QUARTERLY PROGRESS REPORT - 03/31/1983

6
) COIDDIBIONEM Mr, Peter McGlew Waste Management Division U, S, EPA - Region I 'l . I WIWA.IfA. HEALY, PJ. .... ,. DUwtor DAJ>IKI.COI..J..JNS.rJ. lJefiUtT&aouunmtMCor -' ,_,_, April 29, 1983 John F . l<eMedy Federal Building Boston , Hassachuaetts 02203 "'" EPA Project 1018103301-61-1 Keefe Envirorrnental Services (KES}, N. H, Dear Mr, Mdllew: This quarterly rep:>rt sets forth the status of the KES hazardous 0 waste site resp:mse of Hllrdl 31, 1983 . Experditures by cbject class and work plan task are itanized in report attacbnents 1 and 2 respectively , am reflect the previously tecl project budget, As you are aware, in lleceri'ber 1982, the site security fence was CXJ'l- structed ard the cx:ntract for the dnJn ard bulk rerroval t:nase of the pro- ject was signec'l with Resource Technology Services , Inc . (Rl'S) of Devon , Pennsylvania . rue to severe winter conditions, Rl'S management chose to maintain the site tmer the inactive security pt:o.rision of the contract doo.nents, ll'ltil weather conditions had iq:cove::l sufficiently to allow active drun. ard bulk waste rem:wal. On March 28, 1983, site cooditions were such that II'Obiliza- tion could begin for the aaninistrative and tectnical of the drun and b.llk waste rsooval q.eration, It is anticipated active dtun and bulk waste rE!TDYal will start in l ate March and will be by July 31 , 1983. On March 30 and 31 , 1983, the EERU activated carbon unit was on site to draw doom the level of liquid in the lagoon. water quality JTOnitoring in the vicinity of the site is continuing with analyses performed by State KES project persomel. 'nle analytical data developed will serve to cat{)lement the site remerlial investigation.

Transcript of QUARTERLY PROGRESS REPORT - 03/31/1983

Page 1: QUARTERLY PROGRESS REPORT - 03/31/1983

) COIDDIBIONEM

Mr Peter McGlew Waste Management Division U S EPA - Region I

l ~ I

WIWAIfA HEALY PJ bull DUwtor

DAJgtIKICOIJJNSrJ lJefiUtTampaouunmtMCor- __

April 29 1983

John F llteMedy Federal Building Boston Hassachuaetts 02203

EPA Project 1018103301-61-1 Keefe Envirorrnental Services (KES ~irg N H

Dear Mr Mdllew

This quarterly repgtrt sets forth the status of the KES hazardous

0 waste site respmse of Hllrdl 31 1983

Experditures by cbject class and work plan task are itanized in report attacbnents 1 and 2 respectively am reflect the previously s~tshytecl project budget

As you are aware in lleceriber 1982 the site security fence was CXJl shy

structed ard the cxntract for the dnJn ard bulk rerroval tnase of the proshyject was signecl with Resource Technology Services Inc (RlS) of Devon Pennsylvania

rue to severe winter conditions RlS management chose to maintain the site tmer the inactive security ptorision of the contract doonents llltil weather conditions had iqcovel sufficiently to allow active drun ard bulk waste remwal On March 28 1983 site cooditions were such that IIObilizashytion could begin for the aaninistrative and tectnical s~rt of the drun and bllk waste rsooval qeration It is anticipated active dtun and bulk waste rETDYal will start in l ate March and will be ~leted by July 31 1983

On March 30 and 31 1983 the EERU activated carbon unit was on site to draw doom the level of liquid in the lagoon

water quality JTOnitoring in the vicinity of the site is continuing with analyses performed by State KES project persomel nle analytical data developed will serve to cat)lement the site remerlial investigation

I I I I

) r Hr Peter HcGlew

Apltll 29 1983 Page

Plamin for the aolicitatioo of requests for ~a (RFP) for the Renedial InvestigationLegoal Feasibililty (RIFS) study is cxrplete Folshylowirg is the propl6ed schedule of RIFS consultant selection

~~

Apdl 8 1983 RFPs mailed Apltil 21 1983 Site inspection May 9 1983 Sutmittal deadline May 23 1983 Omsultant interviews Jlrle 6 1983 Award recamendation June 22 1983 Contract ~OYed

Wgtrk oo the camunity relations plan is continuirq with informational rdlings and meetirv~s tth local selectren and e~~ergency respJOSe officials planned for the life of the ~ect

Shxild you have any ltpStions please feel free to contact me

Sincerely

0 ~ 11lcrnas Roy P E

State ~Scene Coottlinator

TPvv Att cc Hr Michael P tbnahue P E -~

Mr Iltenneth R fobrrissey - WSPCC

011

~ zz ~lt ~ 00 lgtZ

~ltZ

~ nogt 011

~~ l

Attactvncnt 1

Expenses of 11arch 31 1983

Cooperative Class Category Subtotal Agreellfnt ~

Personnel

On-Scene Coord1 nator $ -0- 27202 27202 Laboratory Scientist IV 5322 21767 16445

Fringe Benefits 852 7835 6983

Travel

In-State -0- 3500 3500 Out-of-State -0- 500 500

Supplies

Off tee Suppl tes -0- 1000 1000laboratory Supplies -0- 5756 5756

Equipment -0- 5000 5000( -- Other

Cormam 1ty Re 1 at 1 ons -0- 10000 10000 Lease of Anal ytical Equipment -0- 3000 3000Administrative Costs -0- 5 000 5000

Contractual

Security Fence 14497 14497 -0shyDrum amp Bu l k Waste Removal -0- 1230503 1230503 Drum Removal Engineering

oversight -0- 100000 100000 State-On-Site Inspection -0- 15000 15000 Remedia l Investigation -0- 184500 184500 Lagoon Feasibility Study -0- 160000 160000 Indirect Costs (5 71 less

equ1 pment amp contractual) ~~ ~

Total Expenses as of 1-arch 31 1983 $20671 $1799945 $1779274

Attachment 2

Expenses as of March 31 1983

Task Expenditures to

Date Expenditures Since

Last Report Percent

Complete Basis CostTfme Variance

Initial Remedial -0shy -0shy 100 Contract Award 00

Safety Plan -0shy -0shy 901 Final Safety Plan 00

Security Fence $14497 -0shy 100 Fence Installers 00

r middottract Services -0shy -0shy 0 Consultant Oversight 00

Implementation (drum amp bulk waste renx~val

-0shy -0shy 5 Project Completion 00

Evaluation (Drum amp Bulk waste reooval)

-0shy -oshy 0 Report 00

Remedial Investigation -0shy -0shy 0 Final Report ongoing water qual tty information

00

Feasibility Study -0shy -oshy 0 Final Report 00

Public Participation -oshy -0shy 10 Publ fc Meetings Press Releases informational maili ng

00

011-Scene Coordination -0shy -0shy 251 Project Coordination 00

(_ 0

~013~ 3flllll~lSINIWOII S31I~3S WlN3WNO~IIN3 3J33gt1

---shy

)

Attactvnent 1

Expenses of t1arch 31 1983

Class Category

Personnel

On middot Scene Coordinator laboratory Scientist IV

Fringe Benefits

Travel

lnmiddot State OutmiddotofmiddotState

Supplies

Office Supp11es Laboratory Supplies

Equipment _)

Other

Comnun1ty Relations Lease of Ana l ytical Equipment Administrative Costs

Contractua 1

Security Fence Drum amp Bul k Waste Removal Drum Removal Engineering

Oversight State-On-Site Inspection Remedial Investigation Lagoon Foasi bili ty Study Indirect Costs (571S less

equipment amp contractual)

Tota 1 Expenses as of March 31 ]g83

Subtotal

$ -0shy5322

852

-0shy-0shy

-0shy-0shy

-0shy

-0shy-0shy-0shy

144g7 -0shy

-0shy-0shy-0shy-0shy

_plusmn_

$20671

Cooperative Agreement

27202 21767

7835

3500 500

1000 5756

5000

10000 3000 5000

144g7 1230503

100000 15 000

184500 160000

~

$17ggg45

Balance

27202 16445

6g83

3500 500

1000 5756

5000

10000 3000 5000

-0shy1230503

100000 15000

184500 160000

~

S177g 274

~--

Task

Initial Remedial

Safety Plan

Security Fence

Contract 5ervLes

llplementatfon (drum l bulk waste removal)

Evaluation (Drum amp Bulk waste retnOval)

Remedial InveStigation

Feasfbflfty Study

Public Particfpatfon

On-Scene Coordination

Expenditures to Date

-0shy

-0shy

$14497

-0shy

-0shy

-0shy

- 0shy

-0shy

-0shy

-0shy

Attacpound At 2

Expenses as o~ March 31 1983

Expenditures Since Last Report

Percent C011plete

-0shy 100

-0shy 90S

-0shy 100

-0shy

- 0shy ~middot

-0shy

-0shy

-0shy

-0- 10

-0- 25S

0--)

CostTine Basis Variance

Contract Award 00

Final Safety Plan 00

Fence Installers 00

Consultant Oversight 00

Project Completion 00

Report 00

Final Report ongoing water 00 quality fnfonnatfon

Final Report 00

Public Meetings Press Releases 00 infonnatfonal nailing

Project Coordination 00

S3liUt3S

~ All bullon~ _ O(OA--o ll

ohbullI 111U A M JIWIII------shy~Ol3ij 31Il~~lSINIW011

fQilN3WNO~ItN3 3~33)1

  1. barcode 576065
  2. barcodetext SDMS Doc ID 576065
Page 2: QUARTERLY PROGRESS REPORT - 03/31/1983

I I I I

) r Hr Peter HcGlew

Apltll 29 1983 Page

Plamin for the aolicitatioo of requests for ~a (RFP) for the Renedial InvestigationLegoal Feasibililty (RIFS) study is cxrplete Folshylowirg is the propl6ed schedule of RIFS consultant selection

~~

Apdl 8 1983 RFPs mailed Apltil 21 1983 Site inspection May 9 1983 Sutmittal deadline May 23 1983 Omsultant interviews Jlrle 6 1983 Award recamendation June 22 1983 Contract ~OYed

Wgtrk oo the camunity relations plan is continuirq with informational rdlings and meetirv~s tth local selectren and e~~ergency respJOSe officials planned for the life of the ~ect

Shxild you have any ltpStions please feel free to contact me

Sincerely

0 ~ 11lcrnas Roy P E

State ~Scene Coottlinator

TPvv Att cc Hr Michael P tbnahue P E -~

Mr Iltenneth R fobrrissey - WSPCC

011

~ zz ~lt ~ 00 lgtZ

~ltZ

~ nogt 011

~~ l

Attactvncnt 1

Expenses of 11arch 31 1983

Cooperative Class Category Subtotal Agreellfnt ~

Personnel

On-Scene Coord1 nator $ -0- 27202 27202 Laboratory Scientist IV 5322 21767 16445

Fringe Benefits 852 7835 6983

Travel

In-State -0- 3500 3500 Out-of-State -0- 500 500

Supplies

Off tee Suppl tes -0- 1000 1000laboratory Supplies -0- 5756 5756

Equipment -0- 5000 5000( -- Other

Cormam 1ty Re 1 at 1 ons -0- 10000 10000 Lease of Anal ytical Equipment -0- 3000 3000Administrative Costs -0- 5 000 5000

Contractual

Security Fence 14497 14497 -0shyDrum amp Bu l k Waste Removal -0- 1230503 1230503 Drum Removal Engineering

oversight -0- 100000 100000 State-On-Site Inspection -0- 15000 15000 Remedia l Investigation -0- 184500 184500 Lagoon Feasibility Study -0- 160000 160000 Indirect Costs (5 71 less

equ1 pment amp contractual) ~~ ~

Total Expenses as of 1-arch 31 1983 $20671 $1799945 $1779274

Attachment 2

Expenses as of March 31 1983

Task Expenditures to

Date Expenditures Since

Last Report Percent

Complete Basis CostTfme Variance

Initial Remedial -0shy -0shy 100 Contract Award 00

Safety Plan -0shy -0shy 901 Final Safety Plan 00

Security Fence $14497 -0shy 100 Fence Installers 00

r middottract Services -0shy -0shy 0 Consultant Oversight 00

Implementation (drum amp bulk waste renx~val

-0shy -0shy 5 Project Completion 00

Evaluation (Drum amp Bulk waste reooval)

-0shy -oshy 0 Report 00

Remedial Investigation -0shy -0shy 0 Final Report ongoing water qual tty information

00

Feasibility Study -0shy -oshy 0 Final Report 00

Public Participation -oshy -0shy 10 Publ fc Meetings Press Releases informational maili ng

00

011-Scene Coordination -0shy -0shy 251 Project Coordination 00

(_ 0

~013~ 3flllll~lSINIWOII S31I~3S WlN3WNO~IIN3 3J33gt1

---shy

)

Attactvnent 1

Expenses of t1arch 31 1983

Class Category

Personnel

On middot Scene Coordinator laboratory Scientist IV

Fringe Benefits

Travel

lnmiddot State OutmiddotofmiddotState

Supplies

Office Supp11es Laboratory Supplies

Equipment _)

Other

Comnun1ty Relations Lease of Ana l ytical Equipment Administrative Costs

Contractua 1

Security Fence Drum amp Bul k Waste Removal Drum Removal Engineering

Oversight State-On-Site Inspection Remedial Investigation Lagoon Foasi bili ty Study Indirect Costs (571S less

equipment amp contractual)

Tota 1 Expenses as of March 31 ]g83

Subtotal

$ -0shy5322

852

-0shy-0shy

-0shy-0shy

-0shy

-0shy-0shy-0shy

144g7 -0shy

-0shy-0shy-0shy-0shy

_plusmn_

$20671

Cooperative Agreement

27202 21767

7835

3500 500

1000 5756

5000

10000 3000 5000

144g7 1230503

100000 15 000

184500 160000

~

$17ggg45

Balance

27202 16445

6g83

3500 500

1000 5756

5000

10000 3000 5000

-0shy1230503

100000 15000

184500 160000

~

S177g 274

~--

Task

Initial Remedial

Safety Plan

Security Fence

Contract 5ervLes

llplementatfon (drum l bulk waste removal)

Evaluation (Drum amp Bulk waste retnOval)

Remedial InveStigation

Feasfbflfty Study

Public Particfpatfon

On-Scene Coordination

Expenditures to Date

-0shy

-0shy

$14497

-0shy

-0shy

-0shy

- 0shy

-0shy

-0shy

-0shy

Attacpound At 2

Expenses as o~ March 31 1983

Expenditures Since Last Report

Percent C011plete

-0shy 100

-0shy 90S

-0shy 100

-0shy

- 0shy ~middot

-0shy

-0shy

-0shy

-0- 10

-0- 25S

0--)

CostTine Basis Variance

Contract Award 00

Final Safety Plan 00

Fence Installers 00

Consultant Oversight 00

Project Completion 00

Report 00

Final Report ongoing water 00 quality fnfonnatfon

Final Report 00

Public Meetings Press Releases 00 infonnatfonal nailing

Project Coordination 00

S3liUt3S

~ All bullon~ _ O(OA--o ll

ohbullI 111U A M JIWIII------shy~Ol3ij 31Il~~lSINIW011

fQilN3WNO~ItN3 3~33)1

  1. barcode 576065
  2. barcodetext SDMS Doc ID 576065
Page 3: QUARTERLY PROGRESS REPORT - 03/31/1983

Attactvncnt 1

Expenses of 11arch 31 1983

Cooperative Class Category Subtotal Agreellfnt ~

Personnel

On-Scene Coord1 nator $ -0- 27202 27202 Laboratory Scientist IV 5322 21767 16445

Fringe Benefits 852 7835 6983

Travel

In-State -0- 3500 3500 Out-of-State -0- 500 500

Supplies

Off tee Suppl tes -0- 1000 1000laboratory Supplies -0- 5756 5756

Equipment -0- 5000 5000( -- Other

Cormam 1ty Re 1 at 1 ons -0- 10000 10000 Lease of Anal ytical Equipment -0- 3000 3000Administrative Costs -0- 5 000 5000

Contractual

Security Fence 14497 14497 -0shyDrum amp Bu l k Waste Removal -0- 1230503 1230503 Drum Removal Engineering

oversight -0- 100000 100000 State-On-Site Inspection -0- 15000 15000 Remedia l Investigation -0- 184500 184500 Lagoon Feasibility Study -0- 160000 160000 Indirect Costs (5 71 less

equ1 pment amp contractual) ~~ ~

Total Expenses as of 1-arch 31 1983 $20671 $1799945 $1779274

Attachment 2

Expenses as of March 31 1983

Task Expenditures to

Date Expenditures Since

Last Report Percent

Complete Basis CostTfme Variance

Initial Remedial -0shy -0shy 100 Contract Award 00

Safety Plan -0shy -0shy 901 Final Safety Plan 00

Security Fence $14497 -0shy 100 Fence Installers 00

r middottract Services -0shy -0shy 0 Consultant Oversight 00

Implementation (drum amp bulk waste renx~val

-0shy -0shy 5 Project Completion 00

Evaluation (Drum amp Bulk waste reooval)

-0shy -oshy 0 Report 00

Remedial Investigation -0shy -0shy 0 Final Report ongoing water qual tty information

00

Feasibility Study -0shy -oshy 0 Final Report 00

Public Participation -oshy -0shy 10 Publ fc Meetings Press Releases informational maili ng

00

011-Scene Coordination -0shy -0shy 251 Project Coordination 00

(_ 0

~013~ 3flllll~lSINIWOII S31I~3S WlN3WNO~IIN3 3J33gt1

---shy

)

Attactvnent 1

Expenses of t1arch 31 1983

Class Category

Personnel

On middot Scene Coordinator laboratory Scientist IV

Fringe Benefits

Travel

lnmiddot State OutmiddotofmiddotState

Supplies

Office Supp11es Laboratory Supplies

Equipment _)

Other

Comnun1ty Relations Lease of Ana l ytical Equipment Administrative Costs

Contractua 1

Security Fence Drum amp Bul k Waste Removal Drum Removal Engineering

Oversight State-On-Site Inspection Remedial Investigation Lagoon Foasi bili ty Study Indirect Costs (571S less

equipment amp contractual)

Tota 1 Expenses as of March 31 ]g83

Subtotal

$ -0shy5322

852

-0shy-0shy

-0shy-0shy

-0shy

-0shy-0shy-0shy

144g7 -0shy

-0shy-0shy-0shy-0shy

_plusmn_

$20671

Cooperative Agreement

27202 21767

7835

3500 500

1000 5756

5000

10000 3000 5000

144g7 1230503

100000 15 000

184500 160000

~

$17ggg45

Balance

27202 16445

6g83

3500 500

1000 5756

5000

10000 3000 5000

-0shy1230503

100000 15000

184500 160000

~

S177g 274

~--

Task

Initial Remedial

Safety Plan

Security Fence

Contract 5ervLes

llplementatfon (drum l bulk waste removal)

Evaluation (Drum amp Bulk waste retnOval)

Remedial InveStigation

Feasfbflfty Study

Public Particfpatfon

On-Scene Coordination

Expenditures to Date

-0shy

-0shy

$14497

-0shy

-0shy

-0shy

- 0shy

-0shy

-0shy

-0shy

Attacpound At 2

Expenses as o~ March 31 1983

Expenditures Since Last Report

Percent C011plete

-0shy 100

-0shy 90S

-0shy 100

-0shy

- 0shy ~middot

-0shy

-0shy

-0shy

-0- 10

-0- 25S

0--)

CostTine Basis Variance

Contract Award 00

Final Safety Plan 00

Fence Installers 00

Consultant Oversight 00

Project Completion 00

Report 00

Final Report ongoing water 00 quality fnfonnatfon

Final Report 00

Public Meetings Press Releases 00 infonnatfonal nailing

Project Coordination 00

S3liUt3S

~ All bullon~ _ O(OA--o ll

ohbullI 111U A M JIWIII------shy~Ol3ij 31Il~~lSINIW011

fQilN3WNO~ItN3 3~33)1

  1. barcode 576065
  2. barcodetext SDMS Doc ID 576065
Page 4: QUARTERLY PROGRESS REPORT - 03/31/1983

Attachment 2

Expenses as of March 31 1983

Task Expenditures to

Date Expenditures Since

Last Report Percent

Complete Basis CostTfme Variance

Initial Remedial -0shy -0shy 100 Contract Award 00

Safety Plan -0shy -0shy 901 Final Safety Plan 00

Security Fence $14497 -0shy 100 Fence Installers 00

r middottract Services -0shy -0shy 0 Consultant Oversight 00

Implementation (drum amp bulk waste renx~val

-0shy -0shy 5 Project Completion 00

Evaluation (Drum amp Bulk waste reooval)

-0shy -oshy 0 Report 00

Remedial Investigation -0shy -0shy 0 Final Report ongoing water qual tty information

00

Feasibility Study -0shy -oshy 0 Final Report 00

Public Participation -oshy -0shy 10 Publ fc Meetings Press Releases informational maili ng

00

011-Scene Coordination -0shy -0shy 251 Project Coordination 00

(_ 0

~013~ 3flllll~lSINIWOII S31I~3S WlN3WNO~IIN3 3J33gt1

---shy

)

Attactvnent 1

Expenses of t1arch 31 1983

Class Category

Personnel

On middot Scene Coordinator laboratory Scientist IV

Fringe Benefits

Travel

lnmiddot State OutmiddotofmiddotState

Supplies

Office Supp11es Laboratory Supplies

Equipment _)

Other

Comnun1ty Relations Lease of Ana l ytical Equipment Administrative Costs

Contractua 1

Security Fence Drum amp Bul k Waste Removal Drum Removal Engineering

Oversight State-On-Site Inspection Remedial Investigation Lagoon Foasi bili ty Study Indirect Costs (571S less

equipment amp contractual)

Tota 1 Expenses as of March 31 ]g83

Subtotal

$ -0shy5322

852

-0shy-0shy

-0shy-0shy

-0shy

-0shy-0shy-0shy

144g7 -0shy

-0shy-0shy-0shy-0shy

_plusmn_

$20671

Cooperative Agreement

27202 21767

7835

3500 500

1000 5756

5000

10000 3000 5000

144g7 1230503

100000 15 000

184500 160000

~

$17ggg45

Balance

27202 16445

6g83

3500 500

1000 5756

5000

10000 3000 5000

-0shy1230503

100000 15000

184500 160000

~

S177g 274

~--

Task

Initial Remedial

Safety Plan

Security Fence

Contract 5ervLes

llplementatfon (drum l bulk waste removal)

Evaluation (Drum amp Bulk waste retnOval)

Remedial InveStigation

Feasfbflfty Study

Public Particfpatfon

On-Scene Coordination

Expenditures to Date

-0shy

-0shy

$14497

-0shy

-0shy

-0shy

- 0shy

-0shy

-0shy

-0shy

Attacpound At 2

Expenses as o~ March 31 1983

Expenditures Since Last Report

Percent C011plete

-0shy 100

-0shy 90S

-0shy 100

-0shy

- 0shy ~middot

-0shy

-0shy

-0shy

-0- 10

-0- 25S

0--)

CostTine Basis Variance

Contract Award 00

Final Safety Plan 00

Fence Installers 00

Consultant Oversight 00

Project Completion 00

Report 00

Final Report ongoing water 00 quality fnfonnatfon

Final Report 00

Public Meetings Press Releases 00 infonnatfonal nailing

Project Coordination 00

S3liUt3S

~ All bullon~ _ O(OA--o ll

ohbullI 111U A M JIWIII------shy~Ol3ij 31Il~~lSINIW011

fQilN3WNO~ItN3 3~33)1

  1. barcode 576065
  2. barcodetext SDMS Doc ID 576065
Page 5: QUARTERLY PROGRESS REPORT - 03/31/1983

)

Attactvnent 1

Expenses of t1arch 31 1983

Class Category

Personnel

On middot Scene Coordinator laboratory Scientist IV

Fringe Benefits

Travel

lnmiddot State OutmiddotofmiddotState

Supplies

Office Supp11es Laboratory Supplies

Equipment _)

Other

Comnun1ty Relations Lease of Ana l ytical Equipment Administrative Costs

Contractua 1

Security Fence Drum amp Bul k Waste Removal Drum Removal Engineering

Oversight State-On-Site Inspection Remedial Investigation Lagoon Foasi bili ty Study Indirect Costs (571S less

equipment amp contractual)

Tota 1 Expenses as of March 31 ]g83

Subtotal

$ -0shy5322

852

-0shy-0shy

-0shy-0shy

-0shy

-0shy-0shy-0shy

144g7 -0shy

-0shy-0shy-0shy-0shy

_plusmn_

$20671

Cooperative Agreement

27202 21767

7835

3500 500

1000 5756

5000

10000 3000 5000

144g7 1230503

100000 15 000

184500 160000

~

$17ggg45

Balance

27202 16445

6g83

3500 500

1000 5756

5000

10000 3000 5000

-0shy1230503

100000 15000

184500 160000

~

S177g 274

~--

Task

Initial Remedial

Safety Plan

Security Fence

Contract 5ervLes

llplementatfon (drum l bulk waste removal)

Evaluation (Drum amp Bulk waste retnOval)

Remedial InveStigation

Feasfbflfty Study

Public Particfpatfon

On-Scene Coordination

Expenditures to Date

-0shy

-0shy

$14497

-0shy

-0shy

-0shy

- 0shy

-0shy

-0shy

-0shy

Attacpound At 2

Expenses as o~ March 31 1983

Expenditures Since Last Report

Percent C011plete

-0shy 100

-0shy 90S

-0shy 100

-0shy

- 0shy ~middot

-0shy

-0shy

-0shy

-0- 10

-0- 25S

0--)

CostTine Basis Variance

Contract Award 00

Final Safety Plan 00

Fence Installers 00

Consultant Oversight 00

Project Completion 00

Report 00

Final Report ongoing water 00 quality fnfonnatfon

Final Report 00

Public Meetings Press Releases 00 infonnatfonal nailing

Project Coordination 00

S3liUt3S

~ All bullon~ _ O(OA--o ll

ohbullI 111U A M JIWIII------shy~Ol3ij 31Il~~lSINIW011

fQilN3WNO~ItN3 3~33)1

  1. barcode 576065
  2. barcodetext SDMS Doc ID 576065
Page 6: QUARTERLY PROGRESS REPORT - 03/31/1983

~--

Task

Initial Remedial

Safety Plan

Security Fence

Contract 5ervLes

llplementatfon (drum l bulk waste removal)

Evaluation (Drum amp Bulk waste retnOval)

Remedial InveStigation

Feasfbflfty Study

Public Particfpatfon

On-Scene Coordination

Expenditures to Date

-0shy

-0shy

$14497

-0shy

-0shy

-0shy

- 0shy

-0shy

-0shy

-0shy

Attacpound At 2

Expenses as o~ March 31 1983

Expenditures Since Last Report

Percent C011plete

-0shy 100

-0shy 90S

-0shy 100

-0shy

- 0shy ~middot

-0shy

-0shy

-0shy

-0- 10

-0- 25S

0--)

CostTine Basis Variance

Contract Award 00

Final Safety Plan 00

Fence Installers 00

Consultant Oversight 00

Project Completion 00

Report 00

Final Report ongoing water 00 quality fnfonnatfon

Final Report 00

Public Meetings Press Releases 00 infonnatfonal nailing

Project Coordination 00

S3liUt3S

~ All bullon~ _ O(OA--o ll

ohbullI 111U A M JIWIII------shy~Ol3ij 31Il~~lSINIW011

fQilN3WNO~ItN3 3~33)1

  1. barcode 576065
  2. barcodetext SDMS Doc ID 576065