LIST COST ESTIMATE ( LCE )
Nomor Proyek : Tanggal : 20-Feb-15
Nama Proyek : Media House Lembar ke :Lokasi Proyek : PT. BMH Nursery Satelit Distrik Simpang Tiga Jumlah Lembar :
No Description SpecificationESTIMATED COST ( Rp. )
KeteranganQuantity Material Upah Amount
1 Pekerjaan Persiapan- Pekerjaan Pembersihan Lokasi 165.00 M2 - Pekerjaan Bouwplank 52.00 M1
2 Pekerjaan Perkerasan- Pasangan Bata Bata press 0.80 m2 - Beton ad 1 : 2 : 3 tct. 10 cm Beton ad 1:2:3 0.40 m3 - Weremesh M6 -1 layer 4.00 m2 - Plastik cor 4.00 m2
3 Pekerjaan Kayu (Dinding)- Pasang Tiang Kayu 5/10 dan 5/7 Broti 5/10 dan Broti 5/7,Paku (kelas III) 1.40 M3 - Pasang Rangka + Dinding Papan Kayu Uk. 5/10, 2/20, 3/20,Paku (kelas III) 3.70 M3 - Pasang Kusen Pintu + Daun Pintu 2.00 bh
4 Pekerjaan Atap- Pekerjaan Kuda-Kuda + Pasang Rangka Atap Kayu 5/10 & 5/7 (kelas III) 2.40 m3 - Penutup Atap Seng Seng Gelombang Uk. 7 ft 168.00 Lbr - Pasang Nok Seng L. 44 cm 17.00 m1 - Pasang Listplank Kayu meranti / setara 3/20 (kelas III) 14.50 m2
Total Rp.
Mobilisasi
Overhead 10%
TOTAL DILUAR PPN
PPN 10 % 10%
GRAND TOTAL ( RP. / Unit ).
LIST COST ESTIMATE ( LCE )
Nomor Proyek : Tanggal : 20-Feb-15
Nama Proyek : Production House ( Rumah Produksi ). Lembar ke :Lokasi Proyek : PT. BMH Nursery Satelit Distrik Simpang Tiga Jumlah Lembar :
No Description SpecificationESTIMATED COST ( Rp. )
KeteranganQuantity Material Upah Amount
1 Pekerjaan Persiapan
- Pekerjaan Pembersihan Lokasi 120.00 M2
Pekerjaan Bouwplank 36.00 M1
2 Pekerjaan Kayu (Dinding)
Pasang Tiang Kayu Broti 10/10 dan Broti 5/10,Paku (kelas III) 1.15 M3
Pasang Rangka + Dinding Papan Kayu Uk. 5/10, 2/20, 3/20,Paku (kelas III) 0.77 M3
3 Pekerjaan Atap
Pekerjaan Kuda-Kuda + Pasang Rangka Atap Kayu 5/10 & 5/7 (kelas III) 1.70 m3
Penutup Atap Seng Seng Gelombang Uk. 7 ft 80.00 Lbr
Penutup Atap Seng Seng Gelombang Uk. 6 ft 40.00 Lbr
Pasang Nok Seng L. 44 cm 12.00 m1
Pasang Listplank Kayu meranti / setara 3/25 (kelas III) 11.50 m2
5 Pembuatan Meja dan Kursi
Pembuatan Meja Kayu 5/7,3/10 dan 3/20,Paku (kelas III) 1.00 Unit
Pembuatan Kursi Kayu 5/7,3/10 dan 3/20,Paku (kelas III) 2.00 Unit
Total Rp.
Mobilisasi
Overhead 10%
TOTAL DILUAR PPN
PPN 10 % 10%
GRAND TOTAL
LIST COST ESTIMATE ( LCE )Nomor Proyek : Tanggal : 20-Feb-15
Nama Proyek : Green House Nursery Lembar ke :
Lokasi Proyek : PT. BMH Nursery Satelit Distrik Simpang Tiga Jumlah Lembar :
ESTIMATED COST ACTUAL COSTREMARKNO DESCRIPTION SPECIFICATION
QTY UNIT PRICE (Rp.) AMOUNT (Rp.) QTY PRICE (Rp.) AMOUNT (Rp.)
I GREEN HOUSE - 1 UNIT = 6 x 30 M ( 1 SET = 16 UNIT )
A M A T E R I A L1 Pondasi Pedestal Green house
a. Angkur Besi dia 10 KS 21.16 kg b. Papan begisting, support, kawat ikat & paku kayu racuk 30.89 m2 c. Beton ad 1 : 2 : 3 beton ad 1 : 2 : 3 1.46 m3
2 Kolom pondasi T. 1.8 m 214.31 kg 3 Rangka kolom T. 1.5 m 171.45 kg 4 Rangka atap bentang 6m 412.55 kg 5 Rangka balok P. 30 m 259.25 kg 6 Pipa 1" sambungan rangka atap include nut-bolt 41.33 kg 7 Plat Strip 3mm penjepit plastik Plate Strip 300 mm - 2.5 mm 88.20 kg 8 Spring Clip 155.00 bh 9 Plastic Clip Pipa 3/4" - P. 0.1 m 150.00 bh
10 PEP Plastic Plastic UV - Tinuvin 14 %. Tct 200 Mikron 327.00 m2 11 galvanized 124.00 bh
TOTAL MATERIAL
B U P A H1 Pembersihan lahan 324.00 M2 2 Bowplank 72.00 M1 3 Pondasi Pedestal Green house
a. Angkur Besi dia 10 KS 21.16 kg b. Papan begisting, support, kawat ikat & paku kayu racuk 30.89 m2 c. Beton ad 1 : 2 : 3 beton ad 1 : 2 : 3 1.46 m3
4 Pasang rangka Kolom pondasi termasuk pengecoran 62.00 ttk 5 Pabrikasi dan instalasi rangka kolom dan atap ( rangka atap sistem bending ) 1.00 unit 6 Pasang PEP plastic 327.00 m2
TOTAL UPAHTOTAL MATERIAL + UPAHMOBILISASIOVERHEADBIAYA UNTUK 1 UNIT BIAYA UNTUK 16 UNIT PPNGRAND TOTAL
Steel Pipe Galvanize Ø 3/4" - Tct. 28 mmSteel Pipe Galvanize Ø 3/4" - Tct. 28 mmSteel Pipe Galvanize Ø 3/4" - Tct. 28 mmSteel Pipe Galvanize Ø 3/4" - Tct. 28 mmSteel Pipe Galvanize Ø 1" - Tct. 33.7 mm
Steel Pipe Galvanize Ø 3/4" - Tct. 28 mm
U-Bolt Ø 10 mm
LIST COST ESTIMATE ( LCE )
Nomor Proyek : Tanggal : 20-Feb-15
Nama Proyek : WTP Sederhana Lembar ke :Lokasi Proyek : PT. BMH Nursery Satelit Distrik Simpang Tiga Jumlah Lembar :
No Description SpecificationVolume Material Upah
Amount Rp. KeteranganJumlah Satuan @ Price Amount Rp. @ Price Amount Rp.
1 Pipa PVC 3 inchi WAVIN AW 15.00 Btg
2 Pipa PVC 2 inchi WAVIN AW 6.00 Btg
3 Elbow 3 inchi Ex Rucika 3.00 Bh
4 T- Joint 3 Inch ke 2 inchi Ex Rucika 3.00 Bh
5 Dop 3 inchi Ex Rucika 1.00 Bh
6 Elbow 2 inchi Ex. Rucika 15.00 Bh
7 Baby Tank + Dudukan Capacity 1,000 Ltr 5.00 Unit
8 Stop Kran 2 inchi Standard 5.00 Bh
9 Ijuk Std. 150.00 Kg
10 Zeolite Std. 150.00 Kg
11 Arang Std. 150.00 Kg
12 Batu Sungai Std. 1.50 m3
13 Wiremesh 10 mm 22.00 m2
14 Rumah Mesin Std. 1.00 Ls
Total Rp.
Mobilisasi
Overhead 10%
TOTAL DILUAR PPN
PPN 10 % 10%
GRAND TOTAL
LIST COST ESTIMATE ( LCE )
Nomor Proyek : Tanggal : 20-Feb-15
Nama Proyek : Tempat Pencucian Tube Lembar ke :Lokasi Proyek : PT. BMH Nursery Satelit Distrik Simpang Tiga Jumlah Lembar :
No Description SpecificationVolume Material Upah
Amount Rp. KeteranganJumlah Satuan @ Price Amount Rp. @ Price Amount Rp.
1 Pemasangan Siku 40x40x3 mm 188.00 kg
2 Angker Siku + Beugel Dia 6 Panjang 20 cm 9.00 Bh
3 Begisting Papan 1.54 m2
4 Wiremesh M-6 ( 1 Layer ) 17.60 m2
5 Cor Beton 1:2:3 1.60 m3
6 Finishing Cat (Cat Meni + Cat Anti karat) 1.00 Ls
Total Rp.
Mobilisasi
Overhead 10%
TOTAL DILUAR PPN
PPN 10 % 10%
GRAND TOTAL
LIST COST ESTIMATE ( LCE )
Nomor Proyek : Tanggal : 20-Feb-15
Nama Proyek : Bak Sterilisasi Tube Lembar ke :Lokasi Proyek : PT. BMH Nursery Satelit Distrik Simpang Tiga Jumlah Lembar :
No Description SpecificationVolume Material Upah
Amount Rp. KeteranganJumlah Satuan @ Price Amount Rp. @ Price Amount Rp.
A Pekerjaan Persiapan
1 Galian Sloof 0.32 m3
2 Cerucuk Gelam (Gelam Dia 8/10) 16.00 Bh
B Pekerjaan Persiapan
1 Pasir Urug 0.14 m3
2 Lantai Kerja ad 1:3:5 0.14 m2
3 Pembesian Sloof
- Besi Dia 8 17.00 kg
- Besi Dia 6 13.00 lg
4 Wiremesh M-6 ( 1 Layer ) 4.50 m2
5 Begisting 1.35 m2
6 Cor Sloof Beton ad 1:2:3 0.32 m3
7 Cor Lantai Beton ad 1:2:3 0.54 m3
8 Pasangan Dinding Bak Bata ad 1:2 10.00 m2
9 Plesteran Dinding ad 1:2 20.00 m2
10 Acian Dinding dan Lantai 25.00 m2
11 Pengisian Air 1.00 Ls
Total Rp.
Mobilisasi
Overhead 10%
TOTAL DILUAR PPN
PPN 10 % 10%
GRAND TOTAL
RECAPITULASI LIST COST ESTIMATE
Nomor Proyek :
Nama Proyek : Rekap Nursery Satelit Distrik Simpang Tiga
Lokasi Proyek : PT. BMH Nursery Satelit Distrik Simpang Tiga
No Item Pekerjaan@ Harga Satuan ( Rp. / Unit )
Amount Rp.Material Upah Sub Total
1 Pembuatan Rumah Media 1
2 Pembuatan Production House 1
3 Green House Nursery 16
4 Water Treatment Sederhana. 1
5 Tempat Pencucian Tube & trays. 1
6 Pembuatan Bak Sterilisasi Tube & Tray 1
TOTAL RP.
Mobilisasi
Overhead
TOTAL DILUAR PPN
PPN 10 % 10%
GRAND TOTAL
Requirement ( Units )
Upgrade Nursery Satelit di PT. BMH Distrik Sungai Penyabungan
No Item PekerjaanHarga Satuan ( Rp. / Unit )
Material ( Rp. ) Upah ( Rp. ) Sub Total1 Pembuatan Rumah Media - - - 1
2 Pembuatan Production House - - - 13 Green House Nursery 55,029,430 14,561,644 69,591,075 164 Water Treatment Sederhana. - - - 15 Tempat Pencucian Tube & trays. - - - 16 Pembuatan Bak Sterilisasi Tube & Tray - - - 1
55,029,430 14,561,644 Sub Total Mobilisasi material
Penyesuaian biaya Jkt-Sumsel 20%Biaya Over Head 10% Total before PPN PPN 10% Grand Total ( Rp. )
Note: Gambar, Spek dan ukuran sama semua untuk DPS, DSP, DSB, DST.
Requirement ( Units )
Upgrade Nursery Satelit di PT. BMH Distrik Sungai Penyabungan
Total
68,981,682
40,878,034 1,113,457,197 108,495,463 8,768,285 6,063,459
1,346,644,119
269,328,824 134,664,412 1,750,637,355 175,063,736
1,925,701,091