psfHomeDocumentsDouglas Simon Fairfield Library · PDF filedrawing title drawing name ... spm...
Transcript of psfHomeDocumentsDouglas Simon Fairfield Library · PDF filedrawing title drawing name ... spm...
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:44 PM
12" = 1'-0"
290 Main Street - Douglas, MA
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
COVERSHEET
G-0.0
Simon Fairfield Public Library - Renovation & Addition
January 18, 2012
De
sig
n D
eve
lop
men
t
SYMBOLS KEY
FLOOR ELEVATION SYMBOL
WINDOW TAG
DOOR TAG
INTERIOR ELEVATION SYMBOL
BUILDING SECTION SYMBOL
DETAIL SYMBOL
WINDOW TYPE
DOOR NUMBER
DETAIL NUMBER
SHEET NUMBER
DETAIL NUMBER
SHEET NUMBER
A101
1SIM
1t
101
A101
SIMA
TOILET ACCESSORY TAG1
TOILET ACCESSORY
ITEM NUMBER
Room name
101
150 SF
1i WALL TAG
ROOM TAG
CENTERLINE SYMBOL
ROOM NUMBER
AREA
WALL TYPE
NEW GRID LINE
EXISTING GRID LINE
SCALE:1
View Name1/8" = 1'-0"
DRAWING TITLE
DRAWING NAME
DRAWING NUMBER
DRAWING SCALE
2 A-2.1 EXTERIOR ELEVATION SYMBOL
DETAIL NUMBER
SHEET NUMBER
4 A-6.1
DETAIL NUMBERS
SHEET NUMBER3
2
1
CALLOUT SYMBOL
DETAIL NUMBER
SHEET NUMBER
A101
1SIM
A
A
MATERIALS KEY
CONCRETE
FINISH LUMBER
FRAMING LUMBER
WOOD BLOCKING
PLYWOOD
PLASTIC TRIM
GWB
EXISTING
NEW
CONCRETE MASONRY UNITS
EARTH
RIGID INSULATION
PLYWOOD
@ ATABV ABOVEACOUST, ACT ACOUSTICAL TILEAFF ABOVE FINISHED FLOORALT ALTERNATEALUM ALUMINUMAPPROX APPROXIMATEARCH ARCHITECT(URAL)AUTO AUTOMATIC
BS BOTH SIDESBLDG BUILDINGBLK BLOCKBLKG BLOCKINGBLW BELOWBM BEAM; BENCH MARKBRG BEARINGBRK BRICKBSMT BASEMENTBTM BOTTOMBTW BETWEENBW BOTH WAYS
CAS CARD ACCESS SYSTEMCGST CERAMIC GLAZED STRUCTURAL TILECH CHANNELCHLKG CAULKINGCJ CONTROL JOINTCLG CEILINGC, C CENTER LINECL, CLR CLEAR(ANCE)CMU CONCRETE MASONRY UNIT(S)COL COLUMNCONC CONCRETECONT CONTINUE; CONTINUOUSCONTR CONTRACTORCO COORDINATECPT CARPETCS COUNTER SUNKCT CERAMIC TILE
DET DETAILDIA DIAMETERDIM DIMENSIONDN DOWNDS DOWNSPOUTDTL DETAILDWG DRAWING
EA EACHEJ EXPANSION JOINTEL ELEVATIONELEV ELEVATOREMERG EMERGENCYEQ EQUALEQP EQUIPMENTEXG EXISTINGEXP EXPOSEDEXT EXTERIOR
FC FIRE CODEFD FLOOR DRAINFDN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFG FIBERGLASSFFE FINISHED FLOOR ELEVATIONFIN FINISHFL FLOORFLG FLASHINGFOB FACE OF BRICKFOC FACE OF CONCRETEFOF FACE OF FINISHFOS FACE OF STUD(S)FR FIRE RESISTANTFTF FACE TO FACEFTG FOOTINGFTY FACTORYFUR FURRING
GA GAUGEGALV GALVANIZEDGC GENERAL CONTRACTORGL GLASSGRT GRATEGWB GYPSUM WALL BOARD / SKIM COAT PLASTERGYP GYPSUM
ABBREVIATIONS
HB HOSE BIBHD HOT DIPPEDHDWR HARDWAREHGT, HT HEIGHTHM HOLLOW METALHOR HORIZONTALHR HAND RAILHT HEIGHTHVAC HEATING VENTILATING & AIR CONDITIONING
IJ ISOLATION JOINTINCL INCLUDE(S); INCLUDINGINSUL INSULATE(S); INSULATIONINT INTERIORJT JOINT
KF KRAFT FACEDKO KNOCK OUT
LAM LAMINATEDLAV LAVATORYLF LIGHT FIXTURELLC LEAD COATED COPPERLVL LAMINATED VENEER LUMBER
MANF MANUFACTURERMAT MATERIALMAS MASONRYMAX MAXIMUMMB MACHINE BOLTMECH MECHANICALMFD MANUFACTUREDMFR MANUFACTURERMIN MINIMUMMISC MISCELLANEOUSMO MASONRY OPENINGMS MACHINE SCREWMTD MOUNTEDMTL METAL
N/A NOT APPLICABLENIC NOT IN CONTRACTNO NUMBERNOM NOMINALNS NEAR SIDENTS NOT TO SCALE
OC ON CENTER(S)OPG, OPNG OPENINGOPP OPPOSITE
P PAINTPC PRECAST CONCRETEPEN PENETRATIONPL, P PROPERTY LINE; PLATEPLAM PLASTIC LAMINATEPL PLATEPLAST PLASTERPNL PANELPOLY POLYURETHANE-POLYPRO POLYPROPYLENEPR PAIRPREFAB PREFABRICATEDPTD PAINTEDPT PRESSURE TREATEDPVC POLYVINYL CHLORIDEPVMT PAVEMENTPLYWD PLYWOOD
QT QUARRY TILE
R R-VALUERB RUBBER BASERD ROOF DRAINREF REFER(ENCE)REL RELOCATEREQ REQUIRE(D)REV REVERSERFG ROOFINGRH ROUND HEADRL RAIN LEADERRM ROOMRMV REMOVERO ROUGH OPENINGR/S REINFORCING STEELRES RESILIENTRUB RUBBER FLOORINGRVS REVISE
SC SKIM COATSCH SCHEDULESCR SCREWSDG SIDINGSECT SECTIONSHT SHEETSIM SIMILARSLR SEALERSPEC(S) SPECIFICATION(S)SPM SINGLE PLY MEMBRANE ROOFSS STAINLESS STEELST STONE TILESTD STANDARDSTL STEELSTRUCT STRUCTURALSUSP SUSPENDEDSV SHEET VINYLSYM SYMMETRY; SYMMETRICAL
T&G TONGUE & GROOVETEMP TEMPORARYTEMPD TEMPEREDTHK THICK(NESS)THR THRESHOLDTOB TOP OF BRICKTOC TOP OF CONCRETETOF TOP OF FOUNDATIONTOP TOP OF PARAPETTOS TOP OS STEELTR TREADTS TUBE STEELTYP TYPICAL
U U-VALUEUL UNDERWRITERS LABORATORIESUNF UNFINISHED
V VENTVB VINYL BASEVCT VINYL COMPOSITION TILEVERT VERTICALVF VINYL FLOORINGVIF VERIFY IN FIELDVIN VINYLVP VENT PIPEVT VINYL TILEVTR VENT THROUGH ROOF
W/ WITHW/O WITHOUTWB WONDERBOARDWC WALL COVERINGWD WOODWF WIDE FLANGEWP WATERPROOFWPC WATERPROOF COATINGWR WASTE RECEPTACLEWS WOOD SCREWWT WEIGHTWWF WELDED WIRE FABRIC
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:44 PM
As indicated
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
SYMBOLSABB'TNS &KEYNOTES
G-0.1
De
sig
n D
eve
lop
men
t
DRAWING LIST
G-0.0 COVER SHEET
G-0.1 SYMBOLS ABB'TNS & KEYNOTES
XL-1.1 EXISTING CONDITIONS PLAN
X-1.1 EXISTING FLOOR PLANS
X-2.1 EXISTING BUILDING ELEVATIONS
X-3.1 EXISTING CONDITIONS PHOTOS
D-1.1 GROUND FLOOR DEMOLITION PLAN
D-1.2 FIRST FLOOR DEMOLITION PLAN
D-1.3 MEZZANINE DEMOLITION PLAN
L-1.1a SITE PLAN
L-1.1b SITE PLAN
L-1.1c SITE PLAN
C-1.1 SITE UTILITIES
C-1.2 SITE DRAINAGE
A-1.1 GROUND FLOOR PLAN
A-1.2 MAIN FLOOR PLAN
A-1.3 MEZZANINE & ATTIC PLAN
A-2.1 EAST ELEVATION
A-2.2 WEST ELEVATION
A-2.3 NORTH ELEVATION
A-2.4 SOUTH ELEVATION
A-3.1 BUILDING SECTION
A-4.1 WALL SECTIONS
A-5.1 EXTERIOR DETAILS
A-6.1 INTERIOR ELEVATIONS
A-6.2 INTERIOR ELEVATIONS
A-6.3 INTERIOR ELEVATIONS
A-6.4 INTERIOR ELEVATIONS
A-7.1 INTERIOR DETAILS
A-8.1 DOORS & WINDOWS
A-9.1 SCHEDULES
S-1.1 STRUCTURAL FRAMING
S-1.2 FOUNDATION DETAILS
S-1.3 STRUCTURAL DETAILS
P-1.1 PLUMBING LEGEND
P-1.2 PLUMBING PLANS & DETAILS
M-1.1 HEATING LEGEND
M-1.2 HEATING PLANS & DETAILS
E-1.1 ELECTRICAL LEGEND
E-1.2 ELECTRICAL PLANS & DETAILS
64' - 1"
38' -
1"
U D
Stacks
Reference Books
Vestibule
Lobby
Office
Bathroom
Childrens Room
Childrens Room
0' -
0"
X-3.1
1
X-3.12
X-3.1
3
X-3.1
4
X-3.1
5X-3.1
6
X-3.1
12
X-3.1
8
Attic
Attic
Mezzanine
Attic
Open to Below
X-3.1
10
U
U
Story Room
Childrens Library
StorageStorage
Storage
Boiler Room
Bathroom
38' -
1"
64' - 1"
X-3.1
7
X-3.1
9X-3.1
11
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:55 PM
3/16" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
EXISTINGFLOORPLANS
X-1.1
De
sig
n D
eve
lop
men
t
SCALE: 3/16" = 1'-0"1
Existing First Floor PlanSCALE: 3/16" = 1'-0"
2Existing Mezzanine Level
SCALE: 3/16" = 1'-0"3
Existing Ground Floor Plan
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:31:11 PM
3/16" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
EXISTINGBUILDING
ELEVATIONS
X-2.1
De
sig
n D
eve
lop
men
t
SCALE: 3/16" = 1'-0"1
SOUTH ELEVATION - EXISTING
SCALE: 3/16" = 1'-0"2
EAST ELEVATION - EXISTINGSCALE: 3/16" = 1'-0"
3NORTH ELEVATION - EXISTING
SCALE: 3/16" = 1'-0"4
WEST ELEVATION - EXISTING
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:31:30 PM
1" = 40'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
EXISTINGCONDITIONS
PHOTOS
X-3.1
De
sig
n D
eve
lop
men
t
1Exterior View from Southwest
2Exterior View from West
3Exterior view from South
4Exterior View from Southeast
7Children's Library (facing SW)
8Reading Room (facing NE)
9Children's Room (facing NW)
5Exterior View from North
10Mezzanine (facing SE)
11Children's Rom (facing NE)
12Mezzanine Stair (facing N)
6Exterior View from Northeast
RE
F.
CUT NEW OPENING INEXG MASONRY WALL
REMOVE EXG WINDOW
REMOVE EXG DOOR
REMOVE EXG PARTITIONS
REMOVE EXG STAIR
REMOVE PARTITION & DOOR
REMOVE EXG DOORS
REMOVE PARTITION
REMOVE DOOR
REMOVE PARTITION
REMOVE PARTITION
REMOVE EXTERIOR STAIR
REMOVE DOOR
REMOVE INTERIOR STAIR
REMOVE EXG CONCSLAB, TYPICAL ATGROUND FLOOR
6' - 3" +/-
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:38 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
GROUNDFLOOR
DEMOLITIONPLAN
D-1.1
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
BASEMENT PLAN - DEMOLITION
NORTH
DN
UP
5' - 11" +/-
REMOVE EXG WINDOW
CUT OPENING IN EXISTINGMASONRY WALL
REMOVE EXG EXTERIORSTORMS, TYPICAL
NEW OPENING IN EXG INT WALL
REMOVE EXG BASEMENT STAIR
REMOVE EXG EXTERIOR STAIR
REMOVE EXG DOOR
3' -
0"
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:39 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
FIRSTFLOOR
DEMOLITIONPLAN
D-1.2
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
FIRST FLOOR PLAN - DEMOLITION
NORTH
DN
REMOVE EXTERIOR STORM WINDOWS
REMOVE EXG STAIR
REMOVE EXG DOOR REMOVECEILING IN THIS
AREA ONLY
REMOVE DOOR
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:42 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
MEZZANINEDEMOLITION
PLAN
D-1.3
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
MEZZANINE PLAN - DEMOLITION
NORTH
403
404
405
406
407
403
404
405
406
407
398
399
400
401
402
398
399
400
401
402
401
402
403
404
405
403
403
406
407
406
407
403
404
405
406
407
403
404
405
406
407
398
399
400
401
402
398
399
400
401
402
401
402
403
404
405
403
8 spaces
8 spaces
9 spaces
5 spaces
NEW ASPHALT PARKINGLOT FOR 30 CARS
CONCRETE SIDEWALK
NEW CONC. RETAINING WALL
NEW ASPHALT DRIVE
SUBSURFACE STORM WATERCOLLECTION SYSTEM
RELOCATE EXISTINGRETAINING WALL
PROPOSED ADDITION
EXISTING BUILDING
200' - 0" RIVER BUFFER
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:48 PM
1" = 10'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
Author
Checker
January 18, 2012
SITE PLAN
L-1.1a
De
sig
n D
eve
lop
men
t
403
404
405
406
407
403
404
405
406
407
398
399
400
401
402
398
399
400
401
402
408
407
405
406
404
402
403
401
402
403
404
405
403
403
8 spaces
8 spaces
9 spaces
5 spaces
NEW ASPHALT PARKINGLOT FOR 30 CARS
CONCRETE SIDEWALK
NEW RETAINING WALL
NEW ASPHALT DRIVE
SUBSURFACE STORM WATERCOLLECTION SYSTEM
EXISTING BUILDING
PROPOSED ADDITION
NEW EXIT TO BANK PARKING LOT
200' - 0" RIVER BUFFER
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:51 PM
1" = 10'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
Author
Checker
January 18, 2012
SITE PLAN
L-1.1b
De
sig
n D
eve
lop
men
t
403
404
405
406
407
403
404
405
406
407
398
399
400
401
402
398
399
400
401
402
401
402
403
404
405
403
403
402
403
404
405
406
407
408
8 spaces
8 spaces
9 spaces
5 spaces
CONCRETE SIDEWALK
NEW RETAINING WALL
NEW ASPHALT DRIVE
SUBSURFACE STORM WATERCOLLECTION SYSTEM
EXISTING BUILDING
PROPOSED ADDITION
NEW EXIT TO BANK PARKING LOT
200' - 0" RIVER BUFFER
NON-POROUS PAVING MATERIAL
POROUS PAVING MATERIAL
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:54 PM
1" = 10'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
Author
Checker
January 18, 2012
SITE PLAN
L-1.1c
De
sig
n D
eve
lop
men
t
UP
JAN
G07
M
G09
MECH
G02
JUV NON-FICTION
G12
STORAGE
G11
CIRC DESK
G01
ELEV MACH
G04
W
G08
1
A-3.1
ENTRY
G13
ELEV
G03
NEW DOOR IN EXG OPENING
NEW TOILET ROOMS
NEW JANITOR'S CLOSET
NEW BOILER ROOM
NEW RATED ENTRY
NEW STEEL STAIR
NEW CONCRETE FLOOR SLAB & FINISHES
NEW WOOD WINDOW & DOOR TRIM
PAINT WALLS & TRIM
NEW ACT CEILING
GENERAL NOTES
OFFICE
G10
READING AREA
G06
MEETING ROOM
G05
2
2
1
3
344
2
2
2
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 5:14:03 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
GROUNDFLOORPLAN
A-1.1
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
Basement Plan
DN
UP
DN
TECH SERVICES
103
FICTION
104
COMPUTER ROOM
105
NEW BOOKS
101
QUIET STUDY
107
NON FICTION
108
VESTIBULE
106
EX
IST
ING
BU
ILD
ING
38' -
2"
+/-
AD
DIT
ION
18' -
5"
1
A-3.1
CIRC DESK
102
OFFICE
109
UNISEX
110
ELEV
G03
26
NEW ELEVATOR
NEW STEEL STAIR
REMOVE DOOR & REPLACEMISSING WINDOW
NEW TOILET ROOM
NEW OFFICE
OPEN UNDER EXG STAIR
NEW WINDOWS IN TECH SERV
NEW RATED DOOR
NEW FLOOR FINISHES
PAINT ALL WALLS, CEILINGS & TRIM
GENERAL NOTES
Biography
Reference
HistoricalCollection
PeriodicalsA/V Non Print
Copier
1
4
HALL
111
STAIR
112
1
1
11
1
3
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:29:13 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
MAINFLOORPLAN
A-1.2
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
First Floor Plan
DN
1
A-3.1
MEZZANINE
M01
ATTIC
M02
STORAGE
M03
RAISE CEILINGABOVE MEZZANINE
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:29:15 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
MEZZANINE& ATTIC
PLAN
A-1.3
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
Mezzanine Plan
FACE BRICK TO MATCH EXISTING BUILDING
NEW ENTRANCE CANOPY
EXISTING BUILDING
43' - 7" +/-
NEW ADDITION
18' - 5" +/-
NEW ALUMINUM DOUBLE-HUNGWINDOWS TO MATCH EXG
COPPER GUTTER
MODIFIED BUILT-UP ROOF
PAINTED MTL FRIEZE
CAST STONE BAND
NEW ENTRANCE CANOPY
NEW ALUMINUM STORMWINDOWS, TYPICAL @ EXG
WINDOWS
NEW CONCRETE FOOTING& FOUNDATION WALLS
CAST STONE WINDOW SILLS, TYP
FLAT BRICK ARCH TO MATCH EXG
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:29:20 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
EASTELEVATION
A-2.1
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
EAST ELEVATION
FACE BRICK TO MATCH EXISTING BUILDING
NEW ENTRANCE CANOPY
ALUMINUM WINDOWS TO MATCH EXG
COPPER GUTTER
MODIFIED BUILT-UP ROOF
PAINTED METAL FRIEZE
CAST STONE BAND
18' - 6"
EXISTING BUILDING
43' - 7" +/-
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 5:14:11 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
WESTELEVATION
A-2.2
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
West Elevation
1
A-3.1
NEW ADDITION
22' - 4"
EXISTING BUILDING
64' - 1" +/-
POSSIBLE FUTURE ELEV EXTENSION
1 1
2
3
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:29:31 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
NORTHELEVATION
A-2.3
De
sig
n D
eve
lop
men
t
1
A-3.1
REPAIR EXISTING CONCRETE STAIRS
REPAIR DAMAGED METAL CORNICE
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:29:39 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
SOUTHELEVATION
A-2.4
De
sig
n D
eve
lop
men
t
A-4.1
3
A-4.1
2
A-4.1
1
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:29:47 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
BUILDINGSECTION
A-3.1
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
New Addition Section
MEZZANINE PLAN427' - 6"
top of foundation407' - 0"
bot of footing400' - 6"
1st flr sub/fin flr412' - 0"
mezzanine fin flr423' - 6"
basement flr402' - 9"
attic flr fin426' - 5"
top of foundation407' - 0"
bot of footing400' - 6"
1st flr sub/fin flr412' - 0"
mezzanine fin flr423' - 6"
basement flr402' - 9"
top of foundation407' - 0"
bot of footing400' - 6"
basement flr402' - 9"
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:29:47 PM
1/2" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
WALLSECTIONS
A-4.1
De
sig
n D
eve
lop
men
t
SCALE: 1/2" = 1'-0"3
Typical New Wall SectionSCALE: 1/2" = 1'-0"
2Elevator Wall Section
SCALE: 1/2" = 1'-0"1
Foundation Under-pinning
EXG OPENING
EXG WINDOWS
EXG TOP RAIL
EXG PLASTER WALL
EXG BASEBOARD
EXG WINDOWSEXG PLASTER WALL
EXG OPENING
EXG BASEBOARD
EXG TOP RAIL
EXG WINDOWS
EXG OPENING
EXG TOP RAILEXG PLASTER WALL
EXG BASEBOARD
EXG RAILING
EXG OFFICE DOORS
EXG OFFICEWINDOW
EXG FLOOR EDGEEXG STAIRS
NEW REAR ENTRY DOOR
EXG CIRCULARWINDOWS
EXG ENTRY DOOR
EXG ENTRYWINDOWS
EXG OPENINGS
EXG TOP RAIL
EXG BASEBOARD
EXG PLASTER WALLSdate
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:02 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
INTERIORELEVATIONS
A-6.1
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
Computer Room - NSCALE: 1/4" = 1'-0"
2Computer Room - E
SCALE: 1/4" = 1'-0"3
Computer Room - SSCALE: 1/4" = 1'-0"
4Computer Room - W
SCALE: 1/4" = 1'-0"5
Reading Room - NSCALE: 1/4" = 1'-0"
6Reading Room - E
SCALE: 1/4" = 1'-0"7
Reading Room - SSCALE: 1/4" = 1'-0"
8Reading Room - W
SCALE: 1/4" = 1'-0"9
Conference Room - NSCALE: 1/4" = 1'-0"
10Conference Room - E
SCALE: 1/4" = 1'-0"11
Conference Room - SSCALE: 1/4" = 1'-0"
12Conference Room - W
SCALE: 1/4" = 1'-0"13
Lobby - NSCALE: 1/4" = 1'-0"
14Lobby - E
SCALE: 1/4" = 1'-0"15
Lobby - SSCALE: 1/4" = 1'-0"
16Lobby - W
EXG TOP RAIL
EXG OFFICE DOORS
EXG OFFICEWINDOW
EXG PLASTER WALLS
EXG BASEBOARD
NEW INT WINDOWS
NEW PLASTER WALLS
NEW TOP RAIL
NEW BASEBOARD
NEW DOOR
EXG OPENING
EXG WINDOWS
EXG BRICK WALLS
NEW TILE WALL
NEW DOOR
EXG WINDOWS
EXG BRICK WALL
EXG WINDOW
EXG BRICK WALL
NEW DOOR
NEW TILE WALL
NEW SINK
NEW TOILET
NEW DOOR
NEW TILE WALL
EXG BRICK WALLNEWPLASTERWALL
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:11 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
INTERIORELEVATIONS
A-6.2
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
Technical Service Room - NSCALE: 1/4" = 1'-0"
2Technical Service Room - E
SCALE: 1/4" = 1'-0"3
Technical Service Room - SSCALE: 1/4" = 1'-0"
4Technical Service Room - W
SCALE: 1/4" = 1'-0"5
Fiction Room - NSCALE: 1/4" = 1'-0"
6Fiction Room - E
SCALE: 1/4" = 1'-0"7
Fiction Room - SSCALE: 1/4" = 1'-0"
8Fiction Room - W
SCALE: 1/4" = 1'-0"9
Office - NSCALE: 1/4" = 1'-0"
10Office - E
SCALE: 1/4" = 1'-0"11
Office - SSCALE: 1/4" = 1'-0"
12Office - W
SCALE: 1/4" = 1'-0"13
Unisex - NSCALE: 1/4" = 1'-0"
14Unisex - E
SCALE: 1/4" = 1'-0"15
Unisex - SSCALE: 1/4" = 1'-0"
16Unisex - W
SCALE: 1/4" = 1'-0"17
Janitor Closet - NSCALE: 1/4" = 1'-0"
18Janitor Closet - E
SCALE: 1/4" = 1'-0"19
Janitor Closet - SSCALE: 1/4" = 1'-0"
20Janitor Closet - W
EXG WOOD PANELING
EXG INT WINDOWS
EXG INT ENTRY DOOR
EXG WOOD PANELING
EXG EXT WINDOWS
EXG ENTRY DOOR
EXG TERRAZOBASEBOARD
NEW REAR ENTRYDOOR
NEW WINDOWS
NEW DOORS
EXG BRICK WALL
EXG CONCRETEFOUNDATIONWALL
NEW ELEVATOR
NEW STAIRS
NEW WINDOWS
NEW EXT BRICKWALL
NEW RAILING
NEW FLOOR
NEW OPENING EXG BRICK WALL
EXG WINDOWS
EXG BRICK COLUMN
NEW DOOREXG BRICK WALLEXG BRICK WINDOWS
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:24 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
INTERIORELEVATIONS
A-6.3
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
Vestibule - NSCALE: 1/4" = 1'-0"
2Vestibule - E
SCALE: 1/4" = 1'-0"3
Vestibule - SSCALE: 1/4" = 1'-0"
4Vestibule - W
SCALE: 1/4" = 1'-0"5
New Addition - NSCALE: 1/4" = 1'-0"
6New Addition - E
SCALE: 1/4" = 1'-0"7
New Addition - SSCALE: 1/4" = 1'-0"
8New Addition - W
SCALE: 1/4" = 1'-0"9
Juvenile Fiction - NSCALE: 1/4" = 1'-0"
10Juvenile Fiction - E
SCALE: 1/4" = 1'-0"11
Juvenile Fiction - SSCALE: 1/4" = 1'-0"
12Juvenile Fiction - W
SCALE: 1/4" = 1'-0"13
Juvenile Non-Fiction - NSCALE: 1/4" = 1'-0"
14Juvenile Non-Fiction - E
SCALE: 1/4" = 1'-0"15
Juvenile Non-Fiction - SSCALE: 1/4" = 1'-0"
16Juvenile Non-Fiction - W
NEW DOOR
NEW WALL
EXG BRICK COLUMN
NEW REAR ENTRY DOORNEW DOORS
NEW WALL
EXG BRICKCOLUMNS
NEW OPENING
EXG BRICK WALL
EXG BRICK COLUMN
NEW DOORS
NEW WALL
EXG BRICK WALL
NEW DOOR
NEW WALL
EXG BRICKCOLUMNSNEW WALLS
NEW DOOREXG BRICK WALLS
NEW WALL
EXG BRICK WALLS
NEW TOILET
NEW TILE WALLS
NEW SINK
NEW DOOR
NEW DOOR
EXG BRICK WALLNEW TILE WALL
NEW TOILET
NEW SINK
EXG WINDOW
EXG BRICKCOLUMNS
EXG APPLIANCES
EXG PLASTERWALL
NEW REAR DOOREXG WINDOWS
EXG BRICK COLUMNS
EXG PLASTER WALL
EXG WINDOWS
EXG BRICKCOLUMN
EXG PLASTERWALL
EXG OPENING
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:32 PM
1/4" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
INTERIORELEVATIONS
A-6.4
De
sig
n D
eve
lop
men
t
SCALE: 1/4" = 1'-0"1
Childrens Room - NSCALE: 1/4" = 1'-0"
2Childrens Room - E
SCALE: 1/4" = 1'-0"3
Childrens Room - SSCALE: 1/4" = 1'-0"
4Childrens Room - W
SCALE: 1/4" = 1'-0"5
Boiler Room - NSCALE: 1/4" = 1'-0"
6Boiler Room - E
SCALE: 1/4" = 1'-0"7
Boiler Room - SSCALE: 1/4" = 1'-0"
8Boiler Room - W
SCALE: 1/4" = 1'-0"9
Machine Room - WSCALE: 1/4" = 1'-0"
10Machine Room - S
SCALE: 1/4" = 1'-0"11
Machine Room - ESCALE: 1/4" = 1'-0"
12Machine Room - N
SCALE: 1/4" = 1'-0"13
Mens Room - WSCALE: 1/4" = 1'-0"
14Mens Room - S
SCALE: 1/4" = 1'-0"15
Mens Room - ESCALE: 1/4" = 1'-0"
16Mens Room - N
SCALE: 1/4" = 1'-0"17
Womens Room - NSCALE: 1/4" = 1'-0"
18Womens Room - E
SCALE: 1/4" = 1'-0"19
Womens Room - SSCALE: 1/4" = 1'-0"
20Womens Room - W
SCALE: 1/4" = 1'-0"25
Meeting Room - NSCALE: 1/4" = 1'-0"
26Meeting Room - E
SCALE: 1/4" = 1'-0"27
Meeting Room - SSCALE: 1/4" = 1'-0"
28Meeting Room - W
HEAD
PARTING RAIL
JAMB
SILL
NEW WEATHERSTRIPPING
NEW WEATHERSTRIPPING
NEW WEATHERSTRIPPING
NEW WEATHERSTRIPPING
HEAD
JAMB
SILL
JAMB
PARTING RAIL
SILL
HEAD
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:35 PM
As indicated
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
DOORS &WINDOWS
A-8.1
De
sig
n D
eve
lop
men
t
SCALE: 3" = 1'-0"1
Typical Window Detail East, South, WestSCALE: 3" = 1'-0"
2Window Detail New
SCALE: 3" = 1'-0"3
Typical Window Detail North
SCALE: 1/4" = 1'-0"
Window Type 2SCALE: 1/4" = 1'-0"
Window Type 1SCALE: 1/4" = 1'-0"
Window Type 3
5/8
"7/8
"7 5
/8"
7 5/8" CMU
7/8" METAL FURRING
5/8" GWB
5/8" DOUBLELAYERED GWB
3 5/8? METAL STUDS @16" O.C., FULL HEIGHT
5/8
"5/8
"3 5
/8"
5/8
"5/8
"
5/8
"3 5
/8"
5/8
"
5/8" GWB FULL HEIGHTEXCEPT CEMENTIOUS TILEBACKER BD. BEHIND TILE
3 5/8" METAL STUDS @16" O.C., FULL HEIGHT
3 5/8" METAL STUDS @16" O.C., FULL HEIGHT
5/8" GWB FULLHEIGHTEXCEPT CEMENTIOUS TILEBACKER BD. BEHIND TILE
5/8
"3 5
/8"
date
scale
drawn by
checked by
revision date
PR
OG
RE
SS
290 M
ain
Str
eet -
Dougla
s, M
A
1/18/2012 4:30:37 PM
3" = 1'-0"
Sim
on F
airfield
Public
Lib
rary
- R
enovation &
Additio
n
J C
C V V
January 18, 2012
SCHEDULES
A-9.1
De
sig
n D
eve
lop
men
t
ROOM FINISH SCHEDULE
NUMBER ROOM NAMEFLOOR
MAT FLOOR FINISH BASE MAT BASE FINISH TRIM MATTRIM
FINISH WALL MATWALLFINISH CEILING MAT
CEILINGFINISH REMARKS
101 NEW BOOKS - CPT EXG WD VARNISH EXG WD VARNISH EXG PLAST PTD EXG PLAST PTD
102 CIRC DESK - RUB EXG WD VARNISH EXG WD VARNISH EXG PLAST PTD EXG PLAST PTD
103 TECH SERVICES - CPT EXG WD VARNISH EXG WD VARNISH EXG PLAST PTD EXG PLAST PTD
104 FICTION - CPT EXG WD VARNISH EXG WD VARNISH EXG PLAST PTD EXG PLAST PTD
105 COMPUTER ROOM - CPT EXG WD VARNISH EXG WD VARNISH EXG PLAST PTD EXG PLAST PTD
106 VESTIBULE EXG TERRAZO EXG WD VARNISH EXG WD VARNISH EXG PLAST PTD EXG PLAST PTD TERRAZO
107 QUIET STUDY - CPT EXG WD VARNISH EXG WD VARNISH EXG PLAST PTD EXG PLAST PTD
108 NON FICTION - CPT EXG WD VARNISH EXG WD VARNISH EXG PLAST PTD EXG PLAST PTD
109 OFFICE - CPT EXG WD VARNISH WD VARNISH EXG PLAST PTD EXG PLAST PTD
110 UNISEX CT - CT - WD PTD CT GWB PTD
111 HALL - CPT WD VARNISH EXG WD VARNISH EXG PLAST PTD EXG PLAST PTD
112 STAIR ST - ST - WD VARNISH GWB PTD GWB PTD
G01 CIRC DESK - RUB WD PTD EXG WD PTD GWB
G02 MECH CONC SLR WD PTD WD PTD GWB
G03 ELEV CONC SLR - - - - CMU - - - SEE ELEV SPEC
G04 ELEV MACH CONC SLR VINYL - - - CMU PTD GWB PTD
G05 MEETING ROOM CPT WD PTD WD PTD GWB
G06 READING AREA CPT WD PTD WD PTD GWB
G07 JAN CONC SLR VINYL PTD GWB PTD
G08 W CT CT WD PTD CT GWB PTD
G09 M CT CT WD PTD CT GWB PTD
G10 OFFICE CPT GWB/BRK
G11 STORAGE CPT GWB/BRK
G12 JUV NON-FICTION CPT GWB/BRK
G13 ENTRY ST ST WD VARNISH GWB PTD GWB PTD
M01 MEZZANINE WD POLY
M02 ATTIC WD
M03 STORAGE WD
3" = 1'-0"1
Wall Type 1
3" = 1'-0"2
Wall Type 2
3" = 1'-0"3
Wall Type 3
3" = 1'-0"4
Wall Type 4