PSL(--G Research Corporation RESEARCH AND TESTING LABORATORY REPORT To the Technical Manager - June. 3, 1987 Hope Creek Generating Station - PSE&G Report No. 71125 Attention: W. H. Schell TRANSIENT AND STEADY STATE ANALYSIS OF THE lAP AND lBP REACTOR RECIRCULATION PUMPS - HOPE CREEK GENERATING STATION Requested By: Gary Stith, Engineer Test Conducted By: W. Pryor INTRODUCTION The PSE&G Research and Testing Laboratory's Vibration Test Group was requested to evaluate the mechanical condition of the lAP and lBP Reactor Recirculation Pumps based on their vibration response characteristics. Specific project objectives as outlined by plant personnel were to: 1) Evaluate the balance condition of the RCP rotor assemblies; 2) Determine the cause of the high vibration alarms received in the control room; 3) Investigate the possibility of RCP vibration contributing to the cracking of the discharge valve drain line. The data contained in this report was acquired at the Hope Creek Station between 13 and 15 February 1987, during a unit start-up. This report documents the vibration response characteristics of the RCP system over that time period.; As such this report represents a valuable reference from which future analysis and malfunction diagnosis can be based. TEST METHOD The steady state and transient data contained in this report was acquired from the shaft relative buffered outputs which are located on the front panel of the permanently installed vibration monitoring system. Shaft vibration was sensed utilizing the installed proximity transducers on each pump. This transducer system measures peak-to-peak shaft vibration i-n mils relative to the transducer mounting bracket. Signals from the proximity probes were combined with a once-per-turn keyphasor pulse. The keyphasor is necessary for phase angle measurement and variable speed tracking.

Transcript of PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer...

Page 1: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSL(--G Research CorporationRESEARCH AND TESTING LABORATORY REPORT

To the Technical Manager - June. 3, 1987Hope Creek Generating Station - PSE&G

Report No. 71125

Attention: W. H. Schell

TRANSIENT AND STEADY STATE ANALYSIS OF THE lAP AND lBP REACTORRECIRCULATION PUMPS - HOPE CREEK GENERATING STATION

Requested By: Gary Stith, Engineer

Test Conducted By: W. Pryor

INTRODUCTION

The PSE&G Research and Testing Laboratory's Vibration Test Groupwas requested to evaluate the mechanical condition of the lAP andlBP Reactor Recirculation Pumps based on their vibration responsecharacteristics. Specific project objectives as outlined byplant personnel were to: 1) Evaluate the balance condition ofthe RCP rotor assemblies; 2) Determine the cause of the highvibration alarms received in the control room; 3) Investigate thepossibility of RCP vibration contributing to the cracking of thedischarge valve drain line.

The data contained in this report was acquired at the Hope CreekStation between 13 and 15 February 1987, during a unit start-up.This report documents the vibration response characteristics ofthe RCP system over that time period.; As such this reportrepresents a valuable reference from which future analysis andmalfunction diagnosis can be based.

TEST METHOD

The steady state and transient data contained in this report wasacquired from the shaft relative buffered outputs which arelocated on the front panel of the permanently installed vibrationmonitoring system. Shaft vibration was sensed utilizing theinstalled proximity transducers on each pump. This transducersystem measures peak-to-peak shaft vibration i-n mils relative tothe transducer mounting bracket. Signals from the proximityprobes were combined with a once-per-turn keyphasor pulse. Thekeyphasor is necessary for phase angle measurement and variablespeed tracking.

Page 2: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

Technical Mgr., - 2 - June 3, 1987Hope Creek Gen. Sta. - PSE&G Report No. 71125

TEST METHOD (cont'd.)

The steady state data presented in the report consists of orbit,timebase, and spectrum information. This data details shaftresponse at several load points. Steady state data provides apowerful tool for evaluating the influences of various rotorpreloads, a wide variety of instability mechanisms, plus a entirearray of rotor response characteristics from simple imbalance tocomplex modal studies.

Transient data was acqhired during a start-up of the unit.Start-up data is presented in the form of bode, polar, andcascade presentation formats. Bode and polar plots are used todetail the synchronous response of the rotating element. Thisdata is important in the identification of rotor balanceresonances and the measurement of system damping characteristics.Cascade information documents excitations outside of the runningspeed range. Cascade data is used in the evaluation of rotorinstabilities such as oil whirl and oil whip, rubs, and vanepassing activity.

The data presented in this report was acquired on magnetic tapeutilizing a 14 channel Honeywell 101 instrument grade FM taperecorder. Vibration data was recorded at a tape speed of 0.9375IPS. At this tape speed the recorder has a frequency responseof DC to 18,750 CPM. The recorded vibration data was subse-quently reduced to hard copy data presentation formats via theBently Nevada ADRE machinery diagnostic computer system. TheADRE system consists of a Bently Nevada DVF2 tracking filter,Hewlett Packard 3582A dual channel spectrum analyzer and a HP9836C desktop computer. Operating software for the system wasdeveloped by Bently Nevada Corporation.

TEST RESULTS AND RECOMMENDATIONS

1. Both RCP rotor assemblies are well balanced at this time.There is currently no need to conduct a trim balance of theunits.

2. The data indicates that shaft runout is a major contributorto the overall vibration levels currently measured at theSmart Monitors. Runout is relatively easy to remedy and canbe corrected during the forthcoming refueling outage. TheResearch and Testing Laboratory is available to discuss thissituation further with the plant and assist in correcting theproblem.

Page 3: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

-

Technical Mgr., - 3 - June 3, 1987Hope Creek Gen. Sta. - PSE&G Report No. 71125

TEST RESULTS AND RECOMMENDATIONS (cont'd.)

3. The high vibration levels are caused by impeller vane passing-activity and occur in two speed ranges. For the lAP pump,these ranges are between 720-800 RPM and 1040-1090 RPM. Onthe lBP pump the high vibration levels exist between700-760 RPM and 1150-1200 RPM. Operation of the equipmentin these speed ranges should be minimized.

4. Experience with RCP systems has shown that high vibrationlevels which- occur in the lower speed range are caused bythe excitation of the pump's first bending resonance by theimpeller vane passing frequency. The presence of impellervane passing activity is considered to be indicative of amachinery malfunction which can limit the long term relia-bility and operation of the pump. It is, therefore, stronglyrecommended that every effort be made to eliminate thisactivity.

5. The specific cause of the high vibration levels measured atthe higher speed range is currently unknown. From the datait appears that this response is due to a structuralresonance. Further testing is warranted during the refuelingoutage to identify and correct the cause of this response.

6. Available data does not allow us to determine if the RC Pumpvibration contributed to the cracking of the discharge valvedrain line. It is possible that pressure pulsations causedby impeller vane passing activity contributed to the failure.Further testing when,the unit is down for refueling isnecessary tormake this determination.

Refer to Table 1 for the vibration summary of the lAP pumpsystem.

Refer to Table 2 for the vibration summary of the 1BP pumpsystem.

Refer to Tab 1 for the transient and steady state vibration dataof lAP pump.

Refer to Tab 2 for the transient and steady state vibration dataof lBP pump.

Refer to Tab 3 for the Bently Nevada Applications Note: "Glitch,Definition of and Methods of Correction, including Shaft Burnish-ing to Remove Electrical Runout."

Refer to Figure No. 1 for a listing of the test equipment.

Page 4: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

Technical Mgr., - 4 - June 3, 1987Hope Creek Gen. Sta. - PSE&G Report No. 71125

DISCUSSION AND CONCLUSIONS

lAP and 1BP Reactor Recirculation Pumps

Analysis of the RCP rotating element reveals that both Pumpsdisplay similar response characteristics. As a result thefollowing discussion pertains to both pumps unless specificallynoted.

Evaluation of transient and steady state data indicates that bothpumps are acceptable for continued operation under full loadconditions and that both pumps contain rotating elements that arewell balanced The condition of the rotors balance is easilyviewed on the start-up Bode and Polar plots where lX runningspeed information has been corrected for shaft runout. Whencorrected for runout the lAP pump displays approximately 1 milof running speed motion while the lBP pump shows about 2.25 milsof motion due to mass imbalance. This indicates that while somereduction in overall vibration levels could be achieved throughtrim balancing, the high vibration levels noted by plantpersonnel are not due to rotor imbalance. As previously stated,the rotors are well balanced for the speed at which they operate,thus, it is not deemed necessary to undertake a rotor balancingprogram at this time.

Data collected on both rotors does indicate, however, thatmeasured overall vibration levels could be reduced by eliminatingthe shaft runout in the transducer target area. Runout canresult from eccentricity, scratches, non-uniform surface hard-ness, etc. in the area observed by the proximity probe. Theresult of runout -is an error in the vibration levels measured bythe permanently installed monitoring system. From our analysisof the rotors a significant reduction in overall vibration levelscould be expected if the runout was eliminated. It is, there-fore, our recommendation that the probe target area be checkedand corrected for runout during the next refueling outage. Formore information on shaft runout and methods of correction, seethe attached Bently Nevada Applications Note "Glitch, Definitionof and methods for correction, including shaft burnishing toremove electrical runout."' This Applications Note is includedin Tab 3 of this report.

Evaluation of acquired data reveals that the high vibrationalarms are due to vane passing excitations. Vane passingactivity is noted over the entire operating speed of the pumps,but there are 2 speed ranges where there is a significantincrease in overall vibration levels. For the lAP pump theseranges are from 720-800 RPM and 1040-1090 RPM. The response

Page 5: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

Technical Mgr., - 5 - June 3, 1987Hope Creek Gen. Sta. - PSE&G Report No. 71125

DISCUSSION AND CONCLUSIONS (cont'd.)

characteristics for the lBP pump are very similar to the lAP pumpexcept that the ranges in which the high vibration occurs differslightly. On the IBP pump high vibration was measured between700-760 RPM and from 1150-1200 PNm. MI-aximum amplitudes throughthese speed ranges can be viewed on Vibration Summary Tables 1and 2.

Previous experience with these and RCP systems of similar designat other stations has shown that the lower speed range highvibration is due to an excitation of the pumps first bendingresonance by the impellers blade passing frequency. Peak ampli-tudes due to the 5X comDonent were measured to approach 3.0 milson the lAP pump and are approximately 4.0 mils on the lBP Pump.Currently the resonance is well damped and should not have animmediate effect on machinery operation. This activity was notedand discussed with the machinery manufacturer during start-uptesting. At that time, it was the manufacturers contention thatthe 5X component was due to the operation of the pumps at off-design conditions (ie. water temperature, pressure and density).They further stated that they would not expect this activity toexist once the unit was operated under design conditions.

The presence of vane passing is considered to be a machinerymalfunction which limits the long term reliability of thepumping system. As a result, it .is our strong recommendationthat engineering and the manufacturer be consulted in order toeliminate the vane passing activity. Until a design change canbe implemented, operation of the pumps in the speed rangespreviously noted should be minimized.

The upper speed range high vibration amplitudes are due to a 15Xrunning speed component. For the lAP pump about 3.0 mils isattributable to this activity and on the lBP pump this vibrationcomponent results in approximately 3.5 mils of dynamic response.From the data it appears that the 15X component is the result ofsome type of structural excitation. At the present time theexact nature of this component is unknown and further testing iswarranted to identify th'e cause and correct for this problem.Until the cause can be identified, machinery operation in thisspeed range should be avoided.

Based on available data, it is impossible for us to determine ifthe RCP vibration contributed to the cracking of the dischargevalve drain line. It is possible however for the drain line tobe excited by pressure pulsations created by the impeller vanepassing frequency. Since this section of piping is small in

Page 6: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

Technical Mgr.,Hope Creek Gen. Sta. - PSE&G

- 6 - June 3, 1987Report No. 71125

DISCUSSION AND CONCLUSIONS (cont'd.)

diameter, long, and unsupported, the resonant frequency of thissection would be prone to structural excitation which could leadto fatigue cracking. To determine the resonant frequency of thepipe is very simple and does not require a great deal of time.It could be tested, by the Research and Testing Laboratory,during the refueling outage and the results compared to thetransient vibration data in order to determine if the RCPresponse contributed to the problem.

Manager,Materials Division

Materials Test Engineer

WTP:mth2593H

C G. Stith

Page 7: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

Report No. 71125

Table No. 1

A RCP VIBRATION SUMMARYHOPE CREEK GENERATING STATION

13-15 FEBRUARY, 1987

SPEEDRPM

400

760

1065

1285

PROBEID

1XD1YD

.1XD1YD

1XDIYD

XD1YD

O.A.MILS

4.85.2

5.6-7.6

9,66.5

6.35.9

VIBRATION1x

MILS

4.24.2

4.54.4

4.64.4

4.94.7

AMPLITUDES1X PHASEDEGREES

157246

169258

166253

168257

5XMILS

15XMILS

0.7

1.02.6

0.32.0

2.8

1.21.3

NOTE: O.A. - OVERALL UNFILTERED VIBRATION LEVEL

Page 8: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

---

Report No. 71125

Table No. 2

B RCP VIBRATION SUMMARYHOPE CREEK GENERATING STATION

13-15 FEBRUARY, 1987

SPEEDRPM

385

730

PROBEID

1XDlYD

1XDIYD

O.A.MILS

3.33.5

4.19.1

VIBRATIONlx

MILS

1.01.1

1.42.3

AMPLITUDES1X PHASEDEGREES

163239

168257

5XMILS

loxMILS

15XMILS

0.10.5

1.04.2

1180

1290

1XDIYD

1XD1YD

3.89.9

5.16.2

2.54.2

2.93.5

173 0.4266 1.6 3.5

169264 1.2

1.0_ _

0.60 .6

NOTE: O.A. - OVERALL UNFILTERED VIBRATION LEVEL

Page 9: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUINiUP

PLOT .1O:

PLANT ID:TRAIN ID:MACHINE ID:PROBE ID:

HOPE CREEK GEN STA.B RCPPUMP C Fi ep m:i ,1XD

RUN: I DATE: 14 FEB 07 TIME: 1500

0U

x

(L

w

w

w

vc:

0

ul

Ir

d

I-t.J

Id-J

LI)t.

Nrr! In t! loK .

FREOUXTCY 4LNENTS.-IIll x I 6B )

Page 10: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPM1ATERIALS DIVISIONVIBRATION TEST DEPT.

RUNUP

PLOT NO:

PLAINT ID:TRAIN ID:MACHINE ID:PROBE ID:

HOPE CREEK GEN STA.B RCP1 PUMP

RUN: I

s .5 _

r2Ix

. _

3 it

'0.

w . vi

a '. to

U

P" .

=

DATE: 14 FEB 87 TIME: 1500

Uc

La

I1

I

W

-i

ILM)

I

"I fl "I I lb,

r-REQUEN'CY CEYNTS-"?iI1 x M

Page 11: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUNUP

PLO T rJO:

PLANT ID:TRAIN ID:MACHINE ID:PROBE ID:

HOPE CREEKB RCPPUMPIAD

GEN STA.

RUN: 1 DATE: 14 FEB 87 TIME: 1500

LX 2x 3x 4.1( SX

1.5 r

I

i .. tv

0

0-Pi

EL

=

(.cc

I

INv"Il I - La

a.

ID-Ja-i

LOEID

C

p. n!i

~FREOLNCY (EYEHTS-1IMI , L OM)

vim-. V..

Page 12: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE.aG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT. PLANT ID:

TRAIN ID:MACHINE ID:

RUNDOWN PROBE ID:

PLOT N0O:

HOPE CREEK GEN STA.A RCPPUMP

X D - / A-' L, ~L / i t'r." 6"'~ '~"

_ RUN: I DATE: 14 FEB 87 TIME: 1500

Ix 5X LOX

I .5

G~

cca

Ii

F, .mAA-m-

mz==:�

15X0U)

'-4

a-

a.

Ia-

DLi

-j

rU

a-

gL=~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Nf

PFREOLANkY (EYEr~,?fliJ x low)

Ma;

Page 13: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUNDOWN

PLOT NO:

PLANT ID:TRAIN ID:MACHINE ID:PROBE ID:

HOPE CREEK GEN STA.A RCPPUMP1YD - PEPP, 7;'w

RUN: 1 DATE: 14 FEB 87 TIME: 1500

ix

1ax

'Cm

C3x

Li

-

IAJc-U2

. 90

A

a-

a-IL

0-

hiru

hi

Li

In

S-M

Page 14: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT. PLANT ID:

TRAIN ID:MACHINE ID:

RUNUP PROBE IF:

PLOT NO:

HOPE CREEK GEN STA.A RCPPUMP

RUN: I DATE: 14 FEB 87 TIME: 1500

xr

0Li

La9In

=

LI

LX zU 3x 4X 5x

A14

r~jm

a-

WI,

LiV:

n

U)

P>p.

FREO4JENCY CEVENTS-112R x LI EM)C

Page 15: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE(.'G RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT. PLANT ID: HOPE CREEK

TRAIN ID: B RCPMACHINE ID: PUMP

RUNUP SOLID DATA: Uncomp lAD

RUN: I DATE: 14i FEB 87

GEN STA.

TIME: 1500

m

-J

Li

e

-218

-Z40

-270

-awm

a-38

.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

............................

..................................................

2

8

Ia

.K > ... .... ........

I. . . . . . . . . . . . . . . . . .

10n :2 n

SPEED (krps)

Page 16: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUNUP

PLOT NU:

PLANT ID:TRAIN ID:MACHINE ID:SOLID DATA: Uncomp

HOPE CREEKB RCPPUMP1 AD

GEN STA.

RUN: I

L.LL.

188 -

DATE: 14 FEB 87 TIME: 1500

4Q2 7 2

a

FULL SCALE AMP = 3 mil pp AMP PER DIV = . 2 mil1 pp

Page 17: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORP PLANT ID: HOPE CREEK GEI'MATERIALS DIVISION TRAIN ID: B RCPVIBRATION TEST DEPT. MACHINE ID: PUMP

RUN: 1 DATE: 14L FEB 87 TIME: 15:00 PROBEOVERALL AMP = 3.22 TO 3.26 mil pp1X = 383 RPM

RUN: 1 DATE: 14 FEB 87 TIME: 15:00 PROBEOVERALL AMP = 3.41 TO 5.14 mi1 pp1X = 385 RPM

2.e E--- * ------ w... . .. . . .. . . . .. . . .. . . . .. . . .

1.0 ._

_ - .......... ............... ....................

138. 'U4~P-. H - ptSp U1 inU N D) t:

2.e G .r . . . . .. . . . . . .. .. . .. . . . . . . . . . . . 5'(.. . . . . ..

. .e ........................................:-£.5

... . . .- . . . . . . .. . .h. .

.5 . . . . . . . . . . . . . . . . . . . .

I STA

E ID: 1XD

I ID: 1YD

PLOT NO:

G n!

FREQUENCY (kcpm)

mN,

Page 18: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

* PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

PLANT ID: HOPE CREEKTRAIN ID: B RCPMACHINE ID: PUMP

PLOT NO:

RUN: 1 DATE: 14 FEB 87 TIME: 15:00

PROBE -1 ID: IXDUNFILTEREDSLOW ROLL COMPENSATED DATA

PROBE -2 ID: IYDUNFILTEREDSLOW ROLL CbM1PENSATED DATA

ROTATION: CCWRPM(START)' 384 RPM(END)=

OR IENTAT ION=MAX AMP=

ORIENTATION=MAX AMP=

0 deg3.30 mil pp

90 deg3.50 mil pp

384

z *ii., iIi: 7 " i. N2 3i. ii

-i. - * j

ScLE I >=~il

TflE S=E se u/div

., .. .*

. .-

TflE SCL.. ~r~

RUN: 1 DATE: 14 FEB 87 TIME: 15:00

PROBE #1 ID: 1XDIX FILTEREDSLOW ROLL COMPENSATED DATA

PROBE #2 ID: 1YO1X FILTEREDSLOW ROLL COMPENSATED DATA

ROTATION: CCWRPM(START)= 384 RPM(END)

ORIENTATION=1X )ECTOR=

ORIENTATION-1X VECTOR=

O deg1.00 mil pp L-I63

90 deg1 .10 mi1 pp L--239

= . 384

Page 19: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEu7G RESEARCH CORP IMATERIALS DIVISIONVIBRATIONTEST DEPT. I

RUN: 1 DATVE: 14, FEB 87OVERA~LL AMP = 3.91 TO1X = 733 RPM

-'LANT lID: HOPE CREEK GEN STATRA~IN ID: B RCP1ACHINE ID: PUMP

TIME: 21:00 PROBE ID: 1XDLJ*06 miu pp

PLOT 1NO:

RUN4: 1 DATE,;- 1'J FEB 87OVERALL AMP =iX: = 732 RPM

8.60 TOTIME: 21 :009.00 muli pp

PROBE ID: IYD

I...........1.5

aE

, -.I ' i A .A I4. ii .A A . .23. C,I -I �T�1 III rI'l.:r:::Ir:r':nif.11

MCt

5. E

CE

2.9

�.oI

J. 10

13. C

C. I

I * . ~...

I . I

� I

C.'

A

I,

C,)It*

tD

. . ..

. . . .

. . . .

. . . .

. . . .

.. ,.A

tn

to

If

r..

0 in In

In

M.

C,

I D .. . I 5I,I"

I )

r'.

FREQUEN4CY (kcprm)

Page 20: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaiG RESEARCH CORPMATERIALS DIVISIONVIBRATIO1N TEST DEPT.

PLANIT ID:TRAIN ID:MACHINE ID:

HOPE CREEK GEN STAB RCPPUMP

PLOT NO:

RUN: 1 DATE: 14 FEB 87Af

TIME: 21:00

PROBE #1 ID: 1XDUNFILTERED

ORIENTATIO=MAX AMP=

0 deg4.06 mil pp

PROBE #2 ID: IYDUNFILTERED

ORIENTATION=MAX AMP=

so deg9.10 mil pp

ROJATION: CCWRPM(START) = 733 RPM(END)= 734

F' ,cIL j ' . .

I . . ' .

.tl .ciL 5 i -imfl-l

It 5CFLE= 50. . a/ddiv

I IfLCH 50. B0 =/dlv

RUN: 1 DATE: 14 FEB 87 TIME: 21:00

PROBE #1 ID: 1XDIX FILTERED

ORIENTATION=IX VECTOR=

0 deg1.36 mil pp @-168

PROBE #2 ID: 1YDIX FILTERED

ORIENETNTION=IX VECTOR=

90 deg2.30 mil pp @-257

ROTATION: CChRPM(START)= 733 RPM1(END)= 733

Page 21: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE.G RESEARCH CORP IMATERIALS DIVISIONVIBRATION TEST DEPT. I

RUN: 1 DATE: 15 FEB 87OVERALL AMP = 3.79 TO1X = 1337 RPM

PLRNIT ID: HOPE CREEK GEN STATRAIN ID: B RCPlACHINE ID: PUMP

TIME: 6:00 PROBE ID: 1XD4.09 mil pp

PLOT 1O:

RUN: 1 DATE: 15 FEB 87 TIME: 6:00 PROBEOVERALL AMP = 9.80 TO 10.20 mil pp1X:= 1181 RPM

.

sa................................................

40................................................

ffi3. ....................... ........................

13 ILp ., \4 1A! E.lvl|ff, 1 I-l IP 9 P 1 ',III rli |(| H

.

0n Sn D 0

-4 . ou - u

....... FREQUY. ...................

-..g . ............. ...................

tj in wls

FREQUEN9CY (kcpm)

ID: 1YD

Page 22: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMA4TERIALS DIVISIONVIBRATION TEST DEPT.

PLANT ID: HOPE CREEK GuEN STATRAIN ID: B RCPMACHI1NE ID: PUMP

PLOT NO:

RUN: 1 DATE: 15 FEB 87 TIME: 6:00

PROBE #1 ID: 1XDU NFILTERED

ORIENTATION= 0 degMAX AMP= 3.81 mil pp

PROBE #2 ID: 1YDUNFILTERED

ORIENTATION= 90 degMAX AMP= 9.90 mil pp

ROTITION: CCWRPM(START)= 1181 RPM(END)= 1182

;I ___ ___ [

---- ]Fi V--. I III r- I It I-,. 11 II -

TfiE SCRLE= 5e.0 ra/div

..i , ' ' E , ,i r a / i v

RUN: 1 DATE: 15 FEB 87 TIME: 6:00

PROBE #1 ID: 1XD1X FILTERED

ORIEN'ITATION= 0 degIX VECTOR= 2.47 mil pp p-173

PROBE #2 ID: 1YD1X FILTERED

ROTATION: CCWRPM(START)= 1

ORIENTATION= 90 degIX VECTOR= 4.20 mil pp @-266

183 RPM(END)= 1182

Page 23: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUN: 1 DATE: 15 FEB 87OVERALL AMP = 4.90 TO1X = 1289 RPM

PLANT ID: HOPE CREEK GEN STATRAIN ID: B RCPMACHINE ID: PUMP

TIME: 14:54 PROBE ID: 1XD5.03 mil pp

PLOT NO:

RUN: 1 DATE: 15 FEB 87OVERALL AMP = 5.57 TO'1X = 1289 RPM

TIME: 14:546.10 mil pp

PROBE ID: 1YD

5.e

4.6

CL 3.8a-

'.9

n C1

.....

it..S . .. .... .ta . . . . .

. . . . . . . . . - . . . . . . : . .

. . . . .. . . . . . . .

......... . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . ...

I . . . . . . . . . . . . . ... . . . . . . . . . . ... . . . . . . . . . . ... . . . . . . . . . . .

. . . . . . . . . . . . . . .... . .. ... .......I. .... ..........

5.8 I - X- - -

2.9 .. x4.0 ...... -

CL. 3.9 . .....

- 2.0 .....

:.0 t.6.8

I ... Rin

.. 5

.....

.A.. .

. . ...

.A

. c -10

.... * .... : ... ...

......... .... .... . .

.... . .... ... *...

. . .. A.* . . .. . *. -

I I *15 . .

.. .5. ..

.... :...

.. . . ....

.......

. .A .

V)N

. . . . . . .

. .. . .. ...... ..

. . . . . . . .

. . . . ... ..... ..

. . . .... ..... . .

I... . .

I . . . .

co fin a VID DU6pq"

FREQUENCY (kcpm)

Page 24: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEiG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT. I

RUN: 1 DATE: 15 FEB 87OVERALL AMP = 4.81 TOIX = 1289 RPM

RUN: I DATE: 15 FEB 87OVERALL AMP = 5.90 TOIX = 1289 RPM

PLANT ID: HOPE CREEK GEN STATRAIN ID: B RCPMACHINE ID: PUMP

TIME: 14:54 PROBE ID: 1XD5.23 mil pp

TIME: 14:54 PROBE ID: 1YD6.27 mil pp

PLOT NO:

5.6

4 .e

afi 3.a

c-

a.2.

.e

A. A

...:

.. .. .. .. . . . . . . . . . . . . . . . . . . ... ......

.JU|.. W X. .. ..... . . .

. . . . . . . . . . ..

. . . . . . . .. . ..

. . . . . . . . . . ..

. . . . . . . . . . ..

. . . . . . . . . . . .,

* IQU -- . -

.I ......

. .. . . . . .

. . . . . . ..

.. ; ......

.. * -*._ I, A . I IQ I I I

o0 I i s

5.0 .. tX- .. .. .. .. .. -5x @......

2..4.0 . .... -

2. .. .. . .. .. . .......

I a .... .....- --.-.-B.8 e I 1=1 k F. Illl I# -

D I!

... .. .........

..............

.... .... ... . .

.I - . .A...I. . - .

. . . I .-

.......

.... .. .

. ... ...

._.....

E-al-

. .. ..- ,

WI

cmw RD

-

FREQUENCY (kcpm)

Page 25: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

PLANT ID: HOPE CREEK GEN STATRAIN ID: B RCPMACHINE ID: PUMP

PLOT NO:

RUN: 1 DATE: 15 FEB 87 TIME: 14:54

PROBE #1 ID: 1XDUNFILTERED

PROBE #2 ID: 1YDUNFILTERED

ROTATION: CCWRPM(START)= 1289 RPM(END)=

ORIENTATION= 0 degMAX AMP= 5.09 mil pp

ORIENTATION- 90 degMAX AMP= 6.15 mil pp

1.290

* ii .~ g i 2

; s. g * ' .

.:VE I, me au/d:v

.::-I :._ .i'

AtRS GLE= 5] . t i d iv

IiL

T

.L

T rEM 5CF1E= 2M. us/div

.1 .

T DE SCFLE= 229 sc

TIME: 1 4:54

ORIENTATION= 0 degIX VECTOR= 2.90 mil pp '~-169

ORIENTATION= 90 degiX VECTOR= 3.45 mil pp

RUN: 1 DATE: 15 FEB 87

PROBE #1 ID: 1XD1X FILTERED

PROBE #2 ID: 1YD1X FILTERED

ROTATION: CCWRPM(START)= 11289 RPM(END)= 1290

Page 26: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

Report No. 71125

Figure No. 1

TEST EQUIPMENT CALIBRATION

ITEMNO.

SERIALDESCRIPTION NUMBER

CALIBRATIONDUE DATE

1 HONEYWELL 101 14 CHANNELFM TAPE RECORDER

2 BENTLY NEVADA DVF2DUAL CHANNEL TRACKING FILTER

3 HEWLETT PACKARD 3582ADUAL CHANNEL SPECTRUM ANALYZER

0800135TG78

H502695

2602A07180

JANUARY 1988

FEBRUARY 1988

NOVEMBER 1987

4 BENTLY NEVADA 8 CHANNELSIGNAL CONDITIONING AMPLIFIERS

5 TEKTRONIX 51102 CHANNEL OSCILLOSCOPE

6 KEITHLEY 131DIGITAL MULTIMETER

J901001

B130494

181127

FEBRUARY 1988

JUNE 1987

AUGUST 1987

VIBRATION TESTING CONDUCTED IN ACCORDANCE WITH THE FOLLOWINGPSE&G RESEARCH CORPORATION PROCEDURES

VP-2 PROCEDURE FOR VIBRATION ANALYSISVP-4 PROCEDURE FOR TEST SETUP OF VIBRATION INSTRUMENTATIONVP-5 PROCEDURE TO DEFINE VIBRATION TESTING REQUIREMENTSVP-6 PROCEDURE TO DEFINE THE FORMAT OF FINAL REPORTS

Page 27: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

Report No. 71125

Figure No. 1

TEST EQUIPMENT CALIBRATION

ITEMNO. DESCRIPTION

SERIALNUMBER

CALIBRATIONDUE DATE

1 HONEYWELL 101 14 CHANNELFM TAPE RECORDER

0800135TG78 JANUARY 1988

2 BENTLY NEVADA DVF2DUAL CHANNEL-TRACKING FILTER

H502695 FEBRUARY 1988

3 HEWLETT PACKARD 3582ADUAL CHANNEL SPECTRUM ANALYZER

2602A07180 NOVEMBER 1987

4 BENTLY NEVADA 8 CHANNELSIGNAL CONDITIONING AMPLIFIERS

5 TEKTRONIX 51102 CHANNEL OSCILLOSCOPE

J901001

B130494

FEBRUARY 1988

JUNE 1987

AUGUST 19876 KEITHLEY 131 181127DIGITAL MULTIMETER

VIBRATION TESTING CONDUCTED IN ACCORDANCE WITH THE FOLLOWING- PSE&G RESEARCH CORPORATION PROCEDURES

VP-2 PROCEDURE FOR VIBRATION ANALYSISVP-4 PROCEDURE FOR TEST SETUP OF VIBRATION INSTRUMENTATIONVP-5 PROCEDURE TO DEFINE VIBRATION TESTING REQUIREMENTSVP-6 PROCEDURE TO DEFINE THE FORMAT OF FINAL REPORTS

Page 28: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT. PLANT ID: HOPE CRI

TRAIN ID: A RCPMACHINE ID: PUMPSOLID DATA: Cor, IXD

RUNUP DASHED DATA:Uncomp 1XD

RUN: 1 DATE: 14 FEB 87

-9,, ...................................................

_1Z.... ...... . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .

-.50

-248 .........-240 . . . . . .. . . . . . . . . . . . . . . . . . . . . ., . . . .

PLOT N,4O:

EEK GEN STA.

TIME: 1500

A

U

C4

0.umcj*,

S

4

2I64I

........... ...........................................

.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .....

.. . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ....

.. . . . .I .3 in

idn

SPEED (krpm)

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (mi pp) @ 400 RPM = 4.20 @j -158

Page 29: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUNU P

PLOT NO:

PLANT ID:TRAIN ID:MACHINE ID:SOLID DATA: Comp

HOPE CREEKA RCPPUMP1XD

GEN STA.

RUN: 1 DATE: 14 FEB 87 TIME: 1500

Nop27B

a

s2

FULL SCALE AMP = 1.5 mil pp AMP PER DIV = .1 mil pp

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (mil pp) f@ 400 RPM = 4.20 i -l58

Page 30: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEAG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT. PLANT ID:

TRAIN ID:MACHINE ID:SOLID DATA: Comp

PLOT NO:

HOPE CREEK GEN STA.A RCPPUMP1 YD

-J

wU,CLa:a.

RUNUP DASHED DATA:Uncomp 1YD

RUN: 1 DATE: 14 FEB 87

-2X0 ..................................................

-24e6.__

-Zia ..................................................

-;20 . . . . . . . . . . . . . . . . . . . . . . . . . . . ... ..... ............

TIME: 1500

S

4

.

z

I

at

..................................................

_...................... .........................

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... ............. .........

,,, .,,§, ,* . . . . . - - . . . . . . - - - . . . . . . - - - . . . . . . - - - . . .

I in so nI

SPEED (krp-)

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (ml1 pp) 400 RPM = 4.20 @ -248

Page 31: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUNUP

PLOT NO:

PLANT ID:TRAIN ID:MACHINE ID:SOLID DATA: Comp

HOPE CREEKA RCPPUMP1YD

GE1N STA.

RUN: 1

LL

279

DATE: 14 FEB 87 TIME: 1500

07~e

se

ISO

- FULL SCALE AMP = .75 mil pp AMP P

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (mi1 pp) i O 400 RPM

ER DIV - .05 mi pp

= 4.20 9 -248

Page 32: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT. PLANT ID:

TRAIN ID:MACHINE ID:

RUNUP SOLID DATA: Comp

PLOT 140:

HOPE CREEK GEN STA.A RCPPUMP

RUN: 1 DATE: 14 FEB 37 TIME: 1500

L7:=:; .,

uicn

-27

_bo

-ss0

_6

-6D

- zn

-15s

.......................... . . . . . . . . . . . . . . . . . . . . . . . . . . ... .

.... ...... ... ....... . . . . . . . . . . . . . . . . . .

..................................................

...................................................

.,.......,.,.,.,.,....................

....... ..........

, ...... ... ...............................

.e

.4

3.ecA Lu in

11:n

I

SPEED (Krp.)

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (mil pp) C 400 RPM .1 6 @ -225

Page 33: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEUG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUNUP

PLOT NO:

PLANT ID:TRAIN ID:MACHINE ID:SOLID DATA: Comp

HOPE CREEKA RCPPUMP

GEN STA.

RUN: 1 DATE: 14 FEB 87 TIME: 1500

qs0E270

-

92

FULL SCALE AMP = .8 mil Dp IMP PER DIV = .04 mil pp

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (mil pp) @ 400 RPM = .16 * -225

Page 34: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORP-. MATERIALS DIVISION

VIBRATION TEST DEPT.

PLANT ID: HOPE CREEK GEN STATRAIN IDr: A RCPMACHINE ID: PUMP

PLOT NO:

RUN: 1 DATE:OVERALL AiMP =IX = 399 RPM

14~ FEB 874.87 TO

14 FEB 875.34 TO

TIME: 15:004.90 mil pp

TIME: 15:005.50 mil pp

RUN: I DATE:OVERALL AMP =1X.= 399 RPM

5..s.e :.........

4.8 .,

a- 3.0 :.. . .. .. .

- 2 z.e ..... ..

1.0 . . . . . . .

PROBE ID: 1XD

PROBE ID: 1YD

. . . ... ... .

. . . . . . . . ..

. . . . . . . . ..

. . . . . . .. .. . .

. .. .. . .... . .... . . ... .. .. . . .

... ............ .. ...... , ...

.. , .. . . . .

Vi -U) NI

... . . .. . . .. . . **-@@x-.....

Ur) cl

4 .

. . . . .. . .. . . .5.8

4.8 ,

M 2.2

1-

_ 2.2

2.2

2.2 L...

:!I...........................................

,........................... ................

..........................................

.........................................

,,-3 .1 - - - - 1 1I .I. .. , ., -

0 1- - I N

FREQUENCY (kcpm)

1~S

.I

Page 35: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMATERIALS DIVISIONVIDRATION TEST DEPT.

PLfANT ID: HOPE CREEKTRAIN ID: A RCPMACHINE ID: PUMP

PLOT NO:

RIJN: 1 DATE: 14 FEB 87 TIME: 15:00

PROBE -1 ID: lXDUNFILTEREDSLOW ROLL COMPENSATED DATA

PROBE #2 ID: IYDUNFILTEREDSLOW ROLL COMPENSATED DATA

ORIENTATION=MAX AMP=

ORIENTATION=MAX AMP=

0 deg4.80 mil pp

90 *deg5.20 mi1 pp

ROTATION: CCWRPII(START) = bOO RPM(END)= 399

, .

Rt i.FL '. ?au/ iiv

I i J~t , a i ?i ( I i li i'. X l Ji t

; Y_________________ _______________________I ____________________ ______________

TIM: 5CFLE= I . s/div

-Ft-' 5 =J-f± I.La at lldtv TIt£ SCLE- I E. E vd v

RUN: I DATE: 14 FEB 87 TIME: 15:00

PROBE #1 ID: 1XDIX FILTEREDSLOW ROLL COMPENSATED DATA

PROBE #2 ID: IYD1X FILTEREDSLOW ROLL COMPENSATED DATA

ROTATION: CCWRPM(START)= 399 RPM(END)-

ORIENTATION=1X VECTOR=

ORIENTATION=IX VECTOR=

0 deg4.20 mil pp @-157

90 deg4.20 mil pp @-246.

= 1400

Page 36: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORP IMATERIALS DIVISIONVIBRATION TEST DEPT. I

RUN: 1 DATE: 14 FEB 87OVERALL AMP = 5.60 TO1X = 758 RPM

PLANT ID: HOPE CREEK GEN STATRAIN ID: A RCPMACHINE ID: PUMP

TIME: 21:40 PROBE ID: 1XD5.90 mil pp

PLOT 14O:

RUN: 1 DATE: 14 FEB 87OVERALL AMP = 7.30 TOIX.= 759 RPM

se....................

4 .a .... .. .. .. .. .. .. .. ..

a- 3.0 .. . .. .. .. .. .. .. .. .. .

2. 0.. .......

3 ... .. . . . . ..........

BX . . . . . . .. . . ...I -

TIME: 21:40 PROBE ID: 1YD7.70 mil pp

......................

_. ... ,.............................. . -..... ..........

I.. 1. T T

5.13 r- - X-

4.6 .... .

2. G - .... .

-2.0 . ... .

J.6B. 6 I j

c:D

in In

. . . . . . . . . . .

. . . . .. . . . . . .

. . . . . . . . . . .

. . . . . . . . . . .

N

.1

....... 5X.....

....... .....

....... ....

....... .. ...

iD

. . . .

. . .

. . .

.. .

t) V)IUr

.. ..... .... I ...

.. . . . . . . . . . . .

. . - . . .r . . , . . . . .. .. .. .. . . .. 1

InIn Df U)

Loj

U,

FREQUENCY (kcpm)

Page 37: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

PLAt'NT ID: HOPE CREEKTRAIN ID: A RCPMA.CHINE ID: PUMP

PLOT 10:

RIJN: 1 DATE: 14 FEB 87 TIME: 15:00

PROBE #1 ID: 1XDUNFILTERED

PROBE #2 ID: lYDUNFILTERED

ROTATION: CCWRPK(START)=

I lP

F-R i SCF= I 0 mi I .div

: * * _:__*. :

ORIENTATION= 0 degMAX AMP= 5.60 mil pp

ORIENTATION= 90 degMAX AMP= 7.60 mil pp

758 RPII(END)= 765

re£ SULE= se.^ /div

.,-

_ f ' o - rs ; S s} \ r \ ,

-e .T - . > . 77 .-,' . t: s ,

-; .

:

S , wi fi

47 aK \s,: :

.

, .

T S4.=f£= SS. S >dtvMMP 5CL =I.m mlSX IfavA

RUN: I DATE: 14 FEB 87 TIME: 15:00

*PROBE #1 ID: 1XDIX FILTERED

ORIENTATION=IX VECTOR=

0 deg4.50 mil pp '&-169

90 deg4.40 mil pp i-258

PROBE #2 ID, VMDIX FILTERED

ORIENTATION=1X VECTOR=

ROTATION: CCWRPM(START)= 755 RPM(ENID)= 764

Page 38: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUN: 1 DATE: 15 FEBOVERALL AMP = 8.001X = 1076 RPM

PLANT ID: HOPE CREEK GEN STATRAIN ID: A RCPMACHINE ID: PUMP

7 TIME: 00:30 PROBE ID:1 8.40 mil pp

PLOT NO:

87TC

1XD

RUN: 1 DATE: 15 FEB 87OVERALL AMP = 6.10 TOlX = 1078 RPM

TIME: 00:306.30 mi1 pp

PROBE ID: 1YD

i .e II***@@@@

5.0 . I ...............

C 3. . .. .. .. .. .. .. .. .

- L .; .: . . .

..: .:.::::i.::.::.::.::.s~ k -9-4 1t

CD in C

..... .. SX .. .........

. .. .. . .. . . . ... .. .. ...

. . . . . . . . . . . . : . . .

. . . . . . . . . . . . . . . .

.. .... ,. . .,. .. .. ,1...

. . . . .

. . . . .

. . . . .

. . . . . .

. . .. ... I...... .fl I I I I | . I r . I I I I I I I I I I I . I I I I I I I I I I. . _ ., . . X ., _ & ff * * * & s * s * z . . T . s _ T s

n

. ...... . . . . . . . . ..

. ...... . . .. ... . .

. . . . . . . . . . . . .

N Ir)t

. . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . .

[. . . A . I . 1 I i z _ s a [ j z s . I .. . . I . . ..* * 1., 1_1 1_t rl & 8 $ * | | | § | ffi- 1- l - j- - v I , fI

_N N

FREQJUENCY (kcpm)

o0

Page 39: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

PLANT ID:TRAIN ID:MACHINE ID:

HOPE CREEKA RCPPUMP

PLOT INOD:

RUN: 1 DATE: 14 FEB 87 TIME: 15:00

PROBE #1 ID: 1XDUNFILTEREDSLOW ROLL COMPENSATED DATA

PROBE 42 ID: IYDUNFILTEREDSLOW ROLL COMPENSATED DATA

ROTATION: CCW.RPK(START)= 1065 RPM(EtID)=

ORIENTATION=MAX AMP=

ORIENTATION=MAX AMP=

0 deg9.60 mil pp

90 deg6..50,nmiI pp

1065

TIryE SCFLE- 58.E mg/div

(

1�

* -7--____ -

F�t-U� .�tE I � mfl/cilv TrIE SCFLE 58. mm/dtv

RUN: 1 DATE: 14 FEB 87 TIME: 15:00

PROBE .1 ID: 1XDIX FILTEREDSLOW ROLL COMPENSATED DATA

PROBE '2 ID: 1YD1X FILTEREDSLOW ROLL COMPENSATED DATA

ROTATION: CCWRPM(START)= 1063 RPM(END)

ORIENTATION=IX VECTOR=

ORIENTATION=IX VECTOR=

0 deg4.60 mil pp i-166

90 deg4.40 mil pp @-253

= 1062

Page 40: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT. I

RUN: 1 DATE: 15 FEB 87OVERALL AMP = 6.11 TO1X = 1285 RPM

PLANT ID: HOPE CREEK GEN STATRAIN ID: A RCPMACHINE ID: PUMP

TIME: 14:54 PROBE ID: 1XD6.33 mil pp

PLOT llO:

RUN: 1 DATE: 15 FEB 87OVERALL AMP = 6.48 TOIX 1285 RPM

5.8 ._.

5.8 ..................

3.e .... ............

- z e2 z.e . ..........

]. . . . . . . . . . . . . . . .

TIME: 14:546.60 mil pp

PROBE ID: 1YD

.. . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . ....

.. . . . . . . . . . . . . . . . . . . . . . . . . . .....

-,- I

U-

;E

w

5.6 .......

4.6 .......

3.0 .......

2.2 .......

1.2 .. . .. .. .

2..

0

. . . ------ * --on tn so W D

. . . .r 5

*-X-----. --.-. . . .. . . . . . . . . . . . . . . . . . . . . . . . 5 .

..... .k1- ., . .. . . . . . . . . . . . . .

_ . . . . ... . . . . . . . .

w , w .. H70. I,-,r,,,l,,jll^,,l,,

WI r5 51

_(

- V I � -1

FREQUENCY (kcpm)

to

Page 41: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

PLANT ID: HUPE (,REEK GLN b-HTRAIN ID: A RCPMACHINE ID: PUMP

rLU I NU:

RUN: 1 DATE: 15 FEB 87 TIME: 14:5A

PROBE #I ID: IXDUNFILTERED

OR I EN TA TI ON=MAX AMP=

O deg6.25 mil pp

90 deg5.90 mil pp

PROBE #2 ID: IYDUNFILTERED

ORIENTATION=MAX AMP=

ROTATION: CCWRPM(START)= 128$ RPX(ENb3)= 1285

.1.

.d1 .L .: . t 1div

T21 SCFLE= Z8.M a/div

TDI 5CL=- Z8.0 am/div

RUN: I DATE: 15 FEB 87 TIME: 14:54

PROBE #1 ID: 1XDIX FILTERED

* ORIENTATION=IX VECTOR=

Odeg4.85 mil pp @-168

90 deg4.69 mil pp @-257

PROBE #2 ID: 1YD1X FILTERED

ORIENTATION=IX VECTOR=

ROTATION: CCWRPM(START)= 1284 RPM(END)= 1284

Page 42: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

R UNUP

RUN: 1

PLOT NO:

PLANT ID:TRAIN ID:MACHINE ID:SOLID DATA: Comp

DATE: 14 FEB 87

HOPE CREEKB RCPPUMP1 YD

GEN STA.

TIME: 1500

,o'B

98

FULL SCALE AMP = 3 ml pp AMP PER

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (mi1 pp) 433 RPM

DIV - .2 mil pp

1 . 14 @ -243

Page 43: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

Pf7EU'G RESEARCH CORPMATERIALS DIVISIONVIPF-ATION TEST DEPT. PLANT ID:

TRAIN ID:MACHINE ID:SOLID DATA: Comp

PLOT NO:

HOPE CREEK GEN STA.B RCPPUMP1 YD

I.,

IJuzcr-,

a.

RUNUP DASHED DATA:Uncomp 1YD

RUN: 1 DATE: 14 FEB 87

-]-._z I ..................................................

-24,6

.................

-3s[--------..-...-..... ...........................

..... ... .......................................

_.e . . . . . . . . . .

TIME: 1500

4

a.0.1:

_... .................................................. ....... . . . . . ,. . . . . . . . . . . . . . ... . . .... . . . . . .... . . . . . . . . . . . . . . . . .... ; ,j

_ I ..... ........ ..,_-_' I . . . . . . . . . . . . . .. ......... . .........

I. . *. . . .. . .. , - .... . . ......... . . ............... .I

I

to U n2

n

SPELD 4krps)

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (mil pp) 0i 433 RPM = 1.14 @ -243

Page 44: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSEaG RESEARCH CORPMATERIALS DIVISIONVIBRATION TEST DEPT.

RUNUP

PLOT 110:

PLANT ID:TRAIN ID:MACHINE ID:SOLID DATA: Comp

HOPE CREEKB RCPPUMP1XD

GEN STA.

RUN: I

L.L

DATE: 14 FEB 87 TIME: 1500

op278

81a8

FULL SCALE AMP = 2 mil pp AMP PER DIV .1 mil pp

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (mil pp) a 433 RPM .99 @ -163

Page 45: PSL(--G Research Corporation · 2012. 11. 20. · Bently Nevada ADRE machinery diagnostic computer system. The ADRE system consists of a Bently Nevada DVF2 tracking filter, Hewlett

PSE&G RESEARCH CORPHATFRTILS DIVISIONVIBRATION TEST DEPT. PLANT ID: HOPE CRE

TRAIN ID: B RCPMACHINE ID: PUMPSOLID DATA: Comp 1XD

RUNUP DASHED DATA:Uncomp 1XD

RUN: 1 DATE: 14 FEB 87--J ..................................................

-)re ..................................................

-ISe . . . .. .-Joe J....................

_I3 .................................................

PLOT NO:

EEK GEN STA.

TIME: 1500

-j

wc)m

-a

2

[.................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................. _:

. . . . . . . . . . . _- . . . . . . . .

ev

t n! o2

SPEED (krps)

VECTOR(S) SUBTRACTED FROM SOLID DATA:SLOW ROLL (mil pp) @ 404 RPM

.99 @ -163