PT VALE INDONESIA TBK
Strategi Pencegahan Kecelakaan Tambang
Berakibat Cidera Berat dan Mati
Agus SuperiadiKTT PT Vale Indonesia Tbk Unit Sorowako
![Page 2: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/2.jpg)
1
Wilayah Kontrak Karya PT Vale Indonesia Tbk
New CoW Amendment
118,435 Ha
![Page 3: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/3.jpg)
2
Main Activities
• Exploration
• Mining
• Ore Screening
• Stockpiling
• Ore Drying
• Ore Smelting
• Slag dumping
• Product transportation to Port
• Bulk material (Coal, Sulfur, and Silica) transportation
from Port to Plant
• Utilities Operation
• Mobile Equipment Maintenance
• Plant Maintenance
• Utilities Maintenance (Hydro power, Thermal Plant, and Steam)
![Page 4: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/4.jpg)
3
Main Equipment
Equipment Type Number of Unit
Mobile Equipment
Heavy Equipment 220 units
Light Truck 21 units
Light Vehicle 499 units
Drill Rig 36 units
Fixed Equipment
Screening Station 5 units
Dryer 3 units
Reduction Kiln 5 units
Electrical Furnace 4 units
Converter/Refinery 3 units
Hydro Generator 8 units ~365MW
Diesel Generator 28 units ~55 MW
Steam Turbine Generator 2 units ~24MW
![Page 5: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/5.jpg)
4
Workforce
![Page 6: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/6.jpg)
Mining Process
![Page 7: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/7.jpg)
Nickel Processing Plant
Slag dumpingMatte Tapping
![Page 8: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/8.jpg)
7
Main Infrastructures
![Page 9: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/9.jpg)
8
Nickel Production Rate
![Page 10: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/10.jpg)
Main Programs
On Going
Felt Leadership
HSEMS Implementation
Major Hazard Standard (MHS)
Review Critical Procedures
Golden Rule Enforcement
Process Safety Management
Since 2013
Starting 2015
Contractor Safety Management System (CSMS)
Restructure HSE Committee
![Page 11: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/11.jpg)
HSEMS
HSEMS Protocol
Version 1.0 12 elements
NOR-0052
13 Requirements
Health &Safety
Indonesia Legal Regulations
NOR-0008
18 Requirements
Environment
![Page 12: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/12.jpg)
MHS
![Page 13: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/13.jpg)
MHS
![Page 14: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/14.jpg)
10 Golden Rules
1 No one should enter confined space, blasting area, blast area furnace 3rd
floor, switch yard & tree
cutting area, without a permit from authorized area personnel.
2 No one shall work under influence of illegal drugs with blood alcohol level in excess of 0.05 %
weight/vol. including the use of company vehicle
3 No one shall operate a vehicle or mobile equipment without a valid PT Vale Indonesia license for that
equipment, except under training program by formal instructor
4 No one shall drive vehicle more than 30 kph over the posted speed limit
5 No one shall work at height of more than 1.8 meters above the ground or fixed walkways of
scaffolding without any fall protection/ prevention (standard hand rail or harness and lanyard)
6 No one shall remove another person’s lock and tag unless approval is received in writing from Kepala
Teknik Tambang or authorized person, and all workers doing maintenance work on equipment that
requires isolation must:
a. Have a personal lock and tag in place on an isolation point at all times; or
b. Be authorized to work under a permit.
7 No one shall be under load being lifted by lifting equipment
8 No one shall get out of his or her equipment while being loaded
9 No one shall work above or near (less than 2 meter horizontally) water or mud pond deeper than 1
meter without either a safe work platform or a correctly fitted buoyancy vest
Note: if risk of swept by strong current exists, falling protection should be used
10 No one shall smoke near fuel storage, fuel dispenser, blasting magazine, pulverized coal, melting
sulphur, and during refueling.
![Page 15: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/15.jpg)
CSMS
![Page 16: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/16.jpg)
CSMS
![Page 17: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/17.jpg)
Safety Management Principles - Leadership
![Page 18: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/18.jpg)
Felt Leadership
• Safety is line management responsibility
• Leaders need to demonstrate their safety commitment and
“Life matters most”
• Leaders need to lead by example
• Leaders need to be visible at workplace conducting regular
safety observation and personal safety discussion to ensure
safe conditions and workers doing the activities safely.
• Leaders present means thousands words
• Safety is not only PPE but motivation
• Recognition and emphaty is postive energy
• Reinforcing safe behavior is more effective than punishing
unsafe actions
• Good safety is good production
![Page 19: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/19.jpg)
Felt Leadership
![Page 20: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/20.jpg)
The Cultural Transformation
![Page 21: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/21.jpg)
PTVI in Safety Culture Curve
![Page 22: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/22.jpg)
Approach
![Page 23: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/23.jpg)
KPI – Leading and Lagging Indicators
![Page 24: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/24.jpg)
KPI
![Page 25: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/25.jpg)
Safety Statistics (include Contractors)
Total Injury
![Page 26: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/26.jpg)
Safety Statistics
![Page 27: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/27.jpg)
The Challenges
![Page 28: PT Vale Indonesia - Strategi Pencegahan Kecelakaan Tambang Berakibat Berat Dan Mati](https://reader034.fdocuments.in/reader034/viewer/2022050710/5695d2621a28ab9b029a37a7/html5/thumbnails/28.jpg)
Closing Statement