8/10/2019 Quality Dir Civil
1/36
SR. NO DATENAME OF THE
INSPECTOR
AREA VISITED
1 23-May-12 S P Karmakar
Cooling Tower #
1 /Eliminator
beams at cell no-
01
REPORT DATE : 24-05-2012
NAME OF CLIENT : JINDAL INDIA THERMAL POWERNAME OF PROJECT : 2X6OOMW THERMAL PROJECT,
DEPARTMENT : CIVIL
INSPECTION DATE : 23-05-2012
-
8/10/2019 Quality Dir Civil
2/36
2 23-May-12 S P Karmakar Laboratory
3 23-May-12 S P Karmakar
Cooling Tower #
1 /Fan cylinder
6B & 10A
4 23-May-12 S P Karmakar
Bottom Ash
Storage Silo #
1/column no - F2
(2 nos) at grid C2
& C3
-
8/10/2019 Quality Dir Civil
3/36
5 23-May-12 S P Karmakar Laboratory
-
8/10/2019 Quality Dir Civil
4/36
6 23-May-12 S P Karmakar Laboratory
-
8/10/2019 Quality Dir Civil
5/36
ACTIVITY
Concrete casting
was in progress.
OBSERVATION/DEVIATION
Concrete casting was in progress at
the mentioned structure about 10:30
am. Checked the following items:
1) Concrete constituents were found
under limit of tolerance as per IS4925 in digital panel board of mini
reversible mixture.
2) Concrete slump checked and found
80 mm.
3) Concrete qty. - 05 m3
approximately. Cube casted at site -
09 nos.
4) Needle vibrator was available at
pouring point.
DAILY INSPECTION REP
LIMITEDRISSA
-
8/10/2019 Quality Dir Civil
6/36
Concrete cube
(15x15x15) cm.
testing of M25
grade.
Moist curing was
in progress.
Mortar finishing incolumn at
honeycomb
portion.
Concrete cube (15x15x15) cm. testing
in lab. and found ok.
The above test is conforming to IS
456:2000.
Moist curing was in progress at the
mentioned structure about 10:45 am.
Cement mortar finishing work was
doing at the mentioned columnswhere small honeycombs were
appeared. Moist curing was not in
progress there.
-
8/10/2019 Quality Dir Civil
7/36
Concrete cube
(15x15x15) cm.
testing of M25
grade
Witnessed the testing in lab. and
found 01 sample was INVALID &other sample was failure (M25 grade
concrete) of 28 days testing.
Another 01 sample of 7 days testing
was failure.
The above test is conforming to IS
456:2000.
-
8/10/2019 Quality Dir Civil
8/36
Electric room no -
2/foundation raft
F2 at grid A1
Concrete casting was in progress at
the mentioned foundation about
11:30 am. Concrete needle vibrator
was available at pouring point.
Concrete slump cone & cubes were
not available at site.
-
8/10/2019 Quality Dir Civil
9/36
REMEDIAL ACTION
SUGGESTED
NAME OF THE
CONTRACTOR
-
M/s. Paharpur
Cooling Towers
Limited
RT
-
8/10/2019 Quality Dir Civil
10/36
-M/s. PaharpurCooling Towers
Limited
-
M/s. Paharpur
Cooling Towers
Limited
Suggested at site to
the concern person of
Contractor about this
as per JITPL
specification.
M/s. Macawber
Beekay Pvt. Ltd.
-
8/10/2019 Quality Dir Civil
11/36
-M/s. Tecpro
Systems Limited
-
8/10/2019 Quality Dir Civil
12/36
Already suggested to
Mr. Kashyap - QA/QC
of TECPRO
M/s. Tecpro
Systems Limited
-
8/10/2019 Quality Dir Civil
13/36
STATUS
RECTIFICATION
REFERENCE WITH
DATE AND SR.NO.
- -
-
8/10/2019 Quality Dir Civil
14/36
Today 02 samples of 7
days and 02 samples of
28 days testing observed.
Dimensions of concrete
cube were ok.
-
- -
Open -
-
8/10/2019 Quality Dir Civil
15/36
Cubes dimensions were
ok.
Structure name:
Stacker - Reclaimer wall
module no -04/south
side wall -2nd lift casting,
BCN 6A/6B, TR-29/01 no
raft, TR-13 & 13A -
column casting. (basedon 28 days result)
Concrete qty.-15.02m3
-
-
8/10/2019 Quality Dir Civil
16/36
Action not taken in spite
of our strictly instruction.-
-
8/10/2019 Quality Dir Civil
17/36
SR. NO DATENAME OF THE
INSPECTOR
AREA VISITED
1 22-May-12 S P Karmakar Cooling Tower # 1 & 2
2 22-May-12 S P Karmakar Laboratory
3 22-May-12 S P Karmakar
Cooling Tower # 1
/Fan cylinder 6B &
10A
REPORT DATE : 23-05-2012
NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMINAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORIS
DEPARTMENT : CIVIL
INSPECTION DATE : 22-05-2012
-
8/10/2019 Quality Dir Civil
18/36
4 22-May-12 S P Karmakar
Bottom Ash
Silo/column no - F2 (2
nos) at grid C2 & C3
5 22-May-12 S P Karmakar Laboratory
-
8/10/2019 Quality Dir Civil
19/36
6 22-May-12 S P Karmakar Laboratory
7 22-May-12 S P KarmakarTownship / 01 no raft
of B5 type quarter.
8 22-May-12 S P KarmakarTownship/C1 type
quarter
-
8/10/2019 Quality Dir Civil
20/36
ACTIVITY
Concrete casting was not
in progress.
No test has done
Moist curing was in
progress.
DAILY INSPECTIO
EDA
OBSERVATION
Concrete casting
progress at the
due to labour prob
They have not arr
materials & concr
.
Moist curing was
the mentioned s
10:25 am.
-
8/10/2019 Quality Dir Civil
21/36
Concrete casting was
going on.
Concrete cube
(15x15x15) cm. testing
of M25 & M30 grade
Concrete casting
the mentioned col
m3 concrete. Du
checked the follow1) Concrete ingre
of tolerance as
digital panel b
reversible mixture.
2) Concrete slum
(15x15x15) cm. w
site. But, not taken
3) Concrete vibrat
at pouring point.
Witnessed the tes
found 02 samplconcrete) of 28 da
failure at Pipe rac
A/43 & B/45 up
and 01 sample
concrete) of 7 d
found ok.
-
8/10/2019 Quality Dir Civil
22/36
Concrete cube
(15x15x15) cm. testing
of M25 grade
Concrete casting was
going on.
Field compaction test
Witnessed the tes
found 02 sampl
testing were INV
samples and one
result was under
''Acceptance Cri
456:2000. So, th
not complianc
'Acceptance Cri
456:2000.
Another 01 sam
testing was found
Concrete vibrator
pouring point.
cone and cubes w
at site.
Witnessed the fi
test as per appr
found ok.
-
8/10/2019 Quality Dir Civil
23/36
REMEDIAL ACTION
SUGGESTED
NAME OF THE
CONTRACTOR
-
M/s. Paharpur
Cooling Towers
Limited
Suggested for testing
to Mr. Ansari -
Manager of PCTL
M/s. Paharpur
Cooling Towers
Limited
-
M/s. Paharpur
Cooling Towers
Limited
REPORT
DEVIATION
was not in
entioned area
lems.
nge any test of
te cube testing
in progress at
tructure about
-
8/10/2019 Quality Dir Civil
24/36
Suggested to Mr.
Santosh for
rectification of item no
- 1 & 2
M/s. Macawber
Beekay Pvt. Ltd.
-M/s. Macawber
Beekay Pvt. Ltd.
as going on at
umn about 1.75
ring concreting
ing items:ients were out
er IS 4925 in
ard at mini
cone & cubes
ere available at
at site.
r was available
ting in lab. and
s (M30 gradeys testing were
pedestal /grid
o plinth beam
(M25 grade
ys testing was
-
8/10/2019 Quality Dir Civil
25/36
-M/s. Tecpro
Systems Limited
Already suggested toMr. Santosh as per
approved FQP.
M/s. Gammon
India Limited
-M/s. Gammon
India Limited
ting in lab. and
s of 28 days
LID out of 03
individual test
he limit as per
teria'' of IS
se result were
with the
eria'' of IS
le of 7 days
k.
as available at
oncrete slump
re not available
ld compaction
oved FQP and
-
8/10/2019 Quality Dir Civil
26/36
STATUS
RECTIFICATION
REFERENCE WITH
DATE AND SR.NO.
- -
Quality Engineer
was absent at
site.
-
- -
-
8/10/2019 Quality Dir Civil
27/36
Quality Engineer
was absent at
site.
-
Cubes
dimensions were
ok.
Concrete qty.-
3.20 m3
-
-
8/10/2019 Quality Dir Civil
28/36
Cubes
dimensions were
ok.
Structure name:
JNT - 6 F12 raft
beam casting ,
BCN 6A/6B, TR - 9
& 9A tie beam, ER
- 2/6 nos raft
foundation.
Concrete qty. -
26.95 m3.
-
Action not taken -
- -
-
8/10/2019 Quality Dir Civil
29/36
SR. NO DATENAME OF THE
INSPECTOR
AREA VISITED
1 13.06.2012 D.Banerjee Tecpro laboratory
2 13.06.2012 D.Banerjee
Paharpur cooling
tower (1)&(2)
REPORT DATE : 13.06.2012
NAME OF CLIENT : JINDAL INDIA THERMAL POWER LINAME OF PROJECT : 2X6OOMW THERMAL PROJECT,O
DEPARTMENT : CIVIL
INSPECTION DATE : 13.06.2012
-
8/10/2019 Quality Dir Civil
30/36
3 13.06.2012 D.Banerjee Tecpro laboratory
4
5
-
8/10/2019 Quality Dir Civil
31/36
ACTIVITY
Bulk density test of
corse and fine
aggrigate
Curing of structure
DAILY INS
MITEDISSA
OBSERV
1.curing done by p
-
8/10/2019 Quality Dir Civil
32/36
Cube test conducted 28 days cube test
-
8/10/2019 Quality Dir Civil
33/36
REMEDIAL ACTION
SUGGESTED
ok
Issued hassion cloth
for curing
ECTION REPORT
TION/DEVIATION
results found ok.
ipes
-
8/10/2019 Quality Dir Civil
34/36
ok onducted.results found ok.
-
8/10/2019 Quality Dir Civil
35/36
NAME OF THE
CONTRACTOR
STATUS
RECTIFICATION
REFERENCE WITH
DATE AND SR.NO.
M/s. Tecpro
systems Limitedclosed -
M/s Paharpur
cooling towerLimited
OPEN -
-
8/10/2019 Quality Dir Civil
36/36
M/s Tecpro
system limitedclosed -
-
-
-