PV - SUSTAINABLE, COMPETITIVE & SECURE ENERGY SUPPLY
En.regional 012
Dag Kralj, MBA – Member of the Board, BISOL Group
Ljubljana, May 31, 2012
• Based near Celje, Slovenia
• Founded in 2006
• Core business production of PV (c-Si, pc-Si) modules, selectively also turn-key PV projects (35 MWp) & own PV investments (> € 50 m)
• Current annual capacity 120 MWp, in process of increasing to 200 MWp by H2 2012
• 80% revenues generated from exports (offices in Germany, Italy, France, Belgium and UK)
• Top rankings in Photon tests in last 2+ years
• 2011 revenues just under € 75 m, „healthy“ EBIT
BISOL GROUP – KEY FACTS
ADVANCED SOURCE OF ELECTRICITY
• Renewable energy source (unlimited to humankind)
• Huge potential for use (exceeding the humankind’s prime energy needs by 8,000 times)
• Reliable (the sun keeps on shining)
• Widely available (geopolitically independent)
• Ecologically acceptable (no greenhouse or other gas emissions)
• State-of-the-art technology (result of modern semiconductor science)
• Distributed (applicable to small and large-scale PV plants)
• Aesthetical (compatible with natural environment & diverse modern & traditional building designs)
• Modular (PV plant sizes vary from just a few watts to several MW)
• Robustness (wide operating temperature range under high mechanical loads)
• Ease of maintenance (reliable with minimum maintenance requirements)
• Way of operation (soundless)
• Cost competitive
PROVEN PRODUCTION COST REDUCTION
6,0
8,0
10,0
12,0
14,0
16,0
18,0
20,0
2007 2008 2009 2010 2011
g/W
p in
%
Yield Si consumption
Trend: 60% cost reduction by 2012
Year 2007 2008 2009 2010 2011
Cell thickness 180 m 170 m 160 m 150 m 120 m
COST COMPETITIVENESS OF PV
UNDERSTANDING POINTS OF GRID PARITY
WHILE TODAY FiTs ARE STILL NEEDED…
…BY 2020 GRID PARITY WILL BE REACHED ON 90% OF EU MARKETS!
PV generation today already less expensive
than residential electricity rates in IT, DE, ES, DK, AU & HI!
SUN IS GENEROUS
ONLY SLOVENIA ACTIVE SO FAR, ALTHOUGH MID-TERM REGIONAL POTENTIAL PROMISING
Country Installed in 2011 (in MWp)
Cummulatively installed by end 2011 (in MWp)
Annual potential in 3 – 5 years (in MWp)
Slovenia ~ 60 ~ 105 55
Croatia 0,4 0,4 50 - 100
BiH (both entities) - - 20 - 30
Serbia 0,01 0,01 50 - 100
FYRo Macedonia 1,47 1,47 15 - 20
Total Ex-Yu ~ 62 ~ 107 ~ 200 - 300
• Currently not much happening outside of Slovenia
• Region will remain (PV) fragmented, administrative obstacles won‘t just disappear overnight yet
• Coming closer to EU (for states) and grid parity (for PV) should mean PV will take hold also in this region
• Within 3 – 5 years regional market of 200 – 300 MWp of annual installations could / should develop
While there surely will be clouds and possibly showers in near future, mid-term weather forecast for the regions is SUNNY!
EX-YU WEATHER FORECAST
THANK YOU FOR YOUR ATTENTION.