696 The District Engineer has received a permit application to conduct work in waters of the United States from Algonquin Gas Transmission, LLC. This work is proposed in Beverly Harbor and Collins Cove in Salem, Massachusetts. The site coordinates are: Latitude 42.537160˚, Longitude -70.882474˚. The work involves work, structures, and the discharge of fill material below the high tide line of waters of the United States in order to construct the Algonquin Gas Salem Lateral Project. The Salem Lateral Project includes the installation of 1.2 miles of new 16-inch diameter pipeline from the existing Hubline pipeline in Beverly Harbor to the Salem Harbor Electric Station to supply natural gas for electricity generation. The Salem Harbor Electric Station is converting from coal-fired electricity generation to natural gas-fired generation. The Salem Lateral Project begins at a new subsea tap connection with the Hubline pipeline and will run south to the Salem Harbor Electric Station. The Salem Lateral will cross the marine areas of Beverly Harbor and Collins Cove using horizontal directional drilling (HDD) to minimize impacts to the marine environment. The Collins Cove HDD will be a land-to-land operation with no in-water work in Collins Cove. However, the Beverly Harbor HDD will involve a land-to- water operation, given that the tie-in location to the existing HubLine for the Salem Lateral is in-water. The Applicant will also need to conduct in-water construction work at the tie-in location to connect the Salem Lateral with the HubLine pipeline. In an effort to isolate in-water activities, the Applicant will install a temporary wet cofferdam in the area surrounding the subsea tie-in. Use of a cofferdam offers the opportunity to limit the amount of suspended sediments leaving the work area, thereby reducing potential impacts on marine resources. Based on design requirements and geotechnical soil analysis performed at the subsea tie-in location, the Applicant determined that the use of a “wet cofferdam” will provide the most efficient approach to perform the in-water work at the HDD exit hole and the Hubline connection point. The connection will be performed via a hot-tap onto the active Hubline. The project will require the hydraulic dredging of an 85 foot by 55 foot area of the seafloor to a depth of 8.5 feet in Beverly Harbor. Approximately 1500 cubic yards of sediment will be excavated and placed in hopper barges for temporary storage and decanting. The decanted material will then be placed back into the cofferdam. A permanent, concrete vault will be installed below the seafloor in order to conduct future internal inspections of the Salem Lateral line. The proposed vault will be about 8 feet by 10 feet. The upper elevation of this vault will lie approximately 1 foot below the existing seafloor elevation. Removing the vault cover will facilitate access to the Salem Lateral connection area and would only disturb about 80 square feet during maintenance. Removal of the estimated 1 foot of sediment located on the top of the vault cover would be done by diver hand jetting and would result in the suspension of about 4 cubic yards of bottom sediment into the water column. 696 Virginia Road Concord, MA 01742-2751 PUBLIC NOTICE Comment Period Begins: September 9, 2014 Comment Period Ends: October 8, 2014 File Number: NAE-2014-114 In Reply Refer To: Kevin Kotelly, P.E. Phone: (978) 318-8703 E-mail: [email protected]

Transcript of PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea...

Page 1: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

696

The District Engineer has received a permit application to conduct work in waters of the United States from

Algonquin Gas Transmission, LLC. This work is proposed in Beverly Harbor and Collins Cove in Salem,

Massachusetts. The site coordinates are: Latitude 42.537160˚, Longitude -70.882474˚.

The work involves work, structures, and the discharge of fill material below the high tide line of waters of the

United States in order to construct the Algonquin Gas Salem Lateral Project. The Salem Lateral Project

includes the installation of 1.2 miles of new 16-inch diameter pipeline from the existing Hubline pipeline in

Beverly Harbor to the Salem Harbor Electric Station to supply natural gas for electricity generation. The Salem

Harbor Electric Station is converting from coal-fired electricity generation to natural gas-fired generation. The

Salem Lateral Project begins at a new subsea tap connection with the Hubline pipeline and will run south to the

Salem Harbor Electric Station.

The Salem Lateral will cross the marine areas of Beverly Harbor and Collins Cove using horizontal directional

drilling (HDD) to minimize impacts to the marine environment. The Collins Cove HDD will be a land-to-land

operation with no in-water work in Collins Cove. However, the Beverly Harbor HDD will involve a land-to-

water operation, given that the tie-in location to the existing HubLine for the Salem Lateral is in-water. The

Applicant will also need to conduct in-water construction work at the tie-in location to connect the Salem

Lateral with the HubLine pipeline. In an effort to isolate in-water activities, the Applicant will install a

temporary wet cofferdam in the area surrounding the subsea tie-in. Use of a cofferdam offers the opportunity to

limit the amount of suspended sediments leaving the work area, thereby reducing potential impacts on marine

resources. Based on design requirements and geotechnical soil analysis performed at the subsea tie-in location,

the Applicant determined that the use of a “wet cofferdam” will provide the most efficient approach to perform

the in-water work at the HDD exit hole and the Hubline connection point. The connection will be performed

via a hot-tap onto the active Hubline.

The project will require the hydraulic dredging of an 85 foot by 55 foot area of the seafloor to a depth of 8.5 feet

in Beverly Harbor. Approximately 1500 cubic yards of sediment will be excavated and placed in hopper barges

for temporary storage and decanting. The decanted material will then be placed back into the cofferdam.

A permanent, concrete vault will be installed below the seafloor in order to conduct future internal inspections

of the Salem Lateral line. The proposed vault will be about 8 feet by 10 feet. The upper elevation of this vault

will lie approximately 1 foot below the existing seafloor elevation. Removing the vault cover will facilitate

access to the Salem Lateral connection area and would only disturb about 80 square feet during maintenance.

Removal of the estimated 1 foot of sediment located on the top of the vault cover would be done by diver hand

jetting and would result in the suspension of about 4 cubic yards of bottom sediment into the water column.

696 Virginia Road Concord, MA 01742-2751

PUBLIC NOTICE Comment Period Begins: September 9, 2014

Comment Period Ends: October 8, 2014

File Number: NAE-2014-114

In Reply Refer To: Kevin Kotelly, P.E.

Phone: (978) 318-8703

E-mail: [email protected]

Page 2: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

CENAE-R

FILE NO. NAE-2014-114

2

Performing maintenance operations with the vault would require the mobilization of a support vessel. No

temporary moorings or decanting barges would be needed. Once the maintenance activity is complete, the vault

cover will be replaced and restoration will occur naturally through sediment deposition or the area will be

backfilled with sandbags or some other suitable fill. Future maintenance activities will take approximately 12

days to complete.

The project will also include 0.67 acres of fill below the ordinary high water line of waters of the United States

for the temporary fill of freshwater wetlands via swamp mats during the construction phase of the project where

the pipeline will cross an overland section of Salem. Due to the use of HDD along the Salem Lateral alignment,

the pipeline will not be constructed across any freshwater wetlands via open trenching. However, the

workspace associated with the construction of the Salem Lateral will temporarily disturb a freshwater wetland

in Salem. This workspace is necessary for the pullback of the Beverly Harbor HDD pipe sections and other

support activities. Wooden mats will be placed to support construction equipment within the wetland. After

construction, the mats will be removed and the wetlands will be restored in place.

The work is shown on the attached plans entitled, “I-System, Salem Lateral Project, Proposed 16” Line No. I-

18, USACE Permit Drawing,” on 23 sheets, and dated July 25, 2014.

In designing the Salem Lateral Project, the Applicant evaluated a number of routing and construction

alternatives to address environmental impacts, as well as other concerns. The route selected and the HDD

construction method will avoid and minimize impacts to aquatic resources, including intertidal area, saltmarsh,

and freshwater wetlands. Temporary wetland impacts will be restored in place. Options for compensatory

mitigation for unavoidable impacts are being considered by the Corps of Engineers.

AUTHORITY

Permits are required pursuant to:

__X Section 10 of the Rivers and Harbors Act of 1899

__X_ Section 404 of the Clean Water Act

____ Section 103 of the Marine Protection, Research and Sanctuaries Act.

The decision whether to issue a permit will be based on an evaluation of the probable impact of the proposed

activity on the public interest. That decision will reflect the national concern for both protection and utilization

of important resources. The benefit which may reasonably accrue from the proposal must be balanced against

its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered,

including the cumulative effects thereof; among those are: conservation, economics, aesthetics, general

environmental concerns, wetlands, cultural value, fish and wildlife values, flood hazards, flood plain value, land

use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality,

energy needs, safety, food production and, in general, the needs and welfare of the people.

The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials;

Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed

activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue,

modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess

impacts on endangered species, historic properties, water quality, general environmental effects, and the other

public interest factors listed above. Comments are used in the preparation of an Environmental Assessment

and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are

Page 3: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

CENAE-R

FILE NO. NAE-2014-114

3

also used to determine the need for a public hearing and to determine the overall public interest of the proposed

activity.

Where the activity involves the discharge of dredged or fill material into waters of the United States or the

transportation of dredged material for the purpose of disposing it in ocean waters, the evaluation of the impact

of the activity in the public interest will also include application of the guidelines promulgated by the

Administrator, U.S Environmental Protection Agency, under authority of Section 404(b) of the Clean Water

Act, and/or Section 103 of the Marine Protection Research and Sanctuaries Act of 1972, as amended.

ESSENTIAL FISH HABITAT

The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries

Act of 1996 (Public Law 104-267), requires all federal agencies to consult with the National Marine Fisheries

Service on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely

affect Essential Fish Habitat (EFH).

This project will impact 4675 SF of Essential Fish Habitat (EFH) for Atlantic cod (Gadus morhua), haddock

(Melanogrammus aeglefinus), pollock (Pollachius virens), whiting (Merluccius bilinearis), red hake (Urophycis

chuss), white hake (Urophycis tenuis), redfish (Sebastes fasciatus), winter flounder (Pseudopleuronectes

americanus), yellowtail flounder (Limanda ferruginea), windowpane flounder (Scophthalmus aquosus),

American plaice (Hippoglossoides platessoides), ocean pout (Macrozoarces americanus), Atlantic halibut

(Hippoglossus hippoglossus), Atlantic sea scallop (Placopecten magellanicus), Atlantic sea herring (Clupea

harengus), bluefish (Pomatomus saltatrix), long finned squid (Loligo pealeii), short finned squid (Illex

illecebrosus), Atlantic butterfish (Peprilus triacanthus), Atlantic mackerel (Scomber scombrus), summer

flounder (Paralichthys dentatus), scup (Stenotomus chrysops), black sea bass (Centropristis striata), surf clam

(Spisula solidissima), and bluefin tuna (Thunnus thynnus). This habitat consists of unvegetated, sandy bottom.

Loss of this habitat may adversely affect the species listed above. However, the District Engineer has made a

preliminary determination that the site-specific adverse effect will not be substantial. Further consultation with

the National Marine Fisheries Service regarding EFH conservation recommendations is being conducted and

will be concluded prior to the final decision.

NATIONAL HISTORIC PRESERVATION ACT

Based on his initial review, the District Engineer has determined that little likelihood exists for the proposed

work to impinge upon properties with cultural or Native American significance, or listed in, or eligible for

listing in, the National Register of Historic Places. Therefore, no further consideration of the requirements of

Section 106 of the National Historic Preservation Act of 1966, as amended, is necessary. This determination is

based upon one or more of the following:

a. The permit area has been extensively modified by previous work.

b. The permit area has been recently created.

c. The proposed activity is of limited nature and scope.

d. Review of the latest published version of the National Register shows that no presence of

registered properties listed as being eligible for inclusion therein are in the permit area or general vicinity.

e. Coordination with the State Historic Preservation Officer and/or Tribal Historic Preservation

Officer(s)

Page 4: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

CENAE-R FILE NO. NAE-2014-114

ENDANGERED SPECIES CONSULTATION The New England District, Army Corps of Engineers has reviewed the list of species protected under the Endangered Species Act of 1973, as amended, which might occur at the project site. It is our preliminary detennination that the proposed activity for which authorization is being sought is designed, situated or will be operated/used in such a manner that it is not likely to adversely affect any Federally listed endangered or threatened species or their designated critical habitat. By this Public Notice, we are requesting that the appropriate Federal Agency concur with our determination.

COASTAL ZONE MANAGEMENT The States of Connecticut, Maine, Massachusetts, New Hampshire and Rhode Island have approved Coastal Zone Management Programs. Where applicable, the applicant states that any proposed activity will comply with and will be conducted in a manner that is consistent with the approved Coastal Zone Management Program. By this Public Notice, we are requesting the State concurrence or objection to the applicant's consistency statement.

The following authorizations have been applied for, or have been, or will be obtained: (X) Pennit, License or Assent from State. (X) Permit from Local Wetland Agency or Conservation Commission. (X) Water Quality Certification in accordance with Section 401 of the Clean Water Act.

In order to properly evaluate the proposal, we are seeking public comment. Anyone wishing to comment is encouraged to do so. Comments should be submitted in writing by the above date. If you have any questions, please contact Kevin Kotelly at (978) 318-8703, (800) 343-4789 or (800) 362-4367, if calling from within Massachusetts.

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for a public hearing shall specifically state the reasons for holding a public hearing. The Corps holds public hearings for the purpose of obtaining public comments when that is the best means for understanding a wide variety of concerns from a diverse segment of the public.

The initial determinations made herein will be reviewed in light of facts submitted in response to this notice. All comments will be considered a matter of public record. Copies of letters of objection will be forwarded to the applicant who will normally be requested to contact objectors directly in an effort to reach an understanding.

THIS NOTICE IS NOT AN AUTHORIZATION TO DO ANY WORK.

Karen K. Adams Chief, Permits and Enforcement Branch Regulatory Division

4

Page 5: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

CENAE-R

FILE NO. NAE-2014-114

5

If you would prefer not to continue receiving Public Notices by email, please contact Ms. Tina Chaisson at

(978) 318-8058 or e-mail her at [email protected]. You may also check here ( ) and return

this portion of the Public Notice to: Bettina Chaisson, Regulatory Division, U.S. Army Corps of Engineers,

696 Virginia Road, Concord, MA 01742-2751.

NAME:

ADDRESS:

PHONE:

Page 6: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

!(

")

")

BEVERLYSALEM

Proposed AlgonquinSalem Lateral Pipeline

SALEM

DANVERS

Milepost (MP) 0.0

MP 1.2

V:\PRO

JECTS

\AUGU

STA\S

PECT

RA\Sa

lem\W

QC_Fi

gure2_

1_1_U

SGS.m

xd

LegendProposed Algonquin Salem Lateral PipelineExisting Algonquin HubLine PipelineExisting Maritimes & Northeast Phase III PipelineTown Boundary

!( Tie-in with Existing Algonquin HubLine Pipeline") Existing Maritimes & Northeast Salem M&R Station") Proposed Algonquin Salem Lateral M&R Station Created: 7/28/2014

Algonquin Gas Transmission, LLCSalem Lateral ProjectSalem/Beverly, MA

Figure 2.1-1

0 1,000 2,000Feet

K

Data Sources: ESRI, SPECTRA, USGS, TRC

Page 7: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

!(

")

Proposed AlgonquinSalem Lateral Pipeline

Milepost (MP) 0.0

MP 1.2

SALEM

BEVERLY

PEABODY

DANVERS

MARBLEHEAD

V:\PRO

JECTS

\AUGU

STA\S

PECT

RA\Sa

lem\W

QC_Fi

gure2_

1_2_N

OAA.m

xd

LegendProposed Salem Lateral PipelineExisting Algonquin HubLine PipelineExisting Maritimes & Northeast Phase III PipelineTown Boundary

!( Tie-in with Existing Algonquin HubLine Pipeline") Existing Maritimes & Northeast Salem M&R Station") Proposed Algonquin Salem Lateral M&R Station Created: 7/25/2014

Algonquin Gas Transmission, LLCSalem Lateral ProjectSalem/Beverly, MA

Figure 2.1-2

Data Sources: ESRI, SPECTRA, USGS, TRC

0 350 700

Feet

K

Page 8: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

LEGEND

PROPOSED PIPEUNE HDO ENTRY /EXIT POINT UIITS OF DISI\JRBANCE PERMANENT EASEMENT CONT'OURS PROPERTY UNE

-·2'--·-SALTMARSH ~ DEUN[ATED FRESHWA'TER ~ WETlAND BOUNDARY ~

WETlAND BOUNDARY ~ WITHIN TEMPCRARY WORI<SPH::E

TOP OF' COASTAL BANK - • • •-SILT FENCE

ME'AN LOW WATER (EL: -4.879') ME'AN HIGH WATER (EL: 4.328') HIGH TIDE UNE FLOOD PLAIN UMn\S

NOTES:

---MLw-

-HTL--··-

BEVERLY HARBOR

COWNS COVE

ISYS-P-1 005

ISYS-P-1 007 ISYS-P-1 006 L---------'

ISYS-P-1 004

KEY SHEET SCALE: N.T.S.

1. NO PERMANENT WETLAND IMPACTS ASSOCIATED WITH PROJECT 2. WETLAND RESOURCES WERE FIELD DELINEATED AND SURVEYED BY TRC ON 1/14/14. 3. 100-YEAR FLOOD ZONE (ZONE AE) LIMITS SHOWN BASED ON FEMA FLOOD INSURANCE RATE MAP NOS. 25009C0417G AND 25009C0419G,

EFFEC"nVE JULY 16, 2014. 4. CONTRACTOR TO COMPLY WITH ALL APPLICABLE PROVISIONS OF SPECTRA ENERGY EROSION & SEDIMENTATION CONTROL PLAN. 5. THE FINAL IMPLEMENTATION AND LOCATION OF EROSION AND SEDIMENT CONTROLS WILL BE DETERMINED BY A SPECTRA ENERGY ENVIRONMENTAL

INSPECTOR. 6. EXISTING CONDITIONS AND PROPERlY INFORMATION COMPILED FROM INFORMATION PROVIDED BY VHB (COORDINATE SYSTEM: UTM ZONE 1 8 / NAD

83, ELEVATION DATUM: NAVD 88) 7. BATHYMETRY SHOWN BASED ON SURVEYS PERFORMED BY OSI ON 11/6/2013 TO 11/9/2013. B. MLW AND MHW ELEVATIONS SHOWN ARE REFERENCED TO THE SALEM HARBOR TIDE STATION #8442645 WHICH PLACES MLLW AT EL. -5.0593'. 9. PROPERlY LINES ARE BASED ON TAX MAPS, PLANS/DEEDS OF RECORD AND ARE NOT THE RESULT OF A FULL BOUNDARY SURVEY.

Hatth Matt MacDonald

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

SpcctlaEneriY} Partners.

Algonquin Gas Transmission, LLC 5400 W~ Ct HIRIIfoo, TX T70.S6-S310 7131627·5400

Page 9: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

l I

BEVERLY HARBOR

LOBSTER ROCKS ARE'A

Hatch Matt MacDonald

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

PROPOSIED ur UNE NO. 1-18

1 BE\IERLY HARBOR HDD

I; /,'

/ / . .-' "' \v '

I

" \.

Spectra E,.,g;} Partners.

Algonquin Gas Transmission, LLC 5400 Weodboirruo-Ct HIRIIfoo, TX 770.S6-S310 7131627-5400

Page 10: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

z 0

!i ~

C!J)' OF SALEM ESSEX COUNTY. MASSACHUSETTS

10'

70'

8~~ +.1..::::1 Nl;t;;

110'

30'

MEAN HIGH WAlER El...E:V. 4.328 e~i

\ ~ 10'

........... ~ -10'

-30'

-ao·

-70'

-10'

0+00

Hatch Moll: MacDonald

'

~LOW WAlER EL£V. -4.679J I ~Ft.OOR 7 ~ ----I

PROPOSED HI" UNE NO. 1-18 BEVERLY HARBOR HDD

1+CXI

STA110N

PBQEILE :PI f• 1• •60' HORIZ. 1·-eo· VERT.

/

2+CXI

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

"'"'

SpccbaEneriY} Partners.

Algonquin Gas Transmission, LLC 5400 Westheimm Ct Hoarton, TX 770!if>.5310 713/627-S4Cl0

Page 11: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

I -y

......

J !/

J

\

-

\ \

..........

- 1+00:

I

. ' /,r-1 I / / -~ / . ...--

<o I

~ \'v

' " \ '

I

" \ )

PLAN VIEW GRAPHIC SCALE 5P' Q

CITY Of SA!..EM ESSEX COUNJY. MASSACHUSETTS

lJ \ I l

1 lj \ I I II I IJ I

I ! I /\ I IJII II " I 1 11 ~ ~ 11~1 ~ 1

1

I 11 1!1 11 I

~ J 11 I II II I 1 coMMONWEALrn oF 1!1"1 I MASSACHUSETTS I \

TRACT NO. 1-18-1 ~ )

/1 /' ,_r.; 'f jl .r.A] I

I I' v ./ BEVERLY HARBOR 1,1 PERMANENT E"ASEUENT

~~~ l I -3+00- _ 4+00- - -5+00- l - -11+00- 7+00-

PROPOSED 11r' UNE NO. 1-18 BEVERLY HARBOR HOD

7 I I

'--.,

\" (

I \

\

-

Hatch Matt MacDonald

J

l \ \ ~ IJ\

I

\ )

I I

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

" --\ \ \. I \]\

SpccttaEneriY} Partners.

Algonquin Gas Transmission, LLC 5400 W...theirmo- Ct. HIRIIfoo, TX T70.S6-S310 7131627-5400

Page 12: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

SIO'

70'

110'

30'

! 10'

!i -10'

~ -30'

-110'

-70'

--80'

- ;i - 8 .§ .......

IZ . L::::l .C'ol. ;z;

- .-~s~ ·ti-l =i

~

CITY OF SALEM ESSEX COUNTY. MASSACHUSEITS

ME'AN HIGH WATER ELEV. 4.328 ---...

f.- SEA FLOOR __,/

11' MfAN J. WATER ELEV. -4.879 --=::::/

' ' ' PROPOSED 16" UNE NO. 1-18 '

Hatth Matt MacDonald

BEVERLY HARBOR HOD

&tOO STATION

PROFILE SCN..E: 1••100' HORIZ. 1·=100' VERT.

' 7..00

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

... ~== O~W-~.:.!-

~~= 1-~ Ill

SpcctlaEneriY} Partners.

Algonquin Gas Transmission, LLC 5400 Weolheinuo- Ct HIRIIfoo, TX T70.S6-S310 7131627-5400

Page 13: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

/I I' ,.,JYV I \ I \ ~~ \ I \l)JL \ I \

I I ..,

8 ., I

i I

a. I I

~!S! A I :::J •:Z: I l/ ii

' I\ I .... 1 I I ~ I ~~

I

II II I\ II I\

~ ~ 2

!i "

I !i ::1

PLAN VIEW GRAPHIC SCALE

LAND UNDER THE OCEAN

,. ,. Q 1'

\ J \

\J J

J

J

I I I I ljl I

~

\I ;I ~I

I I

"" ' I I

/ I

/~

Hatth Matt MacDonald

~ i ll

·~ i "''"'"'] J- -

llDAL. FlAT

I I

(~ J

I I

(

I I

/

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

' 1

r" '\ \ ---·-__j,

./ '\ ("'-........

rUE aasmtt !Wi CoME!~ lMCT NO. 1-111-2 \

L..:/

\

\ \

~

Spectra Eneri¥) Partners.

Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6-S310 7131627-5400

Page 14: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

-i§!i!rl +.I. ::::I

""·~ ~&:J ~

10'

" "' -10'

-70'

CITY OF SALEM ESSEX COUN~ MA5SAQHUSEOS

MEAN HIGH WATER El..E.V. 4.328 ----......._

'--- MEAN L.CW WATER El..E.V. -4.679

Hatth Matt MacDonald

' f-- - ~--~-

/ S£A FLOOR -

PROPOSED 16" UNE NO. 1-18 BEVERLY HARBOR HDD

STAll ON

PROFILE 5CN f• 1·=60' HORIZ. 1·-eo· VERT.

10+00

""" """'

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

i---= ~j!i!rl

L::::l -

~~~-E ~-

...: z; .,.--

-=-,..._

......-----.--

11+00 12+00

Spectra Eneri¥) Partners.

Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6-S310 7131627·5400

Page 15: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

\ )

BEYERL.Y HARBOR

I I

I

7-1

I

I I

Hatth Matt MacDonald

\ \

I-SYSTEM

\ \

SALEM LATERAL PROJECT PROPOSED 16" LINE NO. 1-18

USACE PERMIT DRAWING

I I l I I I I I \ \

\ \

\

" " " "

Spectra Eneri¥) Partners.

Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6-S310 7131627-5400

Page 16: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

z 0

10'

70'

10'

~ -10'

~ -30'

CllY OF SALEM ESSEX COUNTY, MASSACHUSETTS

,~!1! NL::::I -·:z: c&i lili

I MeAN HIGH WAltR El..EV. 4.328 NATURAL GRADE

1

- \ \

-SEA FLOOR - .I ......,.,.,.., / __.,......- /

PROPOSED 1&" UNE NO. 1-18 /

BEVERLY HARBOR HDD

12+00

Hatth Matt MacDonald

I 111!1!--.1;L::::I - · I:Z:--

-E~ ~-~--

~ Ill

'-... "-... -~ ............. ""--

~ / ......... -/ -/

PROPOSED 1 &" UNE NO. 1-18 --' COLLINS COVE HDD

13+00 14+00 1!5+00

STATION

PRORLE SCAlE; 1·-eo· HORtZ. 1·-eo· VERT.

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

Spectra Eneri¥) Partners.

Algonquin Gas Transmission, LLC 5400W~CtH111111oo, TXT70.S6-S310 7131627-5400

Page 17: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

/ -

,.

......... ------

----------I

PLAN VIEW GRAPHIC SCALE ,. 0

/

CITY Of SALEM ESSE~ COUNTY. MASSACHUS~

I I

/ \ \ ', \ 1 0' PERMANENT &Jat1

/ /

/

JO' PERMANENT EASEMENT / \ ~

7---- / '

Hatth Matt MacDonald

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

I

J /

I I

I _...., . ..~ --­L-

/ I \ \ \ \ \ \

1 1 \

/ /

/

) -~~~/ Spectra Eneri¥)

Partners. Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6-S310 7131627-5400

Page 18: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

90'

70'

110'

.,i ..,_w ~·z a.:::J -•:z:

ci~ ti 2

i 30'

1D'

z 0

li -1D'

~

iiiiiiii;, ""'--- ....... , ""'""'

-30'

-110'

-7D'

-ID'

15+00

C!JY OF SA!.EM ESSEX COUNJY. MASSACHUSETTS

~N I-

~! t: t: I- ~! ~N I ~! g:!: I-- ~- ,.,-

+c I-- +c +c ;tc

~; 1- ~; :; ~; NATURAL GRADE ..........

I-

['...

............... ....... ............... ...... ............... ._,._.

PROPOSED HI" UNE NO. I 18 -_/

18+00

COWNS COllE HDD

Hatth Matt MacDonald

17+00

STATION

PRQElLE SCAI f• 1"•80' HORIZ. 1" -so· VERT.

111+00

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

-,~~

I:::J .a.:z: -•e ~&~ i

-

1111+00

Spectra Eneri¥) Partners.

Algonquin Gas Transmission, LLC 5400 Woolh.irruo-Ct H11111too, TX T70.S6.S310 7131627·5400

Page 19: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

PLAN VIEW GRAPHIC SCALE

/ /

/

,. 30' 0 ,. ----

-

Hatth Matt MacDonald

CITY Of SALEM ESSEX COUNTY. MASSACHUSETTS

-:>.

'

"· \

" " \ \ \

N /E WARD II SOCIAL ewe or SALEM TRACT' NO. 1-18-4

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

\ ... ~.

' " " " \

\ \ \ \

Spectra EneriY) Partners.

Algonquin Gas Transmission, LLC 5400W~CtH111111oo, TXT70.S6-S310 7131627·5400

Page 20: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

110'

70'

!10'

JO'

10' - t--

25 -10' ~

~ -JO'

-!10'

-70'

-110'

... s ,o ... "jz

caa.:::J

~t; Iii-~ .,

-

~~ 18~ +c

~~ '----

Hatth Matt MacDonald

CITY OF SALEM ESSEX COUNTY. MAS$ACHUSETIS

... 2~w t::

~l +IZ ~:jL:::J IZ

D.- si~ +c :; ~ --....

NATURAL GRADE - !'-..

" ....___ - t-- - I- - - -~-1-- - f-

PROPOSED 11!" UNE NO. 1-18 ---....., COWNS COVE HOD !"-..

21+00 22+00

STATION

PRQfiLE 5CN f• 1••100' HORIZ. 1••100' VERT.

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

Spectra EneriY) Partners.

Algonquin Gas Transmission, LLC 5400W~CtH111111oo, TXT70.S6-S310 7131627·5400

Page 21: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

<&"®~­<&= ' \ \ \ \ '\ \ '\ \

\ \ \

'\ '\ '\ '\

'\

'\ '\

'\ '\

'\ '\

'\ , N/F NEW ENGLAND ~POWER COMPANY

TRACT NO. 1-18-~

\ "

\ ..

\ \ \ \ \

PLAN VIEW GRAPHIC SCALE ,. 3P' Q ,.

CITY Of SA!..EM ESSEX COUNJY. MASSACHUSETTS

\

' N /F COMMONWEALTH OF MASSACHUSETTS

TRACT NO. 1-1 8-1

Hatch Matt MacDonald

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

II

\ \ 1..,

\ \

\ \f\ \.

'1.

SpccttaEneriY} Partners.

Algonquin Gas Transmission, LLC 5400 W...theirmo' Ct. HIRIIfoo, TX T70.S6-S310 7131627-5400

Page 22: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

- ;:: -&~-! ... +I ~ -~-,. z -,eli ~ _Ji:l_-

-~ ~ NAlURAL GRADE

/ - 1-- --L.... - 1- -

COY OF SALEM ESSEX COUNJY. MASSACHUSETTS

lot~ HIGH WATER El.LV. 4.328 ----....

'

SE'A FlOOR -

PROPOSED 111" UNE NO. 1-18 ~ COUJNS COllE HOD -....

24+00

Hatch Matt MacDonald

STATION

PBOFJLE S'W E· 1·-eo· HORIZ. 1·-eo· VERT.

1'-...

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

~-0

~ I ~ i ~ i-

7 t-- - I- -/

..../

27+00

SpectraE~ Partners.

Algonquin Gas Transmission, LLC 5400 Weodboirruo-Ct HIRIIfoo, TX 770.S6-S310 7131627·5400

Page 23: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

N /F CITY OF SALEM TRACT NO. 1-18-7

CITY Of SALEM ESSEX COUNTY. MASSACHUSETTS

N IF CITY OF SALEM TRACT NO. 1-18-8

Hatth Matt MacDonald

PROPOSED 1&" UNE NO. 1-18 COWNS COVE HDD

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

I N/E CITY Of SALEM

TRACT NO. 1-18-10

-----

Spectra Eneri¥) Partners.

Algonquin Gas Transmission, LLC 5400 WeolheimmCt H11111too, TX T70.S6-S310 7131627·5400

Page 24: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

CrTY OE SALEM ESSEX COUNTY. MASSACHUSEIJS

~ I I

a

J

I "":

10' cool p.

o! olil:.

~ 70' I; !I! ~J~ =; !10' N, ... ~~! ""'l ..,

MEAN HICi H WATER I lEv. 4.321 ~ I JO' In' :ill Ill""'"

I .. " ...:

10' ~ ~

25 -10' --- - --r--- ""7""'"'"" 1---- - --r--- - ~---- - --r- - -~ /'

~~ ~ -JO' / SE'A FLOOR . ----"'

-!10' PROPOSED 111" UNE NO. 1-18

l ........ -70' COLLINS COVE HDD

--4 28+00 2t+OO 30+00 31+00 32+00 33+00 34+00 35+00 31+00 37+00

I STAllON

l ~BQEJLE SCAffi 1"-100' HORIZ. 1"-HlO' VERT.

) ..

~ - I-SYSTEM Spectra Eneri¥) - SALEM LATERAL PROJECT PROPOSED 1 6" LINE NO. 1-18 Partners.

Hatth Matt USACE PERMIT DRAWING Algonquin Gas Transmission, LLC 5400 WeolheimmCt H11111too, TX T70.56-S310 7131627-5400

MacDonald ~: ESSEX COUNTY, UAC:C:Ar.~IIC:8TS

!!![ liT: HMM P\1e 07/25/2014 ll

! CICD. BY: HMt.t ::MJi 1" = 1 00' ISHT.: _! 7 OF 19

ENG.: NO.: ISYS-P-1 009.1

Page 25: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

- - -- - -II

;II , N/F CITY OF SALEM )111 I 1J II

"TRACT NO. 1-18-8 I' I I !I f I///)

{/..////

' / - ~"' // " / '\.,/

PLAN VIEW GRAPHIC SCALE ,. ,. 0 ,.

HaU:h Matt MacDonald

[ 10' PERMANENT fASEMENT

---,--

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

\..-

SpectJa E,.,g;} Partners.

Algonquin Gas Transmission, LLC 5400 Weolheirruo- Ct HIRIIfoo, TX T7D.S6-S310 7131627-5400

Page 26: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

150 LOWER WESTFIELD ROAD

HOLYOKE, MASSACHUSETTS 01040

PHONE (413) 535-0135

FAX (413) 535-0136

g()'

70'

SO'

,~ .... IZ

f3G.:::J I:Z:

~-s~ ~-::II

~ JO'

10'

z 0

li -10'

~ ....

- - -

-30'

-SO'

-70'

-90'

CITY OE SALEM ESSEX COUNTY. MASSACHUSEIT$

NEAN HIGH WATER El..EV. 4.328 - ~ NAl\JRAL GRADE - r'--..

"" ' - f- r=- -- T r- -S£A FlOOR

/

PROPOSED HI" UNE NO. I 18 ----........ COLUNS C<7liE HOD

Hatth Matt MacDonald

r-.....

40tOD

STATION

PBOFJLE SCA!.£· 1••60' HORIZ. ,. -eo· VERT.

41-tOO

I-SYSTEM SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 USACE PERMIT DRAWING

"-.... -- ~- - ~ -

42+00

SpectJa E,.,g;} Partners.

Algonquin Gas Transmission, LLC 5400 Weolheirruo- Ct HIRIIfoo, TX T70.S6-S310 7131627·5400

Page 27: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

ROJECT ONSULTING ERVICES, INC.

0' r.IAIJO 88 LN:

-e' NAVI> M ( NAT. !'OTTUM}

O'NAVDBI!IL1NE

- S' IVAW Ill! (NAT. OOTTOII)

DWG. NO. REFERENCE OVI{i. REV DSN CK

HOD EI.J'TR'f LOCJ\OON (1':/ AI-IGL.£) -8.00 FEET 1>W.I08B

DESCRIPTION

I

:.~-

'I . NAT BOTTOM

-m=m=i

PREUMINARY, NOT FOR CONSTl'lUCTlON

ENGI\JEERING APPROYA.LS 1-SYSTEM ""'"' BY '"" BID CONSTRUCTIOW SALEM LATERAL PROJECT

PROPOSED 16" LINE NO. 1-18 SEC"TlOIIJS

SpedniEnerW'j Partners.

LOC. BEVERLY HARBOR

"Tt"TLE SlGNAnJRE DATE SIGNATURE DATE 'r"EAA; 2.014 DWG. ISYS-Z-3000 REV. A

Page 28: PUBLIC NOTICE - New England District, U.S. Army … wet cofferdam in the area surrounding the subsea tie-in. Use ... Based on design requirements and geotechnical soil analysis ...

Section 404/10 Permit Application 3-6 SALEM LATERAL PROJECT

Figure 3.2-2 Offshore Cofferdam and HDD Workspace Layout in Beverly Harbor (Typical)

As previously described, the cofferdam sheet piling cannot be hammered in at the two locations where the existing HubLine pipeline will cross into and out of the cofferdam area. As such, two gaps will be built into the cofferdam walls. In addition, the buried end of the HDD casing pipe will be located within the cofferdam but it must be extended out through a third gap in the cofferdam wall to reach the HDD support vessel stationed outside of the cofferdam. To provide turbidity containment at these three openings in the cofferdam walls, Algonquin will install an alternative sheeting material that does not affect the integrity of the existing HubLine pipeline or HDD casing pipe, but does allow the water level to fluctuate with the ambient conditions and provide containment for a majority of the suspended sediments. The alternate material will consist of a geotextile fabric sheeting that is attached to wooden slats in the openings. The geotextile fabric will limit the size of particles that can pass through the openings yet will allow sufficient water flow to ensure the elevation of the water depth within the cofferdam is equal to the exterior of the cofferdam. A woven geotextile fabric is commonly used for silt curtains and may be used for this application. This fabric can typically pass approximately 18 gallons per minute per square foot of fabric while limiting particle sizes to 70 sieve and above. Figure 3.2-3 shows a typical view of one of the openings in the cofferdam where the existing HubLine pipeline would pass through. The angle of the installation of the HDD does not allow for the HDD casing to be completely enclosed within the cofferdam without increasing the length of the cofferdam by approximately 25 feet, which would also increase the environmental disturbance from the size and duration of installation. To address this issue, Algonquin will install the HDD casing into the bedrock to minimize the potential for inadvertent returns outside of the cofferdam. Algonquin proposes to install the HDD casing first and then build the cofferdam around it. The cofferdam will potentially provide support for the HDD casing or allow secondary bracing between the HDD casing and the cofferdam. On the west end of the cofferdam, where the HDD casing enters the mudline, the sheet pile can be installed so that it rests on bottom with very little penetration.