PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps –...

42

Transcript of PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps –...

Page 1: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning
Page 2: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2017

CENTER_NAME STATION_NAME STUDENT

AHMEDABAD

ADANI POWER 9

INFIBEAM 15

RAJNAGAR TEXTILE MILLS (NATIONAL TEXTILE CORPORATION LTD) 9

ALWAR HONDA MOTORCYCLE & SCOOTER INDIA PVT. LTD. 8

ANGUL NATIONAL ALUMINIUM COMPANY LIMITED - SMELTER PLANT 12

NATIONAL ALUMINIUM COMPANY LTD - POWER PLANT 12

BAHADURGARH HINDUSTAN PETROLEUM CORPORATION LTD. 5

BANGALORE

ELECTRONO SOLUTIONS PVT. LTD. 8

ERICSSON BANGALORE R & D 5

HAL AEROSPACE DIVISION 6

HAPPIEST MINDS 8

HINDUSTAN AERONAUTICS LIMITED 6

HINDUSTAN AERONAUTICS LIMITED ROTARY WING RESEARCH & DESIGN CENTER 9

HONDA MOTORCYCLE & SCOOTER INDIA PVT. LTD. 6

HORTONWORKS 4

I-LOADS (WDSI) 10

INDIAN INSTITUTE OF SCIENCE 21

INVENTOMAKERSPACES PVT. LTD. 8

NUTANIX 5

SENSEI TECHNOLOGIES 5

SUNPLUS SYSTEM SOLUTIONS PVT. LTD. 4

TAPCHIEF 5

BHARUCH BIRLA CELLULOSIC 14

BHAVNAGAR CENTRAL SALT AND MARINE CHEMICALS RESEARCH INSTITUTE 4

BHILAI BHILAI STEEL PLANT 39

BHOPAL AIIMS 19

NEW BHOPAL TEXTILE MILLS BHOPAL (NATIONAL TEXTILE CORPORATION LTD) 9

BHUBANESHWAR THE INSTITUTE OF MINERALS AND MATERIALS TECHNOLOGY 10

CHENNAI

CARBORUNDUM UNIVERSAL LTD. 15

CENTER FOR MEDICAL GENETICS 5

CENTRAL ELECTRONICS ENGINEERING RESEARCH INSTITUTE 15

CENTRAL LEATHER RESEARCH INSTITUTE 39

EYWAPHARMA PVT. LTD. 5

I-LOADS 8

NATIONAL METALLURGICAL LABORATORY 5

TAMIL NADU EGOVERNANCE AGENCY 15

TAMIL NADU SCIENCE AND TECHNOLOGY CENTRE 13

WHEELS INDIA LTD. 4

COIMBATORE

CAMBODIA MILLS (NATIONAL TEXTILE CORPORATION LTD.) 5

COIMBATORE MURUGAN MILLS (NATIONAL TEXTILE CORPORATION LTD.) 5

SOUTHERN REGIONAL OFFICE (NTCL) 5

ZF WINDPOWER 9

DAMANJODI NATIONAL ALUMINIUM COMPANY LIMITED - SMELTER PLANT 19

DEHRADUN INDIAN INSTITUTE OF PETROLEUM 4

INDIAN INSTITUTE OF REMOTE SENSING 17

WADIA INSTITUTE OF HIMALAYAN GEOLOGY 20

DELHI DELHI METRO RAIL CORPORATION 6

DRDO-SSPL 10

NATIONAL TEXTILE CORPORATION LIMITED 10

DHANBAD CSIR-CENTRAL INSTITUTE OF MINING AND FUEL RESEARCH (CIMFR) 19

FARIDABAD ESCORTS 12

SUPERSEALS INDIA LTD. 7

GANDHINAGAR BHASKARACHARYA INSTITUTE FOR SPACE APPLICATIONS AND GEOINFORMATIC 22

GUJARAT ENVIRONMENT MANAGEMENT INSTITUTE 17

INSTITUTE OF SEISMOLOGICAL RESEARCH (ISR) DST 10

GAUHATI GAUHATI REFINERY 25

ABBOTT INDIA LTD. 4

Page 3: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

GOA

CG PPIADHENSIVE PRODUCTS LTD 4

DEPARTMENT OF AGRICULTURE 6

ENCUBE ETHICALS PVT 5

FUNSKOOL (INDIA) LTD. 5

GOA STATE INFRASTRUCTURE DEVELOPMENT CORP LTD (GSIDC) 4

HELIX TECH. 5

HELPAGE INDIA 9

MORMUGAO PORT TRUST 10

NATIONAL CENTRE FOR ANTARTIC AND OCEAN RESEARCH 9

NATIONAL INSTITUTE OF OCEANOGRAPHY 10

ORCHID BIO MEDICAL SYSTEMS 8

PARINATI SOLUTIONS PRIVATE LIMITED 6

PENTAIR WATER INDIA PVT. LTD. 3

PUTZMEISTER 4

QUALPRO DIAGNOSTICS 7

SMART LINK NETWORK SYSTEMS 5

STARFLEX SEALING INDIA PVT. LTD. 5

ZEPHYR BIOMEDICAL 8

GURGAON

CONVERGENT TECHNOLOGIES 6

MARUTI SUZUKI INDIA LIMITED 10

POWER GRID CORPORATION OF INDIA 7

VALUE FIRST DIGITAL MEDIA PVT. LTD. 10

HALOL ADITYA BIRLA INSULATORS 4

HAZIRA ESSAR POWER 11

HYDERABAD

AYASTA TECHNOLOGIES PVT. LTD. 4

DRDO - ASL 6

DRDO - CAS 5

DRDO - RCI 11

G.M.R. VARALAKSHMI FOUNDATION 16

H.B.L. POWER SYSTEMS LTD. 12

IBOT CONTROL SYSTEMS INDIA PVT LTD 5

KALYANI CENTRE FOR TECHNOLOGY AND INNOVATION 8

L.V.PRASAD EYE INSTITUTE 11

NATIONAL INFORMATICS CENTER (NIC) 10

NCCCM 15

RA CHEMPHARMA 5

SERVOMAX INDIA PVT. LTD. 20

SUDHEESAH SMART SOLUTIONS 5

VASUDHAPHARMACHEM LIMITED 5

TELANGANA E-GOVERNANCE 26

JABALPUR WEST CENTRAL RAILWAY 17

JAFRABAD ULTRATECH CEMENT LIMITED 10

JAGGAYAPET THE RAMCO CEMENTS LTD. 25

JAIPUR

FOREST RESEARCH INSTITUTE 4

JAIPUR DEVELOPMENT AUTHORITY 14

KEC INTERNATIONAL LTD. 17

JAMNAGAR ESSAR POWER 9

JHARSUGUDA SESASTERLITE LTD. (VEDANTA ALUMINIUM& POWER) 15

JODHPUR

BIRLA WHITE CEMENTS 13

DRDO 4

REGIONAL REMOTE SENSING CENTRE 5

KALPAKKAM INDIRA GANDHI CENTRE FOR ATOMIC RESEARCH (IGCAR) 49

KOLKATA

DELTA STEP LEARNING PVT. LTD 5

DEPARTMENT OF PLANNING STATISTICS AND PROGRAM IMPLEMENTATION 15

HEDGE QUANTS ADVISORY LLP 9

IRRIGATION AND WASTE WATER DEPARTMENT 8

TEXMACO LTD. 9

WEST BENGAL E-GOVERNANCE 20

KOTPUTLI ULTRATECH CEMENT LTD. 6

Page 4: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

KOVAYA ULTRATECH CEMENT LIMITED 12

LUCKNOW CENTRE OF SCIENCE & TECHNOLOGY 12

MAHAPE L & T 2

MALKHED RAJSHREE CEMENT 13

MANESAR HONDA MOTORCYCLE & SCOOTER INDIA PVT. LTD. 9

MOHALI

IDS INFOTECH LTD 11

SEMI- CONDUCTOR LABS MOHALI 6

MUMBAI

APEX PACKAGING 5

ASTECH SYSTEMS 6

ATOMIC ENERGY REGULATORY BOARD 11

BEN LINE AGENCIES (INDIA) PVT. LTD. 4

BOMBAY STOCK EXCHANGE (BSE) 5

CENTURY RAYON 20

HINDUSTAN PETROLEUM CORPORATION LIMITED 5

HOMIBHABHA CENTRE FOR SCIENCE EDUCATION 15

INDIA UNITED MILLS (NATIONAL TEXTILE CORPORATION LTD) 10

KEVA 6

L&T-CORPORATE TRAINING-TECHNICAL C-TEA MADH 2

LENEST 14

MUMBAI RAIL VIKAS CORPORATION LTD. 10

ORIENT ENTERPRISES 5

PODAR MILLS MUMBAI (NATIONAL TEXTILE CORPORATION LTD) 5

PRSPERMACELPVT LTD 5

QUORG TECHNOLOGIES 9

REGIONAL OFFICE (NTCL) 15

TATA MILLS- DADAR (MUMBAI) (NATIONAL TEXTILE CORPORATION LTD) 10

WATCONSULT 7

YRALS DIGITAL INDIA PVT LTD 6

MUNDRA ADANI POWER 20

NAGDA GRASIM CHEMICALS 11

GRASIM INDUSTRIES 26

NAGPUR METAL FAB HIGH TECH PVT LTD. 13

NANDYAL NANDI GROUP OF COMPANIES 16

NEEMUCH VIKRAM CEMENT WORKS 4

NEW DELHI

505 ARMY BASE WORKSHOP 20

G.M.R. VARALAKSHMI FOUNDATION 5

INDIAN RED CROSS SOCIETY BLOOD BANK 19

JAGUAR OVERSEAS LTD. 5

MAPMY INDIA 9

PROKURE 7

NOIDA QA INFOTECH 10

PILANI BIRLA MUSEUM 7

CENTRAL ELECTRONICS ENGINEERING RESEARCH INSTITUTE 36

PITHAMPUR

MAHLE ENGINE COMPONENTS INDIA PVT. LTD. 10

PINNACLE INDUSTRIES LTD. 9

POWAI L & T HEAVY ENGINEERING 4

PUNE

BHARAT FORGE LTD 11

INTER-UNIVERSITY CENTRE FOR ASTRONOMY AND ASTROPHYSICS (IUCCA) 5

LIVEWEAVER INDIA PVT.LTD 11

NATIONAL CHEMICAL LABORATORY 6

TATA COMMUNICATIONS LTD. 6

TATA TECHNOLOGIES LIMITED 12

RAIPUR RAWAN CEMENT WORKS 14

REDDIPALAYAM REDDIPALAYAM CEMENT WORKS 13

RENUKOOT HINDALCO INDUSTRIES LIMITED 9

RENUSAGAR HINDALCO INDUSTRIES LIMITED 7

RISHRA ADITYA BIRLA INSULATOR 4

ROURKELA ROURKELA STEEL PLANT 95

SAHIBABAD BHUSHAN STEEL LTD 15

Page 5: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

SHAMBUPURA ADITYA CEMENT WORKS 8

SIMGA HIRMI CEMENT WORKS 12

SURAT

GEPIL 8

HAPPY HOME GROUP 10

JNJ MACHINES PVT. LTD. 12

TADPATHRI ULTRATECH CEMENT LIMITED 7

THANE ECLIPSE INSTRUMENTATION PVT. LTD. 5

THIRUVANANTHAPURAM VIKRAM SARABHAI SPACE CENTRE (VSSC) 9

TIRORA ADANI POWER 12

TRISSUR ALAGAPPA TEXTILE MILLS (NATIONAL TEXTILE CORPORATION LTD.) 5

KERALA LAXMI MILLS THRISSUR ( KERALA) (NATIONAL TEXTILE CORPORATION LTD) 5

TRIVANDRUM CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY 5

UST GLOBAL 19

UDAIPUR PYROTECH ELECTRONICS PVT. LTD. 9

VINAYAKBUILDTECH 4

UMIAM NORTH EASTERN SPACE APPLICATIONS CENTRE 15

VIJAYAWADA EFFTRONICS SYSTEMS PVT. LTD. 10

VIJAYNAGAR JSW STEEL 36

VISAKHAPATNAM

HINDUSTAN PETROLEUM CORPORATION LIMITED 5

SARDA METALS & ALLOYS 6

VISHAKAPATNAM STEEL PLANT 99

VITHALPUR HONDA MOTORCYCLE & SCOOTER INDIA PVT. LTD. 8

197 2192

Page 6: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

BIRLA INSTITUTE OF TECHNOLOGY & SCIENCE

PILANI (Rajasthan)

PRACTICE SCHOOL DIVISION

PROBLEM BANK PROFORMA for PS-II

Station : Center :

PS-II Problem Bank for Semester : Session :

Note: Please fill in duplicate and send a copy to the PS Division and keep one copy for your records. Please fill in the form legibly

(preferably typed).

1. Serial No. of the Assignment :

2. Assignment Priority No. :

3. Title of the Assignment :

4. STATEMENT OF THE ASSIGNMENT

(a) Details about the project description in terms of broad phases:

(b) Identifying various components of the assignment :

5. Estimate the assignment duration (A PERT like chart would be helpful):

6. STUDENT INPUT REQUIREMENT:

(a) Total No. of students needed :

(b) Type of students required :

(i) Discipline-wise break-up with numbers :

(ii) Specific Institute-based courses in which the students have background :

(iii) Project or any other experience needed on part of students :

(iv) Personality traits desired :

7. Any other relevant information in terms of:

(a) Any field trips required? If so, :

(i) Estimated Frequency :

(ii) Duration :

(iii) Possible places of visit :

(b) Knowledge of any specific language required for the project assignment :

Any of the following skills are necessary:

(c) Facilities expected to be used by the student :

(d) Skills required for using such facilities:

(e) Name and Designation of the expert of the organization with whom you have discussed the assignment and who

would be associated with the assignment.

(f) Name and Designation of the person who would be associated with the assignment

Date : Signature of PS Faculty

Page 7: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

(A Specimen)

Skoda Auto India Pvt. Ltd., Mumbai STATION DETAILS **-may subject to change

Address Andheri East,Chakala Metro Station,Mumbai

Stipend(Rupees per Month) 14000

**Preferred Discipline(s) -

Accomodation Affordable accommodations can be found in nearby colonies - JB Nagar, Poonam Nagar, Shanti Nagar, Sher-E-Punjab

Food No Facilities

Transport No Facilities

Website www.skoda-auto.co.in

Other Benefits none

PROBLEM BANK DETAILS

Problem No. 1/4

Problem Title Network Development

Problem

Description

To support network team in managing, monitoring, coordinating in network planning activities and

new CICD roll out at dealership as a part of rebranding. *Outcome/ Result expected from the

Project: 1) Support in automation of enquiries received from various prospects for dealership. 2) Coordinating for various activities and ensure process implementation in department. 3)Completion

and coordination of CICD rebranding of the assigned SAIPL dealership in line the SKODA

approved layouts

Skill Set

Project management , Problem Solver, Self-starter , Ability to follow instructions , Ability to learn

fast , Ability to multitask , ability to work in group , Confidence , Enthusiastic , Good Communication Skills , independent worker, capable of self-management , Marketing and Analytics

, MS EXCEL , MS OFFICE

Problem No. 2/4

Problem Title Sales Planning

Problem

Description

1) Study the DMS Process and make a process book for the different options and modules of Sales

Planning functions available on DMS especially study and analyses the B8 process module. 2) MIS preparation. 3) Analysis on the process of Dealer Claim settlement. 4) Study of wholesale process

and preparing the WS process SOP. *Outcome/ Result expected from the Project: 1) Have an SOP

for DMS Sales Planning Functions. 2) Helpful in analyzing and studying of the past trends. 3) Streamlining of the Dealer Claim settlement process. 4) WS Process SOP development..

Skill Set

Problem Solver, Self-starter , Ability to follow instructions , Ability to learn fast , Ability to

multitask , ability to work in group , Confidence , Enthusiastic , Good Communication Skills , Good

in business analysis, product management , Good reporting skill , independent worker, capable of self-management , Marketing and Analytics , MS EXCEL , MS OFFICE , Presentation skills ,

Willingness to explore & learn

Problem No. 3/4

Problem Title Corporate Sales

Problem

Description

1) Study the car buying / renewal policies of Major Corporates. 2) Study the Business Model of

Taxi Aggregators. *Outcome/ Result expected from the Project: 1) Mapping of major corporates across India on the basis of Eligibility of Employees / Fleet Size and its renewal timelines. 2)

Profitability study of the business model and to find the right fit from Skoda portfolio.

Skill Set

Problem Solver, Self-starter , Ability to follow instructions , Ability to learn fast , ability to work in

group , Confidence , Enthusiastic , Good Communication Skills , Marketing and Analytics , MS EXCEL , MS OFFICE , Presentation skills

Problem No. 4/4

Problem Title Sales

Problem

Description

Detail Analysis of Dealership Sales funnel *Outcome/ Result expected from the Project: Arrest the Gap in Sales Funnel

Skill Set

Problem Solver, Self-starter , Ability to follow instructions , Ability to learn fast , Ability to

multitask , ability to work in group , Confidence , Dedicated , Good Communication Skills ,

Leadership , Marketing and Analytics , MS EXCEL , MS OFFICE , Out of box thinking , Presentation skills

Page 8: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

(A Specimen)

BIRLA INSTITUTE OF TECHNOLOGY AND SCIENCE, PILANI (RAJ.)

PRACTICE SCHOOL DIVISION

PS-II PREFERENCE FORM-A I- Semester, 2017-2018

ID No: Name:

Hostel Address : CGPA:

Stn.

code PS-II Stn & Location Pref. No

Stn.

code

Assignment

No(@)

1. ACUMEN FINANCIAL CONSULTANCY PVT. LTD, PUNE 1

2. ADAEQURE, HYDERABAD 2

3. ADITYA BIRLA CHEMICALS(THAILAND)LTD-SULPHITES, THAILAND 3

4. ADITYA BIRLA INSULATORS, HALOL 4

5. ADITYA BIRLA INSULATORS, RISHRA 5

6. ADITYA BIRLA SCIENCE & TECHNOLOGY COMPANY LTD, MUMBAI 6

7. ADOBE SYSTEMS, BANGALORE 7

8. AFOUR TECHNOLOGIES PVT. LTD, PUNE 8

9. ALOG TECH, HYDERABAD 9

10. ALPHAMD, MUMBAI 10

11. ALTAIR ENGINEERING INDIA PVT. LTD, BANGALORE 11

12. AMAZON BUSINESS INTELLIGENCE, HYDERABAD 12

13. AMAZON DEVELOPMENT CENTER, HYDERABAD 13

14. AMAZON DEVELOPMENT CENTER, CHENNAI 14

15. AMAZON DEVELOPMENT CENTER, BANGALORE 15

16. AMAZON DEVELOPMENT CENTER, DELHI 16

17. AMERICAN EXPRESS INDIA, GURGAON 17

18. AMERICAN EXPRESS INDIA, BANGALORE 18

19. ANALOG DEVICES - DESIGN AND SIMULATION, BANGALORE 19

20. ANALOG DEVICES - DESIGN VERIFICATION, BANGALORE 20

21. ANALOG DEVICES - SOFTWARE DESIGN & DEVELOPMENT, BANGALORE 21

22. APOLLO TYRES LTD. - IOT, BANGALORE 22

23. APOLLO TYRES LTD. - UI DATABASE, BANGALORE 23

24. APPLE INDIA PRIVATE LIMITED, BANGALORE 24

25. ARANCA, BANGALORE 25

26. ARHYAMA SOLAR POWER PLANT, NALGONDA 26

LEGEND @ For each station, mention PS Assignment Nos. from the Problem Bank in which you would like to participate in order of

priority.

Please mention any additional information in terms of the following:

(A) Project assignments undertaken (through Institute based courses and activities).

(B) Organizational and committee work.

(C) Future aspirations.

(D) Knowledge of foreign languages. Be precise and write only authentic information (Use a separate sheet).

(E) Have you already got a placement offer: Y N

If yes name of the Company and Place:

It is appreciated that you may have certain needs and factors such as monetary considerations, personal and family problems or any

other matter which you would like us to keep in mind while arriving at the final allotment decision. (Mention clearly on a separate

sheet).

Date: Signature of Student

Page 9: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

PS – II (STUDENTS ALLOTMENT) DETAILS FOR I SEM. (2017-2018)

(As on 27/07/2017)

Centre PS Station ( No. of Students ) Stipend per month No. of Students

Ahmedabad SKF India Ltd. 6000 1

Aurangabad Skoda Auto India Pvt. Ltd. 8000 2

Bangalore Altair Engineering India Pvt. Ltd. 15100 3

Amazon Development Center 40000 26

American Express India 30000 3

Analog Devices - Design and Simulation 25000 4

Analog Devices - Design Verification 25000 4

Apollo Tyres Ltd. - IoT 25000 5

Apple India Private Limited 45000 2

Aranca 15000 4

ARM Embedded Technologies Private Limited 28000 12

Aurigo Software 35000 2

Beckman Coulter (formerly ReaMetrix India P Ltd) 15000 2

belong.co 20000 6

Blue Jeans Network India Pvt. Ltd. 50000 7

Bundl Technologies Private Limited (Swiggy) 20000 7

CA Technologies 35000 4

Capillary Technologies - Testing Automation 50000 3

Centre for Artificial Intelligence & Robotics 12000 3

Cerner 22000 5

Cisco Systems (India) Pvt. Ltd - Embedded Systems 34000 1

Cisco Systems (India) Pvt. Ltd - Machine Learning 34000 1

Cisco Systems (India) Pvt. Ltd - Software Engineering 34000 1

EMC 25000 12

EnSci - A Unit of Weir Minerals India Pvt. Ltd. 20000 1

Ericsson Global India Pvt. Ltd. 35000 8

Genpact , Bangalore 15000 14

Goldman Sachs India Pvt. Ltd. - Operations 25000 10

Hindustan Unilever Research Centre 12000 1

Infinera - Embedded Software Testing 35000 4

Infinera - VLSI Testing 35000 4

InMobi - Software Development 25000 2

InMobi - Supply Chain 25000 18

Intel - Computer and VLSI Architecture 22000 7

Intel - Embedded Software 22000 4

Intel - GPU and VLSI Design 22000 8

Intel - Machine Learning 22000 2

Intel - Testing & Verification 22000 6

JDA Software Solutions 25000 22

John F Welch Technology Center (GE) 25000 2

JP Morgan Chase - Technology 26250 3

JPMC CIB Operations - Robotics Automation 26250 9

JPMC CIB Operations 26250 3

Media Iq Digital 26500 16

Mercedes Benz 20000 6

National Aerospace Laboratories 12000 2

Page 10: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

National Centre for Biological Sciences 12000 3

National Entrepreneurship Network 15000 15

National Instruments Systems (India) Pvt. Ltd. 20000 1

NetApp 35000 2

NextGen PMS Pvt. Ltd 41000 9

Nutanix Technologies India Pvt. Ltd. 90000 4

Nvidia Graphics - Hardware 30000 16

Nvidia Graphics -Software 30000 12

PayPal 50000 2

Petasense - Embedded Software 40000 1

Petasense - Machine Learning 40000 1

Petasense - Services & App Development 40000 1

PricewaterhouseCoopers (PWC) 40000 2

Qubole 45000 6

Robert Bosch Center for Cyber Physical Systems 10000 2

S.R. Batliboi & CO. LLP 21100 2

Samsung R &D Institute - Image & Video Processing 35000 18

Samsung R &D Institute - Software Systems 35000 10

Sattva Media & Consulting Pvt Ltd 12000 2

Shell Technology Center 20000 2

Siftery 35000 2

SKF India Ltd. 6000 1

StateStreet Global Advisors 40000 2

Symantec Software Solutions Pvt. Ltd - Data Analytics 40000 2

Symantec Software Solutions Pvt. Ltd. - App Development 40000 2

TapChief 10000 4

TESCO Hindustan Service Centre 30000 5

Texas Instruments (I) Pvt. Ltd. -VLSI Design 25000 8

TimeInc.(Time Analytic & Shared Services Private Limited) 15500 3

Tonbo Imaging Pvt Ltd. - Embedded Systems 28000 4

Tonbo Imaging Pvt Ltd. - Image & Video Processing 15000 1

Viacom 18 Pvt Ltd 30000 1

VMware Software India Pvt. Ltd. 35000 5

Vymo 30000 4

Walmart Global Technology Services 30000 20

Zendrive India Pvt Ltd 40000 2

Zeotap India Pvt. Ltd 45000 5

Zinnov Management Consulting Pvt. Ltd. 15000 7

Zoomcar India Pvt. Ltd. 20000 4

Bhopal LHD I* 15000 2

Chennai

Amazon Development Center 40000 9

Central Leather Research Institute (CLRI) 12000 2

Paypal 50000 6

PricewaterhouseCoopers (PWC) 40000 1

S.R. Batliboi & CO. LLP 21100 2

Structural Engineering Research Centre 12000 2

Delhi Amazon Development Center 40000 5

Edupristine 40000 1

Dharwad Tata Motors Ltd. 18000 2

Faridabad Rite Infotech Pvt Ltd 18000 2

Page 11: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

Goa IFB Industries 15000 2

Gurgaon

American Express India 30000 4

Ernst & Young Pvt Ltd. 15100 2

Futures First Info Services Pvt Ltd 20000 7

Of Business.com 30000 3

Orange Business Services 30000 2

Pluss Advanced Technologies Pvt. Ltd. 12000 2

PricewaterhouseCoopers (PWC) 40000 11

S.R. Batliboi & CO. LLP 21100 1

SRF Ltd. 12000 5

Zinnov Management Consulting Pvt. Ltd. 15000 2

Harihar Grasim Polyfiber 5000 1

Hyderabad

Amazon Business Intelligence 40000 12

Amazon Development Center 40000 20

Autodesk 25000 2

AutoRABIT 27000 4

Biophore 8000 3

CA Technologies 30000 9

Cisco Systems (India) Pvt. Ltd - Software Engineering 34000 2

GGK Technologies - Data Analytics 20000 12

GGK Technologies - Mobile App Development 20000 2

GGK Technologies - Mobile Services 20000 2

IMI Mobile 25000 14

JDA Software Solutions 26000 8

Jochebed Tech Solutions 20000 3

Market Data Forecast 12000 15

Mol De Analytics 35000 1

Mordor Intelligence 17000 43

My smart price 25000 2

Mytrah Energy (India) Private Limited 25000 3

Next Education India Pvt. Ltd. 30000 19

NR Equipments 12000 1

Nvidia Graphics - Software 30000 8

PricewaterhouseCoopers (PWC) 40000 5

ReportGarden Technologies Pvt. LTd. 25000 16

Synergiz Global 15000 1

Synopsys India Pvt. Ltd. 20000 2

Tau Films India Pvt. Ltd 30000 2

Worley Parsons India 16000 3

Xilinx India Technology Services Pvt. Ltd. 20000 5

Jaipur Futures First Info Services Pvt. Ltd 20000 2

Jamshedpur Tata Motors Ltd. 18000 11

Lucknow Tata Motors Ltd. 18000 26

Aditya Birla Science & Technology Company Ltd. 11000 5

AlphaMD 17000 2

Century Rayon 7500 2

Credit Suisse - Credit Analytics 25000 6

Credit Suisse - Global Markets Controls COO 25000 3

Credit Suisse - Market Risk Quant 25000 4

Credit Suisse - MLR Non-quant 25000 6

Page 12: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

Mumbai Credit Suisse - Model Risk Management 25000 4

Credit Suisse - Prime Services 25000 4

Credit Suisse - Risk & Finance Data Analytics, Reporting 25000 4

DBOI (Deutsche Bank) - Operations 30000 15

Development Consultants Pvt. Ltd. (DCPL) 8000 1

Edelweiss Financial Services 30000 4

EduPristine - Neev Knowledge Management Pvt. Ltd. 40000 2

Geometric Limited 12000 2

Grasim Industries, Pulp and Fibre Division 17000 2

Henkel 20000 1

Here Maps - Data Structures 30000 6

Here Maps - Distributed Data 30000 2

Here Maps - Software Testing 30000 4

Hourglass Research 15000 3

J P Morgan Services - Quant 40000 10

J P Morgan Services -Centralized Research Group(CRG) 40000 7

J P Morgan Services- Global Markets Group(GMG) 40000 3

J P Morgan services- Global research Centre(GRC) 40000 8

JPMC CIB Operations 26250 9

JPMC CIB Operations- Robotics Automation 26250 16

Morningstar 35000 6

MSCI (Global Implementation Services) 40000 2

MSCI (IMR) 40000 1

MSCI (NPD – Index Research) 40000 2

MSCI (Solution Management) 40000 1

Multi Commodity Exchange of India Ltd. 15000 2

My POS Technologies Pvt. Ltd. 50000 2

Nomura Global Finance 50000 2

Nomura Global Markets 50000 4

Nomura Global Risk 50000 8

PricewaterhouseCoopers (PWC) 40000 3

S.R. Batliboi & CO. LLP 21100 3

Skoda Auto India Pvt. Ltd. 14000 8

Star TV 65000 2

Thornton Tomasetti 15000 2

Viacom18 Media Pvt. Ltd. 30000 6

VMS (Vakil Mehta Seth) Consultants Private Limited 10000 2

Worley Parsons India 19000 5

Yrals Digital India Pvt.Ltd. 16000 4

Nagda Grasim Industries Ltd. 8000 4

Nagpur Techture Structures Pvt Ltd. 30000 2

Navi Mumbai Hindalco Innovation Centre - Semifab, Taloja 10000 2

New delhi Ecom Express Pvt. Ltd. 30000 2

National Council of Applied Economic Research 6500 2

National Institute of Science and Tech. Dev. Studies (NISTADS) 3000 2

Noida

Genpact 15000 2

Mentor Graphics 30000 7

Nucleus Software Export Ltd 25000 15

Pantnagar Tata Motors Ltd. 18000 2

Pilani Central Electronics Engineering Research Institute 12000 1

Page 13: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

Pune

Autodesk India Pvt. Ltd. 25000 3

Avaya India Private Limited 25000 10

B.G.Shirke Construction Technology Pvt. Ltd. 10000 2

Bharat Forge Ltd 5000 2

Cadence Design Systems India Pvt Ltd. - CAD Software 18000 2

Cadence Design Systems India Pvt Ltd. - Processor Design 18000 2

Credit Suisse - Risk & Finance Data Analytics, Reporting 25000 4

Credit Suisse- Finance Change 25000 2

Divgi TorqTransfer Systems Pvt. Ltd, Shivare 12000 2

Divgi TorqTransfer Systems Pvt. Ltd. - Bhosari 12000 2

Geometric Limited 15600 1

Halliburton Technology Center 12000 1

IDeaS - SAS - Analytics 25000 1

IDeaS - SAS - Software Development 25000 3

National Chemical Laboratory 12000 1

Nvidia Graphics - Software Systems 30000 10

Reflexis Systems India Pvt Ltd. 20000 5

Searce 25000 2

SKF India Ltd. 6000 2

Sokrati Technologies Pvt. Ltd. 10000 4

Symantec Software Solutions Pvt. Ltd - Data Analytics 40000 5

Symantec Software Solutions Pvt. Ltd. - Data Structures and

Algorithms 40000 3

Tata Autocomp Systems Ltd. 12000 5

Tata Chemical Innovation Center 10000 5

Tata Motors Ltd. 18000 26

Sanand Tata Motors Ltd. 18000 5

Secunderabad Ducere Technologies - Embedded Systems 20000 1

Ducere Technologies - Pattern Recognition 20000 1

Thailand Aditya Birla Chemicals(Thailand)Ltd-Sulphites 5000 2

Trivandram UST Global, Infiniy Labs 10000 22

1176

Page 14: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

Student Bio-Data Details

Basic Information

Name: SHUBHAM AGRAWAL.

Bits ID Number: 2013A7PS190P

Discipline: B.E.(Hons.) Computer Science

Email: [email protected]

CGPA: 7.3

Date of Birth : 23 Nov 1994

Pan Card No : BEZPA3611P

Address: Bai saheb ki pared, Near Priya bread factory, laxmiganj,

Lashkar, Gwalior

Phone No.: 7597106481

Allotted Station: Amazon Development Center Delhi

Practice School-I Details

Name: India Red Cross Society

Designation: Web Resource Portal

Details of on Campus Courses (Including electives):

S.No Course Name S.No Course Name S.No Course Name

LABORATORY PROJECTS-CS PRACTICE SCHOOL-BITS TECHNICAL REPORT WRITING-BITS

COMPUTER NETWORKS-CS DATA MINING-CS OPERATING SYSTEMS-CS

DISCR STRUC FOR COMP SCI-CS DATA STRUCTURES & ALGO-CS COMPUTER ARCHITECTURE-CS

ELECTRICAL SCIENCES-EEE SYMBOLIC LOGIC-HSS DATABASE SYST AND APPL-CS

MATHEMATICS-MATH WORKSHOP PRACTICE-ME GENERAL BIOLOGY-BIO

MACHINE LEARNING-BITS IMAGE PROCESSING-BITS GENERAL CHEMISTRY-CHEM

THEORY OF COMPUTATION-CS MICROPROC & INTERFACING-CS DIGITAL DESIGN-CS

COMPUTER PROGRAMMING-CS COMPILER CONSTRUCTION-CS INTRODUCTORY PYSCHOLOGY-GS

CROSS CULTURAL SKILLS-HSS PROBABILITY AND STATISTICS-MATH MATHEMATICS-MATH

PHYSICS LABORATORY-PHY BIOLOGY LABORATORY-BIO THERMODYNAMICS-BITS

ENGINEERING GRAPHICS-BITS CHEMISTRY LABORATORY-CHEM PRINCIPLES OF PROGG LANG-CS

LOGIC IN COMPUTER SCIENCE-CS DESIGN & ANAL OF ALGO-CS COMPUTER PROGRAMMING-CS

PRINCIPLES OF ECONOMICS-ECON ORGANIZATIONAL PSYCHOLOGY-HSS OBJECT ORIENTED PROG-CS

NUMBER THEORY-MATH MATHEMATICS-MATH MECHANICS, OSCILLATIONS AND WA-PHY

Software Skills:

C,C++,Java, Python, MatLab, Prolog,HTML, SQL, Php, Auto-Cad, Equally comfortable with Unix and Windows environment.

Any Other Projects/Relevant Courses (formal/informal):

SMS-Spam Filter, Sentiment Analysis, Bank Signature Classifier, Stock Market Price Prediction, Music Classifier.

Extra Curricular Activities:

BasketBall, Snooker, Athletics.

Professional Interest:

Software Development, Web Development, Data Mining, Data Science.

Objective in Pursuing PS-II in About 100 Words

To gain experience through working as a full time employee,

Remark

Page 15: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

( A Specimen )

BIRLA INSTITUTE OF TECHNOLOGY & SCIENCE, PILANI (RAJ.)

BITS C412/C413/G639/G650: PRACTICE SCHOOL-II

COURSE HANDOUT

PRACTICE SCHOOL DIVISION Dated: 12-01-2017

1.DURATION 12-01-2017 to 17-06-2017

2.NAME OF THE STATION Aditya Birla Management Corporation Pvt. Ltd.

3.ADDRESS OF THE STATION BITS Pilani Project Office

4.WEBSITE www.bits-pilani.ac.in

5.TELEPHONE NUMBER 08058585899

6.FAX 01596 244183

7.COORDINATOR

NAME Mr. Manish Dave

DESIGNATION General Manager

ADDRESS BITS Pilani Project Office

PHONE 08058585899

EMAIL [email protected]

8. FACULTY

NAME PSD

ADDRESS -

PHONE Not Available

EMAIL Not Available

OFFICE TIMINGS 09:00AMto05:00PM

WEEKLY HOLYDAYS Sunday

FACULTY WEEKLY SCHEDULE Tuesday, Thursday and Saturday

9. BRIEF DESCRIPTION ABOUT THE ORGANAIZATION

Aditya Birla Management corporation Private Limited works on the Vision 2020, Mission 2015 project at BITS Pilani.

This organization works closely with the leadership team across the four campuses (three Indian campuses +Dubai

campus). The organization intends to develop a dashboard to integrate the four campuses.

10. PS-II PROGRAM Students will be given a brief orientation about the organisation and this will be followed by detailed exposure to the

selected technology and the products for a period of two to three weeks. Projects will be assigned on the basis of this

initial exposure and student interest.

Page 16: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

11. EVALUATION SCHEDULE

Evaluation Component Date Weightage

QUIZ1 26-01-2015 7

OBSERVATION1 09-02-2015 3

DIARY 1 13-02-2015 1

GROUP DISCUSSION 1 13-02-2015 7

OBSERVATION 2 09-03-2015 3

SEMINAR1 13-03-2015 10

PROJECT REPORT 1 13-03-2015 10

VIVA1 13-03-2015 2

OBSERVATION 3 09-04-2015 3

DAIRY 2 10-04-2015 2

QUIZ 2 17-04-2015 8

GROUP DISCUSSION 2 08-05-2015 8

OBSERVATION 4 08-05-2015 3

DAIRY 3 05-06-2015 2

OBSERVATION 5 11-06-2015 3

SEMINAR2 15-06-2015 10

PROJECT REPORT 2 15-06-2015 15

VIVA2 18-06-2015 3

12. Mid-Term Evaluation

• Q1+G1+01+D1+V1+S1+P1+O2 = 43% Weightage • Date of announcement of MID-TERM grades: 31-03-2015

13. Make Up Make up shall not be provided for group discussion.Make up for other components of evaluation,wherever feasible,will

be offered only for genuine cases

14. Mid-semester and final grading Grading will be generally done by preparing a histogram of the marks obtained by the students and cluster

analysis,keeping in view the maximum,minimum and average marks of the group.

15. Special Instructions Taking leave during the PS program is not allowed.In cases of extreme emergency prior permission is to be taken from

the instructor.Any such leave is to be compensated by working on holidays.Fornightly progress report is to be submitted

on 1st and 15th of every month.

16. Format for project report Project report has to be prepared in the prescribed format and a copy of this format will be made available

Dated: 12/01/2015 11:01:46 AM

Instructor's Name: PSD

Page 17: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

(A Specimen)

PS-II Evaluation: Weightage for Attributes

Attributes % Weightage A1 Knowledge of Concepts A1.1 With which he is already familiar 9 A1.2 Newly introduced at Practice School 4 A1.3 Depth of Knowledge 2 A2 Application of Principles A2.1 In a given situation 7 A3 Intellectual Ability A3.1 To comprehend and act in new situations 4 A3.2 To follow logical path in problem-solving 5 A4 Creativity & Originality A4.1 Conceiving new and good solutions 6 A4.2 Suggesting practical and good solutions 3 A5 Professional Judgement & Decision-Making Ability A5.1 In evaluating alternatives 5 A6 Inter-Disciplinary Approach A6.1 Broad-based knowledge 3 A6.2 In problem-solving situation 3 A7 Skills for Data Handling A7.1 Understanding of data gathering/processing techniques 2 A7.2 Choice of measurement tools 2 A7.3 Skills for hardware implementation 1 A8 Documentation A8.1 Review of literature 3 A8.2 Organizing the material 4 A9 Self-Expression A9.1 Conveying the ideas clearly 1 A9.2 Delivery and style of presentation 2 A9.3 Language 4 A9.4 Black-board presentation 1 A9.5 Platform manners 1 A9.6 Introducing and ending of the presentation 1 A10 Initiative A10.1 In taking lead in problem solving situations 3 A11 Self-reliance A11.1 Confidence in one's own abilities 3 A12 Cooperation A12.1 With group/instructor and organization 3 A13 Leadership A13.1 Organizing the efforts of the group 3 A13.2 Moderating discussions 3 A13.3 Inspiring the group members 1 A14 Industry A14.1 Making forceful efforts to know more 1 A14.2 Desire to exceed minimum effort expected 2 A15 Sense of Responsibility A15.1 Reliability in meeting problem objectives 1 A15.2 Planning and meeting deadlines 2 A15.3 Punctuality 2 A16 Social Sense A16.1 Ability to create good impression and act accordingly 3

Page 18: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

RECORPRACTICE SCHOOL DIVISION

RECORD OF ACADEMIC PERFORMANCE IN PRACTICE SCHOOL

DHANEKULA ABHIMANYU CHOWDARY (2010B2A1587G) Degree for which PS Requirement is complete: M.Sc.(Hons.) Chemistry B.E.(Hons.) Chemical

PS-I

Course No: BITS C221

Units : 05

Duration : May 21 to July 13, 2012

Station : THE SINGARENI COLLIERIES COMPANY LTD.,KOTHAGUDAM

Grade : A

Project Title : SINGARENI COLLIERIES COMPANY LIMITED ...........................................................................................................................................................

PS-II

Course No: BITS C412

Units : 20

Duration: 04 Jul 2015-12 Dec 2015

Station : Indian Institute of Chemical Technology , Hyderabad

Grade Awarded : A

Number of days attended : 161

Instructor : SAMIR RAMDAS KALE

Project Title : Commercialization of Hydrazine Hydrate production

Date of Issue ( 18/10/2016) Incharge Instruction Cell Dean Practice School Division

BITS Pilani,Pilani Campus

Tel(0):+ 91-40-66303824

Vidya Vihar, Fax:+91 1596244183

Pilani-333031 Email:[email protected]

Page 19: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

PRACTICE SCHOOL DIVISION

RECORD OF ACADEMIC PERFORMANCE IN PRACTICE SCHOOL

DHANEKULA ABHIMANYU CHOWDARY (2010B2A1587G) Degree for which PS Requirement is complete: M.Sc.(Hons.) Chemistry B.E.(Hons.) Chemical

The following traits are rated to the options- EXCELLENT,GOOD, AVERAGE, POOR , VERY POOR

Sr.No Personality Traits Rating

1 Intellectual Ability Good

2 Professional Judgement Excellent

3 Problem Solving Ability Excellent

4 Decision-Making Ability Excellent

5 Ability to communicate Excellent

6 Initiative and self-reliance Excellent

7 Teamwork Excellent

8 Leadership Excellent

9 Punctuality Excellent

10 Sense of responsibility Excellent

11 Creativity and Art of Guestimation Excellent

12 Knowledge of fundamental Principles Excellent

13 Time Management Excellent

14 OVERALL PERFORMANCE Excellent

15 Hardworker Excellent

16 Discipline Excellent

17 Creative Good

18 Technical Skills Good

19 Soft Skills Good The Statements below best describe the student's total personality observed during Practice School II

should be hardworking In the judgement of the PS II faculty, the student can best match the following professional activities, in order of preference :

Sr.No Professional Activities Professional Activities Rating

1 Development 1

Date of Issue ( 18/10/2016) Incharge Instruction Cell Dean Practice School Division

BITS Pilani,Pilani Campus

Tel(0):+ 91-40-66303824

Vidya Vihar, Fax:+91 1596244183

Pilani-333031 Email:[email protected]

D OF ACADEMIC PERFORMANCE IN PRACTICE SCHOOL

Page 20: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

8

BIRLA INSTIUTE OF TECHNOLOGY & SCIENCE, PILANI (RAJ.)

PRACTICE SCHOOL DIVISION

SURVIVAL CHART OF PS-II STATIONS

Sr. No

Station

In Operation from

Total

Semesters

1 20North Online, Bangalore II Sem. 2010 04

2 6S Capital II Sem. 2009 01

3 A.T.E. Enterprises Private Limited Research & Development, Ahmedabad II Sem. 2015 01

4 A.T.E. Enterprises Private Limited Research & Development, Bangalore II Sem. 2015 01

5 Abexome Biosciences, Bangalore II Sem. 2010 04

6 Accenture, Bangalore II Sem. 2004 07

7 Ace Business and Market Research Group,Surat II Sem. 2014 02

8 ActiveCubes Solutions India (P) Ltd., Bangalore I Sem. 2008 01

9 Adaequare Info Pvt. Ltd., Hyderabad I Sem. 2009 09

10 Aditya Auto Products & Engg. India Pvt. Ltd., Bangalore I Sem. 2002 11

11 Aditya Birla Chemicals Ltd., Thailand II Sem. 2009 12

12 Aditya Birla Corporate IT, Bangalore II Sem. 2009 01

13 Aditya Birla Corporate IT, Mumbai II Sem. 2009 11

14 Aditya Birla Corporate World Class Manufacturing, Mumbai II Sem. 2010 06

15 Aditya Birla Financial Trade Services, Mumbai II Sem. 2010 01

16 Aditya Birla Insulator Ltd., Bangalore I Sem. 2008 01

17 Aditya Birla Insulator Ltd., Halol (Vadodara) I Sem. 2008 11

18 Aditya Birla Insulators, Rishra II Sem 2017 01

19 Aditya Birla Management Corporation Pvt. Ltd., Hyderabad II Sem. 2014 01

20 Aditya Birla Science & Technology Company Ltd., Mumbai II Sem. 2009 16

21 Aditya Birla Skills Foundation-( part of Aditya Birla Group), Bhubaneshwar I Sem.2016 01

22 Administrative Staff College of India, Hyderabad I Sem. 1976 35

23 Adobe Systems, Bangalore II Sem. 2015 02

24 Adobe, Noida II Sem. 2011 06

25 Adormi Technologies, Bangalore II Sem. 2011 02

26 AET Solutions, Detroit, Michigan, U.S.A. I Sem. 2004 02

27 Agilent Tech. Interntional Pvt. Ltd. Gurgaon (Delhi) II Sem. 2006 03

28 Agilent Tech. Interntional Pvt. Ltd., Bangalore I Sem. 2006 04

29 Airbus Engineering Center India, Bangalore II Sem. 2009 01

30 Airbus India Operations Pvt Ltd.,Bangalore II Sem 2014 01

31 AirTight Networks Inc., Pune I Sem. 2006 01

32 Akira Consultancy Private Limited, Bangalore I Sem. 2015 02

33 Akosha, Bangalore II Sem. 2015 01

34 Alembic Ltd., Baroda II Sem. 2004 02

35 Alfa Laval (India) Limited , Pune II Sem. 2016 01

36 Algo Embedded Systems, Bangalore I Sem. 2006 01

37 Algoscale,Ghaziabad II-Sem 2014 01

38 Alliance Infotech Pvt. Ltd., Delhi I Sem. 2011 05

39 Alndra Systems,Bangalore I-Sem 2014 01

40 Alpha Beta Labs, Bangalore II Sem. 2010 03

41 AlphaMD, Mumbai II Sem 2017 02

42 Alstom India, Baroda I-Sem. 2008 02

43 Altair Engg. India Pvt. Ltd., Bangalore I-Sem. 2005 23

44 Altimetrik India Pvt Ltd, Bangalore II Sem 2017 01

45 Altisource Business Solutions, Bangalore II Sem 2017 01

46 Amazon Business Intelligence, Hyderabad I Sem 2017 01

47 Amazon Development Center, Delhi I-Sem. 2015 05

48 Amazon Development Centre, Chennai II Sem. 2009 10

49 Amazon Development Centre, Hyderabad II-Sem. 2007 19

50 Amazon Development Centre-India, Bangalore I-Sem. 2005 19

51 Amazon Fulfillment Center, Bangalore II Sem 2017 01

52 Amazon Fulfillment Center, Chennai II Sem 2017 01

53 Amazon Fulfillment Center, Gurgaon II Sem 2017 01

Page 21: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

9

54 Amazon Fulfillment Center, Hyderabad II Sem 2017 01

55 Amazon Operations, Mumbai II Sem 2017 01

56 American Express India, Bangalore II Sem 2017 02

57 American Express India, Gurgaon I-Sem.2016 03

58 Analeaner Technologies, Hyderabad I-Sem. 2012 01

59 Analog Devices (I) Pvt. Ltd., Bangalore II-Sem 1999 29

60 Andhra Pradesh State Financial Corporation, Hyderabad I-Sem. 2012 02

61 Ankur Scientific Energy Systems, Baroda I-Sem. 2009 07

62 Anovp,Delhi I-Sem 2014 02

63 Anu Labs, Hyderabad I Sem. 2011 01

64 ANZ Grindlays., Bangalore II-Sem 2014 02

65 Apex Decisions, Bangalore II Sem. 2009 06

66 Apex Laboratories Pvt. Ltd., Chennai II Sem. 2011 02

67 Apigee, Bangalore I Sem. 2011 04

68 Apna Technologies & Solutions, Bangalore II Sem. 2010 01

69 Apollo Tyres Ltd., Bangalore I-Sem.2016 03

70 Appcito Networks Pvt.Ltd.,Bangalore I-Sem 2014 01

71 Apple India Private Limited, Bangalore I Sem 2017 01

72 Apprick technologies,Noida I-Sem. 2014 01

73 Aptean,Bangalore I-Sem 2014 01

74 Aranca, Bangalore I Sem 2017 01

75 ARCI’s Centre for Fuel Cell Technology, Chennai II Sem. 2010 07

76 ARDC Design Complex – HAL, Bangalore II-Sem. 2005 09

77 Areca Embedded Sys. Pvt. Ltd., Hyderabad II Sem. 2013 01

78 Arista Networks India Pvt. Ltd., Bangalore I Sem. 2011 01

79 ARKA IMS Pvt. Ltd. (Formerly Saha Software Solutions Pvt. Ltd.), Hyderabad I Sem. 2010 03

80 ARM Embedded Technologies Private Limited., Bangalore II Sem 2017 02

81 ARM Embedded Technologies Private Limited., Noida I-Sem. 2015 02

82 ARM, Bangalore I-Sem. 2008 16

83 Aruba Networks, Bangalore II-Sem. 2007 13

84 Ascendum Systems (P) Ltd., Bangalore II-Sem. 2002 06

85 Ascential Software, Hyderabad I- Sem 2005 01

86 AspirantHunt, Delhi II Sem. 2009 02

87 Aster Teleservices Ltd., Hyderabad I-Sem. 2010 03

88 Atidan Technologies, Mumbai II Sem. 2010 02

89 Atrenta (India) Pvt. Ltd., Delhi II-Sem. 2004 02

90 ATS Services Pvt. Ltd., Delhi II-Sem. 2006 06

91 Atul Ltd., Valsad II Sem. 2011 06

92 Aujas Networks Pvt. Ltd., Bangalore II Sem. 2010 02

93 Aura Mira Energy Company Pvt. Ltd., Chennai I Sem. 2012 03

94 Aura Semiconductor Pvt. Ltd., Bangalore II Sem. 2011 01

95 Aurigo Software , Bangalore II Sem 2016 03

96 Aurum Equity Partners, Gurgaon I Sem. 2013 05

97 Autodesk, Hyderabad I Sem 2017 01

98 AutoDesk, Pune I Sem. 2013 04

99 AutoRABIT, Hyderabad I Sem 2017 01

100 Avaya India, Bangalore I Sem. 2011 02

101 Avaya India, Pune I Sem. 2011 10

102 Avedis Microsystems Pvt. Ltd., Bangalore II-Sem. 2002 05

103 Aviva Investors, Mumbai II Sem. 2012 02

104 Avnet India Pvt. Ltd., Bangalore I- Sem. 2000 09

105 Avon Corporation, Mumbai II Sem. 2010 03

106 Avtec Ltd., Hosur I-Sem. 2006 07

107 Avtec Ltd., Sagore (Nagda) I-Sem. 2006 04

108 Axis Securities and Sales Ltd., Mumbai I Sem. 2011 01

109 Azul Systems, Bangalore II Sem. 2013 04

110 B.G.Shirke Construction Technology Pvt. Ltd.,Pune II Sem 2014 06

111 Bain Capability Center Pvt. Ltd., Gurgaon I-Sem. 2015 02

112 Barclays, Mumbai II Sem. 2015 01

113 Barclays, Noida II Sem. 2015 01

114 Barry-Wehmiller Inte. Resources Pvt. Ltd., Chennai I-Sem. 2006 01

Page 22: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

10

115 BasicNeeds UK, Bangalore II Sem. 2012 03

116 Battelle Science & Technology India Pvt. Ltd., Pune II Sem. 2009 02

117 BEA System, Bangalore II-Sem. 2006 02

118 Beardsell Ltd., Hyderabad II Sem. 2010 01

119 Beardsell Ltd., Mumbai II Sem. 2010 01

120 Beckman Coulter (formerly ReaMetrix India P Ltd). , Bangalore II Sem 2014 07

121 Behr India, Chennai I Sem. 2013 01

122 Behr India, Pune II-Sem. 2006 03

123 belong.co , Bangalore II Sem 2016 04

124 Bentley Systems India Pvt Ltd, Pune II Sem. 2015 01

125 Beroe, Chennai I-Sem. 2008 05

126 Bevcon Wayors Pvt. Ltd., Hyderabad II Sem. 2010 04

127 Bharat Dynamics Ltd., Hyderabad I-Sem. 1993 36

128 Bharat Forge Ltd., Pune I- Sem 2004 25

129 Bharat Petroleum Corp. Ltd., Mumbai I-Sem. 2007 01

130 Bharti Airtel, Jaipur II Sem. 2010 01

131 Bharti Beetel Teletech, Delhi II Sem. 2010 01

132 Bharti Soft Bank, Gurgaon I Sem. 2013 02

133 Bharti Telesoft Ltd., Bangalore II-Sem. 2008 01

134 Bharti Telesoft Ltd., Gurgaon(Delhi) II-Sem. 2008 01

135 BioClinitech Technologies Pvt. Ltd., Mumbai II-Sem. 2008 02

136 Biocon, Bangalore II-Sem. 2009 08

137 Bioneeds, Bangalore II Sem. 2013 01

138 Biophore India Pharmaceutical Pvt. Ltd., Hyderabad I Sem. 2011 04

139 Birla Cellulosic, Kharach (Gujarat) I-Sem. 2010 01

140 Birla Copper, Dahej (Gujarat) II Sem. 2009 07

141 Birla Museum, Pilani I-Sem. 2004 03

142 Birla Polyfibers, Harihar (Karnataka) I-Sem. 2010 05

143 Bisecure Networks Pvt. Ltd., Noida (Delhi) I-Sem. 1998 20

144 BITS Pilani - Project Office II Sem 2013 02

145 BITS, Pilani – Hyderabad Campus, Hyderabad II-Sem. 2006 04

146 Bitsunami, Bangalore II-Sem. 2006 02

147 Bitsunami, Chennai I-Sem. 2006 03

148 Blue Jeans Network India Pvt. Ltd. , Bangalore II Sem 2014 07

149 Blue Tree Consultancy Services Pvt. Ltd. , Bangalore II Sem 2014 01

150 BOC India Ltd., Kolkata II-Sem. 2006 14

151 BOC India, Goa I Sem. 2011 01

152 BOSCH Ltd., Bangalore I-Sem. 2009 06

153 BOSCH Ltd., Goa I Sem. 2011 05

154 Boston Analytics, Mumbai I-Sem. 2007 02

155 Boxbeat Technologies Pvt. Ltd, Gurgaon II-Sem 2014 01

156 Bravo Lucy, Hyderabad II Sem. 2009 09

157 Bridle IT, Chennai I-Sem. 2009 02

158 Bridle IT, Hyderabad II-Sem. 2008 03

159 Broadcom India Pvt. Ltd. , Hyderabad II-Sem 2014 01

160 Broadcom India Pvt. Ltd., Bangalore II- Sem 2003 23

161 Brooks Automation India Pvt. Ltd., Chennai I- Sem 2005 01

162 Browntape Technologies Pvt. Ltd. Porvorim II Sem 2017 01

163 BSE, Mumbai II Sem. 2010 04

164 Buddy Technology, Hyderabad I-Sem. 2010 01

165 Bundl Technologies Private Limited (Swiggy), Bangalore I-Sem. 2015 05

166 Bundl Technologies Private Limited (Swiggy), Chennai I-Sem. 2015 02

167 Bundl Technologies Private Limited (Swiggy), Gurgaon I-Sem.2016 01

168 Bundl Technologies Private Limited (Swiggy), Hyderabad I-Sem. 2015 02

169 Bundl Technologies Private Limited (Swiggy), Kolkata I-Sem.2016 01

170 Bundl Technologies Private Limited (Swiggy), Mumbai I-Sem. 2015 03

171 Bundl Technologies Private Limited (Swiggy),Pune I-Sem.2016 01

172 Busigence, Gurgaon I-Sem.2016 01

173 Business Integration System (I) Ltd. (BISIL), Pune II-Sem. 1994 08

174 Business Objects Software India Pvt. Ltd., Bangalore II-Sem. 2006 04

175 CA India Tech. Pvt. Ltd., Hyderabad II-Sem. 2006 08

Page 23: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

11

176 CA Technologies, Bangalore I-Sem 2014 03

177 CA Technologies, Hyderabad II Sem 2017 02

178 Cadence Design Systems India Pvt Ltd, Bangalore I-Sem 2015 01

179 Cadence Design Systems India Pvt Ltd. - CAD Software, Pune I Sem 2017 01

180 Cadence Design Systems India Pvt Ltd. - Processor Design , Pune I Sem 2017 01

181 Cadence Design Systems, Noida (Delhi) II-Sem. 1993 14

182 Cadence, Pune II-Sem 2014 02

183 Cadila Pharmaceuticals Ltd., Ahmedabad I-Sem.1999 09

184 Calance Corporation, Gurgaon (Delhi) I-Sem. 2007 03

185 Capgemini, Pune II-Sem. 2008 03

186 Capillary Technologies - Testing Automation, Bangalore II Sem 2017 02

187 Capital One Services (I) Pvt. Ltd., Bangalore II-Sem. 2007 03

188 Carraro Technologies India Pvt. Ltd., Pune II Sem. 2011 02

189 Carwale (Automotive Exchange Pvt. Ltd.),Mumbai I Sem 2014 04

190 CDC Software India (P) Ltd., Bangalore II-Sem. 2007 04

191 CDS Solutions, Pilani I-Sem. 2010 01

192 CEG Limited , Jaipur II Sem 2016 02

193 Centillium India Pvt. Ltd., Bangalore II-Sem. 2005 01

194 Central Bank of India, Mumbai I-Sem. 1976 61

195 Central Building Research Institute, Roorkee I-Sem. 2010 11

196 Central Drug Research Institute, Lucknow II-Sem. 1989 39

197 Central Electronics Engg. Research Institute, Chennai Centre, Chennai II-Sem 1996 25

198 Central Electronics Engg. Research Institute, Pilani I-Sem. 1976 34

199 Central Institute of Road Transport, Pune II-Sem. 2005 11

200 Central Leather Research Institute, Chennai I-Sem. 1990 50

201 Central Road Research Institute, Delhi I Sem. 2012 11

202 Central Scientific Instruments Organization, Chandigarh I-Sem. 1976 57

203 Central Scientific Instruments Organization, Chennai I Sem. 2013 02

204 Centre for Artificial Intelligence & Robotics., Bangalore II Sem 2014 07

205 Centre for Cellular And Molecular Platforms (C-CAMP) ., Bangalore II Sem 2017 01

206 Centre for Development of Advanced Computing,Pune I Sem 2014 02

207 Centre for Development of Imaging Technology (C-DIT), Trivandrum II Sem. 2011 08

208 Centre for DNA Fingerprinting and Diagnostics, Hyderabad II-Sem. 2002 25

209 Century Rayon, Kalyan (Mumbai) I-Sem. 1976 81

210 Cerner, Bangalore I-Sem.2016 02

211 Chambal Fertilizers and Chemicals Ltd., Kota II-Sem. 2005 17

212 Chitika, Hyderabad II-Sem. 2015 01

213 Cignex Datamatix Technology, Noida I-Sem. 2015 01

214 Cignex Datamatix, Bangalore II-Sem. 2015 01

215 CIPLA Ltd , Goa II Sem 2016 03

216 CIREL Systems, Bangalore I Sem. 2013 02

217 Cisco Systems (I) Pvt. Ltd., Bangalore II-Sem. 2005 20

218 Cisco Systems (India) Pvt. Ltd - Embedded Sytems, Bangalore I Sem 2017 01

219 Cisco Systems (India) Pvt. Ltd - Machine Learning, Bangalore I Sem 2017 01

220 Cisco Systems (India) Pvt. Ltd - Software Engineering, Bangalore I Sem 2017 01

221 Cisco Systems (India) Pvt. Ltd - Software Engineering, Hyderabad I Sem 2017 01

222 Citi Bank, United Kingdom II-Sem. 2007 01

223 Citrix R&D India Pvt. Ltd. (Formerly NetScaler Pvt. Ltd., Bangalore I-Sem. 2004 11

224 CMC Ltd., Hyderabad I-Sem. 2010 09

225 CMC Ltd., Mumbai I-Sem. 2010 07

226 Cognitive Scale, Hyderabad II Sem. 2015 01

227 Cognizant Technology Solutions, Chennai II Sem. 2011 01

228 Commonwealth Games 2010, Delhi II-Sem. 2008 01

229 Computational Research Laboratories Ltd., Pune II-Sem. 2008 02

230 Computech Enterprises Solutions Pvt. Ltd., Hyderabad I-Sem. 2004 02

231 Conexant Systems (PB) Pvt. Ltd., Hyderabad I-Sem. 2005 01

232 Consilium, Delhi II Sem. 2011 05

233 Consulting Engineers Group Ltd., Hyderabad II Sem. 2010 02

234 Consulting Engineers Group, Jaipur II-Sem. 2007 02

235 Corporate World Class Manufacturing Division,Aditya Birla Group, Mumbai II Sem. 2009 01

236 Cosmic Circuits Pvt. Ltd., Bangalore II-Sem. 2006 15

Page 24: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

12

237 Covidien Engineering Services Pvt. Ltd. , Hyderabad II-Sem. 2014 01

238 Credit Capital Research Technologies, Pune II-Sem. 2003 06

239 Credit Suisse - Global Markets Controls COO , Mumbai I Sem 2017 01

240 Credit Suisse - Market Risk Quant , Mumbai I Sem 2017 01

241 Credit Suisse - MLR Non-quant , Mumbai I Sem 2017 01

242 Credit Suisse - Model Risk Management, Mumbai I Sem 2017 01

243 Credit Suisse - Prime Services , Mumbai I Sem 2017 01

244 Credit Suisse - Risk & Finance Data Analytics Reporting, Mumbai I Sem 2017 02

245 Credit Suisse - Risk & Finance Data Analytics Reporting, Pune I Sem 2017 01

246 Credit Suisse Services India Pvt. Ltd, Mumbai II Sem. 2010 11

247 Credit Suisse Services India Pvt. Ltd., Pune II-Sem. 2008 15

248 Crimsonlogic, Bangalore I-Sem. 2003 06

249 CRISINFAC (CRISIL), Mumbai II-Sem. 1997 15

250 Crompton Greaves Ltd., Mumbai II Sem. 2010 01

251 Crompton Grieves PPI adhesive products Ltd. , Goa II-Sem. 2014 01

252 CSR India Pvt. Ltd. (Formerly Ubinetics India Pvt. Ltd.), Bangalore I-Sem. 2005 16

253 CSR Ltd, Noida II-Sem. 2015 02

254 Cubical Laboratories,Delhi I-Sem.2016 01

255 Customised Technologies P Ltd.,Bangalore I –Sem. 2014 01

256 Cymbio Pharma Pvt. Ltd., Bangalore II Sem. 2011 01

257 Cypress Semi Conductors Ltd., Chennai II-Sem. 2007 07

258 Cypress Semiconductor Tech. India Pvt. Ltd., Bangalore II-Sem. 2004 18

259 Cypress Semiconductor Tech. India Pvt. Ltd., Hyd. II-Sem. 2005 07

260 Cypress Semiconductor Tech. India Pvt. Ltd., USA II Sem. 2006 13

261 DataEmo. Bangalore II Sem 2015 02

262 DB MUdra Group , Gurgaon II Sem 2016 01

263 DBOI (Deutsche Bank) ., Mumbai II Sem. 2014 08

264 Deccan Fine Chemicals (I) Pvt. Ltd., Tuni I Sem. 2012 03

265 Deccansoft Software Services, Hyderabad II Sem. 2010 01

266 Decision Resources Group, Bangalore II Sem 2017 01

267 Decisionresourcesgroup , Gurgaon II Sem 2016 01

268 Delhi Metro Rail Corporation, Delhi I-Sem. 2009 01

269 Dell Services (Formerly Perot Systems, Noida(Delhi) II-Sem. 2008 04

270 Dell Int.Services Centre, Bangalore II-Sem. 2004 03

271 Dell International Services Centre, Hyderabad I- Sem 2005 01

272 Dell R&D, Bangalore II Sem. 2014 02

273 Dell Services , Bangalore II Sem. 2010 01

274 Deloitte Consulting India Pvt. Ltd., Bangalore II Sem. 2010 01

275 Deloitte Consulting India Pvt. Ltd., Chennai II Sem. 2013 02

276 Deloitte Consulting India Pvt. Ltd., Delhi II Sem. 2013 03

277 Deloitte Consulting India Pvt. Ltd., Gurgaon II Sem. 2010 02

278 Deloitte Consulting India Pvt. Ltd., Hyderabad II-Sem. 2007 03

279 Deloitte Consulting India Pvt. Ltd., Mumbai II-Sem. 2007 09

280 Derrick Petroleum, Bangalore II Sem. 2013 04

281 Dessence Consulting, Mumbai II Sem. 2010 01

282 Development Consultant Industrial Plant Services Pvt. Ltd., Jhajhar I-Sem. 2009 02

283 Development consultants Pvt. Ltd., Delhi II Sem. 2011 01

284 Development consultants Pvt. Ltd., Kolkata I-Sem. 2009 09

285 Development Consultants Pvt. Ltd., Mumbai I-Sem. 1977 55

286 Dhanax Information Services Pvt. Ltd., Bangalore I-Sem. 2009 02

287 DHI Group, Denmark II Sem. 2006 01

288 Divami Software Pvt Ltd., Hyderabad I Sem. 2013 01

289 Divgi Warner, Pune I Sem. 2002 22

290 Divgi Warner, Sirsi (Karnataka) I-Sem. 2010 06

291 Divgi TorqTransfer Systems Pvt. Ltd. - Bhosari II Sem 2017 01

292 Divgi TorqTransfer Systems Pvt. Ltd Shivare, Pune I Sem 2017 01

293 Divgi TorqTransfer Systems Pvt. Ltd. – Bhosari, Pune I Sem 2017 01

294 Dolat Capital, Mumbai II Sem. 2012 02

295 Dorsch Consult (India) Pvt. Ltd., Mumbai II Sem 2014 04

296 DotAhead Technologies Pvt. Ltd., Goa II Sem. 2010 01

297 Dow Chemical International Pvt. Ltd., Mumbai II Sem. 2011 07

Page 25: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

13

298 Dr. Reddy's Laboratory (Diagnostics Division), Hyderabad I-Sem 1996 26

299 Dr. Reddy's Laboratory, Vizag. II Sem. 2009 01

300 DreamWorks Animation, Los Angeles I-Sem. 2008 11

301 DreamWorks Animation., Bangalore II Sem 2014 06

302 DSL Software Ltd., Bangalore II-Sem. 2003 04

303 DSP Technology, Bangalore I-Sem. 2008 03

304 Ducere Technologies Pvt. Ltd., Hyderabad II Sem. 2012 02

305 Ducere Technologies - Embedded Systems, Secunderabad I Sem 2017 01

306 Ducere Technologies - Pattern Recognition, Secunderabad I Sem 2017 01

307 Dupont Knowledge Center, Hyderabad I-Sem. 2015 01

308 EA Games, Hyderabad II Sem. 2012 02

309 Eaton Technologies, Pune II Sem. 2010 09

310 eBay India Development Centre, Bangalore II Sem. 2012 07

311 eBay India Development Centre, Chennai II Sem. 2010 03

312 eClerx (Airoli), Mumbai I Sem. 2013 01

313 eClerx (Ghatkopar), Mumbai I Sem. 2013 01

314 eClerx, Pune I Sem. 2013 01

315 Ecoedencity, Mumbai II Sem. 2011 04

316 Ecom Express Pvt. Ltd. New delhi II Sem 2017 02

317 EDCIL INDIA LTD , Noida II Sem 2016 02

318 Edelweiss Financial Services, Mumbai II Sem 2017 02

319 EdServ Softsystems Ltd., Chennai I-Sem. 2010 03

320 EduPristin., Delhi II Sem 2014 02

321 EduPristine - Neev Knowledge Management Pvt. Ltd., Mumbai II Sem 2017 02

322 Edutor Technologies Pvt. Ltd., Hyderabad II Sem. 2011 01

323 Eka Software Solutions Pvt. Ltd., Bangalore II-Sem. 2007 01

324 Elecon Engineering Co. Ltd., Vallabhnagar I-Sem. 2009 07

325 Electronic Arts Games India Pvt. Ltd., Hyderabad I Sem. 2012 01

326 Elgi Equipments, Coimbatore I Sem. 2011 02

327 Elmex Controls Pvt. Ltd., Baroda II Sem. 2011 01

328 Embedded Infotech Pvt. Ltd., Hyderabad II Sem. 2011 01

329 EMC Data Storage Systems, Bangalore I Sem. 2004 16

330 EMC, Pune II Sem 2017 01

331 Endless Robotics Pvt. Ltd. , Hyderabad II Sem 2016 02

332 EnSci - A Unit of Weir Minerals India Pvt. Ltd., Bangalore II Sem 2014 07

333 Enterprise One Consulting Services, Hyderabad I-Sem. 2009 02

334 Enterpriseforce, Mumbai I Sem. 2012 01

335 Ericsson Global India Pvt. Ltd. , Bangalore II Sem 2014 06

336 Ernst & Young Global Delivery Services,Bangalore I-Sem.2016 01

337 Ernst & Young L.L.P. Cochin II Sem 2014 01

338 Ernst & Young, Bangalore I Sem. 2011 08

339 Ernst & Young, Chennai II Sem. 2010 08

340 Ernst & Young, Gurgaon II Sem. 2010 08

341 Ernst & Young, Mumbai I Sem. 2013 03

342 Escorts Construction Equipments Ltd., Faridabad I-Sem. 2010 01

343 Essar Power, Hazira I-Sem. 2009 01

344 Exotel Telecom Pvt. Ltd., Bangalore I Sem 2012 03

345 Expicient Software Pvt. Ltd., Bangalore II Sem. 2009 01

346 Exponentia data, Mumbai II Sem. 2015 03

347 FAB India., Pune II Sem 2014 01

348 Fabmart, Bangalore II Sem 2014 01

349 Fairfield and Power Drive Technology Pvt Ltd, Ahmedabad II Sem 2017 01

350 Faiveley Transport Rail Technologies India Ltd (FTRTIL), Hosur II Sem 2017 01

351 Fiberlink, Bangalore I-Sem. 2006 11

352 Fiorano Software (I) Pvt. Ltd., Delhi II-Sem 1995 18

353 Fiorano Software Technologies Pvt. Ltd, Bangalore I-Sem. 2006 17

354 Fiorano Software Technologies Pvt. Ltd., Hyderabad I-Sem. 2007 14

355 Firefly e-ventures Ltd. (Subsidary HT Media Ltd.), Gurgaon I Sem. 2011 03

356 Flipkart Online Services Pvt. Ltd., Bangalore II Sem. 2009 12

357 FMC Technologies India Pvt. Ltd., Hyderabad I Sem. 2011 04

358 Fox Controls Pvt. Ltd., Nashik II Sem. 2011 02

Page 26: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

14

359 Frambanch Technologies (formerly Anaya Labs), Delhi I Sem. 2011 05

360 Freescale Semiconductor India Pvt. Ltd. , Hyderabad II Sem 2016 01

361 Freescale Semiconductor India, Noida (Delhi) I-Sem. 2006 05

362 Frost & Sullivan, Bangalore I Sem. 2011 04

363 Frost & Sullivan, Chennai II-Sem. 2007 12

364 Frost & Sullivan, Kolkata II Sem. 2009 04

365 FTRTIL, Hosur I Sem. 2013 05

366 Fullerton India Credit Co. Ltd., Mumbai II-Sem. 2006 06

367 Futures First Info Services Pvt. Ltd. Jaipur I Sem 2017 01

368 Futures First Info Services Pvt Ltd, Gurgaon I Sem 2017 01

369 Future Techno Designs Pvt. Ltd., Bangalore I-Sem. 2006 01

370 FutureBazaar, Mumbai II Sem. 2011 01

371 Gabrial India Ltd., Gurgaon II Sem. 2009 03

372 Gabrial India Ltd., Hosur II Sem. 2009 03

373 Gabrial India Ltd., Pune I-Sem. 2007 08

374 Gadhia-Solar, Valsad II Sem. 2009 07

375 Gail (India) Ltd., Noida (Delhi) I-Sem. 2008 01

376 Gammon India, Delhi II Sem. 2009 01

377 Garg Webtech Pvt. Ltd, Bangalore I-Sem. 2015 01

378 GBI Research, Hyderabad I Sem. 2012 01

379 GE India Technology., Bangalore I-Sem. 2003 14

380 GEIPER Consulting Ltd., Noida II Sem. 2011 03

381 GE-John F Welch Tech Centre (GE India Tech. Centre), Bangalore II-Sem. 2005 11

382 GGK Technologies, Hyderabad I-Sem.2016 02

383 GGK Technologies - Data Analytics, Hyderabad I Sem 2017 01

384 GGK Technologies - Mobile App Development I Sem 2017 01

385 GGK Technologies - Mobile Services I Sem 2017 01

386 General Motors India Ltd., Halol (Baroda) I-Sem. 2000 17

387 Genesis Microchip (India) Pvt.td., Bangalore I-Sem. 2006 05

388 Genotypic, Bangalore II-Sem. 2008 02

389 Genpact Analytics, Bangalore II-Sem. 2008 17

390 Genpact Analytics, Gurgaon II-Sem. 2008 09

391 Genpact Analytics, Hyderabad II Sem. 2009 04

392 Genpact, Noida II Sem 2017 02

393 Geometric Ltd., Mumbai I Sem. 2012 11

394 Geometric Software Solutions Ltd., Pune II Sem. 2009 02

395 Gharpay, Hyderabad I Sem. 2012 01

396 GiftXOXO, Bangalore I Sem.2016 02

397 Glaxosmithkline Consumer Health Care R&D, Gurgaon (Delhi) I-Sem. 2007 13

398 Global E Procure, Hyderabad II Sem. 2012 02

399 Global Logic India Pvt. Ltd., Noida I-Sem. 2010 04

400 Global Logic, Bangalore I Sem. 2013 05

401 Global Logic, Nagpur II Sem. 2012 04

402 Globeop Financial Services (I) Pvt. Ltd., Mumbai I-Sem. 2005 04

403 GMI Zarhak Moulders Pvt. Ltd.,Goa I-Sem 2014 01

404 GMR Group, Bangalore I-Sem. 2009 01

405 GMR Group, Hyderabad I-Sem. 2007 04

406 GMR Group, Sankli (Srikakulum) I-Sem. 2007 03

407 GMR, Delhi I-Sem. 2009 01

408 Godrej Sara Lee Ltd., Mumbai II-Sem. 2007 02

409 Goldman Sachs India Pvt. Ltd., Bangalore II Sem. 2010 12

410 Goonj, Bangalore II Sem. 2011 01

411 Goonj, Chennai II Sem. 2011 01

412 Goonj, Delhi I Sem. 2011 02

413 Goonj, Kolkata II Sem. 2011 01

414 Grasim Cements, Kotputli I-Sem. 2009 05

415 Grasim Chemicals, Nagda I-Sem. 2010 09

416 Grasim Industries Ltd., Kumarapatnam I-Sem. 2015 01

417 Grasim Industries Ltd., Nagda I-Sem. 1976 81

418 Grasim Polyfiber, Harihar I Sem 2017 01

419 Grasim Industries Pulp and Fibre Division, Mumbai I Sem 2017 01

Page 27: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

15

420 Greenway Ecodevelopment, Mumbai II Sem. 2010 01

421 Grey Orange Robotics Pvt Ltd., Delhi I Sem. 2011 09

422 GSS America, Hyderabad II Sem. 2010 01

423 Habits Edutainment, Hyderabad I-Sem. 2008 04

424 Halliburton Technology Center, Pune II-Sem. 2015 05

425 Harita Fehrer Ltd., Hosur I-Sem. 2010 02

426 Harita Seating Systems Ltd., Hosur I-Sem. 1993 26

427 Harman International (India) Pvt. Ltd., Bangalore II Sem. 2011 02

428 HCL Technologies Ltd., Bangalore I-Sem. 2006 01

429 HCL Technologies, Singapore II Sem. 2011 01

430 HCL Technologies, Noida II Sem 2017 01

431 HDFC Bank , Mumbai II – Sem 2016 02

432 HDFC Bank, Chennai II Sem 2017 01

433 Healis-Sekhsaria Institute for Public Health, Mumbai II-Sem. 2008 06

434 Health Management Research Institute, Hyderabad II-Sem. 2008 03

435 Healthcare Technology Innovation Centre (HTIC), Chennai I Sem. 2013 04

436 HelpAge, Delhi II-Sem. 2008 01

437 Helsinki University of Technology, Finland II-Sem. 2007 03

438 Here Maps - A Nokia Company., Mumbai II-Sem 2015 05

439 Here Maps - Data Structures ., Mumbai I Sem 2017 01

440 Here Maps - Distributed Data ., Mumbai I Sem 2017 01

441 Here Maps - Software Testing ., Mumbai I Sem 2017 01

442 HERON – A Parexel Company , Chandigarh II – Sem 2016 02

443 Hetero Drugs, Hyderabad I Sem. 2002 22

444 Hetero Med Solutions Ltd., Hyderabad I-Sem. 2010 06

445 HENKEL , Mumbai II – Sem 2016 04

446 HedgeQuants Capital Advisory LLP, Kolkata I-Sem.2016 01

447 Hibiscus Technology Solutions Pvt. Ltd., Bangalore I-Sem. 2010 01

448 Hike,. Gurgaon II- Sem 2015 03

449 HILTI India Pvt. Ltd. , Chennai II Sem 2014 01

450 HILTI India Pvt. Ltd.,Delhi I-Sem 2014 03

451 Hindalco Industries Ltd., Renusagar (UP) I-Sem. 2009 04

452 Hindalco Innovation Centre - Semifab Taloja, Navi Mumbai I-Sem.2016 03

453 Hindustan Construction Company Ltd., Mumbai I Sem. 2012 01

454 Hindustan Lever Ltd., Mumbai II-Sem 2005 02

455 Hindustan Unilever Research Centre, Bangalore II-Sem 2015 06

456 Hindustan Zinc Ltd., Udaipur II-Sem 2005 18

457 HISP (Formerly National Health System Resource Center), Delhi II Sem. 2009 03

458 HISP, Simla II Sem. 2011 03

459 Histogenetics, Chennai II-Sem. 2008 11

460 Histogenetics, New York, USA I-Sem. 2007 06

461 Hitachi Consulting, Hyderabad II Sem. 2011 04

462 Hitachi Home and Life Solutions, Mehsana (Gujarat) I-Sem. 2008 01

463 HLL Lifecare Ltd., Trivandrum II Sem. 2011 01

464 HolidayIQ.com , Bangalore II Sem 2016 01

465 Honeywell Automation India Ltd., Pune II-Sem. 2008 07

466 Honeywell Technology Solutions Lab. Pvt. Ltd. Bangalore I-Sem. 1997 22

467 Honeywell Technology Solutions, Hyderabad I-Sem. 2008 01

468 Hortonworks, Bangalore I-Sem.2016 02

469 Hourglass Research, Mumbai I Sem. 2012 11

470 Housing.com (Locon Solutions Private Limited), Mumbai I-Sem. 2015 01

471 HP (STSD Systems Tech. & Software Division), Bangalore I-Sem. 2006 01

472 HP Global Software, Bangalore II-Sem 2006 10

473 HP Global, Chennai II-Sem. 2008 06

474 HP India Software Operations Pvt. Ltd., Bangalore II Sem. 2009 07

475 HP Labs, Bangalore I-Sem. 2001 22

476 HSBC Global, Bangalore II-Sem. 2008 10

477 HSBC Global, Kolkata II-Sem. 2010 03

478 HCL Technologies, Chennai I Sem.2016 01

479 HCL Technologies, Noida I Sem.2016 01

480 HT Mobile Solutions Ltd., Gurgaon II Sem. 2011 01

Page 28: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

16

481 Hughes Systique Corporation, Gurgaon II Sem. 2013 01

482 Hyderabad Eye Research Foundation (HERF), the research arm of LV Prasad Eye

Institute , Hyderabad

II – Sem 2016 01

483 IBM Global Services, Hyderabad II-Sem. 2005 02

484 IBM India Ltd., Bangalore I-Sem. 2004 07

485 IBM India, Pune I-Sem. 2008 02

486 Icicle Technologies Pvt. Ltd. , Bangalore II Sem 2014 01

487 Idea Cellular Ltd, Ahmedabad I-Sem. 2010 05

488 Idea Cellular Ltd., Bangalore II Sem. 2009 01

489 Idea Cellular Ltd., Chandigarh II Sem. 2009 01

490 Idea Cellular Ltd., Chennai II Sem. 2009 02

491 Idea Cellular Ltd., Cochin I-Sem. 2010 05

492 Idea Cellular Ltd., Guwahati I-Sem. 2010 02

493 Idea Cellular Ltd., Hyderabad II Sem. 2009 03

494 Idea Cellular Ltd., Indore II Sem. 2009 03

495 Idea Cellular Ltd., Jaipur II Sem. 2009 01

496 Idea Cellular Ltd., Jaipur II Sem. 2009 02

497 Idea Cellular Ltd., Kolkata II Sem. 2009 03

498 Idea Cellular Ltd., Lucknow I-Sem. 2010 02

499 Idea Cellular Ltd., Mohali II-Sem. 2010 01

500 Idea Cellular Ltd., Mumbai II Sem. 2009 05

501 Idea Cellular Ltd., Noida II Sem. 2009 03

502 Idea Cellular Ltd., Patna I-Sem. 2010 01

503 Idea Cellular Ltd., Pune II Sem. 2009 03

504 IDeaS - SAS - Software Development, Pune I sem 2017 01

505 IdeaS - SAS, Pune I Sem. 2013 08

506 IFB Automotive Seating & System Pvt. Ltd., Bangalore II-Sem. 2002 06

507 IFB Engineering Division, Kolkata II Sem 2017 01

508 IFB Global, Goa II-Sem. 2010 13

509 ILabs, Bangalore I-Sem. 2010 10

510 Imagination Technologies, Pune I-Sem. 2008 02

511 IMI Mobile, Hyderabad I-Sem. 2009 18

512 IMS Health, Bangalore II Sem 2017 01

513 IMS Health, Gurgaon II Sem 2017 01

514 India Drivers Network, Bangalore II-Sem. 2002 02

515 IndiaBulls, Gurgaon I-Sem. 2010 01

516 Indiamart Intermesh Ltd. Noida II Sem 2017 01

517 Indian Institute of Astrophysics, Bangalore II-Sem. 2007 04

518 Indian Institute of Chemical Tech., Hyderabad I-Sem. 1997 37

519 Indian Institute of Petroleum, Dehradun II-Sem. 1997 33

520 Indian Institute of Toxicological Research, Lucknow I-Sem. 1998 20

521 Indian Oil Corporation Ltd., Faridabad I-Sem. 2009 02

522 Indian Rayon & Industries Ltd., Veraval II-Sem. 1978 53

523 Indian School of Business (ISB), Hyderabad II-Sem. 2007 02

524 Indo Gulf Fertilizers, Jagadishpur II Sem. 2009 02

525 Indrion Technologies (I) Pvt. Ltd., Bangalore II-Sem. 2007 05

526 Indus OS, Mumbai II Sem 2017 01

527 IndustryARC, Hyderabad I-Sem.2016 02

528 Infineon Tech. Asia Pte. Ltd., Singapore I-Sem 1997 14

529 Infineon Tech. India Pvt. Ltd., Bangalore II-Sem. 2006 08

530 Infineon Technologies AG (Munich), Germany I Sem. 2002 07

531 Infinera - VLSI Testing, Bangalore I Sem 2017 01

532 Infinera, Bangalore II-Sem. 2007 10

533 Infiniti Research, Bangalore II Sem 2017 01

534 Informatica Business Solution Pvt. Ltd., Bangalore I-Sem. 2007 07

535 Informatica Business Solution Pvt. Ltd., Hyderabad II Sem. 2013 02

536 Infospectrum India Pvt. Ltd., Nagpur II-Sem. 2008 04

537 Infratab, Bangalore I Sem. 2013 01

538 ING Vyasya Bank Ltd., Bangalore I- Sem 2005 02

539 Ingersoll Rand Engineering Technology Centre, Bangalore I-Sem. 2010 05

540 Ingersoll Rand Engineering Technology Centre, Chennai I-Sem. 2010 01

Page 29: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

17

541 InMobi - Supply Chain, Bangalore I Sem 2017 01

542 InMobi, Bangalore II Sem. 2013 07

543 Innovation Labs, Bangalore I-Sem.2016 01

544 Insead Business School, Fontainebleau, France II-Sem 1999 23

545 Insead, Singapore I-Sem. 2008 07

546 Inside View, Hyderabad I-Sem. 2010 06

547 Insilica Semiconductor India Pvt. Ltd., Bangalore II-Sem. 2004 01

548 Institute for Dev. And Research in Banking Tech. (IDRBT), Hyderabad II-Sem. 2005 03

549 Institute of Mathematical Science, Chennai II Sem. 2005 12

550 Institute of Oil & Gas Production Technology, Mumbai I-Sem. 2009 02

551 Integrated Cleanroom Technologies Ltd., Hyderabad I Sem. 2013 01

552 Intel - Computer and VLSI Architecture, Bangalore I Sem 2017 01

553 Intel - Embedded Software , Bangalore I Sem 2017 01

554 Intel - GPU and VLSI Design , Bangalore I Sem 2017 01

555 Intel - Machine Learning , Bangalore I Sem 2017 01

556 Intel - Testing & Verification , Bangalore I Sem 2017 01

557 Intel India Technology Pvt. Ltd., Bangalore II-Sem 2000 29

558 Intel Mobile Communication Ltd., Bangalore II-Sem. 2010 04

559 Intelligroup Asia Pvt. Ltd., Bangalore I-Sem. 2007 02

560 Intelligroup Asia Pvt. Ltd., Hyderabad II-Sem. 1997 16

561 International Advanced Research Center for Powder Metallurgy & New Materials,

Hyd.

I-Sem. 2008 08

562 International Institute for Energy Conversion (IIEC), Mumbai I-Sem. 2005 08

563 International Institute for Energy Conversion (IIEC), Pune I-Sem. 2011 03

564 International Software Center (Standard Chartered) in India, Chennai I-Sem. 2008 01

565 Intuit Technology Services Pvt. Ltd., Bangalore II Sem. 2011 01

566 Iowa State University, USA II-Sem. 2005 02

567 IPCA Laboratories Ltd., Mumbai II-Sem. 2001 20

568 Iridium Interactive Ltd., Hyderabad II-Sem. 2001 04

569 iRunway, Bangalore I Sem. 2013 01

570 Ishwar Parmar Group, Pune II-Sem. 2015 01

571 ITW India Ltd., Hyderabad I Sem. 2013 01

572 ITW, Bangalore I Sem. 2013 03

573 ITW, Patancheru II Sem. 2011 03

574 ITW, Pune II Sem. 2013 01

575 IVRCL Infrastructures & Projects Ltd., Chennai I-Sem. 2006 11

576 Ixia Technologies, Bangalore I Sem. 2013 01

577 J P Morgan CIB-RFT , Bangalore II –Sem 2016 04

578 JPMC CIB Operations, Bangalore I Sem 2017 01

579 J P MORGAN -CIB , Mumbai II –Sem 2016 04

580 JPMC CIB Operations- Robotics Automation, Mumbai I Sem 2017 01

581 J.P. Morgan Chase, Bangalore II-Sem. 2007 17

582 J.P. Morgan Chase, Mumbai II-Sem. 1998 36

583 J.P. Morgan Investment Bank, Mumbai I Sem. 2012 01

584 J.P. Morgan Services India Pvt. Ltd., Mumbai II Sem. 2013 10

585 J P Morgan Services -Centralized Research Group(CRG) ., Mumbai I Sem 2017 01

586 J P Morgan Services- Global Markets Group(GMG) ., Mumbai I Sem 2017 01

587 J P Morgan services- Global research Centre(GRC) ., Mumbai I Sem 2017 01

588 Jabong, Gurgaon I Sem. 2013 02

589 Jaipur Rugs, Jaipur II Sem. 2009 06

590 Janatics, Coimbatore I Sem. 2012 03

591 JDA Software Solutions (formerly i2 Tech. India Pvt. Ltd.), Bangalore II-Sem 2000 32

592 JDA Software Solutions (formerly i2 Tech. India Pvt. Ltd.), Hyderabad I-Sem. 2010 13

593 Jivox Software India Pvt. Ltd, Bangalore II Sem. 2009 03

594 Jochebed Tech Solutions, Hyderabad I Sem 2017 01

595 John F Welch Technology Center (GE) , Bangalore II- Sem 2016 04

596 John F Welch Technology Center (GE) , Hyderabad II Sem 2017 01

597 Johnson Controls, Pune II Sem 2017 01

598 Jord International, Hyderabad II-Sem. 2015 01

599 JoshWorks, Bangalore I-Sem. 2010 02

600 JSW Steel Ltd., Vijayanagar II-Sem. 2006 16

Page 30: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

18

601 JSW, Salem I-Sem. 2009 03

602 Jubiliant Biosys Ltd., Bangalore II-Sem. 2006 01

603 Juniper Networks India Pvt. Ltd., Bangalore II-Sem. 2004 14

604 Jurong Consultants India Pvt. Ltd., Bangalore I-Sem. 2010 01

605 K.N. Biosciences, Hyderabad II Sem. 2011 02

606 K.Raheja IT Park (Hyderabad) Pvt. Ltd., Hyderabad II-Sem. 2006 04

607 Kalyani Global Engineering, Bhuj (Gujarat) I-Sem. 2011 03

608 Karya Technologies, Chennai I Sem. 2012 03

609 Kawasaki Microelectronics America, San Jose, U.S.A. II-Sem. 2005 01

610 KEC International Ltd., Jaipur II Sem. 2013 01

611 KEC International Ltd., Baroda I Sem. 2012 01

612 KEC International Ltd., Mumbai II-Sem. 2007 04

613 KEC International Ltd., Nagpur II Sem. 2013 01

614 KEC South Asia, Lucknow I-Sem. 2009 01

615 Kemin Industries South Asia Pvt. Ltd., Chennai I-Sem. 2011 02

616 Khosla Labs, Bangalore I-Sem. 2015 01

617 Klientas,Trivandrum II Sem 2014 06

618 Knolscape, Singapore II-Sem. 2008 01

619 Knolskape Solutions Pvt. Ltd., Bangalore I-Sem. 2009 09

620 Knorr-Bremse Systems for Commercial Vehicles India Pvt. Ltd., Pune I Sem. 2012 01

621 Knox Payments , USA II- Sem 2016 01

622 Kony Labs, Hyderabad II Sem. 2009 04

623 KPMG, Gurgaon II Sem 2014 06

624 KPMG, Hyderabad II-Sem. 2010 01

625 KPMG, Mumbai I-Sem. 2010 07

626 KPMG,Bangalore I-Sem 2014 06

627 KPIT Technologies,Bangalore II Sem 2017 01

628 Krayon Pictures Pvt. Ltd., Pune I-Sem. 2010 01

629 Kuliza Technologies, Bangalore II-Sem. 2008 06

630 L & T E Engineering Solutions, Baroda II-Sem. 2008 08

631 L & T E Engineering Solutions, Chennai II-Sem. 2008 04

632 L & T Powai, Mumbai I-Sem. 2002 02

633 L & T, Coimbatore I-Sem. 2009 11

634 L&T E Engineering Solutions, Bangalore I-Sem. 2009 03

635 L&T-Case Equipment Pvt. Ltd., Pithampur I-Sem. 2009 02

636 Lama Capital Management, Gurgaon I-Sem. 2015 02

637 Lanco Global Systems, Hyderabad II-Sem. 2005 03

638 Lantern Lighting Ltd., Bangalore I-Sem. 2010 02

639 Lantiq India Pvt. Ltd., Bangalore II Sem. 2009 13

640 Latent View Analytics Pvt. Ltd., Chennai II-Sem. 2007 07

641 Law Pandits, Trivandrum II Sem 2014 01

642 Lea Associate South Asia Pvt. Ltd., Bhubaneshwar II Sem. 2011 01

643 LEA Associates South Asia Pvt. Ltd., Delhi II-Sem. 2007 09

644 Leap Consulting, Trivandrum I-Sem. 2015 04

645 Lexinnova, Gurgaon I-Sem. 2015 03

646 Lexinnova, Noida II Sem 2014 02

647 LG Soft India Pvt. Ltd., Bangalore II-Sem. 2004 02

648 LHD INDIA, Bhopal I Sem 2017 01

649 Linde India Limited, Kolkata II Sem 2014 01

650 Lisle Tech. Partners (P) Ltd., Bangalore I-Sem. 2007 01

651 Logica, Bangalore I-Sem. 2011 02

652 LOREAL India Pvt. Ltd., Pune II Sem. 2013 01

653 LSI Research & Development Pvt. Ltd., Bangalore II-Sem. 2004 16

654 LSI Research & Development Pvt. Ltd., Pune II-Sem. 2007 09

655 Lucas-TVS Ltd., Chennai II-Sem. 1992 36

656 Lupin Research Park, Pune II-Sem. 2007 12

657 Lupin Research, Goa II Sem. 2011 04

658 M M Imagine Technologies Pvt. Ltd., Chennai II Sem. 2013 01

659 M/s M. Arunachalam & Co., Chennai I-Sem. 2010 01

660 Maarga Systems Pvt. Ltd., Chennai II-Sem. 2007 04

661 MaaS360, Bangalore II-Sem. 2010 02

Page 31: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

19

662 Magnet Works., Bangalore II-Sem 2014 01

663 Mahindra & Mahindra Ltd. Mumbai II Sem. 2009 05

664 Mahindra & Mahindra Ltd., Nagpur II Sem. 2013 01

665 Mahle Beher India Pvt Ltd,Pune I-Sem.2016 01

666 Mahle Behr India Engineering Services, Pune II Sem. 2015 02

667 Mahle Filters India Ltd., Gurgaon I Sem. 2013 07

668 Mahle Filters India Ltd., Pune I Sem. 2013 05

669 Makemytrip.com. Gurgaon (Delhi) I-Sem. 2007 03

670 Man Infraconstruction Ltd II Sem. 2015 01

671 Market Data Forecast, Hyderabad II Sem 2017 02

672 MarketShare Infotech India Pvt. Ltd. , Bangalore II-Sem 2014 02

673 Market Forecast, Hyderabad I-Sem.2016 01

674 Marvel India, Pune II Sem. 2015 01

675 Marvell India Pvt. Ltd., Bangalore I-Sem. 2010 01

676 Mastek Ltd., Mumbai I- Sem 2005 01

677 MathWorks India Private Limited , Bangalore II –Sem 2016 02

678 MaxHeap Technologies Pvt. Ltd., Bangalore II Sem. 2013 01

679 Maytas Infra Ltd., Chennai II-Sem. 2007 02

680 Maytas Infra Ltd., Hyderabad II-Sem. 2007 01

681 Mayuresh Group,Mumbai I-Sem 2014 02

682 Media Iq Digital, Bangalore II Sem. 2013 10

683 Mediology Software Pvt. Ltd., Gurgaon I-Sem. 2010 07

684 Mentor Graphics, Noida II Sem 2017 02

685 Megatech Power Equipments Pvt. Ltd., Pune II Sem. 2013 01

686 Mercedes Benz, Bangalore II-Sem 1996 42

687 Merilytics, Hyderabad II Sem 2017 01

688 Micro Labs Limited,Mumbai II-Sem. 2015 01

689 Microchip, Bangalore I-Sem. 2009 02

690 Microsemi India Pvt Ltd., Hyderabad II-Sem 2014 01

691 Microsoft Corporation (I) Pvt. Ltd., Hyderabad I-Sem. 2004 05

692 Microsoft Research India Pvt. Ltd., Bangalore II-Sem. 2004 09

693 Mila Software Systems Pvt. Ltd., Hyderabad II-Sem. 2007 01

694 Milaap, Bangalore II Sem. 2011 02

695 Milk or Water, Hyderabad I-Sem. 2010 02

696 Mindfire Solutions, Bhubaneshwar I-Sem.2016 01

697 Mindshare, Mumbai II Sem. 2011 01

698 Modelytics India Pvt. Ltd., Bangalore II-Sem. 2003 10

699 Modern Insulator Ltd., Abu Road II Sem. 2012 01

700 Moldtek India, Hyderabad I-Sem. 2015 01

701 Mol De Analytics, Hyderabad II Sem 2017 02

702 Mordor Intelligence, Hyderabad I-Sem. 2015 05

703 Morgan Stanley Advantage Services, Mumbai II-Sem. 2004 12

704 Morgan Stanley Advantage Services., Bangalore II-Sem. 2015 01

705 Morgan Stanley Capital International, Mumbai II-Sem. 2006 05

706 Morningstar, Mumbai II Sem 2014 08

707 Mother Dairy Fruit & Vegetable Pvt. Ltd., Delhi II-Sem. 2010 04

708 Motorola India Electronics Pvt. Ltd., Bangalore I-Sem. 1994 27

709 Motorola India Electronics, Hyderabad II-Sem 1999 17

710 Motorola Mobility Pvt. Ltd., Bangalore I-Sem. 2011 01

711 MoveableCode India Pvt. Ltd., Bangalore I Sem. 2012 01

712 MSCI, Mumbai II Sem 2017 01

713 MSCI Barra Client Services, Mumbai II Sem. 2011 06

714 MSCI Barra, Data Management, Mumbai I-Sem. 2010 10

715 MSCI Barra, Quantitative Equity Research, Mumbai I-Sem. 2010 13

716 MSCI CDP, Mumbai I Sem. 2012 01

717 MSCI Financial Planning & Analysis, Mumbai II Sem. 2013 02

718 MSCI Index and Research, Mumbai II Sem. 2015 01

719 MSCI International Shareholder Services, Mumbai I Sem. 2012 02

720 MSCI (Global Implementation Services), Mumbai I Sem 2017 01

721 MSCI (IMR), Mumbai I Sem 2017 01

722 MSCI (NPD – Index Research), Mumbai I Sem 2017 01

Page 32: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

20

723 MSCI (Solution Management), Mumbai I Sem 2017 01

724 Mu Sigma Business Solutions, Bangalore, Mumbai II-Sem. 2010 08

725 Multi Commodity Exchange of India Ltd. , Mumbai I Sem 2017 01

726 MXIT, Hyderabad II Sem 2014 01

727 MXV Consulting, Bangalore II-Sem. 2007 04

728 My Parichay Services Pvt. Ltd., Bangalore II Sem. 2013 02

729 My POS Technologies Pvt. Ltd., Mumbai II Sem 2017 02

730 My Smart Price, Hyderabad I Sem. 2013 08

731 Mylan Labs Ltd. (Formerly Matrix Labs. Ltd.), Hyderabad I-Sem. 2007 14

732 Myntra.com, Bangalore I-Sem. 2015 03

733 Mytrah Energy (India) Private Limited, Hyderabad II Sem 2017 02

734 Nabler Websolutions Pvt. Ltd., Bangalore I Sem. 2013 01

735 Nadhi Information Technologies Pvt. Ltd., Chennai I Sem. 2012 01

736 Nagarjuna Constructions Co. Ltd., Hyderabad I-Sem. 2005 06

737 Nagarjuna Constructions Co. Ltd., Mumbai II Sem. 2009 02

738 Nagravision India Pvt. Ltd., Bangalore II Sem. 2011 02

739 Nash Industries, Bangalore I-Sem. 2011 01

740 National Aerospace Laboratories, Bangalore I-Sem. 1984 63

741 National Agri-Food Biotechnology Institute, Mohali II-Sem. 2010 02

742 National Centre for Biological Science, Bangalore II-Sem. 2000 30

743 National Chemical Laboratory, Pune II-Sem. 2015 05

744 National Consultancy for Planning & Engineering, Hyderabad II-Sem. 2008 09

745 National Council of Applied Economic Research, Delhi I-Sem. 1976 77

746 National e-Governance Division, Delhi I-Sem. 2011 05

747 National Entrepreneurshop Network, Bangalore II-Sem. 2010 14

748 National Institute of Science and Tech. Dev. Studies, Delhi I-Sem. 1982 55

749 National Instruments Systems (India) Pvt. Ltd. , Bangalore II-Sem 2014 06

750 National Metallurgical Lab., Chennai I Sem. 2013 01

751 National Rural Health Mission, Jaipur II Sem. 2009 03

752 National Stock Exchange of India Ltd., Mumbai I-Sem. 1995 34

753 National Stock Exchange, Delhi I-Sem. 2003 01

754 Navanidhi Electronics Ltd., Hyderabad I-Sem. 2011 01

755 Navatar Group, Noida II-Sem. 2010 01

756 Navyug Infosolutions Pvt. Ltd., Noida I Sem. 2012 02

757 NBC Bearings, Jaipur II-Sem. 2010 09

758 Neomagic Semiconductor India Pvt. Ltd., Noida (Delhi) I-Sem. 2006 01

759 Net Customer Inc II-Sem. 2010 01

760 Net Scaler Pvt. Ltd., Bangalore I- Sem 2005 01

761 Net Scout Systems (I) Pvt. Ltd., Pune I-Sem. 2007 01

762 NetApp (formerly Networks Appliance Systems India Pvt. Ltd.), Bangalore II-Sem. 2006 21

763 Netskope Software India Pvt. Ltd., Bangalore I Sem. 2013 05

764 New Break India Pvt. Ltd., Chennai II-Sem. 2004 03

765 Next Education India Pvt. Ltd, Hyderabad I Sem 2017 01

766 Next First Engineering Technologies Pvt. Ltd, Bangalore I-Sem. 2008 02

767 NextGen Pvt. Ltd., Bangalore I-Sem. 2009 10

768 nextLeap Career Solutions Pvt. Ltd., Pune I-Sem. 2011 01

769 Neyveli Lignite Corporation Ltd., Neyveli I-Sem. 1988 30

770 Nicco Group, Kolkata II-Sem. 2008 04

771 NICMAR Construction Industry Staff College, Hyd. I-Sem. 2005 05

772 Nielsen India, Kolkata II-Sem. 2008 01

773 NIIT-GIS Ltd., Chennai II-Sem. 2006 01

774 NIIT-GIS Ltd., Delhi II-Sem. 2006 02

775 NIIT-GIS, Hyderabad I-Sem. 2007 01

776 NK Buildcon, Jaipur II Sem 2014 01

777 nLeague Software Solutions, Hyderabad II-Sem. 2007 03

778 Nogle Technologies, Noida I-Sem. 2011 02

779 NOKIA – Location & Commerce (Formerly Navteq India Pvt. Ltd.), Mumbai I-Sem. 2011 06

780 Nokia India Pvt. Ltd., Bangalore II-Sem. 2007 02

781 Nomura Global Markets & Global Finance Analyst Division, Mumbai I-Sem.2016 03

782 Nomura Information Technology Division, Mumbai I-Sem.2016 01

783 Nomura Global Risk, Mumbai I Sem 2017 01

Page 33: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

21

784 Nomura Services India Pvt., Mumbai I-Sem. 2015 02

785 North Delhi Power Ltd., Delhi I-Sem. 2007 04

786 Novartis, Hyderabad I-Sem. 2008 13

787 Novell Software Development (I) Pvt. Ltd., Bangalore I-Sem 1996 17

788 Novozymes South Asia Pvt. Ltd., Bangalore II Sem. 2011 02

789 NR Equipments, Hyderabad I Sem 2017 01

790 Nucleus Software Export Ltd., Noida I Sem. 2013 04

791 Nuevosol Energy Pvt. Ltd., Hyderabad II Sem. 2013 02

792 Nvidia Graphics – Hardware, Bangalore I Sem 2017 01

793 Nutanix Technologies India Pvt. Ltd. , Bangalore II Sem 2014 06

794 Nvidia Graphics India Pvt. Ltd., Bangalore II-Sem. 2005 19

795 Nvidia Graphics India Pvt. Ltd., Hyderabad II-Sem. 2010 11

796 Nvidia Graphics India Pvt. Ltd., Pune II Sem. 2013 07

797 Nvidia Graphics - Software Systems, Pune I Sem 2017 01

798 Nvidia Graphics -Software division, Bangalore I-Sem.2016 02

799 Of Business.com, Gurgaon I Sem 2017 01

800 O3 Capital, Bangalore II Sem. 2011 01

801 Oil Country Tubular Ltd., Narketpally (A.P.) I-Sem. 2011 07

802 On-Graph Technologies Pvt. Ltd., Noida(Delhi) II-Sem. 2008 02

803 OnMobile, Bangalore II-Sem. 2010 01

804 Opera Solutions, Noida I-Sem. 2011 07

805 Optumsoft Research Pvt. Ltd., Bangalore I Sem. 2013 02

806 Oracle Financial Services Soft. Ltd.(formerly i-flex Solutions) Bangalore I-Sem. 1998 26

807 Oracle Financial Services Software Ltd., Mumbai I-Sem. 2011 07

808 Oracle Financial Services Software Ltd., Pune I Sem. 2012 02

809 Oracle India Pvt. Ltd., Bangalore I-Sem. 2006 21

810 Oracle India Pvt. Ltd., Hyderabad I-Sem. 2008 15

811 Oracle India Pvt. Ltd., Noida(Delhi) II-Sem. 2008 01

812 Oracle India Pvt. Ltd., Trivandrum II Sem. 2011 01

813 Orange Business Services, Gurgaon I Sem 2017 01

814 Orbees Infolabs (India) Pvt. Ltd., Hyderabad II Sem. 2009 04

815 Orvito Inc., Hyderabad II Sem. 2013 01

816 Oswal Industries, Kalool (Gandhinagar) I-Sem. 2007 02

817 Pantaloons Fashion & Retail Ltd, Bangalore II-Sem. 2015 01

818 Pantaloons Fashion & Retail Ltd. Gurgaon II Sem 2014 01

819 Pantaloons Fashion & Retail Ltd., Kolkata II Sem. 2015 01

820 Pantaloons Fashion &Retail Ltd, New Delhi II Sem. 2015 01

821 Pantaloons Fashion &Retail Ltd., Mumbai II Sem. 2015 01

822 Paramatrix, Austria II-Sem. 2006 01

823 Parexel, Chandigarh II-Sem. 2015 01

824 Parsons Brinckerhoff, Gurgaon(Delhi) II-Sem. 2008 03

825 Parsons Brinckerhoff., Bangalore II Sem 2014 02

826 Patni Computer Systems Ltd., Mumbai II-Sem 1999 15

827 Paxcel Technologies Pvt. Ltd. II Sem. 2009 01

828 PAYPAL , Bangalore II - Sem 2016 03

829 Paypal, Chennai II-Sem. 2010 11

830 Pennywise Solutions, Hyderabad II-Sem. 2005 10

831 Pentair Water India Pvt. Ltd., Goa I-Sem. 2007 14

832 Perot Systems, Hyderabad I-Sem. 2009 02

833 Persistant System,Goa I-Sem 2014 01

834 Persistent Systems Ltd., Pune I Sem. 2012 02

835 Petasense - Embedded Software, Bangalore I Sem 2017 01

836 Petasense - Machine Learning, Bangalore I Sem 2017 01

837 Petasense - Services & App Development, Bangalore I Sem 2017 01

838 PharmARC Analytic Solutions, Bangalore I-Sem. 2008 01

839 Philips Research Asia, Bangalore I Sem. 2012 04

840 Pilani Experts Technology Labs Pvt Ltd, Bangalore I-Sem 2016 01

841 Pilani Soft Labs Pvt. Ltd., Bangalore II-Sem. 2007 01

842 Pipal Research, Bangalore I-Sem. 2007 05

843 Pitney Bowes Software India Pvt. Ltd. Noida II Sem 2017 01

844 Pivotal Bangalore Software Dev. Pvt. Ltd. Bangalore II-Sem. 2004 03

Page 34: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

22

845 Playdom India Pvt. Ltd., Bangalore II Sem. 2013 01

846 Pluss Advanced Technologies Pvt. Ltd. , Gurgaon II - Sem 2016 04

847 Pocket Gems, USA I Sem. 2012 02

848 Polaris Software Lab Ltd., Chennai II-Sem. 1997 09

849 Polaris Software Lab. Ltd., Mumbai I-Sem. 2003 08

850 Polmon, Hyderabad I Sem. 2012 06

851 Polycom Technology (R&D) Centre Pvt. Ltd., Bangalore II Sem. 2013 02

852 Polycom Technology (R&D) Centre Pvt. Ltd., Hyderabad I Sem. 2012 05

853 Porwal Auto Components, Pithampur I-Sem. 2009 01

854 Practo Technologies Pvt. Ltd., Bangalore II Sem. 2013 07

855 Precision Tech. Enterprises, Chennai I Sem. 2012 01

856 Precision Tech. Enterprises, Gurgaon (Delhi) I-Sem. 2007 11

857 Prestige Feed Mills Ltd., Devas (Near Indore) I-Sem. 2009 01

858 Price waterhouse Coopers (PWC) , Bangalore II - Sem 2016 02

859 Price waterhouse Coopers (PWC) , Chennai II - Sem 2016 02

860 Price waterhouse Coopers (PWC) , Delhi II - Sem 2016 01

861 Price waterhouse Coopers (PWC) , Hyderabad II - Sem 2016 02

862 Price waterhouse Coopers (PWC) , Mumbai II - Sem 2016 03

863 Price waterhouse Coopers (PWC) , Gurgaon II Sem 2017 02

864 Pristine, Mumbai II Sem. 2013 02

865 Probe Equity Research Pvt. Ltd., Bangalore II Sem. 2011 04

866 Protechsoft Systems Pvt. Ltd., Chennai I-Sem. 2004 02

867 Purpletalk, Hyderabad II- Sem. 2015 03

868 Puzzolana Heavy Machineries, Hyderabad II-Sem. 2008 11

869 Pyramid IT Consulting, Noida(Delhi) II-Sem. 2008 09

870 Q Construction, Dubai I-Sem. 2011 02

871 QA Infotech, Noida(Delhi) II-Sem. 2007 02

872 Qualcomm India Pvt Limited., Chennai II Sem 2017 01

873 Qualcomm India Pvt. Ltd., Bangalore II-Sem. 2005 14

874 Qualcomm India Pvt. Ltd., Hyderabad II-Sem. 2005 13

875 Quality Council of India , Delhi II - Sem 2016 03

876 Qubole., Bangalore II- Sem. 2015 06

877 Rajputana Constructions , Jaipur II - Sem 2016 01

878 Rajputana Constructions, Kapurthala I-Sem.2016 01

879 Rajputana Constructions, Patiala I-Sem.2016 01

880 Rambus Chip Tech. India (P) Ltd., Bangalore II-Sem. 2006 01

881 Ramco Systems, Chennai I Sem. 2012 05

882 Rane Madras Ltd,Mysore I-Sem 2014 01

883 Rane Madras Ltd. , Chennai II Sem 2014 01

884 Raxa Security Services Ltd., Bangalore I Sem. 2013 01

885 Reametrix, Bangalore II-Sem. 2008 10

886 Reckitt Benckiser, Gurgaon II Sem. 2011 08

887 Redpine Signal, Hyderabad I-Sem. 2011 03

888 RedSeer Consulting, Bangalore II Sem. 2013 02

889 Reflexis Systems India Pvt. Ltd., Chennai I-Sem. 2009 05

890 Reflexis Systems India Pvt. Ltd., Pune II-Sem. 2006 23

891 Religare Technologies Ltd., Mumbai II Sem. 2011 01

892 ReportGarden Technologies Pvt. LTd., Hyderabad I-Sem.2016 03

893 Researchwire, Mumbai I-Sem. 2011 02

894 Rite Infotech Pvt Ltd., Faridabad I Sem. 2013 04

895 Rivigo Services Pvt Ltd, Gurgaon II Sem 2017 01

896 Robert Bosch Center for Cyber Physical Systems, Bangalore II Sem 2017 02

897 Rotary Mechanical Engineering Pvt. Ltd., Bangalore I-Sem. 2009 02

898 Rovi Corporation, Bangalore I-Sem. 2015 02

899 Royal Institute of Technology (KTH)-Stockholm, Sweden II-Sem. 2006 01

900 RSV Construction Pvt. Ltd. Secunderabad II Sem 2014 02

901 Rubamin Pharmaceuticals Ltd., Baroda II-Sem. 2004 01

902 Rupeetalk Financial Services Pvt. Ltd., Mumbai II Sem. 2009 02

904 S cubes Technologies Pvt. Ltd., Hyderabad II-Sem. 2008 05

905 S.R. BATLIBOI & CO. LLP, Bangalore II Sem 2017 02

906 S.R. BATLIBOI & CO. LLP, Mumbai I Sem 2017 02

Page 35: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

23

907 Saavn Media Pvt. Ltd., Mumbai I Sem. 2013 01

908 Sabre Holdings (Formerly Sabre Travel Technologies Pvt. Ltd.), Bangalore I-Sem. 2008 18

909 Sagacious Research, Gurgaon I Sem. 2013 04

910 Sage Design Systems (I) Pvt. Ltd., Bangalore I-Sem. 2003 04

911 Saha Software Solutions Pvt. Ltd.,Hyderabad I-Sem. 2010 02

912 Saharsa Solutions Pvt. Ltd., Chennai II-Sem. 2006 01

913 Sales Force, Hyderabad I Sem. 2013 02

914 Samson and Sons builders and developers, Trivandrum II Sem. 2015 01

915 SAMSUNG India Software Operations, Bangalore II Sem. 2013 04

916 Samsung R & D Institute, Bangalore I-Sem.2016 02

917 Samsung R &D Institute - Image & Video Processing, Bangalore I Sem 2017 01

918 Samsung R &D Institute - Software Systems, Bangalore I Sem 2017 01

919 Sandilya Consulting Engineers, Hyderabad I Sem. 2013 02

920 Sandvik Asia Ltd., Mehsana (Gujarat) I-Sem. 2008 04

921 Sankara Netralaya, Chennai I-Sem. 2007 08

922 Sanyo LSI Technologies Pvt. Ltd., Bangalore I-Sem. 2004 02

923 Sap Lab India Pvt. Ltd., Bangalore II-Sem. 2005 15

924 Sargur Powercon Systems, Mumbai II Sem. 2011 02

925 Sattva Media & Consulting Pvt. Ltd., Bangalore I Sem. 2013 08

926 Satyam Computer Sercices Ltd., Bangalore II-Sem. 2001 06

927 Satyam Computer Services Ltd., Chennai II-Sem. 2001 09

928 Satyam Computer Services Ltd., Hyderabad I-Sem. 2001 14

929 Satyam Computer Services Ltd., Pune I-Sem. 2006 01

930 SCOPE International Pvt. Ltd., Chennai II-Sem. 2008 06

931 Seagate Technology HDD (India) Pvt. Ltd., Bangalore II Sem 2017 01

932 Searce, Pune I Sem 2017 01

933 Sellerworx Online Services Limited I-Sem. 2015 02

934 Senes Consultants India Pvt. Ltd., Noida (Delhi) II-Sem. 2006 01

935 Sevenion Software Systems Pvt. Ltd. , Bangalore II Sem 2014 01

936 Sew Infrastructure, Hyderabad I Sem. 2012 01

937 SHArP Edge Learning Pvt. Ltd., Jaipur I Sem. 2012 03

938 Shell, Bangalore II Sem. 2013 08

939 Shipra Estate Ltd., Ghaziabad (Delhi) II-Sem. 2004 01

940 Shri Krishna Urja Project Ltd., Jaipur I-Sem. 2010 01

941 Siemens Corporate Tech., Bangalore II-Sem. 2006 09

942 Sierra Atlantic Software Services Ltd., Hyderabad I-Sem. 2004 14

943 Siftery, Bangalore I Sem 2017 01

944 Signode India Ltd.,Rudraram., Hyderabad II Sem 2014 01

945 Silicon Image R&D Pvt. Ltd., Hyderabad I Sem. 2013 05

946 Silvan Innovation Labs, Bangalore I-Sem. 2010 04

947 Sipera Systems Pvt. Ltd., Hyderabad II-Sem. 2007 01

948 SiRF Tech., Bangalore I-Sem. 2007 02

949 SiRF Tech., Noida (Delhi) I-Sem. 2007 02

950 SiRIUS Embedded Software (P) Ltd., Bangalore I-Sem. 2009 11

951 SKF India Ltd. Ahmedabad I Sem 2017 01

952 SKF India Ltd., Bangalore I Sem 2017 01

953 SKF India Ltd., Pune I-Sem. 2010 10

954 Skoda Auto India Pvt Ltd.(Chakan), Pune I Sem. 2013 03

955 Skoda Auto India Pvt Ltd., Gurgaon II Sem. 2013 03

956 Skoda Auto India Pvt Ltd., Aurangabad I Sem. 2013 08

957 Skoda Auto India Pvt Ltd., Bangalore II Sem. 2013 03

958 Skoda Auto India Pvt Ltd., Mumbai II Sem. 2013 05

959 Skoda Auto India Pvt Ltd., Pune II Sem. 2013 03

960 Skumars Online , Mumbai II– Sem 2016 01

961 Skyline Consulting Engineers Pvt. Ltd., Nagpur I Sem. 2012 06

962 Skyquest Technology Consulting Pvt. Ltd. Ahmedabad II Sem 2014 03

963 Slave Technologies Pvt. Ltd., Hyderabad I Sem. 2012 02

964 SM Silicon India Pvt Ltd., Hyderabad II Sem. 2015 01

965 SmartLivez , Bangalore II– Sem 2016 01

966 Smartrak, Hyderabad II Sem. 2015 02

967 SocialAppsHQ, Noida II Sem. 2011 01

Page 36: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

24

968 Sokrati Technologies Pvt. Ltd., Pune I-Sem. 2015 05

969 Solairedirect Energy India Pvt. Ltd., Pune I Sem. 2011 04

970 Solar Integration Systems India Pvt. LLd., Hyderabad II Sem. 2013 01

971 Solon India Pvt Ltd, Hyderabad II-Sem. 2015 01

972 Source Pilani, Pilani II Sem. 2009 02

973 Spice Digital Ltd., Noida II Sem. 2011 01

974 Spicer India Ltd. (Formerly Gabriel India Ltd. ), Pune II Sem. 2005 20

975 Spicer India Ltd., Hosur II Sem. 2008 01

976 Spicer India Ltd., Jodali II Sem. 2010 03

977 Spicer India Ltd., Satara II Sem. 2010 08

978 Sprinklr, Gurgaon II Sem. 2015 01

979 SRF Ltd., Gurgaon I Sem. 2010 15

980 SRF, Dahej (Gujarat) I Sem. 2011 01

981 ST Ericsson, Bangalore I Sem. 2010 06

982 ST Ericsson, Greater Noida I Sem. 2010 04

983 ST Microelectronics (I) Pvt. Ltd., Bangalore I Sem. 2004 11

984 ST Microelectronics (I) Pvt. Ltd., Noida II Sem 1995 39

985 ST Microelectronics (I) Pvt. Ltd., Pilani I Sem. 2010 04

986 Star TV, Mumbai I Sem 2017 01

987 Starflex Sealing India Pvt. Ltd., Goa I Sem. 2012 03

988 StateStreet Global Advisors, Bangalore I Sem 2017 01

989 Stayzilla - Inasra Technologies, Bangalore I Sem. 2015 01

990 Steel Wedge Technologies Pvt. Ltd., Hyderabad I Sem. 2013 02

991 Stellar Software Technologies Pvt Ltd., Hyderabad I Sem. 2015 02

992 Stellarix Consulting Services Pvt. Ltd., Jaipur I Sem. 2011 06

993 Stenvy Technology Pvt. Ltd., Bangalore I Sem. 2011 01

994 Sterling Biotech Ltd., Baroda I Sem. 2009 02

995 Sterling Commerce India Solutions Pvt. Ltd., Bangalore I Sem. 2007 07

996 Strides Arcolab Ltd., Bangalore I Sem. 2004 10

997 Structural Engg. Research Center, Chennai II Sem.1995 39

998 Subex Technologies Ltd., Bangalore II Sem. 2005 01

999 Success Factors Business Solutions, Bangalore I Sem. 2011 02

1000 Sukam Power Systems Ltd., Gurgaon (Delhi) II Sem. 2007 09

1001 Sun Microsystems (I) Pvt. Ltd., Bangalore I Sem 2000 11

1002 Sundaram Clayton Ltd., Chennai I Sem. 1988 46

1003 Sundaram Clayton Ltd., Hosur II Sem. 2002 02

1004 SunTec Business Solutions Pvt. Ltd., Trivandrum I Sem. 2011 06

1005 SureWaves, Bangalore II Sem. 2008 01

1006 Sybase Software (India) Pvt. Ltd., Pune II Sem. 2007 01

1007 Symantec Corp. R&D Division, Pune II Sem 1999 23

1008 Symantec Corporation R&D Division, Chennai I Sem. 2008 05

1009 Symantec Software India Pvt. Ltd., Bangalore II Sem. 2010 10

1010 Symantec Software Solutions Pvt. Ltd - Data Analytics., Bangalore I Sem 2017 01

1011 Symantec Software Solutions Pvt. Ltd. - App Development., Bangalore I Sem 2017 01

1012 Symantec Software Solutions Pvt. Ltd. - Data Structures and Algorithms, Pune I Sem 2017 01

1013 Symantec Software Solutions Pvt. Ltd.,Pune I-Sem.2016 03

1014 Symphony, Bangalore I Sem. 2007 12

1015 Symphony, Pune I Sem. 2009 01

1016 Synergiz Global, Hyderabad II Sem 2017 02

1017 Syngene International Ltd., Bangalore II Sem. 2008 02

1018 Syniverse Technologies,Bangalore I-Sem 2014 02

1019 Synopsis, Bangalore II Sem. 2011 01

1020 Synopsis, Noida II Sem. 2013 02

1021 Synopsys India Pvt. Ltd, Hyderabad I Sem 2017 01

1022 Taco Sasken Automotive Electronics, Bangalore II-Sem. 2007 02

1023 Takata ndPvt Ltd., Chennai I Sem. 2013 01

1024 Tangoe India Softek Pvt. Ltd., Bangalore I Sem. 2013 05

1025 TapChief., Bangalore II Sem 2017 02

1026 TAS Analytic Services, Bangalore II Sem. 2013 06

1027 Tata Advanced Materials Ltd , Bangalore II Sem 2016 01

1028 Tata Autocomp Systems Ltd., Pune II Sem. 2007 17

Page 37: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

25

1029 Tata Chemical Innovation Center, Chennai I-Sem.2016 01

1030 Tata Chemical Innovation Center, Pune II Sem. 2015 05

1031 Tata Chemicals Ltd., Babrala (UP) II Sem. 2007 10

1032 Tata Consultancy Services, Bangalore I-Sem.2016 01

1033 Tata Digital Health, Bangalore II Sem 2017 01

1034 Tata Institute of Fundamental Research, Mumbai I Sem. 2001 07

1035 Tata Motors Ltd. Sanand I Sem 2017 01

1036 Tata Motors Ltd., Dharwad I Sem. 2015 05

1037 Tata Motors Ltd., Pune I Sem. 2004 26

1038 Tata Motors, Pantnagar I Sem.2016 03

1039 Tata Motors., Jamshedpur II Sem. 2015 05

1040 Tata Motors., Lucknow I Sem. 2015 05

1041 Tata Power, Mumbai I Sem. 2010 04

1042 Tata Power, Noida II Sem. 2010 01

1043 Tata Projects, Hyderabad I Sem. 2008 04

1044 Tata Quality Management Services (Div. of Tata Sons Ltd.), Pune I Sem. 2012 01

1045 Tata Technologies Ltd., Pune I Sem. 2013 07

1046 Tata Teleservices, Hyderabad II Sem. 2008 04

1047 Tau Films India Pvt. Ltd, Hyderabad II Sem 2017 02

1048 Tech Mahindra, Mumbai I Sem. 2003 18

1049 Tech Mahindra, Pune I Sem. 2003 05

1050 Tech Vedika Software Pvt. Ltd. Hyderabad II Sem 2014 01

1051 Techlead Software Systems Engg. (I) Pvt. Ltd., Pune II Sem. 1993 20

1052 Techniforge, Hyderabad II Sem. 2008 01

1053 Technip India Ltd., Chennai I Sem. 2008 06

1054 Technotree Covergence Ltd., Bangalore I Sem. 2011 02

1055 Techture Structures Pvt. Ltd., Nagpur I Sem 2014 05

1056 Tega Industries Ltd., Dahej II Sem. 2013 02

1057 Tega Industries Ltd., Kolkata II Sem. 2011 09

1058 Tejas Networks, Bangalore II Sem. 2010 08

1059 Tekriti Software, Gurgaon (Delhi) I Sem. 2008 04

1060 Tensilica, Pune I Sem. 2008 13

1061 TESCO Hindustan Service Centre, Bangalore I Sem 2017 01

1062 TESCO, Bangalore II Sem. 2010 13

1063 Tetcos, Bangalore II Sem. 2014 01

1064 Texas Instruments (I) Pvt. Ltd., Bangalore II Sem. 1991 50

1065 TEXMACO, Kolkata I Sem. 2009 12

1066 The Childrens Hospital of Philadelphia, USA II Sem. 2005 02

1067 Thermax Ltd., Pune II Sem 1992 28

1068 Think and learn , Bangalore II Sem 2016 01

1069 Thomas & Betts India Pvt. Ltd., Hyderabad II Sem. 2011 04

1070 Thomas Weisel Int. Pvt. Ltd., Mumbai II Sem. 2006 02

1071 Thomason Reuters, Bangalore II Sem. 2010 01

1072 Thomson Reuters, Hyderabad II Sem 2017 01

1073 Thornton Tomasetti, Mumbai II Sem 2017 02

1074 Time Analytics Services, Bangalore II Sem. 2011 01

1075 TimeInc.(Time Analytic & Shared Services Private Limited), Bangalore II Sem 2017 02

1076 Tiny Owl Technology Pvt. Ltd., Mumbai I Sem. 2015 01

1077 Titan Industries Ltd., Hosur II Sem 1996 24

1078 TNT India Pvt. Ltd., Bangalore II Sem. 2009 02

1079 Tolexo Online Pvt Ltd , Noida II Sem 2016 02

1080 Tolexo Online Pvt Ltd, Bangalore II Sem. 2015 01

1081 Tonbo Imaging Pvt Ltd. - Embedded Systems, Bangalore I Sem 2017 01

1082 Tonbo Imaging Pvt Ltd. - Image & Video Processing, Bangalore I Sem 2017 01

1083 Tonbo Imaging Pvt Ltd. Bangalore II Sem. 2014 07

1084 Torrent Research Centre, Ahmedabad II Sem 1996 19

1085 Toshiba Software (India) Pvt Ltd, Bangalore II Sem 2017 01

1086 Toshniwal Industries Pvt. Ltd., Industrial , Ajmer II Sem 2016 01

1087 Total Environment Building Systems Pvt. Ltd., Bangalore I Sem. 2012 01

1088 Transgraph Consulting Pvt Ltd., Hyderabad II Sem. 2008 06

1089 Travel Boutique Online, Gurgaon I-Sem. 2010 05

Page 38: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

26

1090 Tribalfusion RnD Pvt. Ltd. (Formerly Exponential), Noida II Sem. 2010 02

1091 Trilogy E-Business Software India Pvt. Ltd., Bangalore I Sem. 2005 06

1092 Trivitron Health Services, Chennai I Sem. 2009 01

1093 True Sparrow, Pune II Sem. 2013 03

1094 Tube Investments of India Limited, Chennai I-Sem.2016 01

1095 Tune Patrol Media Labs Pvt. Ltd., Bangalore II Sem. 2013 01

1096 TVS Motor Company, Hosur I Sem 1999 16

1097 TYCO International Ltd , Bangalore II Sem 2016 01

1098 Tyco Valves and Control India Pvt. Ltd., Halol (Baroda) I Sem. 2008 01

1099 Ultratech (Grasim) Cement, Tadipatri I Sem. 2009 09

1100 Ultratech Cement, Mumbai I Sem. 2012 03

1101 Uniliver, Bangalore II Sem. 2011 05

1102 Unisys Global Services India, Bangalore I Sem. 2011 02

1103 United Online Software Dev. (India) Pvt. Ltd. (Formerly Juno Online Services),

Hyd.

II Sem. 2000 15

1104 University of Louisiana at Lafayette, Lafayette, LA, USA I Sem. 2009 02

1105 UOP India Pvt Ltd (A Honeywell company), Gurgaon II Sem 2014 02

1106 UPGRAD, Mumbai II Sem 2017 01

1107 Urban Clap , Gurgaon II Sem 2016 01

1108 Urban Mass Transit Company Ltd., Delhi II Sem. 2011 01

1109 UST Global Infiniy Labs, Trivandrum I Sem 2017 01

1110 Uurmi Systems, Hyderabad I Sem. 2011 01

1111 Vakilmehtasheth, Mumbai II Sem 2014 03

1112 Valtech India Systems Pvt. Ltd., Bangalore I Sem. 2005 03

1113 Value Edge India, Delhi II Sem. 2013 07

1114 ValueFirst Connect, Gurgaon(Delhi) I Sem. 2009 03

1115 Vasant Chimicals & Organics Ltd., Hyderabad I Sem. 2002 21

1116 vConstruct Private Limited , Pune II Sem 2016 02

1117 Vendio Technologies India Pvt. Ltd. (Formerly Andale India (P) Ltd.), Bangalore I Sem. 2004 11

1118 Venture Inteligence, Chennai II Sem. 2011 02

1119 Vergo Pharma Research Laboratories Pvt. Ltd., Goa I Sem. 2011 02

1120 Verisign Services (I) Pvt. Ltd., Bangalore I Sem. 2005 14

1121 Veritas Software (I) Pvt. Ltd., Pune II Sem 1999 19

1122 VERVE CONSULTING PVT LTD , Bhubaneshwar II Sem 2016 01

1123 Vestas R&D, Chennai I Sem. 2009 08

1124 Viacom 18 Pvt Ltd, Bangalore I Sem 2017 01

1125 Viacom18 Media Pvt. Ltd. Mumbai II Sem 2017 02

1126 Victor Gaskets India Ltd., Pune I Sem. 2005 02

1127 Vidcentum R&D Pvt. Ltd., Hyderabad I Sem. 2013 01

1128 Vita Beans Neucal Solutions, Bangalore II Sem. 2008 01

1129 Vitacloud, Bangalore I-Sem.2016 01

1130 Vizury Interactive Solutions, Bangalore II Sem 2017 01

1131 VMS (Vakil Mehta Seth) Consultants Private Limited , Mumbai II Sem 2016 04

1132 VMware Software India Pvt. Ltd., Bangalore I Sem 2017 01

1133 VMWare, Bangalore II Sem. 2007 13

1134 VMware, Pune I Sem. 2009 02

1135 Voxta, Hyderabad I Sem. 2010 01

1136 Vrindi India Pvt. Ltd., Anand I Sem. 2009 02

1137 Vrindi India Pvt. Ltd., Delhi I Sem. 2009 02

1138 Vymo , Bangalore II Sem 2016 02

1139 Wadhani Foundation, Bangalore I Sem. 2013 01

1140 Walmart Global Technology Services, Bangalore II Sem. 2013 09

1141 Wavelet Tech. Pvt. Ltd., Pune I Sem. 2007 05

1142 WCG Robotics, Gurgaon I Sem. 2013 01

1143 Weir Engineering Services India Ltd. Hubli II Sem. 2009 07

1144 Weir Engineering Services India Ltd., Bangalore I Sem. 2012 02

1145 Wipro Infotech., Bangalore II Sem. 1984 31

1146 Wipro Tech., Hyderabad II Sem. 2004 04

1147 Wockhardt Ltd., Aurangabad II-Sem. 2005 03

1148 Wockhardt Ltd., Mumbai II Sem. 2005 03

1149 Wootify,Mumbai I Sem 2014 01

Page 39: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

27

1150 Work Monk Solutions, Bangalore I Sem. 2012 01

1151 Worley Parsons India, Hyderabad I Sem 2014 06

1152 Worley Parsons,Mumbai I Sem 2014 05

1153 Xilinx India Technology Services Pvt. Ltd., Hyderabad I Sem 2017 01

1154 Xora Software Systems Pvt. Ltd., Bangalore II Sem. 2007 01

1154 Yahoo Software Development (I) Pvt. Ltd., Bangalore II Sem. 2003 15

1155 Yardstic, Hyderabad I Sem. 2013 01

1156 YoruStory.in, Bangalore II Sem. 2011 03

1157 Yrals Digital India Pvt.Ltd. Mumbai I Sem 2017 01

1158 YUPPTV,Hyderabad II-Sem. 2016 01

1159 Zapr, Gurgaon I Sem. 2013 01

1160 Zendrive India Pvt Ltd, Bangalore I Sem 2017 01

1161 Zeotap India Pvt. Ltd., Bangalore II Sem 2017 02

1162 Zinnov Management Consulting Pvt. Ltd., Bangalore II Sem. 2011 09

1163 Zinnov Management Consulting Pvt. Ltd., Gurgaon I-Sem.2016 03

1164 ZOHO corporation , Chennai II Sem. 2016 01

1165 ZOMATO, Gurgaon II Sem. 2010 03

1166 Zoomcar India Pvt. Ltd., Bangalore I Sem 2014 07

1167 ZS Associates, Gurgaon II Sem. 2015 02

1168 ZS Associates, Pune I Sem. 2011 06

1169 Zynga India, Bangalore I Sem. 2011 05

1170 [24]7 iLabs, Bangalore I Sem. 2015 02

Page 40: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

28

Practice School Division, In-charges & Nucleus Members

Dean, Practice School

S.No. Name of Faculty Member Office Res. / Mobile E-mail Address

1 Prof. Niranjan Swain 040-

66303660

09553381682 [email protected]

pilani.ac.in/[email protected]

Associate Deans, Practice School

1 Prof. P Srinivasan

(Quality Assessment & Assurant

cell )

1596-245073 9928671151 [email protected]

[email protected]

2 Dr. K. R. Anupama

(Publication Cell)

8322580317 8805012966 [email protected]

3 Prof. K V G Chandrasekhar

(Instruction Cell)

040-

66303527

9010202867 [email protected]

[email protected]

4 Prof. S Sindhu

(Planning & Development Cell)

8041161200 9986248640 [email protected]

[email protected]

Nucleus Members, Pilani Campus

1 Dr. BhartiKhungar 1596515663 9414543592 [email protected]

2 Mr. G Muthukumar 1596515821 9413150035 [email protected]

Nucleus Members, BITS Pilani –K.K. Birla Goa Campus

1 Dr. Narayan Manjarekar 8322580194 8805141077 [email protected]

Manager - Off campus Operations, BITS Pilani – K.K. Birla Goa Campus

1 Mr. Atul Sankaw 0832-

2580273

09822482615 [email protected]

Nucleus Members, Hyderabad Campus

1 Dr. Sashideep Gutti 4066303590 09951861932 [email protected]

pilani.ac.in

Manager (PSD, BITS Pilani –Hyderabad Campus)

1 Mr.Mantri Panendra Srinivas 040-

66303824

9010948917 [email protected]

pilani.ac.in

Manager-Operation (PSD, BITS Pilani –Hyderabad Campus)

1 Mr.Varun Singh 040-

66303713

9010200768 [email protected]

pilani.ac.in

Page 41: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

29

Off –Campus Faculty

Sr.

No

Name Contact Details Email Id

Bangalore

1 Prof. S. Sindhu 9986248640 [email protected]

2 Dr. Lucy J. Gudino 9422740023 [email protected]

3 Dr. SatyaSudhakarYedlapalli 9845900118 [email protected]

4 Dr. Sreedhar Madichetty 9642559646 [email protected]

5 Dr. Annapoorna Gopal 9845943564 [email protected]

6 Ms. Akanksha Bharadwaj 9972688558 / 9582589098 [email protected]

7 Ms. Anita Ramachandran 9900519195 [email protected]

8 Mr. Brajabandhu Mishra 9535143205 [email protected]

9 Mr. Chandrasekhar RK 9986489685 [email protected]

10 Mr.MohammadSaleem.J.Bagew

adi 9986601090 [email protected]

11 Ms. Manda Saisekhar Das 9740188113 [email protected]

12 Mr. Nayan Khare 9886672847 [email protected]

13 Mr. P.B.Venkatraman 9036091967 [email protected]

14 Ms. Preeti N G 9035867577 [email protected]

15 Ms. Raja Vadhana 9972908510 [email protected]

16 Ms. RekhaAnandarao 9480703518 [email protected]

17 Ms. Rita Gopalan 9886378429 [email protected]

18 Ms. Surabhi Bothra 7411770244 [email protected]

19 Ms. SwapnaKulkarni 9886672265 [email protected]

20 Mr. Srinivas Kota 9414935853 [email protected]

21 Mr. S.P.Vimal 9983526379 [email protected]

22 Mr. Vineet Garg 9845015640 [email protected]

23 Mr. Viswanathan Hariharan 9880416418 [email protected]

pilani.ac.in

Chennai

24 Ms. R. Bharathi 9094322706 [email protected]

25 Dr. P.R. Deepa 9840755264 [email protected]

26 Dr. Pradheep Kumar 9791031776 [email protected]

27 Dr. Padma Murali 8754439440 [email protected]

28

Mr. Akshaya Ganesan

9791034200 [email protected]

29

Ms. Dhanashree NP

9840826148

[email protected]

30 Mr. S. Raghuraman 8939080025 [email protected]

Delhi

31 Mr. R.K. Tiwary 9871482697 [email protected]

32 Mr. Ashish Narang 7838222009 [email protected]

33 Mr. M.K. Hamirwasia 85868 14104, 09449020120 [email protected]

34 Ms. Ritu Arora 9811439331 [email protected]

35 Ms.Shailja Singhdev Sodhi 9871260167, 9818520310 [email protected]

Goa

Page 42: PS - Birla Institute of Technology and Science, · PDF file · 2017-09-05ps – i (students ... g.m.r. varalakshmi foundation 16 h.b.l. power systems ltd. 12 ... department of planning

30

36 Dr. Narayan Suresh

Manjarekar

0 8322580194 [email protected]

Hyderabad

37 Mr. Anjani Srikanth Koka 9492686869 [email protected]

38 Prof. K.G. Krishna 9849171224 [email protected]

39 Dr. Shekhar Rajagopalan 9949473675 [email protected]

40 Dr. YVK Ravi Kumar 9430233116 [email protected]

41 Mr. Akula Sashikanth 9848184814 [email protected]

42 Mr. Chennupati R Prasanna 9491126992 [email protected]

43 Mr. Krishnamurthy

Bindumadhaan

9966204390 [email protected]

44 Dr. Naga Vamsi Krishna Jasti 9158042090/ 9373740561 [email protected]

45 Mr. Sandeep Kayastha 80089 44226 [email protected]

46 Mr. Samir R. Kale 9030279063 [email protected]

47 Ms. B. Radhika 9966408329 [email protected]

48 Mr. T.V. Rao 9849314331 [email protected]

49 Mr. Vinay Balde 9652829338 [email protected]

50 Ms. Varsha Mamidi 9989272755 [email protected]

Kolkata

51 Dr. Arun Maity 9748821168, 9903523835 [email protected]

Mumbai

52 Mr. Pavan Kumar Potdar 9869771853 / 9594891045 [email protected]

53 Dr.Mahalakshmi R. Mudliar 9004145421 [email protected]

54 Ms. Swarna Chaudhary 9769591626 [email protected]

55 Ms. Uma Maheswari Natarajan 9930877332 [email protected]

Pune

56 Dr. B.V. Prasad 9422392108 [email protected]

57 Dr. Ankur Pachauri 9927590910 [email protected]

58 Dr. Sudeep Kumar Pradhan 7875294390 [email protected]

59 Mr. Dinesh W. Wagh 7798887073 [email protected]

60 Mr.Manoj s. Kakade 9822479950 [email protected]

61 Mr.P. Vijaya Bhaskar Reddy 9619105795 [email protected]

62 Mr. Ravi S. Reosekar 9822326534 [email protected]

63 Ms. A.Vijayalakshmi 9922585427 [email protected]

64 Mr. Santosh Khandgave 7798245575 [email protected]

65 Ms. Sonika C Rathi 8237032252 [email protected]

Pilani

66 Mr. Pawan Sharma 9829652832 [email protected]

Vijayanagar

67 Mr. S.S. Gupta 9449598319 [email protected]