RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

33
RADIAL 16 CANAL AND ROAD BETWEEN 5 TH RING AND 30 TH DE AGOSTO CURICHI International Senior Design Project

Transcript of RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Page 1: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

RADIAL 16 CANAL AND ROAD BETWEEN 5TH RING AND 30TH DE AGOSTO CURICHI

International Senior Design Project

Page 2: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

I l S D•International Senior Design• Walter Henry School• Design Project

Page 3: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Introduction

International Senior Design 2008 International Senior Design 2008 Tip Third Engineering

Page 4: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Outline

Santa Cruz, Bolivia Santa Cruz, Bolivia Project Site Methods and Procedures Methods and Procedures Design Options

Fi l R d i Final Recommendation Cost Benefit Analysis Conclusion Questions

Page 5: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

General Backgroundg

Page 6: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Project Backgroundj g

Page 7: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …
Page 8: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

M h d d P dMethods and Procedures

Page 9: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Santa Cruz, Bolivia,

Page 10: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Michigan Technological Universityg g y

Water calculations Roadway calculationsy Project estimate and schedule AutoCAD drawings AutoCAD drawings

Page 11: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Watershed

Page 12: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Existing Conditionsg

Section D

Section C

5th Ring

Section BCurichi

Section A

Page 13: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

30th de Agosto Curichig

Formation Formation Landfill

R i S Rainy Season Curichi Health

Page 14: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Existing Conditionsg

Page 15: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Canal DesignCanal Design

5th Ring Intersectionand Existing Catch Basin

Section Under RoadAt 5th Ring

Curichi

Page 16: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Canal Design Optionsg p

Canal Canal Underground Pipe Earthen Earthen Concrete Lined

Page 17: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Underground Pipeg p

Slope/Grade Slope/Grade 5th Ring Intersection

Page 18: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Earthen Canal

Page 19: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Concrete Lined Canal

Page 20: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Canal Layouty

Canal/Box Culvert Transition

Box Culvert/Catch Basin Transition

Canal Section

Inlet at Curichi

Page 21: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Canal Summaryy

Page 22: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Canal Summary

Page 23: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Canal Recommendation

Open Canal Open Canal1 kilometer 126 Days

(1 Construction Season)

Box Culvert$364,000

(2,543,000 Bolivianos)

11 meters

Box Culvert / Sediment Trap Extension14 meters

Page 24: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Road Design Optionsg p

Roadoad Asphalt Gravel Concrete

Page 25: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Asphalt Pavementp

Advantagesg Less maintenance than

gravel road Less dust than gravel road Easier maintenance than

non reinforced concrete non-reinforced concrete pavement

Disadvantages High Initial Cost Poor resistance to fatigue

failure Availability of Equipment

Page 26: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Gravel Road

Advantagesg Relatively low initial cost Constructed using simple

equipment

dDisadvantages Requires continuous

maintenancemaintenance Dust Sediments entering canalg

Page 27: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Non-Reinforced Concrete Pavement

Advantagesg Durable Low maintenance Experienced labor Bolivian Standard

Disadvantages Higher initial cost Expensive to repair

Page 28: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Road Recommendation

Non-Reinforced Concrete Road $395,000 (2,764,000 Bolivianos)

OR

Temporary Gravel Road $76 000 (527 000 Bolivianos) $76,000 (527,000 Bolivianos) ~20% Cost of NRC Future Base

120 Days Future Base

Page 29: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Benefits

Page 30: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Conclusion

In Santa Cruz In Houghton In Houghton Overall Experience

Page 31: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Acknowledgements g

Ing. Linda Phillips Ing. Dennis Magolan

Amanda Schmidt – ISD August MentorKarina Jousma – ISD August Mentorg g

Ing. Mike DrewyorIng. Waldo Varas

Ing. Juan Carlos MartinezIng. Javier Marín

Sr. Horacio Cardenas

gDr. Brian Barkdoll

Sub-Alcaldesa. Jannet CarmonaIng. Kendy Montenegro

Ing. Edil AponteSr. Moisés Herbas Rico

Heather WrightMarilyn Phillips

Lic. Carmen Arias PalaciosGiancarlo Calbimonte – ISD August Mentor

Faculty and Staff of the Colegio Walter Henry SchoolDr. Dan Hinojosa and family

Aerial EngineeringCinco Cero EngineeringCinco Cero EngineeringDon Jaguar Engineering

Señor Design Engineering

Page 32: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

M I f i A il blMore Information Available

Page 33: RADIAL 16 CANAL AND ROAD BETWEEN 5 RING AND 30 DE …

Q i ?Questions?