Pump Transfomers Bundwall BOQ Tanga

12
1/12 Bill of Quantities - Tanga Transfomer Pump Installa Bill number 1 Item Description Qty Unit A EXCAVATIONS AND EARTHWORKS Excavation & Earthwork Supports A.1 4 A.2 2.4 A.3 Filling & Back filling A.4 2.4 A Excavation and Earth Works To Grand Total Rate- Rand Unless other wise stated, Rate shall include a) back filling with selected excavated material & consolidating. Surface treatment; compaction before filling / b) disposal of surplus soil as directed & keeping all excavations free from water unless other wise measured separately. c) any additional excavation for working Remove stone and stockpile for later usage on completionof pipe installation to m 2 Excavation of trenches for 50mm pipe up to 1.0m deep to expose Subsoil drain Filling around strip foundations with selected excavated materials that has been excavated and compact to 93% Mod Aashto

description

BOQ - TANGA

Transcript of Pump Transfomers Bundwall BOQ Tanga

Page 1: Pump Transfomers Bundwall BOQ Tanga

1/6

Bill of Quantities - Tanga Transfomer Pump Installation

Bill number 1

Item Description Qty Unit

A EXCAVATIONS AND EARTHWORKS

Unless other wise stated, Rate shall include for

c) any additional excavation for working space.

Excavation & Earthwork Supports

A.14 0

A.22.4 m³ 0

A.3 Filling & Back filling

A.4

2.4 m³ 0

A Excavation and Earth Works To Grand Total 0

Rate-Rand

Amount - Rand

a) back filling with selected excavated material & consolidating. Surface treatment; compaction before filling / foundation.

b) disposal of surplus soil as directed & keeping all excavations free from water unless other wise measured separately.

Remove stone and stockpile for later usage on completionof pipe installation to subsoil m2

Excavation of trenches for 50mm pipe up to 1.0m deep to expose Subsoil drain

Filling around strip foundations with selected excavated materials that has been excavated and compact to 93% Mod Aashto

Page 2: Pump Transfomers Bundwall BOQ Tanga

2/6

Item Description Qty UnitRate-Rand

Amount - Rand

B

Plumber

a

Note

b

Note

cNote

d Rates for plumbing work shall include for:-

d.01 Cutting and waste of pipes etc., and joining pipes. Note

d.02

Note

d.03 Connecting pipes to sanitary fixtures and appliances. Note

d.04Note

d.05

Note

d.06 Connecting of different types of pipes. Note

d.07 Testing and disinfection after completion. Note

d.08Note

e Rates for sanitary fittings shall include for:-

WATER SUPPLY, PUMP & DRAINAGE WORKS All Provisional

Plasticized polyvinyl chloride (PVC) pipes shall be used in the plumbing installation and they must confirm in every respect to the requirements of SABS 967

All fittings and pipe specials used in the plumbing installation shall be suitable and compatible with all respects to the pipe line to which fittings and specials are fixed.

All sanitary fittings & fixtures shall be SABS Standards or approved equivalent.

All specials such as elbows, bends, tees, junctions, plugs, reducers and similar pipe fittings except for valves which will be measured separately.

Casing to brick walls etc. and making good all works disturbed.

Necessary screws, nails sockets, connection back nuts standard pipe fixing or supporting clips, saddles, brackets, holder bats, straps etc.

Excavation, backfilling, disposal of surplus soil for items which were specifically mentioned.

Page 3: Pump Transfomers Bundwall BOQ Tanga

3/6

Item Description Qty UnitRate-Rand

Amount - Rand

e.01

Note

e.02

Note

e.03 Jointing and connecting of pipes to sanitary fittings. Note

e.04 Testing and commissioning of the installation. Note

e.05 Making good of the work disturbed. Note

e.06 Submitting samples for the approval of the Engineer. Note

e.07 Protecting the works. Note

f Rates for drainage work shall include for :-

f.01 Laying of pipes to falls. Note

f.02 Excavation, backfilling, disposal of surplus soil Note

f.03 All pipe specials such as bends, junctions, elbows, tees etc.Note

f.04 Connection to sides of manholes ( subsoil ) etc. Note

f.05Note

f.06Note

Fittings such as taps, waste water outlet, internal overflows etc. and supporting brackets, incidental materials for fixing, unless otherwise measured separately.

Assembling, jointing together fixing components parts, and jointing to pipes including necessary coupling and for leaving perfectly clean and in perfect working order on completion.

Providing sleeves etc., when pipes pass through walls, foundations etc.

Giving notices, obtaining permits, paying fees, fixing, testing and commissioning etc.

Page 4: Pump Transfomers Bundwall BOQ Tanga

4/6

Item Description Qty UnitRate-Rand

Amount - Rand

C Pump installation

On the price 20% discount and vat is included 2 No. 4888.32 9776.64

Water Disposal

C.127.52 m 0

C.2 50mm Clamps - Holder bat galvanised 20 No. 0

C.3 12 No. 0

C.42 No. 0

B Water Supply,Pump and Drainage Work (Plumbing) To Grand Total 9776.64

D. CHEQUERED PLATE - 6mm thick

D.1

4 Nos. 0

Type - Submersible pump - US-40A SAKURAWA PUMP with a Total head 8m , capacity = 0.1m 3/min motor output 0.4 kW installed and inserted in the sump inside the bundwall close to valve connected with flexible 50mm

Type 50mm PVC pipe with all necessary specials laid for internal and external waste Disposal system clamped on the bundwall as shown on the drawing to location or laid through ground Subsoil position IL2 and IL4 .

50mm diameter. ( To accommodate both transformer and all the pieces)

50mm PVC 900 elbows

50mm flexible pipe to connect between pump and the 50mm PVC pipe ( 100mm )

Chequered plates ( 500 x 348 mm ) as shown on the drawing ( item 5 ) with a 90mm diameter hole cut as shown

Page 5: Pump Transfomers Bundwall BOQ Tanga

5/6

Item Description Qty UnitRate-Rand

Amount - Rand

D Chequered plate To Grand Total 0

E ELECTRICAL INSTALLATIONS

a

Note

b

Note

c

Note

dNote

Sub Distribution Board (SDB-1)

E.1

Control panel for 40A, 3 Phase supply

Wiring & other installation cost Item Nos.

Final Circuit Wiring

Unless otherwise stated, Rates in Bill of Quantities shall include all necessary materials Cables, conduits, PVC sunk box, bulbs, switches etc.) and labour required to complete the electrical installation to good working order.

Except where specifically stated, all costs associated with provision of all holes, openings, chases, ducts and other builders' work required for installation and make them good, shall be included in the rates.

Testing and commissioning of the electrical installation is to be carried out by the contractor and Cost of such testing and reports to be included in the rates unless otherwise mention separately.

All types of fittings, materials, painting and finishes shall be approved by the Engineer prior to installation.

Switch supplied to connect to transformer & approved by the Engineer.

Page 6: Pump Transfomers Bundwall BOQ Tanga

6/6

Item Description Qty UnitRate-Rand

Amount - Rand

E.2 Cable from the pump 12 m 0

E.3 1 item 0

E Electrical Installation To Grand Total 0

GRAND TOTAL R 9,776.64

Rates for final circuit wiring shall include all necessary switches, sockets, materials Cables, conduits, PVC sunk box, & junction boxes, draw wires, etc. and labour required to complete the electrical installation to good working order.

Testing & commissioning the entire installation