Quarterly Report – September 2013
Natural Connected Prosperous
Natural Connected Prosperous
Our Vision
3
Highlights 2013-14
September Quarter 2013 Highlights Plastic fee July was held throughout the Shire
which was supported by Council
A Recovery Hike and Sundowner was held to mark the end of official recovery activities from the Margaret River Bushfire – 60 participants joined in on the 14km hike along the fire affected coast and then attended a Sundowner at Gnarabar
The Skeg Bite Premiere - 300 attendees
enjoyed the surf injury prevention film at the Cultural Centre which was a project undertaken by the Youth Advisory Council
Cowaramup Skate Park Opening – Celebrations
were held on 8 September to open the Cowaramup Skate Park which was a project initiated by the Cowaramup Lions Club and supported by the Shire and the Department of Sport and Recreation.
Count me In Crazy Hair Party – 40 participants
from the Count Me In Program enjoyed a Crazy Hair dance party at the Margaret River Recreation Centre.
Prospective Councillors Presentation was held
in August encouraging community members to consider nominating in the upcoming October Local Government elections.
Cinefest Oz screenings were held in Margaret
River and Augusta with the world premiere of ‘An Accidental Solider’ at the Cultural Centre.
The Margaret River Recreation Centre was host to the BHP Billiton Aquatic Super Series in September where Olympians Libby Trickett and Ashley Callus held a swimming clinic for children
LED lighting has been installed at the Margaret
River Recreation Centre which is anticipated to save approximately $40,000 in utility costs
The Cocoon Gallery space at the Margaret River
Library is in high demand with bookings up to July 2015
Works continue to progress at Surfers Point with the amenity buildings almost complete, rock walling is under construction and tenders closed for shelter construction.
Margaret River Town Centre works have
commenced at the north end of town with rammed earth walling being installed and drainage works to commence in October.
Works crews provided an emergency response
and have coordinated the clean-up from the flood event of July 2013 and storm event of September. Works are ongoing and both events have been proclaimed natural disasters and are eligible for WANDRRA funding.
Review and implementation of new
Development Approval and Delegation Process designed to substantially reduce processing times for 75% of planning applications by approximately 2-3 weeks.
There has been the completion of the review
into Waste Services designed to improve efficiencies and canvas a long term solution for waste management in the Shire.
A monthly Development Activity Report has
been introduced. This report provides approval and construction data with analysis and benchmarking against previous years.
Grants
Bridle Trails Feasibility Study grant of $20,000 was received from Lotterywest
$50,000 of funding from the Federal Government’s Natural Disaster Resilience Program was received to conduct a new Community Preparedness Project in conjunction with the Red Cross
WANDRRA funding applications have been
approved for both the July 2013 Flood Event and the September 2013 Storm Event which both caused significant damage in the Shire
4
Cowaramup Skate Park Opening
Skeg Bites Premiere
Recovery Walk
5
Cinefest Oz Premiere “An Accidental Solider’
Main Street Works
Surfers Point Works
6
Progress on Operational Plan Actions
Valuing the natural environment
Welcoming and inclusive communities
Managing growth sustainably
Vibrant and diverse economy
Effective leadership and governance
Completed
Future Action
In Progress
Completed
Future Action
In Progress
Completed
Future Action
In Progress
Completed
Future Action
In Progress
Completed
Future Action
In Progress
7
Chief Executive Office
Chief Executive Office
Service Team Chief Executive OfficeResponsibility Chief Executive Officer
Services
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x xReport to be provided to Council on outcomes on 9 October
2013.
ST x x x
CEO has met with State Treasurer, Member Warren
Blackwood, Acting Director General Department of Culture and
the Arts, CEO and Board Tourism WA, DG of Department
Regional Development and Lands, Cinefest Oz, Arts Margaret
River regarding funding opportunities as well as investigated
options for charitable philanthropic donations.
ST x x x x Meetings held as programmed
x x xCEO has made strong representation to consultants RPS to
finalise the project and deliver final report to Council on 19
November 2013
xCEO arranged Councillor Briefing and supported Margaret River
Chamber of Commerce and Industry (MRCCI) efforts
ST xCEO has requested data from Small Business Centre SW
(SBCSW)
ST x x x xMRCCI, Arts MR using facilites for meetings. Mountain biking
seminar hosted.
Lead the management and administration of the Shire of Augusta-Margaret River, delivering a positive and values based organisation
Facilitate the decision making and leadership of Council
Indicators
Community Outcome
Challenges
Create and support productive and strategic relationships with the community and key stakeholder groups
Manage the resources of the Shire to ensure sustainable performance and service delivery
Provide confidential secretarial and administrative support to the Chief Executive Officer and Shire President
Prepare for Australian Citizenship Ceremonies
Bi-annual Community Satisfaction Report
Number of direct approaches to CEO and Shire President
2.2.1 Seek sponsorship and develop a funding application for
funding for Stage 1 & 2 of the Margaret River Cultural Centre
Redevelopment in accordance with Council resolution of 28
August 2013
Shire Strategic Response
1. Sense of identity and belonging1.1 Foster participation in cultural evants and activities that encourage a sense of
identity and belonging
2.2 Develop and implement master plans for Shire facilities and projects so they are well
designed, have aesthetic appeal and accessible by all
1.1 Ensure Shire processes support the development of strong agricultural and viticultural
sectors
3.3 Facilitate access to affordable, high speed communication networks for all residents
and businesses
4.2 Retain commercial and retail activities through support programs for year-round
stability
1.1.1 Call for expressions of interest for management of
the Cultural Centre and enter into a licence agreement for
the centre for the next five years
1.1.4 Convene regular meetings of the Industry Leaders Group
3.3.1 Lobby the Federal Government for priority connection to the
National Broadband Network
4.2.1 Support continued operation of the Small Business Centre
4.2.2 Provide facilities to hold regular events with partners to act as
a convenor of local businesses
1. Strong agriculture and viticulture sectors
3. Infrastructure for economic growth
4. Sustainable economic development
2. Liveable and well designed places
Increasing visibility of Shire and demand on CEO and Shire President
Meeting the community’s expectations with available resources
2 FTEs
2. Sustainable tourism industry2.3 Provide family friendly quality caravan and camping grounds to encourage visitors to
extend their stay
2.3.1 Finalise the Turner Caravan Park Business Plan and
plan for the construction of chalets to commence in 2014-15
using Caravan Park Reserve Funds
8
ST x x x x Meeting to be held in October 2013
x x x x
Deed for Cowaramup Resort signed and dispatched. Worked
with SWDC to convene seminar on the future of the Margaret
River Education Centre (MREC).
x x No meetings held this quarter
ST x x
Developing Shire promotional DVD including Asian content.
CEO attended anniversary celebrations at Chinese Consultate
in Perth.
ST x x x x Commencing compilation of the Regional Events Calendar
x xHave advised SWDC of review and will arrange for future
meeting of stakeholders.
x x x x Ongoing and will conduct secretariat in 2014.
ST x xWorked with SWDC to convene "Future Directions" seminar.
Established good working relationship with incoming Managing
Director of SWIT.
xCompleted. Meeting conducted in accordance with Department
of Local Government and Communitiies (DLGC) guideines.
x Induction program planned for 28 October 2013
x xCouncillors will be provided with WALGA training program
folowing elections
x x x xValues reinforced in selection program and in the Employee
Recognition Program
x xSelected women staff members attended LGMA Women in
Leadership Conference
xCEO, Director CCS and Manager CIS participating in
conference planning committee
xPlanned as part of induction for new Councillors and a revision
sheet will be distributed for returning Councillors
x x x xCEO is preparing report on Councillor Briefings for Council
consideration in November 2013
x x Session planned for 19 November 2013
x x x x
Three meetings have been held to look at options to reduce
expenditure with options to be presented to Council in February
2014
1.1 Attract and develop high quality Councillors that are able to lead and articulate the
community’s aspirations
1.2 Develop staff leadership through the organisation to assist with accountable decision
making
1.3 Ensure Councillors and employees demonstrate the importance of ethical behaviour
and compliance with codes of conduct
1.4 Provide Councillors with high quality and current information for effective decision
making
1.1.3 Conduct compreshensive Councillor induction program for
incoming and returning Councillors and coordinate ongoing
Councillor training
4.4.11 Review progress of sister city relationship in conjunction with
the South West Development Commission (SWDC)
4.4.12 Participate in CAPEROC meetings and convene meetings
and provide secretariat services in 2014
1.2.5 Facilitate staff participation in the LGMA 2014 Aspiring
Leaders and Mentors Conference in Margaret River
1.4.3 Conduct strategic planning days with new Council in
November/December 2013 following the October elections with a
follow up in February 2014
2. Effective strategy, planning and asset
management
2.5 Ensure the Shire's financial performance is well managed and leads to a strong
financial position
4.4 Foster sustainable economic growth which provides local employment
5.1 Work collaboratively with other agencies to provide enhanced tertiary education
facilities
4.4.10 Sponsor initiatives in collaboration with the City of Busselton
through the Capes Regional Organisation of Councils (CAPEROC)
governance structure
5.1.1 Work with Margaret River Education Campus to investigate
opportunities and coordinate strategies to improve the vitality and
long term viability of the campus
1.1.2 Conduct prospective Councillor information sessions prior to
the opening of nominations for the 2013 elections
4.4.1 Implement actions from the Economic Development Unit
1. Effective governance and corporate leadership
1.1.4 Coordinate a comprehensive Councillor development and
capacity building program using WALGA modules and other
identified courses
4.4.3 Work collaboratively with the South West Development
Commission (SWDC), other tiers of government and the community
sector to maximise sustainable economic development
4.4.4 Attend Regional Airport Steering Committee meetings
convened by the City of Busselton and support funding applications
4.4.6 Foster sister city relationships with Haining and develop
promotional materials in appropriate formats
2.5.14 Review the Long Term Financial Plan through the CEO
appointed internal Expenditure Review Committee and present
options to Council for increasing revenue and reducing operational
costs
1.2.1 Develop the Shire as a values based and driven organisation
5. Improved educational infrastructure
1.2.3 Promote and support Women in Leadership program to foster
greater participation of female Councillors and staff into leadership
positions
1.3.2 Provide Code of Conduct training for Councillors
1.4.1 Conduct information workshops for Councillors
9
x x x xEBA process has included a full staff meeting with regular
updates. End of year recognition function planned.
x xOngoing program includes Employee Recognition Awards,
Innovation is included on each agenda for staff meetings.
x To be presented before end of calendar year
x x x Next meeting will be to receive annual audited accounts7.1.7 Convene tri-annual meetings of the Audit and Risk
Management Committee
6. A culture of innovation, quality and continuous
improvement
7.1 Effectively measure our success and progress to a sustainable future
6.1 Foster a culture of innovation and continuous improvement
6.1.1 Implement a continuous improvement program across the
organisation
6.2 Ensure Shire services and processes meet or exceed customer needs and recognised
industry standards
6.2.8 Complete review of policies by Council adopting new policies
in Economic Development
7. Measure and report on success and
sustainability
4. Highly skilled and motivated people4.4 Ensure staff are consulted and are informed of key decisions and issues within the
organisation
4.4.1 Conduct regular staff meetings
10
Governance
Service Team
Responsibility
Services
Workforce
Challenges
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x To be completed in October
x Future quarter action - no reporting
x x x x Meetings held
x x Infrastructure Policies recently updated
Responding to increasing requirement for electronic reporting
Ensuring systems and procedures are developed for compliance
Responding to growing demand for permits for commercial trading
Annual Statutory Compliance ReturnIndicators
Number of direct approaches to CEO and Shire President
1 FTE
6.2.1 Conduct a comprehensive rolling review of Shire
policies over a three year period.
1.3.3 Complete and submit Statutory Compliance Return and
remediate any errors in a timely manner
1.1.1 Conduct biennial election program by postal voting aimed at
attracting a competitive field of high quality candidates
1. Effective governance and corporate leadership1.1 Attract and develop high quality Councillors that are able to lead and articulate the
community’s aspirations
1.3 Ensure Councillors and employees demonstrate the importance of ethical behaviour
and compliance with codes of conduct
1.4 Provide Councillors with high quality and current information for effective decision
making
6.1 Ensure Shire services and processes meet or exceed customer needs and
recognised industry standards
Provide governance support services to the Chief Executive Officer and Council
Prepare agendas and record and distribute minutes relating to Council and Committee meetings
Liaise with members of the community and other government agencies relating to Council meeting matters
Coordinate compliance process and maintain and review governance registers in accordance with relevant legislation
Provision of commercial trading permits
Community Outcome
Governance Chief Executive Officer
Shire Strategic Response
1.4.2 Hold meetings of Council
6. A culture of innovation, quality and continuous
improvement
11
Marketing
Service Team
Responsibility
Services
Workforce
Challenges
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x
Meetings held through the Industry Leaders Meetings,
facilitated teleconference on the Broadband network for the
MRCCI and MRWIA, assisting in permit approvals for the MR
Gourmet Escape
x x x xCEO attended a workshop at MREC with the Food Innovation
Australia Ltd (FIAL) with key stakeholders
x x 2014 calendar commenced
x Under development
x x x Awaiting final report
x x x xCEO met with new AMRTA CEO. Shire is sharing promotional
material with AMRTA.
ST x x x x
Sponsored Cinefest Oz in August with premiere of "An
Acciental Soldier" screened in Margaret River plus community
screenings in Margaret River and Augusta
ST x x x x Promotional DVD under development
x x Future quarter action - no reporting
x x x xNew promotional DVD under production, Shire website being
reviewed.
Indicators
1. Strong agriculture and viticulture sectors
Marketing
Administration of icon events funding and sponsorship packages
Chief Executive Officer
Management, production and monitoring of Shire media, promotions and advertising
Establishment and maintenance of Shire branding
Graphic design services
Community, Shire and stakeholder event organisation
1 FTE
Responding to increasing media requests as a result of wider distribution
Creating media to appeal to highly varying demographics
Responding to social changes in consumption of news, media and advertising
Maintaining knowledge and awareness of policy and activities across Shire business units
Public feedback to Shire and through media
2.4.1 Sponsor iconic events that showcase the Shire to national
and international audiences
2.2.1 Maintain a positive collaborative relationship with the Augusta
Margaret River Tourism Authority (AMARTA) to measure visitor
numbers and impacts and maximise visitor benefits to the Shire
2.1.1 Produce the Capes Regional Organisation of Councils
(CAPEROC) Calendar of Events in conjunction with the City of
Busselton
2.1.2 Develop a CAPEROC events website in conjunction with the
City of Busselton
1.1.3 Maintain a positive collaborative relationship with the dairy
industry and other agricultural sectors
2. Sustainable tourism industry
5.2.3 Implement the Shire’s Marketing Plan
5. Community and customer focus 5.2 Communicate effectively with the community and promote the Shire’s positive image
5.2.2 Review the Shire’s Marketing Plan
4. Sustainable economic development 4.4 Foster sustainable economic growth which provides local employment
4.4.5 Develop and maintain a comprehensive suite of marketing
materials, including foreign language, to attract business investment
1.1 Ensure Shire processes support the development of strong agricultural and viticultural
sectors
2.1 Work collaboratively with the tourism sector to increase visitor numbers and length of
stay to the Shire
2.2 Work collaboratively with the tourism sector to promote and develop eco-tourism
2.4 Encourage tourism in the Shire through the development and support of iconic events
Community Outcome Shire Strategic Response
2.1.3 Participate in the Regional Branding project in conjunction
with the Geographe Bay Tourism Association
1.1.2 Maintain a positive collaborative relationship with the Margaret
River Wine Industry Association and promote the Margaret River
Wine Region as Australia’s premiere wine region
Number of approaches by media
12
Human Resources
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x
An ongoing program is established whereby emerging leaders
are eligible for Acting higher duties positions and training and
professional development opportunities are identified
x x x xThe staff volunteerism procedure has been incorporated within
the Shire's draft EBA and bargaining process
x Training will take place in 2014 at an all staff meeting
xEBA negotiations are being finalised. Workforce Plan will be
reviewed alongside the LTFP review.
x x x xThe Shire's Training and Development procedure reviewed and
endorsed
x Future quarter action - no reporting
x Future quarter action - no reporting
x Future quarter action - no reporting
x x x x Employee submissions open
x x
There has been 8 EBA bargaining group meetings since July
this year and the Shire's draft agreement has been progressed
to version 6
Manager Human Resources
Employment
Challenges
Services
Service Team
Responsibility
Personnel
Workplace Relations
Occupational Safety, Health and Wellbeing
Workforce Planning
5.4 FTEs
Ability to meet growing service demands with limited resources
Continual increase in the level of workforce legislative and reporting requirements
Labour market skills shortage
Declining employee health associated with an ageing workforce
Lack of an efficient and effective Human Resources Information System
Increase in demand for flexible working arrangements and career growth opportunities
Diminishing level of supervisory and leadership experience within the workforce
Human Resources
4.2.2 Negotiate a sustainable Enterprise Bargaining
Agreement in accordance with Council's adopted budget for
2013-14
4.2 Recognise and reward high achieving employees
4.2.1 Facilitate employee recognition program
4.1.5 Review Shire training and development plans
4.1.4 Review induction program for new employees
4.1.3 Implement online training induction system
4. Highly skilled and motivated people 4.1 Recruit, train and retain high achieving employees
4.1.1 Implement employee development and growth program
1. Effective governance and corporate leadership1.2 Develop staff leadership through the organisation to assist with accountable decision
making
Indicators
Number employees (headcount)
Number employment vacancies
Number workers compensation claims
Business Excellence Audit Rating – People
Occupational Safety and Health Audit AS/NZS4801:2001 rating
Community Outcome Shire Strategic Response
2.2.5 Undertake desktop review of Workforce Plan
1.3 Ensure Councillors and employees demonstrate the importance of ethical behaviour
and compliance with codes of conduct
1.3.1 Provide Code of Conduct training for staff
1.2.2 Promote and support Emerging Leadership program to foster
leadership
1.2.4 Participate in suitable programs with a wider community
benefit that demonstrate good corporate citizenship
2. Effective strategy, planning and asset2.2 Develop long term Resourcing Strategy that is aligned to the Community Strategic
Plan
13
x x x xThere have been 10 safety inspections undertaken within this
quarter
x x x xThe Shire has undertaken external recruitment for 3 vacancies
within this quarter.
x x
Shire executive addressed staff on Mental Health Day re-
inforcing work-life balance and caring for oneself and other
workers
x x x x
There have been 10 OSH Management Procedures and 46 Safe
Operating Procedures that have been reviewed within this
quarter
xModule for PES has been purchased as part of the enhanced
Interplan system
x Future quarter action - no reporting
xOHS Coordinator has arranged Audit to commence in October
2013
4.3 Ensure the Shire provides a safe and fair workplace
4.3.1 Implement Occupational Safety and Health Management
Plan
4.3.4 Review Occupational Safety Management system
4.3.3 Implement employee health program
4.3.2 Implement Equal Opportunity Plan
7.1.5 Coordinate OSH Audit AS/NZS4801:2001
4.4.3 Develop an integrated performance management system
7. Measure and report on success and
sustainability7.1 Effectively measure our success and progress to a sustainable future
4.4.2 Coordinate the employee personnel evaluation system
4.4 Ensure staff are consulted and are informed of key decisions and issues within the
organisation
14
Directorate of Corporate and Community Services
Corporate and Community Services
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
xComplete - Financial Assistance Policy adopted at the
Ordinary Council Meeting 11 September 2013
x x Future quarter action - no reporting
x x x xSport & Recreation Advisory Committee Meeting held 7 August
2013
x x x xContinued contact with Arts Margaret River Operations
Manager
x x Future quarter action - no reporting
xOperational Plan has been developed and quarterly reporting
scheduled
x x Future quarter action - no reporting
x Future quarter action - no reporting
x x x x Developed as part of the Long Term Financial Plan
2.1.5 Develop annual Operational Plan linked to Corporate Plan and
Annual budget
2.1.6 Review Business Unit Plans for directorate in line with
strategic direction
2.3 Develop and review long term asset management and replacement plans
2.2.15 Undertake equipment upgrades to the Margaret River Cultural
Centre
1. Effective governance and corporate leadership 1.5 Develop effective partnerships and strategic alliances to maximise community benefits
1.5.1 Hold regular meetings with the Sport and Recreation Advisory
Committee
2.3.2 Program and fund a rolling ten year Light Fleet Replacement
Program
2. Liveable and well designed places2.2 Develop and implement master plans for Shire facilities and projects so they are well
designed, have aesthetic appeal and accessible by all
Community Outcome Shire Strategic Response
1.5.2 Hold regular meetings with Arts Margaret River
2. Effective strategy, planning and asset
management
2.1 Develop and maintain the Community Strategic Plan that sets long term directions and
goals for the future of the Shire
Services
Providing strategic direction, management and leadership for Financial Services, Customer and Information Services, Community Development and
Safety, Sport and Recreation Services and Library Services
Providing corporate and administrative support
Undertaking Integrated Planning and Corporate reporting
Providing strategic input and advice as a member of the Executive Leadership Team
Delivering strategic projects and policy
Administering community contributions and donations
Managing the Light Fleet Program
Providing an interface between the Directorate, elected members, media and community
3.5 FTEs
Challenges
Changing legislation in regards to corporate planning and reporting
Lack of efficient and integrated corporate software system
Competing demands of community groups
Indicators
Annual Report meets legislative requirements and timeframes
Integrated Planning and Reporting legislative requirements meet the basic standard
Dispersal of the annual round of Community Contributions and Donations requests
Availability of light fleet as required by the organisation in a cost effective manner
1. Sense of identity and belonging 1.2 Support community celebrations, events and local festivals
1.2.3 Develop and implement a Donations, Sponsorships and
Waiver of Fees and Charges policy
Service Team Corporate and Community Services
Responsibility Director Corporate and Community Services
2.1.9 Recruit a new Strategic Planning/Organisational
Development Officer to manage the Integrated Planning and
Reporting program
2.1.3 Undertake a desktop review of the Corporate Plan
15
x x x xPurchasing in line with 2013-14 Light Fleet Replacement
Program commenced
x x x xNew procedures and guidelines developed for the Financial
Assistance Policy
x x x x Quarterly reporting commenced
x Future quarter action - no reporting
x Future quarter action - no reporting
x Future quarter action - no reporting7.3.2 Measure and report on Key Performance Indicators in the
Corporate Plan
7.3 Develop indicators and measure the performance of the Shire and the success in
achieving its vision
6. A culture of innovation, quality and continuous
improvement
6.2 Ensure Shire services and processes meet or exceed customer needs and recognised
industry standards
6.2.4 Review and update procedures for Corporate and Community
Services directorate
7. Measure and report on success and
sustainability7.2 Report on our success and sustainability to the community and stakeholders
7.2.1 Implement quarterly reporting against the Operational
Plan to Council
2.4 Maintain and renew Shire assets according to agreed standards
2.4.5 Implement the annual Light Fleet Replacement Program
7.2.2 Implement Annual Reports consistent with the
guidelines for the Department of Local Government
Integrated Planning and Reporting Framework
7.3.1 Measure and report on Key Performance Indicators in the
Community Strategic Plan
16
Financial Services
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Rates billed and distributed by 5 August 2013
x x x x Sundry debtors billed in accordance with requests received
2.5.6 Billing of property rates
2.5.7 Billing of sundry debtors
2.8 FTEs
Challenges Increasing revenue raised
Improving rate of debtor collection
Indicators Ratio of debts written off
Amount of rates paid by the due date
Service Team Revenue
Community Outcome Shire Strategic Response
2. Effective strategy, planning and asset
management
2.5 Ensure the Shire's financial performance is well managed and leads to a strong
financial position
Responsibility Manager Finance
Services
Calculating, administering and collecting property rates
Ensuring the completeness and integrity of the Shire’s property records
Determining the fees and charges that apply for Shire services and facilities
Raising and collecting debts for sundry business services such as property leases and usage of Shire facilities
17
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x xExcess funds invested in term desposits in accordance with
Policy
x x x xLoan repayments processed. No new loans expected in
2013/14.
x x x xReserve balances increased and interest earned being
transferred each month.
2. Effective strategy, planning and asset
management
2.5 Ensure the Shire's financial performance is well managed and leads to a strong
financial position
2.5.8 Administering the Shire’s investment portfolio
2.5.9 Administering the Shire’s loan portfolio
2.5.10 Manage the Shire’s financial reserves
Indicators
Level of debt outstanding
Ratio of loan repayments to revenue
Amount of interest on investments earned
Level of reserves compared to debt
Community Outcome Shire Strategic Response
Included in Finance FTEs
Challenges
Complying with investment guidelines
Maximising return on investment
Obtaining most favourable loan borrowing rate possible
Increasing the balance of the Shire’s reserves
Service Team General Financing
Responsibility Manager Finance
Services
Administer the Shire’s investment portfolio
Administering the Shire’s loan portfolio
Manage the Shire’s financial reserves
18
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x Long Term Financial Plan Review Committee formed
x x x x Monthly financial reports prepared and reviewed
x x x xPerformance reviewed as part of process of preparing monthly
financial reports
x x x x Included in LTFP Review committee objectives
x x x x Included in LTFP Review committee objectives
x x x x Included in LTFP Review committee objectives
x x 2013/14 Budget adopted on 24 July 2013
xAudit signoff of 2012/13 Annual Financial Report expected
during the week commencing 21 October 2013
x x x xPrepared and provided to Council in accordance with statutory
requirements
x x External audit conducted from 20-22 August 2013
x Future quarter action - no reporting7.3.3 Develop financial indicators for Business Units
2.5.13 Preparation of monthly management reports
7. Measure and report on success and
sustainability7.1 Effectively measure our success and progress to a sustainable future
7.1.3 Conduct external audit and interim audit annually and
remediate any problems within timeframes
7. Measure and report on success and
sustainability
7.3 Develop indicators and measure the performance of the Shire and the success in
achieving its vision
2.5.2 Ensure monthly, year to date and annual financial
performance is in accordance with budget and corporate
performance targets and initiate correct action as required.
2.5.3 Ensure revenue opportunities are maximised by identifying
grant opportunities, additional revenue sources and cost recovery
2.5.4 Use appropriate processes to assess the short and long term
financial viability of capital and other projects
2.5.5 Promote a whole of life assessment approach for projects
2.5.11 Preparation of annual budget
2.5.12 Preparation of financial reports
2. Effective strategy, planning and asset
management
2.2 Develop long term Resourcing Strategy that is aligned to the Community Strategic
Plan
2.2.1 Undertake desktop review of the Long Term Financial Plan
2.5 Ensure the Shire’s financial performance is well managed and leads to a strong
financial position
2.5.1 Continue to monitor and analyse monthly, year to date and
annual financial performance
Indicators
Balanced budget
Improvement in financial ratios
No instances of non-compliance with financial legislative requirements
Community Outcome Shire Strategic Response
4 FTEs
Challenges
Balancing the Shire’s annual budget
Preparing a balanced long term financial plan
Ensuring adherence to financial practices and legislation
Implementing fair value accounting
Responsibility Manager Finance
Services
Preparing the Shire’s annual budget and long term financial plan and monitoring financial performance against budget and plan targets
Calculating, reviewing and analysing monthly, year to date and annual financial results
Ensuring compliance with financial legislation and regulations
Assisting the organisation with general financial matters
Review the Shire’s insurances and ensure schedules are up to date and assets are adequately insured
Service Team Finance
19
Customer and Information Services
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x Future quarter action - no reporting
x xCommenced, meeting with key stakeholders, Senior
Leadership Team (SLT) feedback received
Community Outcome Shire Strategic Response
1 FTE
Challenges
Responding to growing demand for on-line services
Variable internet speed across the Shire
Increasing cost of power supply
Indicators
Quality checks of website undertaken
Competitive Black Power Supply contract in place
Increase in visitation to the Shire website
Services
Maintaining customer communication systems
Facilitating Light Fleet purchases
Providing printing and stationary supplies
Managing black power supply contract
Developing and reviewing corporate policies and procedures
Managing Service Teams, staffing and financials
Service Team Customer and Information Services
Responsibility Manager Customer and Information Services
2.2 Develop long term Resourcing strategy that is aligned to the Community Strategic Plan
5.2 Communicate effectively with the community and promote the Shire’s positive image
5.2.1 Review and refresh the Shire website every four years
2.2.7 Develop Information and Communication Technology (ICT)
Strategic Framework
2. Effective strategy, planning and asset
management
5. Community and Customer Focus
20
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Service provision ongoing
x x x xOperations Manual complete, specialist area training in
progress
x Future quarter action - no reporting5.1.7 Renew Department of Transport licencing agreement
Community Outcome Shire Strategic Response
5. Community and customer focus5.1 Provide high quality customer and community focussed services and programs across
the organisation
5.1.5 Provide Department of Transport licencing services
5.1.6 Provide one-stop shop customer service centre
6 FTEs
Challenges
Responding to growing demand for on-line services
Variable internet speed across the Shire
Increasing cost of power supply
Indicators
Number of customer complaints outstanding year to date
Percentage of complaints resolved within timeframe
Percentage of new employees completed Customer Relations induction
Department of Transport Licencing Services contract in place
Services
Delivering Shire one-stop-shop counter service
Delivering Department of Transport licencing service
Delivering Shire phone service
Delivering customer service training and support
Maintaining customer information and system
Service Team Customer Relations
Responsibility Manager Customer and Information Services
21
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x Review complete and forwarded to State Records
x x x xReview of Induction Process commenced, Vital records
overview commenced
x Commenced, Shire Procedure in progress3.1.3 Undertake annual Records Disposal program
Community Outcome Shire Strategic Response
3. Effective knowledge and information
management
3.1 Ensure that information is managed in accordance with statutory requirements and is
available for decision making
3.1.1 Undertake review of Recordkeeping Plan in line with
legislative requirements
3.1.2 Provide recordkeeping service to the organisation
Delivering recordkeeping training and support
2 FTEs
Challenges Changing technologies and capturing appropriate records
Meeting legislative requirements in a digital environment
Indicators
Number of outstanding records year to date
Percentage of records actioned within timeframe
Percentage of FOIs and PIDs actioned within timeframe
Percentage of new employees completed Customer Relations induction
Service Team Records
Responsibility Manager Customer and Information Services
Services
Delivering recordkeeping service to internal customers
Providing Freedom of Information (FOI) and Public Interest Disclosure (PID) service to external customers
Maintaining recordkeeping systems
Ensuring compliance with legislation
22
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x Future quarter action - no reporting
x x Future quarter action - no reporting
x x xCommenced, key stakeholder feedback, phone requirements
currently out with all staff
x x x x Service provision ongoing
x x x x Service provision ongoing
x Future quarter action - no reporting
3.2.7 Provide Help Desk support to users
3.2.8 Connect the Cultural Centre to fibre optic
3.2.2 Review Information and Communication Technology Disaster
Recovery plan
3.2.4 Undertake phone system refresh program
3.2.6 Upgrade and extend software licensing to meet the needs of
the organisation
Community Outcome Shire Strategic Response
3. Effective knowledge and information
management
3.2 Ensure information and technology systems meet corporate needs and add value to
the Shire’s operations
3.2.1 Undertake review of Information and Communication
Technology Strategic Plan
2 FTEs
Challenges
Regional power infrastructure reliability
Specialised skill area
Changing technical environment
Indicators
Availability of network infrastructure during business hours
Average outstanding Help Desk support requests
Success of full monthly data backup
Percentage of new employees completed ICT induction
Service Team Information and Communication Technology
Responsibility Manager Customer and Information Services
Services
Desktop support for 150+ computers
Maintenance and support of 15+ servers
Daily backup and on-demand restore services
Disaster recovery planning and maintenance
23
Community Development and Safety
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Support services ongoing
x x Future quarter action - no reporting
x Future quarter action - no reporting
x x x x Support services ongoing
x x x x Support services ongoing
x
Annual Report completed and forwarded to Commission.
Review plan developed but review deferred to 3rd quarter due to
competing demands
x x x x Count Me In disco party held. ACROD project completed
x x Consultation undertaken and draft plan developed
x x x x
Cowaramup Skatepark opening held. Skeg Bite premier held.
Art Mural EOI advertised. Advanced planning commenced for
second quarter activities.
2. Equity and opportunities for all2.1 Provide programs and facilities that encourage resilience in seniors, young people
and families
2.1.1 Review Disability Access and Inclusion Plan
2.1.2 Implement actions from the Disability Access and Inclusion
Plan
2.1.3 Review Youth Plan
2.1.4 Implement actions from the Youth Plan
1.1.2 Manage the Community Development Fund
1.1.3 Implement Arts and Cultural Policy
1.1.4 Support Historical groups
1.2 Support community celebrations, events and local festivals
1.2.2 Provide professional advice and support to community groups
Community Outcome Shire Strategic Response
5. Quality parks, gardens and green spaces5.1. Ensure green and public open spaces cater for a range of users including people
with disabilities
5.1.5 Liaise with the community on disability access and inclusion
requirements
1. Sense of identity and belonging1.1 Foster participation in cultural events and activities that encourage a sense of identify
and belonging
Indicators
Number of youth initiatives implemented
Number of young people attending Shire programs and activities
Level of occupancy of Zone Room
Number of Disability Access and Inclusion programs implemented
Number of community safety and crime prevention initiatives implemented
Level of customer satisfaction with Shire services
Challenges
Increasing requirements and expectations of Access and Inclusion Standards
An ageing population, increased demand for youth activities and an increasing FIFO population
Decreasing amount of funding from State Government, increased demand to provide more community services, with a lack of some health and
community services in the local area
Cost of insurance in relation to community group activities
Increased cost of living including housing and availability
Costs associated with asset management
Community capacity building
Augusta Historical Museum
Minor events
Community development advice, advocacy and support
Managing service teams, financials and staffing
3.1 FTEs and 1 Trainee
Responsibility Manager Community Development and Safety
Services
Bushfire recovery coordination and support
Youth, including coordination of Youth Advisory Council and operation of Zone Room facility
Community safety and crime prevention
Disability access and inclusion
Arts and culture
Heritage
Community grants
Service Team Community Development
24
x x x x Reviewed and streamlined Zone Room Bookings procedure
x x x x Successfully applied for a grant for Seniors Week
ST x x x Draft Concept Design developed and review currently undeway
x x x xStaff inductions held. Liaising with Infrastructure on upcoming
projects.
xSuccessfully applied for a grant for Thank a Volunteer
celebrations
x x x xCommunity Connect portal established and procedures
developed
x x x x Support services ongoing
x x Consultation undertaken and draft plan developed
x x x x Local Drug Action Group training undertaken
xFinal Recovery event held and Recovery brought to a close with
the exception of some minor projects requiring finalisation
x x x x Meeting held during first quarter
x x x x Meeting held during first quarter
x x x x Meeting held during first quarter
x x x x Meetings held monthly
x x x x Meetings held during first quarter
x Future quarter action - no reporting
3. Strong community groups and networks 3.1 Support and value volunteers across the Shire
3.1.1 Organise ‘Thank a Volunteer’ celebrations
3.2 Encourage community organisations and local communities to work together to be self
sufficient
3.2.1 Facilitate the ‘Community Connect’ program
2.1.5 Manage the Zone Room Youth Precinct
2.1.6 Implement actions from the Active Ageing program
2.1.7 Develop Skate Park Precinct Plan (Margaret River) for
Council adoption and identify funding sources
2.2 Ensure Shire facilities and services are accessible by all
2.2.1 Implement actions from the Disability Access and Inclusion
Plan
6.2.2 Facilitate Bushfire Recovery Program
1. Effective governance and corporate leadership 1.5 Develop effective partnerships and strategic alliances to maximise community benefits
1.5.3 Hold regular meetings with the Community Access and
Inclusion Reference Group
1.5.4 Hold regular meetings with the Art and Culture Advisory
Group
1.5.5 Hold regular meetings with the Community Network Group
3.2.2 Support Hall Management groups
6. Safer communities 6.1 Provide community safety through regulatory and support programs
6.1.1 Review Community Safety and Crime Prevention Plan
6.1.2 Implement actions from the Community Safety and Crime
Prevention Plan
6.2 Enhance the Shire’s emergency and disaster management capabilities
1.5.6 Hold regular meetings with the Youth Advisory Council
1.5.7 Hold regular meetings with the Liquor Forum
6.2.9 Complete review of policies by Council adopting new
policies in Community Development
6. A culture of innovation, quality and continuous
improvement
6.2 Ensure Shire services and processes meet or exceed customer needs and recognised
industry standards
25
Responsibility
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Service provision ongoing
x x x xExercise areas provided. Signage installed in Augusta and
Cowaramup.
x x Tender successfully awarded and building works commenced6.1.10 Develop and construct an animal management facility
in Margaret River
Community Outcome Shire Strategic Response
6. Safer communities 6.1 Provide community safety through regulatory and support programs
6.1.3 Provide Rangers regulatory service
6.1.4 Provide dog exercise areas
Indicators
Number of warnings issued
Number of infringements issued
Number of withdrawals
Number of firebreak inspections completed
Number of burials
Challenges
Meeting levels of servicing due to tourism, community expectations, population growth and environmental sensitivities
High level of transient / seasonal / tourist population resulting in responsible camping issues
Competing interests during peak tourism periods impacting on current resources eg parking, camping, fire break inspections, dog exercise areas
Increased levels of compliance / requirement regarding fuel hazard reduction and fire break inspections
Implementation of Cat Act in November 2013
Shark response
Act as Fire Control Officers and support to fire response requirements
Provide support to animals during emergency recovery
Administer the Fines Enforcement Registry
Administer and implement the Fuel Hazard Reduction and Fire Break Notice
4.4 FTEs
Service Team Rangers
Manager Community Development and Safety
Services
Community education
Regulatory service: dogs, camping, parking, abandoned vehicles, wandering stock
Administer cemeteries and niche walls
Animal management and stock control
26
Responsibility
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Shire awarded grant to undertake bushfire risk management
x x x x Service provision ongoing
x Future quarter action - no reporting
x x x Future quarter action - no reporting
x x xCommunity Preparednesss program commenced in partnership
with Red Cross
6.2.1 Provide community emergency services and programs
6.2.7 Facilitate the grant funded Community Preparedness Program
6.2.3 Implement Emergency Preparedness Program
6.2.6 Partner with Department of Fire and Emergency
Services (DFES) and the Office of Bush Fire Risk Management
in Bush Fire Risk Management planning in the Shire
4. Ecology and biodiversity protection 4.1 Collaborate with State Government to protect the biodiversity of the Shire
4.1.4 Liaise with State Government on bushfire strategies and
resourcing
6. Safer communities 6.2 Enhance the Shire’s emergency and disaster management capabilities
Indicators
Number of incidents attended
Number of hours at incidents
Number of Bush Fire Brigade volunteers
Number of new volunteers trained
Number of hectares managed via fuel hazard reduction methods
1 FTE
Challenges
Increased sensitivities regarding fire prevention and preparedness
Increased demands on Fire Services due to climate change
Maintaining an active, trained volunteer Bush Fire Brigade network in a climate of diminishing volunteer support
Consistent Emergency Services Levy operating funding source (DFES).
Managing the responsibilities of the role within a limited resource capacity on a 24 hours 7 days a week requirement
Growing level of Shire role in emergency management
Community Outcome Shire Strategic Response
Service Team Community and Emergency Services
Manager Community Development and Safety
Services
Maintain effective current local emergency management arrangements and test plan effectiveness
Maintain a strong well prepared and responsive network of volunteer Bush Fire Brigades
Provide strategic advice on sub-division planning and fire protection standards
In partnership with Department of Fire and Emergency Services (DFES), develop and implement emergency risk mitigation strategies for local
town sites
Maintain a strong Local Emergency Management Committee in compliance with the Emergency Management Act
Respond to emergency incidents
27
Responsibility
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Service provision ongoing
x x x Future quarter action - no reporting
x x Future quarter action - no reporting
x x x xCapital works and maintenance commenced so works
completed by peak period
2.3.11 Undertake detailed planning of caravan park infrastructure
renewal and maintenance requirements
2. Sustainable tourism industry2.3 Provide family friendly quality caravan and camping grounds to encourage visitors to
extend their stay
2.3.2 Operate caravan and camping facilities at Augusta and
Alexandra Bridge
2.3.3 Develop and construct a new office at Flinders Bay Caravan
Park
2.3.4 Implement actions within Alexandra Bridge Camp Ground
Business Plan
2. Effective strategy, planning and asset
management2.3 Develop and review long term asset management and replacement plans
Ongoing difficulty in attracting and retaining skilled staff
Indicators
Level of occupancy
Level of customer service
Revenue generated from operations
Community Outcome Shire Strategic Response
Develop and implement business plans to ensure the future sustainability of Shire operated Caravan Parks and Camping Grounds.
Develop and implement annual small capital works improvement programs
6.6 FTEs
Challenges
Increase in aged Australian population using caravanning for extended periods
Pressures on LG to sustain infrastructure and deal with infrastructure backlog
Changing requirements in the management of caravan parks
Increased cost of utilities
Capacity to improve business processes and procedures
Patronage dependant on weather
Service Team Caravan Parks
Manager Community Development and Safety
Services
Operation of:
– Turner Caravan Park
– Flinders Bay Caravan Park
– Alexandra Bridge Camping Ground
28
Sport and Recreation Services
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Performance reviewed and continally monitored
x x xSeason to commence late December 2013 to complete April
2014
x x x x Kidsport program ongoing
x x x xLiving Longer, Living Stronger and Count Me In programs
running successfully
x x x x Ongoing review of group fitness programming
x x x Tender awarded and surface being manufactured
x x x xIncluded in LTFP Review, ongoing
x x Future quarter action - no reporting
2.3.9 Undertake detailed planning of recreation infrastructure
renewal and maintenance requirements
6. A culture of innovation, quality and continuous
improvement
6.2 Ensure Shire services and processes meet or exceed customer needs and recognised
industry standards
6.2.10 Complete review of policies by Council adopting new
policies in Recreation
5.1.7 Provide gymnasium equipment and fitness programs that
cater for the population
5.2 Provide the community with high standard recreational facilities and sporting grounds
5.2.7 Complete Cowaramup Bowling Club synthetic green upgrade
2. Effective strategy, planning and asset
management2.3 Develop and review long term asset management and replacement plans
5. Active and healthy lifestyles5.1 Maximise participation in physical activity and promote the benefits of healthy
lifestyles
5.1.2 Operate Recreation Centres in Margaret River and Augusta
5.1.3 Provide beach lifeguard services during peak periods
5.1.5 Partner with groups to provide children’s active lifestyle
programs
5.1.6 Provide fitness programs that cater for seniors and persons
with a disability
Indicators
Percentage of the population using the Shire’s Recreation Centres
Percentage of annual active members of the Shire’s Recreation Centres
Number of sporting events and carnivals held
Shire facilities and sporting grounds meet the needs of sporting groups and the community
Community Outcome Shire Strategic Response
19 FTEs
Challenges
Availability of trained umpires
Seasonal variations with high demand/overuse and underuse/low demand
Lack of space
Age of infrastructure and building maintenance requirements
Better returns for usage on room hire
Access to qualified staff
Services
Manage centre facilities in Margaret River and Augusta utilised by community groups, schools, members, health workers and visitors
Manage indoor aquatic centre in Margaret River and hydrotherapy pool at Augusta
Manage gymnasium and group fitness facilities
Facilitate and schedule community health and sport programs
Facilitate private swim schools
Manage seasonal beach lifeguards
Provide café and catering services
Manage hire of rooms and facilities by users
Support Cultural Centre management group
Service Team Recreation Centres
Responsibility Recreation Operations Manager
29
Workforce
Challenges
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Service provision ongoing.
x x x x
National Quality Standard met as part of recent National
Quality Standard Assessment & Rating Audit in Element:
Physical Environment, Design and Location of the Premises
being appropriate.
2.1.12 Provide upgrades and equipment for Childcare to meet
legislative requirements
Bouncy Castles
Included in Recreation Centres FTEs
Access to qualified staff
Indicators
Number of families and children registered for After Hours School Care
Number of families and children registered for Vacation Care
Number of children attending Crèche service
Community Outcome Shire Strategic Response
2. Equity and opportunities for all2.1 Provide programs and facilities that encourage resilience in seniors, young people
and families
2.1.8 Provide Childcare services
Service Team Childcare
Responsibility Recreation Operations Manager
Services
Crèche
Out of School Hours Care (OSHC)
Vacation Care
Birthday Parties
30
Library Services
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x
Author Annabel Smith visited the Margaret River Library on 16
July. Annabel spoke about the process of writing her book
'Whiskey Charlie Foxtrot' and attendees enjoyed a chat with
Annabel and refreshments afterwards. Library staff are
continuing to teach new members how to use the online and
automated services, and assisting with Wifi and internet
access. Ongoing informal training sessions are also provided to
teach patrons to effectively search the online catalogue and
make use of online services such as downloadable e-audio and
audio books. Staff are also responding to regular requests for
assistance from patrons who lack the skills required to
effectively navigate the internet, with the most common
requests being for help to retrieve and print emails, and help to
access and print forms from government websites.
Statistics show that increasing numbers of patrons are
accessing the online services, including catalogue searches,
viewing the blog, and browsing the library website. New large
print and audio books have been added to the collection to
enhance the services to seniors.
x x x x
All schools have now been visited and presentations given for
Reading Rabbits Year 1 reading rewards program. Over 170
children were given Reading Rabbits packs and many are
already participating with 43 children taking part to date.
x x x xTwo very successful author nights have been held in
conjunction with local publishers Margaret River Press
x x x x Included in LTFP Review, ongoing
4.2.2 Partner with groups to provide events that support lifelong
learning
2. Effective strategy, planning and asset
management2.3 Develop and review long term asset management and replacement plans
6.5 FTE
Challenges
Changing demographics
Service Team Library Services
2.3.10 Undertake detailed planning of library infrastructure renewal
and maintenance requirements
4. Lifelong learning in the community4.1 Provide and promote libraries as community hubs and centres of information and
learning
4.1.1 Operate a library service in Margaret River and Augusta
4.2 Promote programs that foster lifelong learning in the community
4.2.1 Design and implement programs for children and youth
Indicators
Percentage of annual active members
Number of participants for school holiday programs
Number of participants for children’s programs
Increase in visitation to the library websites
Community Outcome Shire Strategic Response
Changing technical environment
Ageing infrastructure at Augusta
Changes to funding stream by State Government
Services
Provide a community hub for all ages in which to meet, work, read & relax in Margaret River and Augusta
Provide a collection that meets the needs of a diverse community
Provide a partnership with Curtin University of Technology Wine School
Provide a 24/7 library services including on-line services
Provide direct community involvement through the ‘Cocoon’ emerging artists’ gallery space and an edible community garden
Provide programs for children and adults, and in partnership with other organisation
Responsibility Manager Library Services
31
Directorate of Sustainable Development
Sustainable Development
Workforce
Indicators
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
ST xA preferred site for the facility has been finalised via Council
resolution. Project Complete.
x Stage 1 finalised and policies adopted
x x Report to Council in November 2013 to finalise Strategy
x x Review commenced
x Most short term actions commenced
x Commencement due in December 2013
1.1.2 Finalise a preferred long term location for the Margaret
River Police and Courthouse
4. Sustainable economic development 4.4 Foster sustainable economic growth which provides local employment
4.4.9 Implement actions from the Tourism Strategy
2.1.7 Review Business Unit plans for directorate in line with
strategic direction
2.3 Develop and review long term asset management and replacement plans
2.3.6 Implement the Land Asset Management Plan
2.3.7 Review the Land Asset Management Plan
Delivering strategic projects in accordance with established timeframes
Efficient implementation of statutory processes and consistent decision making
Effective implementation of statutory, strategic and policy requirements.
Community Outcome Shire Strategic Response
2. Effective strategy, planning and asset
management
2.1 Develop and maintain the Community Strategic Plan that sets long term directions and
goals for the future of the Shire
3.1.1 Progress the Regional Landfill Facility project by
implementing the recommendations of CAPEROC as follows:
• Participate in a Rgional Landfill Working Froup comprising
key officers from both local govenments
•Undertake more detailed and onsite assessment of the
preferred sites identified in the CAPEROC Regional Landfill
Study Report and further investigate governance,
management, financial and tenure options for a Regional
Landfill Facility
• Convene a workshop involving CAPEROC members and the
working group as part of the further investigations on or
before October 2013
• Report back to CAPEROC prior to March 2014 detailing the
outcomes of the further investigations and recommending a
preferred site/s and governance model
ST x x x
Working Group formed and have met. Investigations on
preferred sites commenced.
1. Clearly defined areas for growth and renewal 1.1 Implement Local Planning Scheme No.1 (LPS1)
1.1.7 Finalise Stage 1 and commence Stage 2 of the Planning
Policy review
Service Team Sustainable Development
Responsibility Director Sustainable Development
3. Sustainable waste management3.1 Reduce environmental impact of waste and maximise converstional of natural
resources
4.5 FTE
Challenges
Changing legislative framework for statutory processes and waste management
Balancing growth with retention of community values
Establishing a sustainable waste service for the Shire
Services
Provide strategic direction, management and leadership for Planning and Development Services, Environmental Health and Waste Services
Business Units
Provide corporate and administrative support
Provide strategic input and advice as a member of the Executive Leadership Team
Deliver strategic projects and policy
Implement Council’s Land Asset Management Plan
Provide an interface between the Directorate, elected members, media and community
32
x
Draft Local Laws advertised and to be reported back to Council
later in year. Workshop on Extractive Industry Local Law to be
facilitated prior.
xDAU, delegation and planning application assessment levels
reviewed and implemented
6.2.3 Complete review of local laws and adopt remaining
local laws where relevant to the Shire's needs
6.2.5 Review and update procedures for Sustainable Development
directorate
6. A culture of innovation, quality and continuous
improvement
6.2 Ensure Shire services and processes meet or exceed customer needs and recognised
industry standards
33
Planning and Development
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x xInitial meetings held with Sustainability Advisory Committee
(SAC), scope and project plan prepared. Grant funding sought.
x x x
Monitoring program established with Planet Footprint. To be
further reviewed following December quarter reporting under
Planet Footprint.
x x Follows from LEAP review to be concluded early 2014
x x Follows from LEAP review to be concluded early 2014
ST x x xInitial meetings held with SAC and further consultation
undertaken with key stakeholders
x x Follows from LEAP review to be concluded early 2014
x x Follows from LEAP review to be concluded early 2014
x x x x Ongoing
x x x x Ongoing
x x x x Ongoing
ST x x x x Ongoing
4.1.5 Implement the Local Planning Strategy
4.1.6 Implement the Leeuwin Naturaliste Ridge Statement of
Planning Policy
4.1.7 Implement the Biodiversity Incentive Strategy
4.1.9 Undertake detailed investigations of remnant vegetation and
surface drainage areas at the Structure Plan stage, and ensure
environmental improvements through the development process
2.3.1 Implement actions from the Local Energy Action Plan
2.5 Encourage the adoption of renewable energy
2.5.1 Implement actions from the Local Energy Action Plan
4. Ecology and biodiversity protection 4.1 Collaborate with State Government to protect the biodiversity of the Shire
2.1.3 Implement actions from the Local Energy Action Plan
2.2 Reduce the Shire’s corporate carbon emissions to meet adopted targets
2.2.1 Implement actions from the Local Energy Action Plan
2.2.2 Review the Local Energy Action Plan and present to
Council for adoption
2.3 Assist the community to reduce their carbon emissions to meet adopted targets
Community Outcome Shire Strategic Response
2. Climate change response 2.1 Plan proactively and respond to climate change
2.1.1 Develop a draft Climate Change Response Plan
2.1.2 Establish a Carbon Emission Monitoring program
9.6 FTEs
Challenges
Managing the impacts of population growth and retention of the character and values of the Shire
Increasing legislative and community requirements for greater rigour in development assessment, and devolution of assessment matters (such as
environmental and heritage assessment) to local government
Balancing competing expectations of appropriate responses to growth with economic development within the Shire
Indicators
Average number of days for determining major and minor development applications
Percentage of applications determined within statutory timeframes
Timely implementation of strategic programmes and Business Unit priorities
Services
Development control through implementation, monitoring and review of the Shire’s Local Planning Scheme No. 1 and associated policy
Research and evaluation of development and growth issues, and preparation of local government responses to ensure appropriate environmental
outcomes
Liaison and partnership with State and Federal Government agencies on policy, plans and legislative change
Guidance and advice to the community and broader stakeholders in relation to development, subdivision, environmental protection and
enhancement
Preparation and implementation of strategic goals and projects to encourage and provide sustainable environmental outcomes
Provision of Geographic Information System (GIS) services to the organisation, administration of the Intramaps public information system, and
preparation of plans and spatial data
Service Team Planning Services
Responsibility Manager Planning and Development Services
34
ST x x x x Draft strategy prepared. Internal review being undertaken.
x x x x Ongoing
x x x x Ongoing
x x x x Ongoing
x x x x Project plan prepared
x x x x Follows from LEAP review to be concluded early 2014
ST x x x xProject plan prepared, initial contact made with key
stakeholders
ST x x x xProject plan prepared, meetings held with government
agencies, scope of works for business case established
x x x Draft advertised, to be reported to Council in before 2014
x x x x Ongoing
x Ongoing
x x x x Project plan prepared
x x x xScheme changes arising from cojoint policy/scheme provision
review have been incorporated into draft scheme amendment
ST x x x x Awaiting receipt of signed deed of agreement
1.1.5 Provide planning services
2.2 Develop and implement master plans for Shire facilities and projects so they are well
designed, have aesthetic appeal and are accessible by all
2.1.1 Develop a Masterplan for the Augusta Civic and
Recreation Precinct for adoption by Council
2.1.2 Prepare a business case and seek joint venture interest
for development of the Augusta Retirement Village
5.1.1 Scope additional playground requirements and distribution
through preparation of a Public Open Space Strategy
6. Unique and iconic coastal and natural
landscapes6.1 Plan effectively to protect coastal and other key landscapes
6.1.1 Implement the Local Planning Strategy
6.1.2 Implement the Leeuwin Naturaliste Ridge Statement of
Planning Policy
1. Clearly defined areas for growth and renewal 1.1 Implement Local Planning Scheme No.1 (LPS1)
5. Quality parks, gardens and green spaces5.1 Ensure green and public open spaces cater for a range of users including people with
disabilities
4.4 Foster sustainable economic growth which provides local employment
4.4.8 Work with Cowaramup Resort developer to facilitate
establishment of a resort
4. Connected and safe transport network4.1 Develop and maintain a high quality transport network in partnership with all levels of
government
4.1.15 Review of the parking standards within the Local Planning
Scheme No 1
4. Sustainable economic development4.1 Ensure the Shire’s regulatory environment is business friendly and considerate of
business needs
4.1.1 Work collaboratively with the City of Busselton for
consistency and to minimise regulatory constraints
3. Unique natural and settlement character3.1 Protect heritage places, values and significant regional landscapes in the planning
scheme
3.1.1 Maintain the Shire’s local inventory list
3.1.2 Ensure development consistent with the landscape and
character policies and provisions of the Leeuwin Naturaliste Ridge
Statement of Planning Policy
1.1.6 Finalise a Developer Contributions Plan
1.2 Ensure new communities are developed using ecologically sustainable development
principles
1.2.1 Implement Local Energy Action Plan
2. Liveable and well designed places2.1 Develop and implement master plans for centres, towns and villages to preserve and
enhance their unique character
2.2.17 Finalise concept plan for Council adoption and seek
funding from the Regional Boating Facilities Fund for staged
implementation of the Ellis Street Jetty Concept Plan
35
Environmental Health and Waste Services
Service Team
Responsibility
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Ongoing
x x x x Service provision ongoing
x x x x Service provision ongoing
x x x x Service provision ongoing
x x x x Service provision ongoing
x x x x Service provision ongoing
x x x x Service provision ongoing
x Future quarter action - no reporting
6.1.8 Provide caravan park and camping grounds compliance
service
6.1.9 Provide environmental health services
6.3 Undertake measures to ensure the protection of public health
6.3.1 Provide environmental health programs
6.3.2 Develop and implement Regional Public Health Plan
1. Sense of identity and belonging 1.2 Support community celebrations, events and local fesitvals
1.2.1 Administer events application and approval process
6. Safer communities 6.1 Provide community safety through regulatory and support programs
6.1.7 Provide events application and approval service
1. Healthy waterways and foreshores 1.3 Implement measures to improve the quality of water entering catchments
1.3.1 Participate in Department of Health recreational water quality
monitoring program
1.3.2 Administer approval process for effluent disposal systems
Competing interests during peak tourism periods impacting on current resources eg complaints, inspections, sampling.
Increasing numbers of events within the region place substantial strain on the Shire to ensure all events meet minimum regulatory requirements
Indicators
Number of applications for environmental health approval
Number of environmental samples taken
Number of health risk assessments achieved
Number of communicable disease notifications within the Shire of August Margaret River
Number of Event applications processed by the Shire
5.3 FTEs
Challenges
Limited resources to fulfil all areas of responsibility
Increasing breadth and complexity of Environmental Health legislation and Codes of Practice to be implemented by Shire Environmental Health
staff
Meeting community expectation for Environmental Health Officers to be technical specialists over this diverse and evolving field
Meeting levels of servicing due to tourism, community expectations, population growth and environmental sensitivities
High level of transient / seasonal / tourist population resulting in significant increase in workloads
Community Outcome Shire Strategic Response
Environmental Health
Manager Environmental Health and Waste Services
Services
Manage health risks through ensuring food manufactured, supplied and consumed within the Shire is safe
Ensuring risks to health from unsafe accommodation, buildings and public events are effectively managed
Manage health risks through ensuring safe recreational and drinking waters
Managing health risks posed by biological hazards in the community through vector borne disease control and infectious disease control
Minimising pollution and contamination to ensure the protection and management of public and environmental health. It includes wastewater
management, air pollution management, pesticide management, noise management, smoking regulations, contaminated sites management and
waste management
Land use planning & development which encompasses the assessment of plans to ensure the safety of proposals for development of the natural
or built environment
Planning for and managing potential disasters and emergencies and developing appropriate responses to minimise the negative impacts on public
and or environmental health and safety
Ensuring safe events within the Shire that comply with legislative requirements
36
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x Complete
ST x xWorks approval submitted to DER and currently awaiting
response
x x x x Service provision ongoing
x x Future quarter action - no reporting
x x Future quarter action - no reporting
x Future quarter action - no reporting
3.1.2 Prepare an application and seek works approval from
the Department of Environmental Regulation for expansion of
the Davis Road Waste Facility
3.1.3 Manage Davis Road Waste Management facility to best
practice requirements
Community Outcome Shire Strategic Response
2. Climate change response 2.2 Reduce the Shire’s corporate carbon emissions to meet adopted targets
2.2.3 Undertake data collection of Shire landfill facilities carbon
emissions
3. Sustainable waste management3.1 Reduce environmental impact of waste and maximise conservation of natural
resources
3.1.4 Undertake a comprehensive community survey for waste
management options and provision in the Shire and report
findings to Council
3.1.6 Undertake a viability assessment of Davis Road waste
facility to determine the whole of life disposal costs to
continue landfilling on the site and compare with alternative
waste disposal options
3.1.5 Prepare a report to Council on the future options
including the costs of licencing requirements and ongoing
operations, service levels, cost recovery improvements and
framework for the Shire Waste Transfer Stations
Community acceptance of user pays and polluter pays
Indicators
Recyclables generation – tonnes per capita per annum
Domestic waste generation– tonnes per capita per annum
Total amounts of waste received at landfill
Kerbside collection participation rate
Recycling contamination rate
Municipal solid Waste - % waste diversion from landfill
Challenges
Site viability – lack of airspace could force closure of the landfill facility within 12 months
Seasonal impacts and high tourist numbers are placing unprecedented pressure on existing waste management systems
Transport costs, lack of economies of scale, lack of access to end markets, and limited capacity to generate funds place financial burdens upon
local government with regard to recycling operations
Cost of landfill relatively low compared to the cost of recovery operations, while cost of landfill remains low it will undermine the economic viability
of preferred uses, such as recycling and hinders the achievements of the waste strategy and targets
Communications, engagement and education programs to ensure industry, community and government entities essential to reduce waste
generation. There is a need to invest in education and promotion to limit long term staffing costs through increased waste loads
Waste policy and compliance changes
8.9 FTEs
State waste strategies and legislation aimed at moving to a low waste society within the next decade through best practice, continuous
improvements and waste diversion target setting
Increasing waste volumes – growth and tourism, impacting on operations without increases in staffing levels
Need for long term waste management planning at both local and state level
Waste generated from significant tourism numbers places an operational and financial burden on the Shire and rate payers to fund
Access to confident data sets to underpin the measurement of strategies and services
Dirty recyclables becoming more and more common as a result of insufficient opportunity to educate the community on correct recycling
requirements
Labour market skills shortage – difficult to attract staff, and aging workforce
Significant technical and specific landfill management skills required to manage landfill operations
Service Team Waste Services
Responsibility Manager Environmental Health and Waste Services
Services
Provide a safe sustainable waste management service for the Shire
Provide waste disposal facilities management consisting of landfill operations, recycling operations, transfer station operations, waste water
treatment plant
Manage the waste disposal facilities and operations and services to acceptable Council standards and Department of Environment and
Conservation licence requirements
Coordinate resource recovery and recycling services including processing, transport and sales of recovered waste materials
Manage the development and construction of new assets and /or upgrading of existing facilities to meet the needs of current and future
generations
Community education
Manage kerbside domestic and recycling collection contracts and their programming and delivery within the Shire
37
x Future quarter action - no reporting
x x x x New contracts commenced July 2013
x x x x Ongoing
x x x x Included in LTFP, ongoing
x x x x Ongoing
2. Effective strategy, planning and asset
management2.3 Develop and review long term asset management and replacement plans
2.3.8 Undertake detailed planning of waste infrastructure renewal
and maintenance requirements
2. Effective strategy, planning and asset
management2.4 Maintain and renew Shire assets according to agreed standards
2.4.3 Develop annual schedules for maintenance and renewal of
Shire Waste Services assets
6. Safer communities 6.3 Undertake measures to ensure the protection of public health
6.3.3 Maintain kerbside collection contracts for waste collection and
disposal
2 Liveable and well designed places2.2 Develop and implement master plans for Shire facilities and projects so they are well
designed, have aesthetic appeal and accessible by all.
2.2.13 Implement strategies to determine expansion and
infrastructure requirements for waste management
3.2 Reduce raw material use and increase materials and energy recovery
3.2.1 Review Strategic Waste Management Plan
38
Directorate of Infrastructure Services
Infrastructure Services
Service Team
Responsibility
Services
Workforce
Challenges
Indicators
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
ST x x xAwarded contract for storm water, roadworks and paths
reduced scope of works
ST x x xLandscaping works commenced in July 2013. Remaining works
on schedule for completion by January 2014.
x x Future quarter action - no reporting
x x Future quarter action - no reporting
x xPolicies reviewed. Consultation period for policies closing on 4
October 2013.
2. Effective strategy, planning and asset
management
2.1 Develop and maintain the Community Strategic Plan that sets long term directions and
goals for the future of the Shire
2.1.8 Review Business Unit plans for directorate in line with
strategic direction
6. A culture of innovation, quality and continuous
improvement
6.2 Ensure Shire services and processes meet or exceed customer needs and recognised
industry standards
6.2.7 Complete review of policies by Council adopting new
policies in Infrastructure
2. Liveable and well designed places2.1 Develop and implement master plans for centres, towns and villages to preserve and
enhance their unique character
2.1.4 Progress and complete Stage I of Margaret River Main
Street Town Centre Improvements
2.2 Develop and implement master plans for Shire facilities and projects so they are well
designed, have aesthetic appeal and accessible by all
2.2.9 Complete Surfers Point Precinct in line with staged
construction works
6.2.6 Review and update procedures for Infrastructure Services
directorate
High level of customer satisfaction
Community Outcome Shire Strategic Response
Provide strategic input and advice as a member of the Executive Leadership Team
Deliver strategic projects and policy
Provide an interface between the Directorate, elected members, media and community
2.8 FTEs
Ensuring that the Shire’s infrastructure and other assets are managed to provide an appropriate level of service to the community
Ensuring that the Shire’s infrastructure and other assets are maintained in accordance with sound asset management principles
Infrastructure Services
Director Infrastructure Services
Provide strategic direction, management and leadership for Asset Services and Works Business Units
Provide corporate and administrative support
Ensuring that the effectiveness of the Directorate is maximised through the development of appropriate procedures
Ensuring that the Directorate’s capacity and capability meet strategic, customer and operational needs
Projects are delivered on time, within budget and to appropriate standards
39
Asset Services
Service Team
Responsibility
Services
Workforce
Challenges
Indicators
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
ST x x x Future quarter action - no reporting
ST x x x x Annual donation paid. Work is ongoing.
ST x x x x Annual donation paid. Work is ongoing.
ST x x x Future quarter action - no reporting
ST x x Future quarter action - no reporting
x x x x Undertook weed control in fire affected areas
x x Future quarter action - no reporting
x x x xLiaising with Department Parks and Wildlife (DPaW) in relation
to rail trail, bridle trails study and Kilcarnup area
ST x x x xUndertook revegetation and erosion control at Prevelly and
Gracetown
x x Future quarter action - no reporting
x x x Future quarter action - no reporting
6. Safer communities 6.2 Enhance the Shire’s emergency and disaster management capabilities
6.2.4 Prepare bushfire mitigation strategies for Shire managed land
4.1.2 Prepare management plans for major Shire reserves
4.1.3 Work with Department of Environment and Conservation to
achieve an appropriate balance between conservation and park use
4.1.10 Implement rehabilitation of areas affected by November 2011
bushfire events
4.2 Educate the community and visitors on environmental preservation
4.2.1 Establish and implement an environmental awareness
program
1.2 Manage responsibly coastal areas under the Shire’s control
1.2.1 Work with Leeuwin Tourism Precinct Group to finalise
the alignment of a trail/path from Flinders Bay to Cate
Leeuwin
4. Ecology and biodiversity protection 4.1 Collaborate with State Government to protect the biodiversity of the Shire
4.1.1 Provide environmental management and landcare services
1. Healthy waterways and foreshores1.1 Develop partnerships to maintain and improve the quality of beaches, waterways,
rivers and wetlands
1.1.1 Implement actions from the State of the Environment Report
1.1.3 Maintain partnership with Lower Blackwood Landcare
1.1.4 Maintain partnership with Cape to Cape Catchment Group
1.1.5 Implement findings of the District Water Management
Strategies
Asset consumption ratio
Asset renewal ratio
Asset sustainability ratio
Community Outcome Shire Strategic Response
Coordinating the development of reserve management plans and their implementation
Preparing and implementing building maintenance and inspection programs
8.7 FTE
Ageing infrastructure nearing the end of its economically useful life
Increasing cost to manage Shire assets at the desired service levels
Improving asset management practices
Managing future asset demand and lifecycle cost
Asset Services
Manager Asset Services
Undertaking asset management
Undertaking development assessment
Undertaking project planning and management for Shire projects
Administering land tenure and management
Providing customer service and technical advice
40
ST x x Future quarter action - no reporting
ST x xMain Roads WA engaged consultant to complete the John
Archibald Drive design and Stage II of the Perimeter Road
x Future quarter action - no reporting
x Future quarter action - no reporting
x x x xResponded to several customer requests in a proactive and
timely manner
x x x xConducted inspections of constructed crossovers and
battleaxes in the Kiewa Road East Stucture Plan Area
ST x x Future quarter action - no reporting
x xCommunity Reference Group formed with two meetings held
and community survey underway
x xCommunity consultation conducted. Liaising with DPaW
regarding environmental issues.
x x x x Staff member seconded as Clerk of Works.
ST x x x x Providing support for Community Reference Group
x x Future quarter action - no reporting
x x Future quarter action - no reporting
ST x x x xCommenced Asset Management Improvement Strategy,
compiled Parks inventory (Parkcheck)
x x x xNegotiating Waddington Road, native title (Treeton
Road/Augusta Golf Course) and Yacht Club access matters
ST x Future quarter action - no reporting
x x x Future quarter action - no reporting
4. Connected and safe transport network4.1 Develop and maintain a high quality transport network in partnership with all levels of
government
4.1.2 Progress detailed Bussell Highway street designs for
Perimeter Road Stage I, II construction
2. Liveable and well designed places2.2 Develop and implement master plans for Shire facilities and projects so they are well
designed, have aesthetic appeal and are accessible by all
2.2.7 Finalise planning and programming for Margaret River
Foreshores upgrades
4.2.1 Review Path Plan 2004 in line with Townsite Strategy 2008
and Transport Strategy 2012
4.2.11 Finalise Rails to Trails Master Plan and obtain
environmental approval
3. Infrastructure for economic growth 3.1 Develop major infrastructure to cater for increased residents and visitors
3.1.1 Assist Department of Transport to deliver Augusta Boat
Harbour Stage I
3.1.2 Provide any assistance required by Main Roads WA to
progress development of the Margaret River Perimeter Road
4.1.3 Undertake study of upgrade options at Station Road –
Wallcliffe Road intersection
4.1.12 Prepare master plan for Augusta Airport
4.1.16 Provide customer service for the Infrastructure Directorate
4.1.17 Undertake quality control of developer provided assets
4.2 Provide a network of connected cycleways and pedestrian pathways
4.2.9 Conduct bridle trails feasibility study
2.3.3 Provide asset management planning services
2.3.4 Provide land administration services
2.3.5 Conduct investigations into townsite areas and light industrial
areas with inadequate stormwater
2.4 Maintain and renew Shire assets according to agreed standards
2.4.1 Develop annual schedules for maintenance and renewal of
Shire assets
2. Effective strategy, planning and asset
management2.2 Develop long term Resourcing Strategy aligned to the Community Strategic Plan
2.2.3 Undertake desktop review of the Asset Management Plan
2.2.10 Undertake desktop review of Ten Year Capital Works
Program
2.3 Develop and review long term asset management and replacement plans
41
Works
Service Team
Responsibility
Services
Workforce
Challenges
Indicators
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x Future quarter action - no reporting
ST x Future quarter action - no reporting
ST x x Future quarter action - no reporting
ST x Future quarter action - no reporting
ST x Future quarter action - no reporting
x x x xDesigns for 2013/14 construction program are well advanced
with all projects having at least draft design complete
x x Clearing of vegetation to commence in late October
x Future quarter action - no reporting
x x Future quarter action - no reporting
x x Future quarter action - no reporting
Balancing increasing community demand and the cost of providing new infrastructure and ongoing maintenance
The shortage of key construction resources
Managing risk
Projects completed within budget, on time and to required standards
Community Outcome Shire Strategic Response
Design, Construction & Maintenance
Manager Works
Undertaking surveys and engineering design for key infrastructure
Constructing and maintaining infrastructure including roads, paths, kerbs and drainage, car parks, streetscapes, aerodromes and foreshore
facilities
Undertaking regular maintenance of roads, paths, drainage, roadside signage, car parks, boating facilities, foreshores and airstrips
40 FTEs
2.1.9 Implement Stage 2 of improvements to the Town Centre
Streetscape in Cowaramup (drainage and landscaping)
2.2 Develop and implement master plans for Shire facilities and projects so they are well
designed, have aesthetic appeal and accessible by all
2.2.10 Prepare and implement public facility improvements in the
Shire vested land at Gracetown in consultation with Department of
Environment and Conservation, Landcorp and the community
4. Connected and safe transport network4.1 Develop and maintain a high quality transport network in partnership with all levels of
government
1. Healthy waterways and foreshores 1.2 Manage responsibly coastal areas under the Shire’s control
1.2.2 Commence staged implementation of access, car
parking and picnic faciliites at Ringbolt Bay, subject to
receiving Coastwest grant funding
2. Liveable and well designed places2.1 Develop and implement master plans for centres, towns and villages to preserve and
enhance their unique character
2.1.5 Construct two disabled parking bays in Blackwood
Avenue (Augusta Town Centre Streetscape improvements)
4.1.10 Undertake safety upgrade of Margaret River Airport
4.1.23 Complete the 2013-14 reseal/overlay program
2. Effective strategy, planning and asset
management2.3 Develop and review long term asset management and replacement plans
2.3.12 Undertake detailed planning of depot infrastructure renewal
and maintenance requirements
2.4.6 Undertake depot upgrades Stage 2
4.1.13 Provide survey design services
4.1.22 Complete widening/upgrading of 1200m on Ellenbrook
Road and 3500m on Fisher Road
2.4 Maintain and renew Shire assets according to agreed standards
42
Service Team
Responsibility
Services
Workforce
Challenges
Indicators
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x x x x Undertook weed control in fire affected areas
x x Future quarter action - no reporting
x x x xWinter maintenance program completed including mulching
gardening beds, planting and pruning
x x x x Working with FESA, identified high risk reserves were cleared
x x Future quarter action - no reporting
Parks and Gardens
Manager Works
Developing the Shire’s parks, gardens, reserves and cemeteries
Undertaking regular maintenance of parks, gardens, reserves, cemeteries, road reserves, trees and recycled water system including testing
Managing fuel loads in parks and reserves
11 FTEs
4.1.8 Undertake targeted weed control in priority areas
5. Quality parks, gardens and green spaces5.1 Ensure green and public open spaces cater for a range of users including people with
disabilities
5.1.3 Install playground equipment throughout the Shire
5.1.4 Maintain Shire parks and gardens
6. Safer communities 6.2 Enhance the Shire’s emergency and disaster management capabilities
Balancing increasing community demand and the cost of providing parks and gardens and maintenance
Managing risk
Projects completed within budget, on time and to required standards
Community Outcome Shire Strategic Response
4. Ecology and biodiversity protection 4.1 Collaborate with State Government to protect the biodiversity of the Shire
6.2.5 Implement bushfire mitigation strategies for Shire managed
land
2. Effective strategy, planning and asset
management2.3 Develop and review long term asset management and replacement plans
2.3.13 Undertake detailed planning of playground and skate park
infrastructure renewal and maintenance requirements
43
Workforce
Activities and Priorities Key 1 Q 2Q 3 Q 4 Q Comment
x Developed as part of the Long Term Financial Plan
x x xBushfire and construction plant and equipment maintenance
completed during winter months
x x x x Specifications for plant being replaced have been developed
Services Purchase of the Shire’s vehicle and plant fleet and equipment
Maintenance of the Shire’s vehicle and plant fleet and equipment
3 FTEs
Service Team Workshop
2.4 Maintain and renew Shire assets according to agreed standards
2.4.2 Undertake annual maintenance and renewal works of Shire
assets
2.4.4 Implement annual Heavy Plant Replacement Program
Flat rate repair times
Community Outcome Shire Strategic Response
2. Effective strategy, planning and asset
management2.3 Develop and review long term asset management and replacement plans
2.3.1 Program and fund a rolling ten year Heavy Plant Replacement
Program
Challenges
Funding of the Shire’s fleet
Optimising fleet utilisation
Reducing downtime
Indicators
Fleet utilisation
Optimum replacement
Whole of life cost
Downtime
Maintenance failure
Responsibility Manager Works
44
Shire of Augusta-Margaret River Main Administration Office 41 Wallcliffe Road (PO Box 61)
45
Margaret River 6285 P: 08 9780 5255, F: 08 9757 2512 Office Hours: Mon to Fri, 9am – 4pm Phone enquiries: 8am – 4.30pm Augusta Administration Office 66 Allnutt Terrace Augusta 6290 P: 08 9780 5660, F: 08 9758 0033 Office Hours: Mon to Fri, 9am – 4pm (closes for lunch 12pm — 1pm) Phone enquiries 8am – 4.30pm
www.amrshire.wa.gov.au [email protected]