Afcons House,16, Shah Industrial Estate,Veera Desai Road, Post Box No.11978,Azad Nagar, P.O. Andheri (W),Mumbai – 400053Ph. – 022-6719-1000Fax – 022-2673-0047

30 months +12 months (Defect Liability period)

PACKAGE- ANV4: “CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.40 KM LENGTH EXCLUDING STATION AREAS FROM CH. 18630.00 TO CH. 25102.00 BETWEEN CBD-1 TO RABINDRA TIRTHA, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE”.

225.84 Cr. 199.1 Cr. 11.84 (below)

RVNL/KOL/METRO(ANV4)/1141 dated 21.10.2011

M/s. Larsen & Toubro Limited. TCTC Building, Mount Poonamallee Road, Manapakkam, Chennai - 600089

30 months +12 months (Defect Liability period)

November'11 NIL NIL NIL NIL NIL NIL NIL NILDecember'11 NIL NIL NIL NIL NIL NIL NIL NILJanuary'12 NIL NIL NIL NIL NIL NIL NIL NILFebruary'12 Construction of 4-Lane Cable Stayed Road

Over Bridge over Barddhaman Yard in lieu of existing 2-Lane ROB Bridge No.213 of Eastern Railway in the State of West Bengal, India.

105.61 Cr. 110.88 Cr. 4.99% Above

RVNL/KOL/ROB-BWN/GPT-RANHILL/1/3012 dt.

20.02.2012

M/s GPT-RANHILL (JV), "Jeewansaatya" DD-6, Sector-I, Salt Lake City, Kolkata - 700064.

25 months + 6 months (Defect Liability period)

March'12 NIL NIL NIL NIL NIL NIL NIL NILJMS-1:- Construction of Joka, Thakurpukur, Sakher Bazar and Behala Chowrasta Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line.

167.76 Cr. 200.91 Cr. 19.76% Above

RVNL/KOL/JOKA-MAJERHAT/JMS1/096

Dt.14.04.2012

Simplex Infrastructure Limited Simplex House, 27, Shakespear Sarani, Kolkata - 700017.

24 months +12 months (Defect Liability period)

JMS-2:- Construction of Behala Bazar, Taratala and Majerhat Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line.

138.65 Cr. 162.66Cr 17.31% Above

RVNL/KOL/JOKA-MAJERHAT/JMS2/097

Dt.14.04.2012

Gammon India LimitedGammon House, Veer Savarkar Marg.,Prabha Devi.Mumbai-400 025.

24 months +12 months (Defect Liability period)

April'12

2

4

RVNL

Page 12: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Month No. of tender awarded

costing more than Rs. 1

Crore value

Name of the Work & Location Estimated Cost (Rs.)

Tendered Cost (Rs.)

Percentage above

/below SOR

LOA No. Agency Name Time of Completion

May'12

1

Design and construction of power supply & distribution, traction electrififcation, 750 VDC third rail and SCADA system for a total length of 4.465 km (approx) from Noapara (ex) - Baranagar - Dakshineswar station in connection with the extension of existing Metro corridor kolkata.

43.44 Cr. 42.09 Cr. 3.12% (below)

RVNL/KOL/EL/NEW-METRO LINE(NOA - DAKE Section)/Vol-

II dt. 22.05.2012

Isolux Ingenieria, SA 12th floor, Building No - 10, Tower - C, DLF Cyber City Sector - 25, Phase - II Gurgaon - 122002, Hariyana.

24 months +6 months (Defect Liability period)

June'12 NIL NIL NIL NIL NIL NIL NIL NILJuly'12 NIL NIL NIL NIL NIL NIL NIL NILAugust'12 NIL NIL NIL NIL NIL NIL NIL NILSeptember'12 NIL NIL NIL NIL NIL NIL NIL NIL

RVNL

Page 13: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Sl. No. Tender No.Date of

OpeningDescription of Work Contract No. & date Contractor's Name

Quantity (for supply contract)

Estimated Cost (for

Engg./Elect/S&T/Mech.)

Rate (for supply contact)

Tender Cost (for

Engg./Elect/S&T/Mech.)

Scheduled

Completion

Date

1

RVNL/KOL/JOKA-

MAJERHAT/JMS1/096

Dated 14.04.2012

19.02.2012

JMS-1:- Construction of Joka,Thakurpukur, Sakher Bazar and BehalaChowrasta Stations including all relatedworks (architectuire, electrical &Mechanical (E&M), HVAC, Firedetection and Fire suppression systemand public health engineering works) inJoka-BBD Bag corridor of Kolkata MetroRailway Line.

Notification of Award No. RVNL/KOL/JOKA-

MAJERHAT/JMS1/096 Dt.14.04.2012

M/s. Simplex

Infrastructure

Limited

Simplex House, 27,

Shakespear Sarani,

Kolkata - 700017.

- INR 200.91 Cr. Apr-14

2

RVNL/KOL/JOKA-

MAJERHAT/JMS2/097

Dated 14.04.2012

19.02.2012

JMS-2:- Construction of Behala Bazar,Taratala and Majerhat Stations includingall related works (architectuire, electrical& Mechanical (E&M), HVAC, Firedetection and Fire suppression systemand public health engineering works) inJoka-BBD Bag corridor of Kolkata MetroRailway Line.

Notification of Award No. RVNL/KOL/JOKA-

MAJERHAT/JMS2/097 Dt.14.04.2012

M/s. Gammon India

Limited

Gammon House,

Veer Savarkar

Marg.,

Prabha Devi.

Mumbai-400 025.

- INR 162.66 Cr. Apr-14

3RVNL/KOL/CLW/DKAE/

1 Date : 28.05.201218.07.2012

Construction of sheds, structures, water

supply arrangement, sewerage, drainage,

roads, track, S&T, power supply

arrangement, general electrical & OHE

works and supply, erection &

commissioning of machinery & plant in

connection with setting up of Electric

Locomotives Factory at Dankuni, West

Bengal, India.

Notification of Award No.

RVNL/KOL/CLW/DKAE/1/18

76 Dated 02.10.2012

M/s Simplex

Infrastructures Ltd.

Simplex House

27,Shakespear

Sarani,

Kolkata – 700017

- INR 146.44 Cr. Apr-14

BID AWARD DETAILS w.e.f. March 2012 and onwards for Projects under CPM/M Kolkata

RVNL

Page 14: Rail Vikas Nigam limited Kolkata RVNL · Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Es timated

Sl. No. Tender No.Date of Opening

Description of Work Contract No. & date Contractor's NameQuantity (for supply contract) 

Estimated Cost (for Engg./Elect/S&T/Mech.)

Rate (for supply contact) Tender Cost (for 

Engg./Elect/S&T/Mech.) 

Scheduled Completion 

Date

1RVNL/KOLKATA/CLW/PMC/1 Date : 11.03.2013

09.04.2013

Project Management ConsultancyServices for Construction of sheds,structures, water supply arrangement,sewerage, drainage, roads, track, S&T,power supply arrangement, generalelectrical & OHE works and supply,erection & commissioning of machinery& plant in connection with setting up ofElectric Locomotives Factory atDankuni, West Bengal, India.

Notification of Award No.RVNL/KOLKATA/CLW/950 Dated 02.08.2013

M/s Data Technosys(Engineers) Pvt. Ltd.TF‐II, Asha Apartment‐I, 19,Ram Mohan Rai Marg,Lucknow‐226001

INR 1.77 Cr. INR 1.60 Cr.18 months(including 6months DLP)

BID AWARD DETAILS w.e.f. May 2013 and onwards