Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump...

33
Pump Replacement at a Key Pump Station Tom Greaves, P.Eng., PMP 1 Photo by Mitch Cheek

Transcript of Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump...

Page 1: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Pump Replacement at a Key Pump Station

• Tom Greaves, P.Eng., PMP

1

Photo by Mitch Cheek

Page 2: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Tom Greaves, P.Eng., PMP

Tom is a civil engineer with 27 years experience in the municipal and crude oil pipeline engineering fields. In 2013 Tom started on a pump performance review that ultimately lead to the replacement of the mainline crude oil pumps in 2015. Tom has worked as project manager and designer on projects as varied as the routing of large watermains through urban environments, crude oil tank inspections, hillside remediations, and pump optimization and replacements. 

Presenters

2

Page 3: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Problems at the site

3

• Vibration issues• Multi‐Stage pumps–Series pumps

• Key Station

Page 4: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

4

Pump Station: PFD

4 x 2000 Hp multistage pumps

2 x 2000 Hp single stage pumps

2 x 5000 Hp single stage pumps

Page 5: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

5

• Replace parallel pumps one at a time• Design Principles

• Obsolete parallel pumps will be replaced, maintenance project (not an increase in flow project)

• Existing suction/discharge piping not acceptable, replace

• New station will be built in convenient location• New operating philosophy will be series pumps with dedicated VFD starts

• Pump selection and pump station design will mirror best practices from other pump station projects

• Fit for purpose

Options

Page 6: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

6

Pump / Motor Selection

Page 7: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

7

Pump / Motor Selection

Page 8: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

8

Operating Philosophy• Continuous Operation

– 3 years continuous service

• Series– Like all other pumps in system

• Spare philosophy– 100% redundancy

• Maintenance frequency• Pump control

– VFD starts

– Controlled remotely

• Service conditions

• Previous history– Look to what worked in the past

• Function– Mainline pumps

Page 9: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

9

Pump / Motor Selection

c

Page 10: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

10

Pump / Motor Selection

Page 11: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Fluid Type

• Density• Viscosity• Corrosiveness• Erosiveness• Volatility• Flammability• Toxicity• Temperature

11

Gasoline: 720 kg/m3, 0.4 cStDiesel: 840 kg/m3, 4 cStLight/medium crude: 850 kg/m3, 7‐13 cStHeavy crude:925 kg/m3, 250 cSt

Heavy crude: sand particles/ orifice plate 

Gasoline: vapour pressure

Crudes: H2S 

All products

Page 12: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

12

Pump / Motor Selection

Page 13: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Pump Analysis

13

• FEED:• Spreadsheet 

software analysis• Pump 

characteristics• 2332 m3/h 

(352,000 bpd)• 500 m head

• API 610, Vendor Curves

• Multistage worked, single stage worked

• Detailed Design:• Stoner software 

analysis• Boundary 

conditions (NPSHa)

• Pipe Geometry• Vendor Pump 

Curve• Multiple fluids

Page 14: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Pump Selection

14

• Pump: Sulzer 20x 20 x 19B, 

• single stage 2332 m3/hr (352,000 bpd) at BEP

• 518 m differential head

• Replaceable volute• Forced oil bearing • ANSI 600 (PN 100) 

Transient Analysis:10 runsDifferent products

Page 15: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

15

Pump / Motor Selection

Page 16: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Electric Motor Selection

16

Motor: • Toshiba 5000 Hp 

induction motor, 3600 RPM*, 

• 3 phase, 60 Hz, 4160 V• SF 1.15 • Class 1, Div. 2• VFD starting

• Forced oil bearing lubrication

Page 17: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Pump & Motor Selection Summary

17

API 610: Pump SpecsAPI 541Motor Specs

Page 18: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Design

18

Page 19: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Process

19

Page 20: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

20

Detailed Design: Changes– Stepped foundations (2014 IPC paper)

– Gabion wall (245 m2)

– Dedicated VFDs for each motor

– Spill containment:• Asphalt base (containment and parking)• Storage chamber and instrumentation/pond

– MCC Room instead of e‐house

– AHUs for cooling VFDs

Page 21: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

21

Procurement (equipment)

Page 22: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

22

Procurement (equipment)• Challenges/ Strategies

• Long lead time items (pumps 1 year, motors Japan, VFDs Houston)

• Medium lead time items (Ball Valves: Tuscany Italy…local inspector)

• No tinkering: Sulzer Pumps “custom build”• Shipping, cheaper to handle yourself• Weekly procurement meeting

Page 23: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

23

Procurement (equipment)– Tom’s Urgency Law

• Urgency of Vendor to Respond = Physical proximity to your project

• Work with Expeditors to keep vendor’s engaged

Vendor PM Vendor 

Mngt, BD

Proximity to Your Project

Urgen

cy

Sub‐vendors

FabricatorsDGAD* Line

Page 24: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

24

ConstructionFall 2014:• Gabion Wall, 20” pipe supports• November 25, 2014: shutdown and re‐route of suction line

200 mm snow 

Page 25: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

25

Pump Station: Testing Inline Pumps2 x 2000 Hp single stage pumps

Temp. bypass• Run temp. bypass 

across pump suction/discharge (NPSHa) to reduce cavitation

• Across the line start of inline pumps

Success!! 

c

c

c

Page 26: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

26

ConstructionSpring 2015: • foundation and underground conduitSummer 2015:• 480 V cable trayand communicationcable tray

• Installation ofbuilding (cable tray)

Page 27: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Construction

27

“Borrowed” motor for sole plate adjustments

Page 28: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

28

ConstructionSummer 2015• Mounting motor sole plates (critical), and aligning motors and

pumps• Terminating piping and electrical• Spill management system construction starts

Fall 2015• All trades now in building (congestion)• Spill management system continues• Lube oil system (480 V)• Yard piping (with hydrotests)• PLC programming(critical path)• Energize electrical equipment (480 V)

Page 29: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Dry Commissioning(Fall / Winter  2015)

29

• Commissioning manager on board• Equipment and system dry commissioning • Commissioning Lead

• Turn Over Committee

Page 30: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

30

Design HighlightsLouvres/ Fans= Class 1, Div. 2Expansion Pipes: nozzle loadsCoarse Screens: leave them inStepped FoundationsJack and roll motor removalAir handling unit: snow fall

Page 31: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Project Management

31

• Scope Management• Development of pump station ScopeList™• 816 deliverables• Spreadsheet based

Page 32: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Summary & Conclusions

32

• List of guiding principles– Fit for purpose, use tested technology– Consider expeditor: just in time contract

• Changes: – spill management system– Canadian economy

Page 33: Pump Replacement at a Key Pump Station · Pump Replacement at a Key Pump Station ... • Pump selection and pump station design will mirror ... • Spreadsheet based.

Questions

33

• Tom Greaves

• Check me out on Linked In

[email protected]