PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd....

55

Transcript of PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd....

Page 1: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research
Page 2: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018

CENTER_NAME STATION_NAME STUDENT

AGRA IG AGRA RANGE 9

AHMEDABAD ADANI POWER 9

INFIBEAM 10

INTERNATIONAL CENTRE FOR ENTREPRENEURSHIP AND TECHNOLOGY (ICREATE) 12

RAJNAGAR TEXTILE MILLS (NATIONAL TEXTILE CORPORATION LTD) 9

ALWAR HONDA MOTORCYCLE & SCOOTER INDIA PVT. LTD. 5

AURANGABAD AURANGABAD ELECTRICALS 10

GOODYEAR SOUTH ASIA TYRES PVT LTD. 5

BAHADURGARH HINDUSTAN PETROLEUM CORPORATION LTD. 5

BANGALORE ADARSHA CONTROL & AUTOMATION PVT. LTD. 7

COUTURE AI PVT LTD. 6

HAL HELICOPTER DIVISION 12

HAPPIEST MINDS 6

HEADOUT 6

METARAIN DISTRIBUTORS PVT LTD 6

METRON LABS SOFTWARE TECHNOLOGIES PVT. LTD. 10

PAYTM 10

POWER GRID CORPORATION OF INDIA LIMITED 6

SEN SEI TECHNOLOGIES 5

SUNPLUS SYSTEM SOLUTIONS PVT. LTD. 4

TAPCHIEF 7

ZINNOV MANAGEMENT CONSULTING 2

BHARUCH BIRLA CELLULOSIC 13

BHOPAL AIIMS 18

NEW BHOPAL TEXTILE MILLS BHOPAL (NATIONAL TEXTILE CORPORATION LTD) 7

BHUBANESHWAR THE INSTITUTE OF MINERALS AND MATERIALS TECHNOLOGY 16

CHANDRAPUR MANIKGARH CEMENT 4

CHENNAI BELIEF SYSTEMS 5

CARBORUNDUM UNIVERSAL LTD. 9

CENTER FOR MEDICAL GENETICS 6

CENTRAL ELECTRONICS ENGINEERING RESEARCH INSTITUTE 16

CENTRAL LEATHER RESEARCH INSTITUTE 54

EYWA PHARMA PVT. LTD. 4

NATIONAL METALLURGICAL LABORATORY 5

TAMIL NADU EGOVERNANCE AGENCY 20

TAMIL NADU SCIENCE AND TECHNOLOGY CENTRE 12

UST GLOBAL 5

COIMBATORE CAMBODIA MILLS (NATIONAL TEXTILE CORPORATION LTD.) 5

COIMBATORE MURUGAN MILLS (NATIONAL TEXTILE CORPORATION LTD.) 5

SOUTHERN REGIONAL OFFICE (NTCL) 5

ZF WINDPOWER 4

DAMANJODI NATIONAL ALUMINIUM COMPANY LIMITED - SMELTER PLANT 17

DEHRADUN INDIAN INSTITUTE OF PETROLEUM 5

INDIAN INSTITUTE OF REMOTE SENSING 20

DELHI 505 ARMY BASE WORKSHOP 21

COSMOS INFRA ENGINEERING (INDIA) PVT. LTD. 7

G.M.R. VARALAKSHMI FOUNDATION 5

Page 3: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

GAIL (INDIA) LIMITED 5

INDIAN COUNCIL FOR RESEARCH ON INTERNATIONAL ECONOMIC RELATIONS 7

INDIAN RED CROSS SOCIETY BLOOD BANK 22

JAGUAR OVERSEAS LTD. 4

MAPMYINDIA 11

NATIONAL TEXTILE CORPORATION LIMITED 10

DHANBAD CSIR-CENTRAL INSTITUTE OF MINING AND FUEL RESEARCH (CIMFR) 16

FARIDABAD ESCORTS 15

SUPERSEALS INDIA LTD. 9

GANDHINAGAR BHASKARACHARYA INSTITUTE FOR SPACE APPLICATIONS AND GEOINFORMATIC 21

GUJARAT ENVIRONMENT MANAGEMENT INSTITUTE 10

INSTITUTE OF SEISMOLOGICAL RESEARCH (ISR) DST 10

SRISTI SUMMER SCHOOL 1

GAUHATI GAUHATI REFINERY 25

GOA CG PPI ADHESIVE PRODUCTS LTD 4

DEPARTMENT OF AGRICULTURE 5

ENCUBE ETHICALS PVT 5

FUNSKOOL (INDIA) LTD. 8

HELIX TECH. 5

HELPAGE INDIA 6

MORMUGAO PORT TRUST 7

NATIONAL CENTRE FOR ANTARTIC AND OCEAN RESEARCH 12

NATIONAL INSTITUTE OF OCEANOGRAPHY 11

ORCHID BIO MEDICAL SYSTEMS 10

PARINATI SOLUTIONS PRIVATE LIMITED 5

PENTAIR WATER INDIA PVT. LTD. 4

QUALPRO DIAGNOSTICS 8

SMART LINK NETWORK SYSTEMS 5

STARFLEX SEALING INDIA PVT. LTD. 5

ZEPHYR BIOMEDICAL 9

GREATER NOIDA BHARAT PETROLEUM CORPORATION LTD. 6

GURGAON CONVERGENT TECHNOLOGIES 5

MARUTI SUZUKI INDIA LIMITED 22

POWER GRID CORPORATION OF INDIA 6

HALOL ADITYA BIRLA INSULATORS 4

HARIHAR BIRLA POLYFIBERS 7

HUBBALLI DESHPANDE FOUNDATION 6

HYDERABAD ALEXA APPS 15

CAPIOT SOFTWARE PVT. LTD. 7

DRDO - ASL 7

DRDO - CAS 10

DRDO - RCI 13

EGNIFYÂ TECHNOLOGIES 8

G.M.R. VARALAKSHMI FOUNDATION 15

H.B.L. POWER SYSTEMS LTD. 9

L.V.PRASAD EYE INSTITUTE 10

MYTRAH ENERGY 6

NCCCM 15

ONE97 COMMUNICATIONS LIMITED 3

PASS CONSULTING 10

Page 4: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

POWER GRID CORPORATION OF INDIA LIMITED 5

RA CHEM PHARMA 4

VASANT CHEMICALS PRIVATE LIMITED 5

TELANGANA E-GOVERNANCE 37

JAFRABAD ULTRATECH CEMENT LIMITED 5

JAGGAYAPET THE RAMCO CEMENTS LTD. 19

JAIPUR IT DEPARTMENT GOVERNMENT OF RAJASTHAN 11

JAIPUR DEVELOPMENT AUTHORITY 15

KEC INTERNATIONAL LTD. 18

JHARSUGUDA SESA STERLITE LTD. (VEDANTA ALUMINIUM & POWER) 9

JODHPUR BIRLA WHITE CEMENTS 6

REGIONAL REMOTE SENSING CENTRE 5

KALPAKKAM INDIRA GANDHI CENTRE FOR ATOMIC RESEARCH (IGCAR) 50

KOLAR HONDA MOTORCYCLE & SCOOTER INDIA PVT. LTD. 6

KOLKATA DELTA STEP LEARNING PVT. LTD 6

DEPARTMENT OF PLANNING STATISTICS AND PROGRAM IMPLEMENTATION 15

HEDGE QUANTS ADVISORY LLP 5

IRRIGATION AND WASTE WATER DEPARTMENT 8

TEXMACO LTD. 9

VARIABLE ENERGY CYCLOTRON CENTRE 5

WEST BENGAL E-GOVERNANCE 15

KOTPUTLI ULTRATECH CEMENT LTD. 8

KOVAYA ULTRATECH CEMENT LIMITED 8

LUCKNOW BOARD OF REVENUE - UP GOVERNMENT 18

COUNCIL OF SCIENCE & TECHNOLOGY (CST) 20

UP -100 (POLICE EMERGENCY MANAGEMENT SYSTEM) 10

MAHAPE L & T ELECTRIC DIVISION 7

MALKHED RAJSHREE CEMENT 8

MANESAR HONDA MOTORCYCLE & SCOOTER INDIA PVT. LTD. 8

MOHALI IDS INFOTECH LTD 10

SEMI- CONDUCTOR LABS MOHALI 5

MUMBAI ARCON TECHSOLUTIONS PVT LTD. 7

ASTECH SYSTEMS 6

ATOMIC ENERGY REGULATORY BOARD 10

CENTURY RAYON 18

COUTURE AI PVT LTD 5

HINDUSTAN PETROLEUM CORPORATION LIMITED 4

HOMI BHABHA CENTRE FOR SCIENCE EDUCATION 15

INDIA UNITED MILLS (NATIONAL TEXTILE CORPORATION LTD) 10

INSTAKASH TECHNOLOGIES PVT LTD 4

KANSAI NEROLAC PAINTS LIMITED 6

LENEST 13

MAHINDRA SUSTEN PVT. LTD. 10

MUMBAI RAIL VIKAS CORPORATION LTD. 10

ORIENT ENTERPRISES 8

PODAR MILLS MUMBAI (NATIONAL TEXTILE CORPORATION LTD) 6

REGIONAL OFFICE (NTCL) 15

SAMHITA SOCIAL VENTURES 10

TATA MILLS- DADAR (MUMBAI) (NATIONAL TEXTILE CORPORATION LTD) 10

ULTRATECH CEMENT LTD AHURA CENTER 13

Page 5: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

NAGDA GRASIM CHEMICALS 10

GRASIM INDUSTRIES 51

NAGPUR METAL FAB HIGH TECH PVT LTD. 10

NANDYAL NANDI GROUP OF COMPANIES 16

NASHIK CG POWER AND INDUSTRIAL SOLUTIONS LTD. 10

STARLITE LIGHTING LTD. 5

NEEMUCH VIKRAM CEMENT WORKS 8

NOIDA MILLION SPARKS FOUNDATION 5

NOIDA METRO RAIL CORPORATION (NMRC) 10

PILANI BIRLA MUSEUM 7

CENTRAL ELECTRONICS ENGINEERING RESEARCH INSTITUTE 38

PITHAMPUR MAHLE ENGINE COMPONENTS INDIA PVT. LTD. 6

PINNACLE INDUSTRIES LTD. 5

PUNE APS LIFETECH 6

ASCENT CYBER SOLUTIONS PVT. LTD. 10

BANK OF MAHARASHTRA 20

BHARAT FORGE LTD 19

CENTURY TEXTILES 10

CHIZEL PRINTS MANUFACTURING PVT LTD 6

FORBES MARSHALL 10

INDIAN METEOROLOGICAL DEPARTMENT 12

INTER-UNIVERSITY CENTRE FOR ASTRONOMY AND ASTROPHYSICS (IUCCA) 4

LIVEWEAVER INDIA PVT.LTD 10

MINDA CORPORATION LTD 5

SA ELECTRONIC 5

TATA COMMUNICATIONS LTD. 5

TATA MOTORS LTD. 10

TATA TECHNOLOGIES LIMITED 10

RAIPUR RAWAN CEMENT WORKS 10

REDDIPALAYAM REDDIPALAYAM CEMENT WORKS 8

RENUKOOT HINDALCO INDUSTRIES LIMITED 8

RENUSAGAR HINDALCO INDUSTRIES LIMITED 13

RISHRA ADITYA BIRLA INSULATOR 6

ROORKEE GOVERNMENT IRRIGATION WORKSHOP 9

ROURKELA ROURKELA STEEL PLANT 68

SAHIBABAD BHARAT ELECTRONICS LIMITED 5

SANGAREDDY AB-INBEV INDIA LIMITED (CHARMINAR BREWERIES) 4

SHAMBUPURA ADITYA CEMENT WORKS 6

SHIMLA HELPAGE INDIA 6

SIMGA HIRMI CEMENT WORKS 9

SURAT JNJ MACHINES PVT. LTD. 3

MAVERICK INSTITUTE PVT LTD 9

TADPATHRI ULTRATECH CEMENT LIMITED 6

THANE ECLIPSE INSTRUMENTATION PVT. LTD. 7

TIRORA ADANI POWER 7

TRIVANDRUM CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY 7

ISRO INERTIAL SYSTEMS UNIT 5

UST GLOBAL 40

UDAIPUR PYROTECH ELECTRONICS PVT. LTD. 15

VINAYAK BUILDTECH 4

Page 6: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

UMIAM NORTH EASTERN SPACE APPLICATIONS CENTRE 14

VIJAYAWADA ANDHRA PRADESH INNOVATION SOCIETY 15

EFFTRONICS SYSTEMS PVT. LTD. 11

VIJAYNAGAR JSW STEEL 29

VISAKHAPATNAM ANDHRA PRADESH INNOVATION SOCIETY 9

HINDUSTAN PETROLEUM CORPORATION LIMITED 4

SARDA METALS & ALLOYS 8

VITHALPUR HONDA MOTORCYCLE & SCOOTER INDIA PVT. LTD. 3

205 2119

Page 7: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

BIRLA INSTITUTE OF TECHNOLOGY & SCIENCE

PILANI (Rajasthan) PRACTICE SCHOOL DIVISION

PROBLEM BANK PROFORMA for PS-II Station : Center : PS-II Problem Bank for Semester : Session : Note: Please fill in duplicate and send a copy to the PS Division and keep one copy for your records. Please fill in the form legibly

(preferably typed). 1. Serial No. of the Assignment : 2. Assignment Priority No. : 3. Title of the Assignment : 4. STATEMENT OF THE ASSIGNMENT (a) Details about the project description in terms of broad phases:

(b) Identifying various components of the assignment : 5. Estimate the assignment duration (A PERT like chart would be helpful): 6. STUDENT INPUT REQUIREMENT: (a) Total No. of students needed : (b) Type of students required : (i) Discipline-wise break-up with numbers : (ii) Specific Institute-based courses in which the students have background : (iii) Project or any other experience needed on part of students :

(iv) Personality traits desired : 7. Any other relevant information in terms of: (a) Any field trips required? If so, : (i) Estimated Frequency : (ii) Duration : (iii) Possible places of visit :

(b) Knowledge of any specific language required for the project assignment : Any of the following skills are necessary:

(c) Facilities expected to be used by the student : (d) Skills required for using such facilities: (e) Name and Designation of the expert of the organization with whom you have discussed the assignment and who

would be associated with the assignment. (f) Name and Designation of the person who would be associated with the assignment

Date : Signature of PS Faculty

Page 8: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

(A Specimen)

Skoda Auto India Pvt. Ltd., Mumbai STATION DETAILS **-may subject to change

Address Andheri East,Chakala Metro Station,Mumbai

Stipend(Rupees per Month) 14000

**Preferred Discipline(s) -

Accomodation Affordable accommodations can be found in nearby colonies - JB Nagar, Poonam Nagar, Shanti Nagar, Sher-E-Punjab

Food No Facilities

Transport No Facilities

Website www.skoda-auto.co.in

Other Benefits none

PROBLEM BANK DETAILS

Problem No. 1/4

Problem Title Network Development

Problem Description

To support network team in managing, monitoring, coordinating in network planning activities and new CICD roll out at dealership as a part of rebranding. *Outcome/ Result expected from the Project: 1) Support in automation of enquiries received from various prospects for dealership. 2) Coordinating for various activities and ensure process implementation in department. 3)Completion and coordination of CICD rebranding of the assigned SAIPL dealership in line the SKODA approved layouts

Skill Set

Project management , Problem Solver, Self-starter , Ability to follow instructions , Ability to learn fast , Ability to multitask , ability to work in group , Confidence , Enthusiastic , Good Communication Skills , independent worker, capable of self-management , Marketing and Analytics , MS EXCEL , MS OFFICE

Problem No. 2/4

Problem Title Sales Planning

Problem Description

1) Study the DMS Process and make a process book for the different options and modules of Sales Planning functions available on DMS especially study and analyses the B8 process module. 2) MIS preparation. 3) Analysis on the process of Dealer Claim settlement. 4) Study of wholesale process and preparing the WS process SOP. *Outcome/ Result expected from the Project: 1) Have an SOP for DMS Sales Planning Functions. 2) Helpful in analyzing and studying of the past trends. 3) Streamlining of the Dealer Claim settlement process. 4) WS Process SOP development..

Skill Set

Problem Solver, Self-starter , Ability to follow instructions , Ability to learn fast , Ability to multitask , ability to work in group , Confidence , Enthusiastic , Good Communication Skills , Good in business analysis, product management , Good reporting skill , independent worker, capable of self-management , Marketing and Analytics , MS EXCEL , MS OFFICE , Presentation skills , Willingness to explore & learn

Problem No. 3/4

Problem Title Corporate Sales

Problem Description

1) Study the car buying / renewal policies of Major Corporates. 2) Study the Business Model of Taxi Aggregators. *Outcome/ Result expected from the Project: 1) Mapping of major corporates across India on the basis of Eligibility of Employees / Fleet Size and its renewal timelines. 2) Profitability study of the business model and to find the right fit from Skoda portfolio.

Skill Set Problem Solver, Self-starter , Ability to follow instructions , Ability to learn fast , ability to work in group , Confidence , Enthusiastic , Good Communication Skills , Marketing and Analytics , MS EXCEL , MS OFFICE , Presentation skills

Problem No. 4/4

Problem Title Sales

Problem Description

Detail Analysis of Dealership Sales funnel *Outcome/ Result expected from the Project: Arrest the Gap in Sales Funnel

Skill Set

Problem Solver, Self-starter , Ability to follow instructions , Ability to learn fast , Ability to multitask , ability to work in group , Confidence , Dedicated , Good Communication Skills , Leadership , Marketing and Analytics , MS EXCEL , MS OFFICE , Out of box thinking , Presentation skills

Page 9: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

(A Specimen)

BIRLA INSTITUTE OF TECHNOLOGY AND SCIENCE, PILANI (RAJ.) PRACTICE SCHOOL DIVISION

PS-II PREFERENCE FORM-A I- Semester, 2018-2019

ID No: Name:

Hostel Address : CGPA:

Stn. code

PS-II Stn & Location Pref. No Stn. code

Assignment No(@)

1. ADITYA AUTO PRODUCTS & ENGG (I) .P.LTD. , BANGALORE 1

2. ADITYA BIRLA GROUP -DATA AND ANALYTICS , BANGALORE 2

3. Aditya Birla Insulators , Halol 3

4. ADITYA BIRLA SCIENCE & TECHNOLOGY COMPANY LTD. , MUMBAI 4

5. ADOBE SYSTEMS , BANGALORE 5

6. ADOBE SYSTEMS , NOIDA 6

7. AFOUR TECHNOLOGIES , PUNE 7

8. AGARWALS HEALTHCARE LIMITED , CHENNAI 8

9. ALTAIR ENGINEERING INDIA PVT. LTD. - SOFTWARE DIVISION , BANGALORE 9

10. AMAZON BUSINESS INTELLIGENCE , HYDERABAD 10

11. AMAZON DEVELOPMENT CENTER , BANGALORE 11

12. AMAZON DEVELOPMENT CENTER , DELHI 12

13. AMAZON DEVELOPMENT CENTER , HYDERABAD 13

14. AMERICAN EXPRESS - BIG DATA LABS (BDL) , BANGALORE 14

15. AMERICAN EXPRESS - RISK INFORMATION MANAGEMENT €“ CAPABILITIES (RIM- C) , BANGALORE

15

16. AMERICAN EXPRESS INDIA-RISK INFORMATION MANAGEMENT-CAPABILITIES(RIM-C) , GURGAON

16

17. AMRUT INTERNATIONAL , GANDHINAGAR 17

18. ANALOG DEVICES INDIA PVT. LTD. , BANGALORE 18

19. ANANT INFOMEDIA PVT. LTD. , GOA 19

20. APOLLO TYRES LTD. ADVANCED ENGINEERING CENTRE , CHENNAI 20

21. APPLE INDIA PVT LIMITED , HYDERABAD 21

22. ARM EMBEDDED TECHNOLOGIES PRIVATE LIMITED , BANGALORE 22

23. ARM EMBEDDED TECHNOLOGIES PRIVATE LIMITED , NOIDA 23

24. AUQUAN , BANGALORE 24

25. B.G.SHIRKE CONSTRUCTION TECHNOLOGY PVT. LTD. , PUNE 25

26. BALDOR TECHNOLOGIES PVT LTD , MUMBAI 26

LEGEND @ For each station, mention PS Assignment Nos. from the Problem Bank in which you would like to participate in order of

priority. Please mention any additional information in terms of the following: (A) Project assignments undertaken (through Institute based courses and activities). (B) Organizational and committee work. (C) Future aspirations. (D) Knowledge of foreign languages. Be precise and write only authentic information (Use a separate sheet).

(E) Have you already got a placement offer: Y N

If yes name of the Company and Place: It is appreciated that you may have certain needs and factors such as monetary considerations, personal and family problems or any other matter which you would like us to keep in mind while arriving at the final allotment decision. (Mention clearly on a separate sheet). Date: Signature of Student

Page 10: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

PS – II (STUDENTS ALLOTMENT) DETAILS FOR I SEM. (2018-2019) (As on 28/07/2018)

Centre PS Station ( No. of Students ) Stipend per month No. of Students

Aurangabad Skoda Auto India Pvt. Ltd. 8000 2 Bangalore Aditya Auto products & Engg (I) .P.Ltd.

20000 1 Aditya Birla Group -Data and Analytics

30000 3 Adobe Systems

40000 4 Altair Engineering India Pvt. Ltd. - Software Division

21500 2 Amazon Development Center

40000 10 American Express - Big Data Labs (BDL) 100000 3 American Express - Risk Information Management –Capabilities(RIM- C) 30000 2 Analog Devices India Pvt. Ltd.

25000 2 ARM Embedded Technologies Private Limited

28000 17 Auquan 20000 2 Beckman Coulter (formerly ReaMetrix India P Ltd)

15000 2 belong.co

20000 3 Blue Jeans Network India Pvt. Ltd.

50000 7 Bosch

15000 1 Bosch Research and Technology center

25000 4 Bundl Technologies Private Limited (Swiggy)

40000 17 Capillary Technologies - Testing Automation

40000 3 Centre for Artificial Intelligence & Robotics

12000 2 Chizel Prints Manufacturing PVT LTD

10000 2 Cisco Systems (India) Pvt. Ltd - Software Engineering

44000 6 Cloudcherry Analytics Pvt Ltd

30000 4 Cohesity Storage Solutions India Pvt. Ltd. 90000 2 Dell R&D

25000 3 Ericsson Global India Pvt. Ltd.

35000 4 Ernst & Young Global Delivery Services

25000 3 Eye - D

12000 2 Fidelity Investments

40000 3 Genpact

18000 25 Goldman Sachs India Pvt. Ltd. - Operations

35000 12 Goodera (NextGen PMS Pvt. Ltd)- Non IT

40000 7 Goodera (NextGen PMS) - IT

65000 10 Groww

21000 1 HAPPAY (VA Tech Ventures Pvt Ltd.)

40000 1 HCL Technologies 18000 6 HealthCubed

15000 2 Hindustan Unilever Research Centre

20000 9 HSBC

35000 4 HyperVerge Inc

45000 1 IBM India Software Group

30000 15 IMS Health

16500 1 Infinera

35000 4 InMobi - Software Development

35000 5 InMobi- Business Development

25000 23 Intel - Computer and VLSI Architecture

22000 8 Intel - GPU and VLSI Design

22000 10 Intel - Testing & Verification 22000 4

Page 11: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

JDA Software Solutions 25000 24 John F Welch Technology Center (GE)

25000 4 JP Morgan Chase - Technology

35500 10 JPMC CIB Operations

35000 9 Kristal.AI

40000 2 Kubric.io

25000 2 Lowes India

25000 5 Media Iq Digital

35000 6 Mercedes Benz

25000 8 National Aerospace Laboratories

12000 3 National Entrepreneurship Network

15000 7 NetSkope Software India Pvt. Ltd.

40000 1 Nutanix Technologies India Pvt Ltd - Data Science 90000 1 Nutanix Technologies India Pvt Ltd - MTS

90000 10 Nvidia Graphics - Hardware

35000 19 Nvidia Graphics -Software

35000 19 Oracle India Pvt Ltd.

35000 7 PAYPAL

50000 2 Postman

40000 4 PricewaterhouseCoopers (PWC)

40000 2 Qubole

85000 9 Reliance Jio

35000 8 Robert Bosch Center for Cyber Physical Systems

10000 2 Samsung R &D Institute - Image & Video Processing

35000 6 Samsung R &D Institute - Intelligent Services 35000 6 Samsung R &D Institute - Networks

35000 7 Samsung Semiconductor India R&D Center

35000 7 Sattva Media & Consulting Pvt Ltd

18000 2 SKF India Ltd.

6000 2 StateStreet Global Advisors

40000 4 Sun Mobility

15000 4 SupplyBasics - E-Commerce

25000 3 TapChief

20000 5 TESCO Hindustan Service Centre

30000 5 Texas Instruments (I) Pvt. Ltd - Systems

40000 2 Texas Instruments (I) Pvt. Ltd. -Analog

40000 2 Texas Instruments (I) Pvt. Ltd. -Digital 40000 1 Thinkerbell Labs - Electronics

25000 1 Thinkerbell Labs - Mechanical Design

25000 1 Thinkerbell Labs - Partnerships

22500 1 Thinkerbell Labs - People Operations

22500 1 Thorogood

25000 4 Udhyam Learning Foundatation

20000 5 VMware Software India Pvt. Ltd.

35000 3 Wealth India Financial Services Pvt. Ltd

30000 4 Zinnov Management Consulting Pvt. Ltd (IT Project)

30000 3 Zinnov Management Consulting Pvt. Ltd.

18000 11 Chennai

Agarwals Healthcare Limited 25000 2

Apollo Tyres Ltd. Advanced Engineering centre 25000 6

Belief Systems 12000 2

Page 12: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

Central Leather Research Institute (CLRI) 12000 8

Crigloo 30000 2

Ericsson Global India Pvt. Ltd. 35000 9

FreshWorks Inc 25000 3

Frost & Sullivan 15000 2

Healthcare Technology Innovation Centre (HTIC) 10000 3

Paypal 50000 11

PricewaterhouseCoopers (PWC) 40000 3

S.R. BATLIBOI & CO. LLP 21000 3

Structural Engineering Research Centre 12000 2

UST Global 20000 5

Delhi

Amazon Development Center 40000 1

Ecom Express Pvt. Ltd. 30000 3

Goodera (Next Gen PMS) (Non IT) 40000 2

Goodera (Next Gen PMS) (Non IT) 65000 2

Kraftshala 15000 2

National Council of Applied Economic Research 12000 2

National Institute of Science and Tech. Dev. Studies (NISTADS) 12000 4

PricewaterhouseCoopers (PWC) 40000 9

Sattva Media and Consulting Pvt Ltd 20000 1

Germany FATH GmbH Components 92592 1

Goa

Anant Infomedia Pvt. Ltd. 25000 4

Siemens Ltd 21000 2

Greater noida

Mahle Behr India 8000 3

ST Microelectronics(I) Pvt.Ltd. 26000 3 Gurgaon

American Express India-Risk Information Management-Capabilities(RIM-C) 30000 2

Ericsson Global India Pvt. Ltd. 35000 4

Ernst & Young (Advisory Services) 15100 2

Nykaa 40000 3

OYO Rooms 45000 3

Pluss Advanced Technologies Pvt. Ltd. 12000 2

Reckitt Benckiser 25000 2

Rivigo Services Pvt Ltd 40000 3

Studypad 20000 9

United Airlines Business Services Pvt. Ltd. 32000 2

wheels Eye 20000 6

Zinnov Management Consulting Pvt. Ltd. 15000 2

Halol Aditya Birla Insulators 15000 5 Hyderabad

Amazon Business Intelligence 40000 1

Amazon Development Center 40000 3

Apple India Pvt Limited 45000 6

Dream Vu 25000 1

GGK Technologies - Mobile Services 25000 31

IMI Connect Product Development 35000 3

IMI Mobile R&D 35000 7

JDA Software Solutions 26000 9

JPMC - Technology 35500 5

LV Prasad Eye Institute 20000 4

Mytrah Energy (India) Private Limited 25000 2

Novartis 25000 2

Page 13: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

Nvidia Graphics - Hardware 35000 2

Nvidia Graphics - Software 35000 1

Oracle India Pvt Ltd. 35000 7

OYO Rooms 45000 5

Perceptive Analytics 20000 2

PricewaterhouseCoopers (PWC) 40000 8

RBJ Technologies Pvt Ltd 15000 2

ReportGarden Technologies Pvt. LTd. 25000 8

Synergiz Global 15000 3

Synopsys India Pvt. Ltd. 20000 2

Tau Films India Pvt. Ltd 40000 1

UBS Business Solutions (India) Private Limited - Group Operations 25000 2

Vasant Chemicals and Organics Ltd. 7500 2

Worley Parsons India 19000 3

Xilinx India Technology Services Pvt. Ltd. 20000 5

Jamshedpur Tata Motors Ltd. 18000 3

Kolkata Texmaco Rail & Engineering Ltd. 3000 2

Lucknow Tata Motors Ltd. 18000 3 Mumbai

Aditya Birla Science & Technology Company Ltd. 13000 4

Baldor Technologies Pvt Ltd 30000 4

Century Rayon 7500 3

Credit Suisse - Credit Analytics 40000 5

Credit Suisse - Finance Change 40000 1

Credit Suisse - Global Markets Controls COO 40000 6

Credit Suisse - Market Risk Quant 40000 3

Credit Suisse - MLR Non-quant 40000 3

Credit Suisse - Model Risk Management 40000 4

Credit Suisse - Operational Risk Management 40000 1

Credit Suisse - Prime Services 40000 3

Credit Suisse - Risk & Finance Data Analytics Reporting 40000 4

Credit Suisse - Stress Testing 40000 1

DBOI - Credit Risk 30000 7

DBOI - MLRM Risk Methodology & NFRM 30000 3

DBOI - MLRM Risk Methodology & NFRM 30000 2

DBOI - Trading Risk & PL 30000 5

Development Consultants Pvt. Ltd. (DCPL) 8500 2

Exponentia data 25000 5

GEP 30000 4

Goodera - (Next Gen) (Non IT) 40000 2

Grasim Industries Pulp and Fibre Division 17000 2

Here Maps - Distributed Data 30000 10

Hindalco Innovation Centre - Semifab Taloja 10000 2

Hourglass Research 17000 2

J P Morgan Services - Quant 75000 5

J P Morgan Services -Centralized Research Group(CRG) 50000 9

J P Morgan Services- Global Markets Group(GMG) - (Markets +Risk) 75000 7

J P Morgan services- Global research Centre(GRC) 75000 11

Jarvis Technology and Strategy Consulting Pvt. Ltd. 30000 15

JPMC - Technology 35500 5

JPMC CIB Operations 35000 12

Page 14: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

Morningstar 35000 3

MSCI (Global Implementation Services) 40000 1

MSCI (IMR) 40000 2

MSCI (NPD – Index Research) 40000 1

Multi Commodity Exchange of India Ltd. 15000 2

My POS Technologies Pvt. Ltd. 50000 2

Nomura - FinTech 50000 2

Nomura Global Finance 50000 3

Nomura Global Markets 50000 3

Nomura Global Risk 50000 5

PaySense 25000 3

Piramal Group 70000 2

PricewaterhouseCoopers (PWC) 40000 3

QUANTIPHI 30000 5

Reliance Jio 35000 5

Samhita Social Ventures 18000 2

Skoda Auto India Pvt. Ltd. 14000 7

UBS Business Solutions (India) Private Limited - GRC 25000 5

UBS Business Solutions (India) Private Limited - Group Operations 25000 4

UBS Business Solutions (India) Pvt. Ltd. - IMT 25000 1

UltraTech Cement Limited (Ahura Centre) 50000 5

UPGRAD 40000 4

Viacom18 Media Pvt. Ltd - Digital Ventures 30000 3

VMS (Vakil Mehta Seth) Consultants Private Limited 10000 2

Worley Parsons India 19000 3

Nagda Grasim Industries Ltd. 8500 6

Nagpur Techture Structures Pvt Ltd. 12000 3

Neemrana Hero MotoCorp Ltd 5000 2

New Delhi Investopad 10000 1 Noida

Adobe Systems 40000 4

ARM Embedded Technologies Private Limited 28000 2

Ericsson India Global Services Pvt. Ltd 35000 5

Mentor Graphics 30000 3

Nucleus Software Export Ltd 25000 15

Pantnagar Tata Motors Ltd. 18000 1

Pilani Central Electronics Engineering Research Institute 12000 1 Pune

AFour Technologies 25000 2

B.G.Shirke Construction Technology Pvt. Ltd. 10000 2

Bharat Forge Ltd 5000 4

Century Enka Ltd. 10000 3

Credit Suisse - Product Control 40000 2

Credit Suisse - Risk & Finance Data Analytics 40000 1

Credit Suisse - Risk & Finance Data Analytics Reporting 40000 2

Credit Suisse- Finance Change 40000 1

Divgi TorqTransfer Systems Pvt. Ltd Shivare 12500 2

Divgi TorqTransfer Systems Pvt. Ltd. - Bhosari 12500 2

Ecozen Solutions (P) Ltd. 20000 3

HCL Technologies 18000 1

IBM India Software Group 30000 5

IDeaS - SAS - Software Development 30000 5

Page 15: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

Knorr-Bremse Technology Center India Private Limited 15000 2

Mahle Behr 8000 8

Minda Corporation 10000 3

National Chemical Laboratory 12000 1

Nvidia Graphics - Software Systems 35000 5

RBJ Technologies Pvt Ltd 15000 1

Reflexis Systems India Pvt Ltd. 40000 15

Spicer India Ltd. 8000 1

Symantec Software Solutions Pvt. Ltd. - Data Structures and Algorithms 40000 3

Tata Autocomp Systems Ltd. 12000 2

Tata Chemical Innovation Center 10000 4

Tata Motors Ltd. 18000 11

UBS Business Solutions (India) Private Limited - Group Operations 25000 1

UBS Business Solutions (India) Private Limited - IMT 25000 3

UBS Business Solutions (India) Private Limited - RAS FINANCE 25000 7

Satara Spicer India Ltd. 8000 1 Trivandrum

Law Pundits 10000 3

UST Global 20000 33

Udaipur MunshiG Pvt Ltd 21000 6

1216

Page 16: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

Student Bio-Data Details

Basic Information

Name: SHUBHAM AGRAWAL.

Bits ID Number: 2013A7PS190P

Discipline: B.E.(Hons.) Computer Science

Email: [email protected]

CGPA: 7.3

Date of Birth : 23 Nov 1994

Pan Card No : BEZPA3611P

Address: Bai saheb ki pared, Near Priya bread factory, laxmiganj,

Lashkar, Gwalior

Phone No.: 7597106481

Allotted Station: Amazon Development Center Delhi

Practice School-I Details

Name: India Red Cross Society

Designation: Web Resource Portal

Details of on Campus Courses (Including electives):

S.No Course Name S.No Course Name S.No Course Name

LABORATORY PROJECTS-CS PRACTICE SCHOOL-BITS TECHNICAL REPORT WRITING-BITS

COMPUTER NETWORKS-CS DATA MINING-CS OPERATING SYSTEMS-CS

DISCR STRUC FOR COMP SCI-CS DATA STRUCTURES & ALGO-CS COMPUTER ARCHITECTURE-CS

ELECTRICAL SCIENCES-EEE SYMBOLIC LOGIC-HSS DATABASE SYST AND APPL-CS

MATHEMATICS-MATH WORKSHOP PRACTICE-ME GENERAL BIOLOGY-BIO

MACHINE LEARNING-BITS IMAGE PROCESSING-BITS GENERAL CHEMISTRY-CHEM

THEORY OF COMPUTATION-CS MICROPROC & INTERFACING-CS DIGITAL DESIGN-CS

COMPUTER PROGRAMMING-CS COMPILER CONSTRUCTION-CS INTRODUCTORY PYSCHOLOGY-GS

CROSS CULTURAL SKILLS-HSS PROBABILITY AND STATISTICS-MATH MATHEMATICS-MATH

PHYSICS LABORATORY-PHY BIOLOGY LABORATORY-BIO THERMODYNAMICS-BITS

ENGINEERING GRAPHICS-BITS CHEMISTRY LABORATORY-CHEM PRINCIPLES OF PROGG LANG-CS

LOGIC IN COMPUTER SCIENCE-CS DESIGN & ANAL OF ALGO-CS COMPUTER PROGRAMMING-CS

PRINCIPLES OF ECONOMICS-ECON ORGANIZATIONAL PSYCHOLOGY-HSS OBJECT ORIENTED PROG-CS

NUMBER THEORY-MATH MATHEMATICS-MATH MECHANICS, OSCILLATIONS AND WA-PHY

Software Skills:

C,C++,Java, Python, MatLab, Prolog,HTML, SQL, Php, Auto-Cad, Equally comfortable with Unix and Windows environment.

Any Other Projects/Relevant Courses (formal/informal):

SMS-Spam Filter, Sentiment Analysis, Bank Signature Classifier, Stock Market Price Prediction, Music Classifier.

Extra Curricular Activities:

BasketBall, Snooker, Athletics.

Professional Interest:

Software Development, Web Development, Data Mining, Data Science.

Objective in Pursuing PS-II in About 100 Words

To gain experience through working as a full time employee,

Remark

Page 17: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

( A Specimen )

BIRLA INSTITUTE OF TECHNOLOGY & SCIENCE, PILANI (RAJ.)

BITS C412/C413/G639/G650: PRACTICE SCHOOL-II COURSE HANDOUT

PRACTICE SCHOOL DIVISION Dated: 12-01-2017

1.DURATION 12-01-2017 to 17-06-2017

2.NAME OF THE STATION Aditya Birla Management Corporation Pvt. Ltd.

3.ADDRESS OF THE STATION BITS Pilani Project Office

4.WEBSITE www.bits-pilani.ac.in

5.TELEPHONE NUMBER 08058585899

6.FAX 01596 244183

7.COORDINATOR

NAME Mr. Manish Dave

DESIGNATION General Manager

ADDRESS BITS Pilani Project Office

PHONE 08058585899

EMAIL [email protected]

8. FACULTY

NAME PSD

ADDRESS -

PHONE Not Available

EMAIL Not Available

OFFICE TIMINGS 09:00AMto05:00PM

WEEKLY HOLYDAYS Sunday

FACULTY WEEKLY SCHEDULE Tuesday, Thursday and Saturday

9. BRIEF DESCRIPTION ABOUT THE ORGANAIZATION Aditya Birla Management corporation Private Limited works on the Vision 2020, Mission 2015 project at BITS Pilani. This organization works closely with the leadership team across the four campuses (three Indian campuses +Dubai campus). The organization intends to develop a dashboard to integrate the four campuses. 10. PS-II PROGRAM Students will be given a brief orientation about the organisation and this will be followed by detailed exposure to the selected technology and the products for a period of two to three weeks. Projects will be assigned on the basis of this initial exposure and student interest.

Page 18: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

11. EVALUATION SCHEDULE

Evaluation Component Date Weightage

QUIZ1 26-01-2015 7

OBSERVATION1 09-02-2015 3

DIARY 1 13-02-2015 1

GROUP DISCUSSION 1 13-02-2015 7

OBSERVATION 2 09-03-2015 3

SEMINAR1 13-03-2015 10

PROJECT REPORT 1 13-03-2015 10

VIVA1 13-03-2015 2

OBSERVATION 3 09-04-2015 3

DAIRY 2 10-04-2015 2

QUIZ 2 17-04-2015 8

GROUP DISCUSSION 2 08-05-2015 8

OBSERVATION 4 08-05-2015 3

DAIRY 3 05-06-2015 2

OBSERVATION 5 11-06-2015 3

SEMINAR2 15-06-2015 10

PROJECT REPORT 2 15-06-2015 15

VIVA2 18-06-2015 3

12. Mid-Term Evaluation

• Q1+G1+01+D1+V1+S1+P1+O2 = 43% Weightage • Date of announcement of MID-TERM grades: 31-03-2015 13. Make Up Make up shall not be provided for group discussion.Make up for other components of evaluation,wherever feasible,will be offered only for genuine cases 14. Mid-semester and final grading Grading will be generally done by preparing a histogram of the marks obtained by the students and cluster analysis,keeping in view the maximum,minimum and average marks of the group. 15. Special Instructions Taking leave during the PS program is not allowed.In cases of extreme emergency prior permission is to be taken from the instructor.Any such leave is to be compensated by working on holidays.Fornightly progress report is to be submitted on 1st and 15th of every month. 16. Format for project report Project report has to be prepared in the prescribed format and a copy of this format will be made available

Dated: 12/01/2015 11:01:46 AM

Instructor's Name: PSD

Page 19: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

(A Specimen)

PS-II Evaluation: Weightage for Attributes Attributes % Weightage A1 Knowledge of Concepts A1.1 With which he is already familiar 9 A1.2 Newly introduced at Practice School 4 A1.3 Depth of Knowledge 2 A2 Application of Principles A2.1 In a given situation 7 A3 Intellectual Ability A3.1 To comprehend and act in new situations 4 A3.2 To follow logical path in problem-solving 5 A4 Creativity & Originality A4.1 Conceiving new and good solutions 6 A4.2 Suggesting practical and good solutions 3 A5 Professional Judgement & Decision-Making Ability A5.1 In evaluating alternatives 5 A6 Inter-Disciplinary Approach A6.1 Broad-based knowledge 3 A6.2 In problem-solving situation 3 A7 Skills for Data Handling A7.1 Understanding of data gathering/processing techniques 2 A7.2 Choice of measurement tools 2 A7.3 Skills for hardware implementation 1 A8 Documentation A8.1 Review of literature 3 A8.2 Organizing the material 4 A9 Self-Expression A9.1 Conveying the ideas clearly 1 A9.2 Delivery and style of presentation 2 A9.3 Language 4 A9.4 Black-board presentation 1 A9.5 Platform manners 1 A9.6 Introducing and ending of the presentation 1 A10 Initiative A10.1 In taking lead in problem solving situations 3 A11 Self-reliance A11.1 Confidence in one's own abilities 3 A12 Cooperation A12.1 With group/instructor and organization 3 A13 Leadership A13.1 Organizing the efforts of the group 3 A13.2 Moderating discussions 3 A13.3 Inspiring the group members 1 A14 Industry A14.1 Making forceful efforts to know more 1 A14.2 Desire to exceed minimum effort expected 2 A15 Sense of Responsibility A15.1 Reliability in meeting problem objectives 1 A15.2 Planning and meeting deadlines 2 A15.3 Punctuality 2 A16 Social Sense A16.1 Ability to create good impression and act accordingly 3

Page 20: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

RECORPRACTICE SCHOOL DIVISION

RECORD OF ACADEMIC PERFORMANCE IN PRACTICE SCHOOL

DHANEKULA ABHIMANYU CHOWDARY (2010B2A1587G) Degree for which PS Requirement is complete: M.Sc.(Hons.) Chemistry B.E.(Hons.) Chemical

PS-I

Course No: BITS C221

Units : 05

Duration : May 21 to July 13, 2012

Station : THE SINGARENI COLLIERIES COMPANY LTD.,KOTHAGUDAM

Grade : A

Project Title : SINGARENI COLLIERIES COMPANY LIMITED ........................................................................................................................................................... PS-II

Course No: BITS C412

Units : 20

Duration: 04 Jul 2015-12 Dec 2015

Station : Indian Institute of Chemical Technology , Hyderabad

Grade Awarded : A

Number of days attended : 161

Instructor : SAMIR RAMDAS KALE

Project Title : Commercialization of Hydrazine Hydrate production

Date of Issue ( 18/10/2016) Incharge Instruction Cell Dean Practice School Division

BITS Pilani,Pilani Campus

Tel(0):+ 91-40-66303824

Vidya Vihar, Fax:+91 1596244183

Pilani-333031 Email:[email protected]

Page 21: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

PRACTICE SCHOOL DIVISION

RECORD OF ACADEMIC PERFORMANCE IN PRACTICE SCHOOL

DHANEKULA ABHIMANYU CHOWDARY (2010B2A1587G) Degree for which PS Requirement is complete: M.Sc.(Hons.) Chemistry B.E.(Hons.) Chemical

The following traits are rated to the options- EXCELLENT,GOOD, AVERAGE, POOR , VERY POOR

Sr.No Personality Traits Rating

1 Intellectual Ability Good

2 Professional Judgement Excellent

3 Problem Solving Ability Excellent

4 Decision-Making Ability Excellent

5 Ability to communicate Excellent

6 Initiative and self-reliance Excellent

7 Teamwork Excellent

8 Leadership Excellent

9 Punctuality Excellent

10 Sense of responsibility Excellent

11 Creativity and Art of Guestimation Excellent

12 Knowledge of fundamental Principles Excellent

13 Time Management Excellent

14 OVERALL PERFORMANCE Excellent

15 Hardworker Excellent

16 Discipline Excellent

17 Creative Good

18 Technical Skills Good

19 Soft Skills Good The Statements below best describe the student's total personality observed during Practice School II

should be hardworking In the judgement of the PS II faculty, the student can best match the following professional activities, in order of preference :

Sr.No Professional Activities Professional Activities Rating

1 Development 1

Date of Issue ( 18/10/2016) Incharge Instruction Cell Dean Practice School Division

BITS Pilani,Pilani Campus

Tel(0):+ 91-40-66303824

Vidya Vihar, Fax:+91 1596244183

Pilani-333031 Email:[email protected]

D OF ACADEMIC PERFORMANCE IN PRACTICE SCHOOL

Page 22: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

8

BIRLA INSTIUTE OF TECHNOLOGY & SCIENCE, PILANI (RAJ.)

PRACTICE SCHOOL DIVISION SURVIVAL CHART OF PS-II STATIONS

Sr. No

Station

In Operation from

Total Semesters

1 20North Online, Bangalore II Sem. 2010 04

2 6S Capital II Sem. 2009 01

3 A.T.E. Enterprises Private Limited Research & Development, Ahmedabad II Sem. 2015 01

4 A.T.E. Enterprises Private Limited Research & Development, Bangalore II Sem. 2015 02

5 Abexome Biosciences, Bangalore II Sem. 2010 04

6 Accenture, Bangalore II Sem. 2004 07

7 Ace Business and Market Research Group, Surat II Sem. 2014 02

8 ActiveCubes Solutions India (P) Ltd., Bangalore I Sem. 2008 01

9 Adaequare Info Pvt. Ltd., Hyderabad I Sem. 2009 09

10 Aditya Auto Products & Engg. India Pvt. Ltd., Bangalore I Sem. 2002 12

11 Aditya Birla Chemicals Ltd., Thailand II Sem. 2009 12

12 Aditya Birla Corporate IT, Bangalore II Sem. 2009 01

13 Aditya Birla Corporate IT, Mumbai II Sem. 2009 11

14 Aditya Birla Corporate World Class Manufacturing, Mumbai II Sem. 2010 06

15 Aditya Birla Financial Trade Services, Mumbai II Sem. 2010 01

16 Aditya Birla Insulator Ltd., Bangalore I Sem. 2008 01

17 Aditya Birla Insulator Ltd., Halol (Vadodara) I Sem. 2008 13

18 Aditya Birla Insulators, Rishra II Sem 2017 01

19 Aditya Birla Management Corporation Pvt. Ltd., Hyderabad II Sem. 2014 01

20 Aditya Birla Science & Technology Company Ltd., Mumbai II Sem. 2009 18

21 Aditya Birla Skills Foundation-( part of Aditya Birla Group), Bhubaneswar I Sem.2016 01

22 Aditya Birla Group -Data and Analytics, Bangalore I Sem 2018 01

23 Administrative Staff College of India, Hyderabad I Sem. 1976 35

24 Adobe Systems, Bangalore II Sem. 2015 04

25 Adobe Systems, Noida II Sem 2018 02

26 Adobe, Noida II Sem. 2011 06

27 Adormi Technologies, Bangalore II Sem. 2011 02

28 AET Solutions, Detroit, Michigan, U.S.A. I Sem. 2004 02

29 AFour Technologies, Pune I Sem 2018 01

30 Agarwals Healthcare Limited, Chennai I Sem 2018 01

31 Agilent Tech. Interntional Pvt. Ltd. Gurgaon (Delhi) II Sem. 2006 03

32 Agilent Tech. Interntional Pvt. Ltd., Bangalore I Sem. 2006 04

33 Airbus Engineering Center India, Bangalore II Sem. 2009 01

34 Airbus India Operations Pvt Ltd., Bangalore II Sem 2014 01

35 AirTight Networks Inc., Pune I Sem. 2006 01

36 Akira Consultancy Private Limited, Bangalore I Sem. 2015 02

37 Akosha, Bangalore II Sem. 2015 01

38 Alembic Ltd., Baroda II Sem. 2004 02

39 Alfa Laval (India) Limited , Pune II Sem. 2016 01

Page 23: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

9

40 Alexa Apps, Hyderabad II Sem 2018 01

41 Algo Embedded Systems, Bangalore I Sem. 2006 01

42 Algoscale, Ghaziabad II-Sem 2014 01

43 Alliance Infotech Pvt. Ltd., Delhi I Sem. 2011 05

44 Alndra Systems, Bangalore I-Sem 2014 01

45 Alpha Beta Labs, Bangalore II Sem. 2010 03

46 AlphaMD, Mumbai II Sem 2017 02

47 Alstom India, Baroda I-Sem. 2008 02

48 Altair Engg. India Pvt. Ltd., Bangalore I-Sem. 2005 24

49 Altair Engineering India Pvt. Ltd. - Software Division, Bangalore I Sem 2018 01

50 Altimetrik India Pvt Ltd, Bangalore II Sem 2017 01

51 Altisource Business Solutions, Bangalore II Sem 2017 02

52 Amazon Business Intelligence, Hyderabad I Sem 2017 04

53 Amazon Development Center, Bangalore I Sem 2018 01

54 Amazon Development Center, Delhi I-Sem. 2015 06

55 Amazon Development Centre, Chennai II Sem. 2009 12

56 Amazon Development Centre, Hyderabad II-Sem. 2007 20

57 Amazon Development Centre-India, Bangalore I-Sem. 2005 20

58 Amazon Fulfillment Center, Bangalore II Sem 2017 02

59 Amazon Fulfillment Center, Chennai II Sem 2017 02

60 Amazon Fulfillment Center, Gurgaon II Sem 2017 01

61 Amazon Fulfillment Center, Hyderabad II Sem 2017 02

62 Amazon Fulfillment Center, Mumbai II Sem 2018 01

63 Amazon Operations, Mumbai II Sem 2017 01

64 American Express India, Bangalore II Sem 2017 03

65 American Express - Big Data Labs (BDL) , Bangalore I Sem 2018 01

66 American Express India, Gurgaon I-Sem.2016 03

67 American Express India - Risk Information Management Capabilities (RIM- C), Gurgaon

II Sem 2018 02

68 American Express - Risk Information Management Capabilities (RIM- C), Bangalore

I Sem 2018 01

69 Anant Infomedia Pvt. Ltd., Goa I Sem 2018 01

70 Analeaner Technologies, Hyderabad I-Sem. 2012 01

71 Analog Devices (I) Pvt. Ltd., Bangalore II-Sem 1999 30

72 Analog Devices - Design and Simulation, Bangalore II Sem 2018 01

73 Analog Devices - Design Verification , Bangalore II Sem 2018 01

74 Analog Devices India Pvt Ltd -Quality management , Bangalore II Sem 2018 01

75 Andhra Pradesh State Financial Corporation, Hyderabad I-Sem. 2012 02

76 Ankur Scientific Energy Systems, Baroda I-Sem. 2009 07

77 Anovp, Delhi I-Sem 2014 02

78 Anu Labs, Hyderabad I Sem. 2011 01

79 ANZ Grindlays., Bangalore II-Sem 2014 02

80 Apex Decisions, Bangalore II Sem. 2009 06

81 Apex Laboratories Pvt. Ltd., Chennai II Sem. 2011 02

82 Apigee, Bangalore I Sem. 2011 04

83 Apna Technologies & Solutions, Bangalore II Sem. 2010 01

Page 24: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

10

84 Apollo Tyres Ltd., Bangalore I-Sem.2016 03

85 Apollo Tyres Ltd. Advanced Engineering center , Chennai I Sem 2018 01

86 Appcito Networks Pvt.Ltd., Bangalore I-Sem 2014 01

87 Apple India Private Limited, Bangalore I Sem 2017 01

88 Apple India Pvt Limited , Hyderabad I Sem 2018 01

89 Apprick technologies,Noida I-Sem. 2014 01

90 Aptean,Bangalore I-Sem 2014 01

91 Aranca, Bangalore I Sem 2017 01

92 ARCI’s Centre for Fuel Cell Technology, Chennai II Sem. 2010 07

93 ARDC Design Complex – HAL, Bangalore II-Sem. 2005 09

94 Areca Embedded Sys. Pvt. Ltd., Hyderabad II Sem. 2013 01

95 Arista Networks India Pvt. Ltd., Bangalore I Sem. 2011 01

96 ARKA IMS Pvt. Ltd. (Formerly Saha Software Solutions Pvt. Ltd.), Hyderabad

I Sem. 2010 03

97 ARM Embedded Technologies Private Limited., Bangalore II Sem 2017 04

98 ARM Embedded Technologies Private Limited., Noida I-Sem. 2015 03

99 ARM, Bangalore I-Sem. 2008 16

100 Aruba Networks, Bangalore II-Sem. 2007 13

101 Ascendum Systems (P) Ltd., Bangalore II-Sem. 2002 06

102 Ascential Software, Hyderabad I- Sem 2005 01

103 AspirantHunt, Delhi II Sem. 2009 02

104 Aster Teleservices Ltd., Hyderabad I-Sem. 2010 03

105 A.T.E. Enterprises Private Limited, Pune II Sem 2018 01

106 Atidan Technologies, Mumbai II Sem. 2010 02

107 Atrenta (India) Pvt. Ltd., Delhi II-Sem. 2004 02

108 ATS Services Pvt. Ltd., Delhi II-Sem. 2006 06

109 Atul Ltd., Valsad II Sem. 2011 06

110 Aujas Networks Pvt. Ltd., Bangalore II Sem. 2010 02

111 Aura Mira Energy Company Pvt. Ltd., Chennai I Sem. 2012 03

112 Aura Semiconductor Pvt. Ltd., Bangalore II Sem. 2011 01

113 Aurigo Software , Bangalore II Sem 2016 03

114 Aurum Equity Partners, Gurgaon I Sem. 2013 05

115 Autodesk, Hyderabad I Sem 2017 01

116 AutoDesk, Pune I Sem. 2013 04

117 AutoRABIT, Hyderabad I Sem 2017 01

118 Auquan, Bangalore I Sem 2018 01

119 Avaya India, Bangalore I Sem. 2011 02

120 Avaya India, Pune I Sem. 2011 10

121 Avedis Microsystems Pvt. Ltd., Bangalore II-Sem. 2002 05

122 Aviva Investors, Mumbai II Sem. 2012 02

123 Avnet India Pvt. Ltd., Bangalore I- Sem. 2000 09

124 Avon Corporation, Mumbai II Sem. 2010 03

125 Avtec Ltd., Hosur I-Sem. 2006 07

126 Avtec Ltd., Sagore (Nagda) I-Sem. 2006 04

127 Axis Securities and Sales Ltd., Mumbai I Sem. 2011 01

128 Azul Systems, Bangalore II Sem. 2013 04

Page 25: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

11

129 B.G.Shirke Construction Technology Pvt. Ltd.,Pune II Sem 2014 08

130 Bain Capability Center Pvt. Ltd., Gurgaon I-Sem. 2015 02

131 Bajaj Auto, Pune II Sem 2018 01

132 Bajaj Auto, Aurangabad II Sem 2018 01

133 Baldor Technologies Pvt Ltd, Mumbai II Sem 2018 02

134 Barclays, Mumbai II Sem. 2015 01

135 Barclays, Noida II Sem. 2015 01

136 Barry-Wehmiller Inte. Resources Pvt. Ltd., Chennai I-Sem. 2006 01

137 BasicNeeds UK, Bangalore II Sem. 2012 03

138 Battelle Science & Technology India Pvt. Ltd., Pune II Sem. 2009 02

139 BEA System, Bangalore II-Sem. 2006 02

140 Beardsell Ltd., Hyderabad II Sem. 2010 01

141 Beardsell Ltd., Mumbai II Sem. 2010 01

142 Beckman Coulter (formerly ReaMetrix India P Ltd). , Bangalore II Sem 2014 09

143 Behr India, Chennai I Sem. 2013 01

144 Behr India, Pune II-Sem. 2006 03

145 belong.co , Bangalore II Sem 2016 06

146 Belief Systems , Chennai I Sem 2018 01

147 Bentley Systems India Pvt Ltd, Pune II Sem. 2015 01

148 Beroe, Chennai I-Sem. 2008 05

149 Bevcon Wayors Pvt. Ltd., Hyderabad II Sem. 2010 04

150 Bharat Dynamics Ltd., Hyderabad I-Sem. 1993 36

151 Bharat Forge Ltd., Pune I- Sem 2004 27

152 Bharat Petroleum Corp. Ltd., Mumbai I-Sem. 2007 01

153 Bharti Airtel, Jaipur II Sem. 2010 01

154 Bharti Beetel Teletech, Delhi II Sem. 2010 01

155 Bharti Soft Bank, Gurgaon I Sem. 2013 02

156 Bharti Telesoft Ltd., Bangalore II-Sem. 2008 01

157 Bharti Telesoft Ltd., Gurgaon(Delhi) II-Sem. 2008 01

158 BioClinitech Technologies Pvt. Ltd., Mumbai II-Sem. 2008 02

159 Biocon, Bangalore II-Sem. 2009 08

160 Bioneeds, Bangalore II Sem. 2013 01

161 Biophore India Pharmaceutical Pvt. Ltd., Hyderabad I Sem. 2011 04

162 Birla Cellulosic, Kharach (Gujarat) I-Sem. 2010 01

163 Birla Copper, Dahej (Gujarat) II Sem. 2009 07

164 Birla Museum, Pilani I-Sem. 2004 03

165 Birla Polyfibers, Harihar (Karnataka) I-Sem. 2010 05

166 Bisecure Networks Pvt. Ltd., Noida (Delhi) I-Sem. 1998 20

167 BITS Pilani - Project Office II Sem 2013 02

168 BITS, Pilani – Hyderabad Campus, Hyderabad II-Sem. 2006 04

169 Bitsunami, Bangalore II-Sem. 2006 02

170 Bitsunami, Chennai I-Sem. 2006 03

171 Blue Jeans Network India Pvt. Ltd. , Bangalore II Sem 2014 09

172 Blue Tree Consultancy Services Pvt. Ltd. , Bangalore II Sem 2014 01

173 BOC India Ltd., Kolkata II-Sem. 2006 14

Page 26: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

12

174 BOC India, Goa I Sem. 2011 01

175 Bombardier, Delhi II Sem. 2018 01

176 Bombardier Transportation, Hyderabad II Sem. 2018 01

177 BOSCH Ltd., Bangalore I-Sem. 2009 07

178 Bosch Research and Technology center, Bangalore I Sem. 2018 01

179 BOSCH Ltd., Goa I Sem. 2011 05

180 Boston Analytics, Mumbai I-Sem. 2007 02

181 Boxbeat Technologies Pvt. Ltd, Gurgaon II-Sem 2014 01

182 Bravo Lucy, Hyderabad II Sem. 2009 09

183 Bridle IT, Chennai I-Sem. 2009 02

184 Bridle IT, Hyderabad II-Sem. 2008 03

185 Broadcom India Pvt. Ltd. , Hyderabad II-Sem 2014 01

186 Broadcom India Pvt. Ltd., Bangalore II- Sem 2003 23

187 Brooks Automation India Pvt. Ltd., Chennai I- Sem 2005 01

188 Browntape Technologies Pvt. Ltd., Porvorim II Sem 2017 01

189 BSE, Mumbai II Sem. 2010 04

190 Buddy Technology, Hyderabad I-Sem. 2010 01

191 Bundl Technologies Private Limited (Swiggy), Bangalore I-Sem. 2015 07

192 Bundl Technologies Private Limited (Swiggy), Chennai I-Sem. 2015 02

193 Bundl Technologies Private Limited (Swiggy), Gurgaon I-Sem.2016 01

194 Bundl Technologies Private Limited (Swiggy), Hyderabad I-Sem. 2015 02

195 Bundl Technologies Private Limited (Swiggy), Kolkata I-Sem.2016 01

196 Bundl Technologies Private Limited (Swiggy), Mumbai I-Sem. 2015 04

197 Bundl Technologies Private Limited (Swiggy),Pune I-Sem.2016 01

198 Busigence, Gurgaon I-Sem.2016 01

199 Business Integration System (I) Ltd. (BISIL), Pune II-Sem. 1994 08

200 Business Objects Software India Pvt. Ltd., Bangalore II-Sem. 2006 04

201 CA India Tech. Pvt. Ltd., Hyderabad II-Sem. 2006 08

202 CA Technologies, Bangalore I-Sem 2014 03

203 CA Technologies, Hyderabad II Sem 2017 02

204 Cadence Design Systems India Pvt Ltd, Bangalore I-Sem 2015 01

205 Cadence Design Systems India Pvt Ltd. - CAD Software, Bangalore II Sem 2018 01

206 Cadence Design Systems India Pvt Ltd. - CAD Software, Pune I Sem 2017 01

207 Cadence Design Systems India Pvt Ltd. - Processor Design , Pune I Sem 2017 02

208 Cadence Design Systems, Noida (Delhi) II-Sem. 1993 14

209 Cadence, Pune II-Sem 2014 02

210 Cadila Pharmaceuticals Ltd., Ahmedabad I-Sem.1999 09

211 Calance Corporation, Gurgaon (Delhi) I-Sem. 2007 03

212 Capgemini, Pune II-Sem. 2008 03

213 Capillary Technologies - Testing Automation, Bangalore II Sem 2017 04

214 Capital One Services (I) Pvt. Ltd., Bangalore II-Sem. 2007 03

215 Carraro Technologies India Pvt. Ltd., Pune II Sem. 2011 02

216 Carwale (Automotive Exchange Pvt. Ltd.),Mumbai I Sem 2014 04

217 CDC Software India (P) Ltd., Bangalore II-Sem. 2007 04

218 CDS Solutions, Pilani I-Sem. 2010 01

Page 27: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

13

219 CEG Limited , Jaipur II Sem 2016 03

220 Centillium India Pvt. Ltd., Bangalore II-Sem. 2005 01

221 Central Bank of India, Mumbai I-Sem. 1976 61

222 Central Building Research Institute, Roorkee I-Sem. 2010 11

223 Central Drug Research Institute, Lucknow II-Sem. 1989 39

224 Central Electronics Engg. Research Institute, Chennai Centre, Chennai II-Sem 1996 25

225 Central Electronics Engg. Research Institute, Pilani I-Sem. 1976 36

226 Central Institute of Road Transport, Pune II-Sem. 2005 11

227 Central Leather Research Institute, Chennai I-Sem. 1990 52

228 Central Road Research Institute, Delhi I Sem. 2012 11

229 Central Scientific Instruments Organization, Chandigarh I-Sem. 1976 57

230 Central Scientific Instruments Organization, Chennai I Sem. 2013 02

231 Centre for Artificial Intelligence & Robotics., Bangalore II Sem 2014 09

232 Centre for Cellular And Molecular Platforms (C-CAMP) ., Bangalore II Sem 2017 01

233 Centre for Development of Advanced Computing, Pune I Sem 2014 02

234 Centre for Development of Imaging Technology (C-DIT), Trivandrum II Sem. 2011 08

235 Centre for DNA Fingerprinting and Diagnostics, Hyderabad II-Sem. 2002 26

236 Century Rayon, Kalyan (Mumbai) I-Sem. 1976 83

237 Century Enka Ltd., Pune I Sem 2018 01

238 Cerner, Bangalore I-Sem.2016 02

239 Chambal Fertilizers and Chemicals Ltd., Kota II-Sem. 2005 17

240 Chitika, Hyderabad II-Sem. 2015 01

241 Cignex Datamatix Technology, Noida I-Sem. 2015 01

242 Cignex Datamatix, Bangalore II-Sem. 2015 01

243 CIPLA Ltd , Goa II Sem 2016 03

244 CIREL Systems, Bangalore I Sem. 2013 02

245 Cisco Systems (I) Pvt. Ltd., Bangalore II-Sem. 2005 20

246 Cisco Systems (India) Pvt. Ltd - Embedded Sytems, Bangalore I Sem 2017 01

247 Cisco Systems (India) Pvt. Ltd - Machine Learning, Bangalore I Sem 2017 01

248 Cisco Systems (India) Pvt. Ltd - Software Engineering, Bangalore I Sem 2017 03

249 Cisco Systems (India) Pvt. Ltd - Software Engineering, Hyderabad I Sem 2017 01

250 Citi Bank, United Kingdom II-Sem. 2007 01

251 Citrix R&D India Pvt. Ltd. (Formerly NetScaler Pvt. Ltd., Bangalore I-Sem. 2004 11

252 CMC Ltd., Hyderabad I-Sem. 2010 09

253 CMC Ltd., Mumbai I-Sem. 2010 07

254 Chizel Prints Manufacturing PVT LTD, Bangalore I Sem 2018 01

255 Cloudcherry Analytics Pvt Ltd, Bangalore I Sem 2018 01

256 Cohesity Storage Solutions India Pvt. Ltd., Bangalore I Sem 2018 01

257 Cognitive Scale, Hyderabad II Sem. 2015 01

258 Cognizant Technology Solutions, Chennai II Sem. 2011 01

259 Commonwealth Games 2010, Delhi II-Sem. 2008 01

260 Computational Research Laboratories Ltd., Pune II-Sem. 2008 02

261 Computech Enterprises Solutions Pvt. Ltd., Hyderabad I-Sem. 2004 02

262 Conexant Systems (PB) Pvt. Ltd., Hyderabad I-Sem. 2005 01

263 Consilium, Delhi II Sem. 2011 05

Page 28: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

14

264 Consulting Engineers Group Ltd., Hyderabad II Sem. 2010 02

265 Consulting Engineers Group, Jaipur II-Sem. 2007 02

266 Corporate World Class Manufacturing Division, Aditya Birla Group, Mumbai II Sem. 2009 01

267 Cosmic Circuits Pvt. Ltd., Bangalore II-Sem. 2006 15

268 Covidien Engineering Services Pvt. Ltd. , Hyderabad II-Sem. 2014 01

269 Crigloo, Chennai I Sem 2018 01

270 Credit Capital Research Technologies, Pune II-Sem. 2003 06

271 Credit Suisse - Global Markets Controls COO , Mumbai I Sem 2017 03

272 Credit Suisse - Market Risk Quant , Mumbai I Sem 2017 03

273 Credit Suisse - MLR Non-quant , Mumbai I Sem 2017 03

274 Credit Suisse - Model Risk Management, Mumbai I Sem 2017 03

275 Credit Suisse - Operational Risk Management, Mumbai I Sem 2018 01

276 Credit Suisse - Credit Analytics, Mumbai II Sem 2018 02

277 Credit Suisse - Prime Services , Mumbai I Sem 2017 03

278 Credit Suisse - International Wealth Management, Mumbai II Sem 2018 01

279 Credit Suisse - Risk & Finance Data Analytics Reporting, Mumbai I Sem 2017 03

280 Credit Suisse - Risk & Finance Data Analytics Reporting, Pune I Sem 2017 02

281 Credit Suisse Services India Pvt. Ltd, Mumbai II Sem. 2010 11

282 Credit Suisse Services India Pvt. Ltd., Pune II-Sem. 2008 15

283 Credit Suisse - Stress Testing, Mumbai I Sem 2018 01

284 Credit Suisse - Product Control, Pune II Sem 2018 02

285 Credit Suisse - Technology, Pune II Sem 2018 01

286 Credit Suisse- Finance Change, Pune II Sem 2018 02

287 Credit Suisse - Finance Change, Mumbai I Sem 2018 01

288 Crimsonlogic, Bangalore I-Sem. 2003 06

289 CRISINFAC (CRISIL), Mumbai II-Sem. 1997 15

290 Crompton Greaves Ltd., Mumbai II Sem. 2010 01

291 Crompton Grieves PPI adhesive products Ltd. , Goa II-Sem. 2014 01

292 CSR India Pvt. Ltd. (Formerly Ubinetics India Pvt. Ltd.), Bangalore I-Sem. 2005 16

293 CSR Ltd, Noida II-Sem. 2015 02

294 Cubical Laboratories, Delhi I-Sem.2016 01

295 Customised Technologies P Ltd., Bangalore I –Sem. 2014 01

296 Cymbio Pharma Pvt. Ltd., Bangalore II Sem. 2011 01

297 Cypress Semi-Conductors Ltd., Chennai II-Sem. 2007 07

298 Cypress Semiconductor Tech. India Pvt. Ltd., Bangalore II-Sem. 2004 19

299 Cypress Semiconductor Tech. India Pvt. Ltd., Hyd. II-Sem. 2005 07

300 Cypress Semiconductor Tech. India Pvt. Ltd., USA II Sem. 2006 13

301 DataEmo. Bangalore II Sem 2015 02

302 DB MUdra Group , Gurgaon II Sem 2016 01

303 DBOI (Deutsche Bank) ., Mumbai II Sem. 2014 09

304 DBOI - Credit Risk, Mumbai I Sem 2018 01

305 DBOI - MLRM Risk Methodology & NFRM, Mumbai I Sem 2018 01

306 DBOI - Trading Risk & PL, Mumbai I Sem 2018 01

307 Deccan Fine Chemicals (I) Pvt. Ltd., Tuni I Sem. 2012 03

308 Deccansoft Software Services, Hyderabad II Sem. 2010 01

Page 29: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

15

309 Decision Resources Group, Bangalore II Sem 2017 02

310 Decisionresourcesgroup , Gurgaon II Sem 2016 02

311 Delhi Metro Rail Corporation, Delhi I-Sem. 2009 01

312 Dell Services (Formerly Perot Systems, Noida(Delhi) II-Sem. 2008 04

313 Dell Int.Services Centre, Bangalore II-Sem. 2004 03

314 Dell International Services Centre, Hyderabad I- Sem 2005 01

315 Dell R&D, Bangalore II Sem. 2014 04

316 Dell Services , Bangalore II Sem. 2010 01

317 Deloitte Consulting India Pvt. Ltd., Bangalore II Sem. 2010 02

318 Deloitte Consulting India Pvt. Ltd., Chennai II Sem. 2013 02

319 Deloitte Consulting India Pvt. Ltd., Delhi II Sem. 2013 03

320 Deloitte Consulting India Pvt. Ltd., Gurgaon II Sem. 2010 02

321 Deloitte Consulting India Pvt. Ltd., Hyderabad II-Sem. 2007 04

322 Deloitte Consulting India Pvt. Ltd., Mumbai II-Sem. 2007 09

323 Derrick Petroleum, Bangalore II Sem. 2013 04

324 Dessence Consulting, Mumbai II Sem. 2010 01

325 Development Consultant Industrial Plant Services Pvt. Ltd., Jhajhar I-Sem. 2009 02

326 Development Consultants Pvt. Ltd. (DCPL) , Mumbai II Sem 2018 01

327 Development consultants Pvt. Ltd., Delhi II Sem. 2011 01

328 Development consultants Pvt. Ltd., Kolkata I-Sem. 2009 09

329 Development Consultants Pvt. Ltd., Mumbai I-Sem. 1977 56

330 Dhanax Information Services Pvt. Ltd., Bangalore I-Sem. 2009 02

331 DHI Group, Denmark II Sem. 2006 01

332 Divami Software Pvt Ltd., Hyderabad I Sem. 2013 01

333 Divgi Warner, Pune I Sem. 2002 22

334 Divgi Warner, Sirsi (Karnataka) I-Sem. 2010 06

335 Divgi TorqTransfer Systems Pvt. Ltd. – Bhosari II Sem 2017 04

336 Divgi TorqTransfer Systems Pvt. Ltd Shivare, Pune I Sem 2017 03

337 Dolat Capital, Mumbai II Sem. 2012 02

338 Dorsch Consult (India) Pvt. Ltd., Mumbai II Sem 2014 04

339 DotAhead Technologies Pvt. Ltd., Goa II Sem. 2010 01

340 Dow Chemical International Pvt. Ltd., Mumbai II Sem. 2011 07

341 Dr. Reddy's Laboratory (Diagnostics Division), Hyderabad I-Sem 1996 27

342 Dr. Reddy's Laboratory, Vizag. II Sem. 2009 01

343 Dr Reddys Laboratories, Visakhapatnam II Sem. 2018 01

344 Dream Vu, Hyderabad II Sem. 2018 02

345 DreamWorks Animation, Los Angeles I-Sem. 2008 11

346 DreamWorks Animation., Bangalore II Sem 2014 06

347 DSL Software Ltd., Bangalore II-Sem. 2003 04

348 DSP Technology, Bangalore I-Sem. 2008 03

349 Ducere Technologies Pvt. Ltd., Hyderabad II Sem. 2012 02

350 Ducere Technologies - Embedded Systems, Secunderabad I Sem 2017 01

351 Ducere Technologies - Pattern Recognition, Secunderabad I Sem 2017 01

352 Dupont Knowledge Center, Hyderabad I-Sem. 2015 01

353 EA Games, Hyderabad II Sem. 2012 02

Page 30: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

16

354 Eaton Technologies, Pune II Sem. 2010 09

355 eBay India Development Centre, Bangalore II Sem. 2012 07

356 eBay India Development Centre, Chennai II Sem. 2010 03

357 eClerx (Airoli), Mumbai I Sem. 2013 01

358 eClerx (Ghatkopar), Mumbai I Sem. 2013 01

359 eClerx, Pune I Sem. 2013 01

360 Ecoedencity, Mumbai II Sem. 2011 04

361 Ecom Express Pvt. Ltd. New Delhi II Sem 2017 03

362 Ecozen Solutions (P) Ltd., Pune II Sem 2018 02

363 EDCIL INDIA LTD , Noida II Sem 2016 02

364 Edelweiss Financial Services, Mumbai II Sem 2017 03

365 EdServ Softsystems Ltd., Chennai I-Sem. 2010 03

366 EduPristin., Delhi II Sem 2014 02

367 EduPristine - Neev Knowledge Management Pvt. Ltd., Mumbai II Sem 2017 02

368 Edutor Technologies Pvt. Ltd., Hyderabad II Sem. 2011 01

369 Eka Software Solutions Pvt. Ltd., Bangalore II-Sem. 2007 01

370 Elecon Engineering Co. Ltd., Vallabhnagar I-Sem. 2009 07

371 Electronic Arts Games India Pvt. Ltd., Hyderabad I Sem. 2012 01

372 Elgi Equipments, Coimbatore I Sem. 2011 02

373 Elmex Controls Pvt. Ltd., Baroda II Sem. 2011 01

374 Embedded Infotech Pvt. Ltd., Hyderabad II Sem. 2011 01

375 EMC Data Storage Systems, Bangalore I Sem. 2004 16

376 EMC, Bangalore II Sem 2018 01

377 EMC, Pune II Sem 2017 01

378 Endless Robotics Pvt. Ltd. , Hyderabad II Sem 2016 02

379 EnSci - A Unit of Weir Minerals India Pvt. Ltd., Bangalore II Sem 2014 08

380 Enterprise One Consulting Services, Hyderabad I-Sem. 2009 02

381 Enterpriseforce, Mumbai I Sem. 2012 01

382 Ericsson Global India Pvt. Ltd., Bangalore II Sem 2014 08

383 Ericsson Global India Pvt. Ltd., Chennai I Sem 2018 01

384 Ericsson Global India Pvt. Ltd., Gurgaon I Sem 2018 01

385 Ericsson India Global Services Pvt. Ltd, Noida I Sem 2018 01

386 Ernst & Young Global Delivery Services, Bangalore I-Sem.2016 03

387 Ernst & Young L.L.P. Cochin II Sem 2014 01

388 Ernst & Young, Bangalore I Sem. 2011 08

389 Ernst & Young, Chennai II Sem. 2010 08

390 Ernst & Young, Gurgaon II Sem. 2010 09

391 Ernst & Young, Mumbai I Sem. 2013 03

392 Ernst & Young (Advisory Services), Gurgaon I Sem 2018 01

393 Escorts Construction Equipment’s Ltd., Faridabad I-Sem. 2010 01

394 Essar Power, Hazira I-Sem. 2009 01

395 Exotel Telecom Pvt. Ltd., Bangalore I Sem 2012 03

396 Expicient Software Pvt. Ltd., Bangalore II Sem. 2009 01

397 Exponentia data, Mumbai II Sem. 2015 04

398 FATH GmbH Components, Germany I Sem 2018 01

Page 31: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

17

399 FAB India., Pune II Sem 2014 01

400 Fabmart, Bangalore II Sem 2014 01

401 Fairfield and Power Drive Technology Pvt Ltd, Ahmedabad II Sem 2017 01

402 Faiveley Transport Rail Technologies India Ltd (FTRTIL), Hosur II Sem 2017 01

403 Fiberlink, Bangalore I-Sem. 2006 11

404 Fidelity Investments, Bangalore II Sem 2018 02

405 Fiorano Software (I) Pvt. Ltd., Delhi II-Sem 1995 18

406 Fiorano Software Technologies Pvt. Ltd, Bangalore I-Sem. 2006 17

407 Fiorano Software Technologies Pvt. Ltd., Hyderabad I-Sem. 2007 14

408 Firefly e-ventures Ltd. (Subsidary HT Media Ltd.), Gurgaon I Sem. 2011 03

409 Flipkart Online Services Pvt. Ltd., Bangalore II Sem. 2009 12

410 Flipkart Analytics, Bangalore II Sem 2018 01

411 Flipkart Internet Services Pvt. Ltd, Bangalore II Sem 2018 01

412 FMC Technologies India Pvt. Ltd., Hyderabad I Sem. 2011 04

413 Fox Controls Pvt. Ltd., Nashik II Sem. 2011 02

414 Frambanch Technologies (formerly Anaya Labs), Delhi I Sem. 2011 05

415 Freescale Semiconductor India Pvt. Ltd. , Hyderabad II Sem 2016 01

416 Freescale Semiconductor India, Noida (Delhi) I-Sem. 2006 05

417 Frost & Sullivan, Bangalore I Sem. 2011 05

418 Frost & Sullivan, Chennai II-Sem. 2007 14

419 Frost & Sullivan, Kolkata II Sem. 2009 04

420 FreshWorks Inc, Chennai I Sem 2018 01

421 FTRTIL, Hosur I Sem. 2013 05

422 Fullerton India Credit Co. Ltd., Mumbai II-Sem. 2006 06

423 Futures First Info Services Pvt. Ltd. Jaipur I Sem 2017 01

424 Futures First Info Services Pvt Ltd, Gurgaon I Sem 2017 01

425 Future Techno Designs Pvt. Ltd., Bangalore I-Sem. 2006 01

426 FutureBazaar, Mumbai II Sem. 2011 01

427 Gabrial India Ltd., Gurgaon II Sem. 2009 03

428 Gabrial India Ltd., Hosur II Sem. 2009 03

429 Gabrial India Ltd., Pune I-Sem. 2007 08

430 Gadhia-Solar, Valsad II Sem. 2009 07

431 Gail (India) Ltd., Noida (Delhi) I-Sem. 2008 01

432 Gammon India, Delhi II Sem. 2009 01

433 Garg Webtech Pvt. Ltd, Bangalore I-Sem. 2015 01

434 GBI Research, Hyderabad I Sem. 2012 01

435 GE India Technology., Bangalore I-Sem. 2003 14

436 GEIPER Consulting Ltd., Noida II Sem. 2011 03

437 GE-John F Welch Tech Centre (GE India Tech. Centre), Bangalore II-Sem. 2005 11

438 GEP, Mumbai I Sem 2018 01

439 GGK Technologies, Hyderabad I-Sem.2016 03

440 GGK Technologies - Data Analytics, Hyderabad I Sem 2017 01

441 GGK Technologies - Mobile App Development I Sem 2017 01

442 GGK Technologies - Mobile Services , Hyderabad I Sem 2017 02

443 General Motors India Ltd., Halol (Baroda) I-Sem. 2000 17

Page 32: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

18

444 Genesis Microchip (India) Pvt.td., Bangalore I-Sem. 2006 05

445 Genotypic, Bangalore II-Sem. 2008 02

446 Genpact, Bangalore I Sem 2018 01

447 Genpact Analytics, Bangalore II-Sem. 2008 18

448 Genpact Analytics, Gurgaon II-Sem. 2008 09

449 Genpact Analytics, Hyderabad II Sem. 2009 04

450 Genpact, Noida II Sem 2017 02

451 Geometric Ltd., Mumbai I Sem. 2012 12

452 Geometric Software Solutions Ltd., Pune II Sem. 2009 02

453 Geometric Limited, Pune II Sem. 2018 01

454 Gharpay, Hyderabad I Sem. 2012 01

455 GiftXOXO, Bangalore I Sem.2016 02

456 Glaxosmithkline Consumer Health Care R&D, Gurgaon (Delhi) I-Sem. 2007 13

457 Global E Procure, Hyderabad II Sem. 2012 02

458 Global Logic India Pvt. Ltd., Noida I-Sem. 2010 04

459 Global Logic, Bangalore I Sem. 2013 05

460 Global Logic, Nagpur II Sem. 2012 04

461 Globeop Financial Services (I) Pvt. Ltd., Mumbai I-Sem. 2005 04

462 GMI Zarhak Moulders Pvt. Ltd.,Goa I-Sem 2014 01

463 GMR Group, Bangalore I-Sem. 2009 01

464 GMR Group, Hyderabad I-Sem. 2007 04

465 GMR Group, Sankli (Srikakulum) I-Sem. 2007 03

466 GMR, Delhi I-Sem. 2009 01

467 Godrej Sara Lee Ltd., Mumbai II-Sem. 2007 02

468 Goldman Sachs India Pvt. Ltd., Bangalore II Sem. 2010 13

469 Goldman Sachs India Pvt. Ltd. - Operations I Sem 2018 01

470 Goodera (NextGen PMS Pvt. Ltd)- Non IT, Bangalore II Sem. 2018 02

471 Goodera (NextGen PMS) - IT, Bangalore II Sem. 2018 02

472 Goodera (Next Gen PMS) (Non IT),Chennai I Sem 2018 01

473 Goodera - (Next Gen) (Non IT),Mumbai I Sem 2018 01

474 Goonj, Bangalore II Sem. 2011 01

475 Goonj, Chennai II Sem. 2011 01

476 Goonj, Delhi I Sem. 2011 02

477 Goonj, Kolkata II Sem. 2011 01

478 Groww, Bangalore I Sem 2018 01

479 Grasim Cements, Kotputli I-Sem. 2009 05

480 Grasim Chemicals, Nagda I-Sem. 2010 09

481 Grasim Industries Ltd., Kumarapatnam I-Sem. 2015 01

482 Grasim Industries Ltd., Nagda I-Sem. 1976 83

483 Grasim Polyfiber, Harihar I Sem 2017 01

484 Grasim Industries Pulp and Fibre Division, Mumbai I Sem 2017 03

485 Greenway Ecodevelopment, Mumbai II Sem. 2010 01

486 Grey Orange Robotics Pvt Ltd., Delhi I Sem. 2011 09

487 GSS America, Hyderabad II Sem. 2010 01

488 Habits Edutainment, Hyderabad I-Sem. 2008 04

Page 33: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

19

489 Halliburton Technology Center, Pune II-Sem. 2015 05

490 Harita Fehrer Ltd., Hosur I-Sem. 2010 02

491 Harita Seating Systems Ltd., Hosur I-Sem. 1993 26

492 Harman International (India) Pvt. Ltd., Bangalore II Sem. 2011 02

493 HAPPAY (VA Tech Ventures Pvt Ltd.), Bangalore I Sem 2018 01

494 HCL Technologies Ltd., Bangalore I-Sem. 2006 02

495 HCL Technologies, Pune I Sem 2018 01

496 HCL Technologies, Singapore II Sem. 2011 01

497 HDFC Bank , Mumbai II – Sem 2016 03

498 HDFC Bank, Chennai II Sem 2017 02

499 Healis-Sekhsaria Institute for Public Health, Mumbai II-Sem. 2008 06

500 HealthCubed, Bangalore I Sem 2018 01

501 Health Management Research Institute, Hyderabad II-Sem. 2008 03

502 Healthcare Technology Innovation Centre (HTIC), Chennai I Sem. 2013 05

503 HelpAge, Delhi II-Sem. 2008 01

504 Helsinki University of Technology, Finland II-Sem. 2007 03

505 Here Maps, Bangalore II Sem. 2018 01

506 Here Maps - A Nokia Company., Mumbai II-Sem 2015 05

507 Here Maps - Data Structures ., Mumbai I Sem 2017 02

508 Here Maps - Distributed Data ., Mumbai I Sem 2017 03

509 Here Maps - Software Testing ., Mumbai I Sem 2017 01

510 HERON – A Parexel Company , Chandigarh II – Sem 2016 02

511 Hero MotoCorp Ltd, Neemrana I Sem 2018 01

512 Hetero Drugs, Hyderabad I Sem. 2002 22

513 Hetero Med Solutions Ltd., Hyderabad I-Sem. 2010 06

514 HENKEL , Mumbai II – Sem 2016 04

515 HedgeQuants Capital Advisory LLP, Kolkata I-Sem.2016 01

516 Hibiscus Technology Solutions Pvt. Ltd., Bangalore I-Sem. 2010 01

517 Hike,. Gurgaon II- Sem 2015 03

518 HILTI India Pvt. Ltd. , Chennai II Sem 2014 01

519 HILTI India Pvt. Ltd.,Delhi I-Sem 2014 03

520 Hindalco Industries Ltd., Renusagar (UP) I-Sem. 2009 04

521 Hindalco Innovation Centre - Semifab Taloja, Navi Mumbai I-Sem.2016 05

522 Hindustan Construction Company Ltd., Mumbai I Sem. 2012 01

523 Hindustan Lever Ltd., Mumbai II-Sem 2005 02

524 Hindustan Unilever Research Centre, Bangalore II-Sem 2015 08

525 Hindustan Zinc Ltd., Udaipur II-Sem 2005 18

526 HISP (Formerly National Health System Resource Center), Delhi II Sem. 2009 03

527 HISP, Simla II Sem. 2011 03

528 Histogenetics, Chennai II-Sem. 2008 11

529 Histogenetics, New York, USA I-Sem. 2007 06

530 Hitachi Consulting, Hyderabad II Sem. 2011 04

531 Hitachi Home and Life Solutions, Mehsana (Gujarat) I-Sem. 2008 01

532 HLL Lifecare Ltd., Trivandrum II Sem. 2011 01

533 HolidayIQ.com , Bangalore II Sem 2016 01

Page 34: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

20

534 Holiday IQ- Tech, Bangalore II Sem 2018 01

535 Honeywell Automation India Ltd., Pune II-Sem. 2008 07

536 Honeywell Technology Solutions Lab. Pvt. Ltd. Bangalore I-Sem. 1997 22

537 Honeywell Technology Solutions, Hyderabad I-Sem. 2008 01

538 Hortonworks, Bangalore I-Sem.2016 03

539 Hourglass Research, Mumbai I Sem. 2012 13

540 Housing.com (Locon Solutions Private Limited), Mumbai I-Sem. 2015 01

541 HP (STSD Systems Tech. & Software Division), Bangalore I-Sem. 2006 01

542 HP Global Software, Bangalore II-Sem 2006 10

543 HP Global, Chennai II-Sem. 2008 06

544 HP India Software Operations Pvt. Ltd., Bangalore II Sem. 2009 07

545 HP Labs, Bangalore I-Sem. 2001 22

546 HSBC, Bangalore I Sem 2018 01

547 HSBC Global, Bangalore II-Sem. 2008 10

548 HSBC Global, Kolkata II-Sem. 2010 03

549 HCL Technologies, Chennai I Sem.2016 01

550 HCL Technologies, Noida I Sem.2016 02

551 HT Mobile Solutions Ltd., Gurgaon II Sem. 2011 01

552 Hughes Systique Corporation, Gurgaon II Sem. 2013 01

553 HyperVerge Inc, Bangalore I Sem 2018 01

554 Hyderabad Eye Research Foundation (HERF), the research arm of LV Prasad Eye Institute , Hyderabad

II Sem 2016 01

555 LV Prasad Eye Institute ,Hyderabad I Sem 2018 01

556 IBM India Software Group, Bangalore I Sem 2018 01

557 IBM India Software Group, Pune I Sem 2018 01

558 iBÂ Hubs, Hyderabad II Sem 2018 01

559 IBM Global Services, Hyderabad II-Sem. 2005 02

560 IBM India Ltd., Bangalore I-Sem. 2004 08

561 IBM Security - Fiberlink, Bangalore II Sem 2018 01

562 IBM India, Pune I-Sem. 2008 02

563 Icicle Technologies Pvt. Ltd. , Bangalore II Sem 2014 01

564 Idea Cellular Ltd, Ahmedabad I-Sem. 2010 05

565 Idea Cellular Ltd., Bangalore II Sem. 2009 01

566 Idea Cellular Ltd., Chandigarh II Sem. 2009 01

567 Idea Cellular Ltd., Chennai II Sem. 2009 02

568 Idea Cellular Ltd., Cochin I-Sem. 2010 05

569 Idea Cellular Ltd., Guwahati I-Sem. 2010 02

570 Idea Cellular Ltd., Hyderabad II Sem. 2009 03

571 Idea Cellular Ltd., Indore II Sem. 2009 03

572 Idea Cellular Ltd., Jaipur II Sem. 2009 01

573 Idea Cellular Ltd., Jaipur II Sem. 2009 02

574 Idea Cellular Ltd., Kolkata II Sem. 2009 03

575 Idea Cellular Ltd., Lucknow I-Sem. 2010 02

576 Idea Cellular Ltd., Mohali II-Sem. 2010 01

577 Idea Cellular Ltd., Mumbai II Sem. 2009 05

578 Idea Cellular Ltd., Noida II Sem. 2009 03

Page 35: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

21

579 Idea Cellular Ltd., Patna I-Sem. 2010 01

580 Idea Cellular Ltd., Pune II Sem. 2009 03

581 IDeaS - SAS - Software Development, Pune I sem 2017 03

582 IdeaS - SAS, Pune I Sem. 2013 09

583 IFB Automotive Seating & System Pvt. Ltd., Bangalore II-Sem. 2002 06

584 IFB Engineering Division, Kolkata II Sem 2017 01

585 IFB Global, Goa II-Sem. 2010 14

586 IFB Home appliances division, Goa II Sem 2018 01

587 ILabs, Bangalore I-Sem. 2010 10

588 Imagination Technologies, Pune I-Sem. 2008 02

589 IMI Mobile, Hyderabad I-Sem. 2009 18

590 IMS Health, Bangalore II Sem 2017 03

591 IMS Health, Gurgaon II Sem 2017 02

592 IMI Connect Product Development, Hyderabad II Sem 2018 02

593 IMI Mobile Data Analytics, Hyderabad II Sem 2018 01

594 IMI Mobile R&D, Hyderabad II Sem 2018 02

595 India Drivers Network, Bangalore II-Sem. 2002 02

596 IndiaBulls, Gurgaon I-Sem. 2010 01

597 India Mart, Chennai II Sem 2018 01

598 Indiamart Intermesh Ltd. Noida II Sem 2017 02

599 Indian Institute of Astrophysics, Bangalore II-Sem. 2007 04

600 Indian Institute of Chemical Tech., Hyderabad I-Sem. 1997 37

601 Indian Institute of Petroleum, Dehradun II-Sem. 1997 33

602 Indian Institute of Toxicological Research, Lucknow I-Sem. 1998 20

603 Indian Oil Corporation Ltd., Faridabad I-Sem. 2009 02

604 Indian Rayon & Industries Ltd., Veraval II-Sem. 1978 53

605 Indian School of Business (ISB), Hyderabad II-Sem. 2007 02

606 Indo Gulf Fertilizers, Jagadishpur II Sem. 2009 02

607 Indrion Technologies (I) Pvt. Ltd., Bangalore II-Sem. 2007 05

608 Indus OS, Mumbai II Sem 2017 01

609 IndustryARC, Hyderabad I-Sem.2016 02

610 Infineon Tech. Asia Pte. Ltd., Singapore I-Sem 1997 14

611 Infineon Tech. India Pvt. Ltd., Bangalore II-Sem. 2006 08

612 Infineon Technologies AG (Munich), Germany I Sem. 2002 07

613 Infinera - VLSI Testing, Bangalore I Sem 2017 01

614 Infinera, Bangalore II-Sem. 2007 12

615 Infiniti Research, Bangalore II Sem 2017 01

616 Informatica Business Solution Pvt. Ltd., Bangalore I-Sem. 2007 07

617 Informatica Business Solution Pvt. Ltd., Hyderabad II Sem. 2013 02

618 Infospectrum India Pvt. Ltd., Nagpur II-Sem. 2008 04

619 Infratab, Bangalore I Sem. 2013 01

620 ING Vyasya Bank Ltd., Bangalore I- Sem 2005 02

621 Ingersoll Rand Engineering Technology Centre, Bangalore I-Sem. 2010 05

622 Ingersoll Rand India Ltd, Bangalore II Sem. 2018 01

623 Ingersoll Rand Engineering Technology Centre, Chennai I-Sem. 2010 01

Page 36: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

22

624 InMobi - Supply Chain, Bangalore I Sem 2017 02

625 InMobi - Global Outreach, Bangalore II Sem. 2018 01

626 InMobi, Bangalore II Sem. 2013 07

627 InMobi - Market Sales Delivery, Bangalore II Sem. 2018 01

628 InMobi - Software Development, Bangalore I Sem 2018 01

629 InMobi- Business Development, Bangalore II Sem. 2018 02

630 Innovation Labs, Bangalore I-Sem.2016 01

631 Insead Business School, Fontainebleau, France II-Sem 1999 23

632 Insead, Singapore I-Sem. 2008 07

633 Inside View, Hyderabad I-Sem. 2010 06

634 Insilica Semiconductor India Pvt. Ltd., Bangalore II-Sem. 2004 01

635 Institute for Dev. And Research in Banking Tech. (IDRBT), Hyderabad II-Sem. 2005 03

636 Institute of Mathematical Science, Chennai II Sem. 2005 12

637 Institute of Oil & Gas Production Technology, Mumbai I-Sem. 2009 02

638 Integrated Cleanroom Technologies Ltd., Hyderabad I Sem. 2013 01

639 Intel - Computer and VLSI Architecture, Bangalore I Sem 2017 03

640 Intel - Embedded Software , Bangalore I Sem 2017 02

641 Intel - GPU and VLSI Design , Bangalore I Sem 2017 03

642 Intel - Machine Learning , Bangalore I Sem 2017 01

643 Intel - Testing & Verification , Bangalore I Sem 2017 03

644 Intel India Technology Pvt. Ltd., Bangalore II-Sem 2000 29

645 Intel Mobile Communication Ltd., Bangalore II-Sem. 2010 04

646 Intelligroup Asia Pvt. Ltd., Bangalore I-Sem. 2007 02

647 Intelligroup Asia Pvt. Ltd., Hyderabad II-Sem. 1997 16

648 International Advanced Research Center for Powder Metallurgy & New Materials, Hyd.

I-Sem. 2008 08

649 International Institute for Energy Conversion (IIEC), Mumbai I-Sem. 2005 08

650 International Institute for Energy Conversion (IIEC), Pune I-Sem. 2011 03

651 International Software Center (Standard Chartered) in India, Chennai I-Sem. 2008 01

652 Intuit Technology Services Pvt. Ltd., Bangalore II Sem. 2011 01

653 Investopad, New Deilhi I Sem 2018 01

654 Iowa State University, USA II-Sem. 2005 02

655 IPCA Laboratories Ltd., Mumbai II-Sem. 2001 20

656 Iridium Interactive Ltd., Hyderabad II-Sem. 2001 04

657 iRunway, Bangalore I Sem. 2013 01

658 Ishwar Parmar Group, Pune II-Sem. 2015 01

659 ITW India Ltd., Hyderabad I Sem. 2013 01

660 ITW, Bangalore I Sem. 2013 03

661 ITW, Patancheru II Sem. 2011 03

662 ITW, Pune II Sem. 2013 01

663 IVRCL Infrastructures & Projects Ltd., Chennai I-Sem. 2006 11

664 Ixia Technologies, Bangalore I Sem. 2013 01

665 J P Morgan CIB-RFT , Bangalore II –Sem 2016 04

666 JPMC CIB Operations, Bangalore I Sem 2017 03

667 JPMC CIB Operations, Mumbai I Sem 2018 01

668 JPMC – Technology , Hyderabad I Sem 2018 01

Page 37: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

23

669 JPMC – Technology, Mumbai I Sem 2018 01

670 J P MORGAN -CIB , Mumbai II –Sem 2016 05

671 JPMC CIB Operations- Robotics Automation, Mumbai I Sem 2017 01

672 JP Morgan Chase – Technology, Bangalore I Sem 2018 01

673 J.P. Morgan Chase, Bangalore II-Sem. 2007 18

674 J.P. Morgan Chase, Mumbai II-Sem. 1998 36

675 J.P. Morgan Investment Bank, Mumbai I Sem. 2012 01

676 J.P. Morgan Services India Pvt. Ltd., Mumbai II Sem. 2013 10

677 J P Morgan Services -Centralized Research Group(CRG) ., Mumbai I Sem 2017 03

678 J P Morgan Services- Global Markets Group(GMG) ., Mumbai I Sem 2017 02

679 J P Morgan Services- Global Markets Group(GMG) - (Markets +Risk),Mumbai

I Sem 2018 01

680 J P Morgan services- Global research Centre(GRC) ., Mumbai I Sem 2017 03

681 J P Morgan Services – Quant, Mumbai II Sem 2018 02

682 Jarvis Technology and Strategy Consulting Pvt. Ltd.,Mumbai I Sem 2018 01

683 Jabong, Gurgaon I Sem. 2013 02

684 Jaipur Rugs, Jaipur II Sem. 2009 06

685 Janatics, Coimbatore I Sem. 2012 03

686 JDA Software Solutions, Bangalore I Sem 2018 01

687 JDA Software Solutions , Hyderabad I Sem 2018 01

688 JDA Software Solutions (formerly i2 Tech. India Pvt. Ltd.), Bangalore II-Sem 2000 33

689 JDA Software Solutions (formerly i2 Tech. India Pvt. Ltd.), Hyderabad I-Sem. 2010 14

690 Jivox Software India Pvt. Ltd, Bangalore II Sem. 2009 03

691 Jochebed Tech Solutions, Hyderabad I Sem 2017 01

692 John F Welch Technology Center (GE) , Bangalore II- Sem 2016 06

693 John F Welch Technology Center (GE) , Hyderabad II Sem 2017 01

694 Johnson Controls, Pune II Sem 2017 01

695 Jord International, Hyderabad II-Sem. 2015 01

696 JoshWorks, Bangalore I-Sem. 2010 02

697 JSW Steel Ltd., Vijayanagar II-Sem. 2006 16

698 JSW, Salem I-Sem. 2009 03

699 Jubiliant Biosys Ltd., Bangalore II-Sem. 2006 01

700 Juniper Networks India Pvt. Ltd., Bangalore II-Sem. 2004 14

701 Jurong Consultants India Pvt. Ltd., Bangalore I-Sem. 2010 01

702 K.N. Biosciences, Hyderabad II Sem. 2011 02

703 K.Raheja IT Park (Hyderabad) Pvt. Ltd., Hyderabad II-Sem. 2006 04

704 Kalyani Global Engineering, Bhuj (Gujarat) I-Sem. 2011 03

705 Karya Technologies, Chennai I Sem. 2012 03

706 Kawasaki Microelectronics America, San Jose, U.S.A. II-Sem. 2005 01

707 KEC International Ltd., Jaipur II Sem. 2013 01

708 KEC International Ltd., Baroda I Sem. 2012 01

709 KEC International Ltd., Mumbai II-Sem. 2007 04

710 KEC International Ltd., Nagpur II Sem. 2013 01

711 KEC South Asia, Lucknow I-Sem. 2009 01

712 Kemin Industries South Asia Pvt. Ltd., Chennai I-Sem. 2011 02

713 Kinapse Ltd, Gurgaon II Sem 2018 01

Page 38: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

24

714 Khosla Labs, Bangalore I-Sem. 2015 01

715 Klientas,Trivandrum II Sem 2014 06

716 Knolscape, Singapore II-Sem. 2008 01

717 Knolskape Solutions Pvt. Ltd., Bangalore I-Sem. 2009 09

718 Knorr-Bremse Systems for Commercial Vehicles India Pvt. Ltd., Pune I Sem. 2012 01

719 Knorr-Bremse Technology Center India Private Limited, Pune I Sem 2018 01

720 Knox Payments , USA II- Sem 2016 01

721 Kony Labs, Hyderabad II Sem. 2009 04

722 KPMG, Gurgaon II Sem 2014 06

723 KPMG, Hyderabad II-Sem. 2010 01

724 KPMG, Mumbai I-Sem. 2010 07

725 KPMG,Bangalore I-Sem 2014 06

726 KPIT Technologies,Bangalore II Sem 2017 01

727 Kristal.AI , Bangalore I Sem 2018 01

728 Kraftshala, Delhi I Sem 2018 01

729 Kubric.io , Bangalore I Sem 2018 01

730 Krayon Pictures Pvt. Ltd., Pune I-Sem. 2010 01

731 Kuliza Technologies, Bangalore II-Sem. 2008 06

732 L & T E Engineering Solutions, Baroda II-Sem. 2008 08

733 L & T E Engineering Solutions, Chennai II-Sem. 2008 04

734 L & T Powai, Mumbai I-Sem. 2002 02

735 L & T, Coimbatore I-Sem. 2009 11

736 L&T E Engineering Solutions, Bangalore I-Sem. 2009 03

737 L&T-Case Equipment Pvt. Ltd., Pithampur I-Sem. 2009 02

738 Lama Capital Management, Gurgaon I-Sem. 2015 02

739 Lanco Global Systems, Hyderabad II-Sem. 2005 03

740 Lantern Lighting Ltd., Bangalore I-Sem. 2010 02

741 Lantiq India Pvt. Ltd., Bangalore II Sem. 2009 13

742 Latent View Analytics Pvt. Ltd., Chennai II-Sem. 2007 07

743 Law Pandits, Trivandrum II Sem 2014 02

744 Lavelle Networks, Bangalore II Sem 2018 01

745 Lea Associate South Asia Pvt. Ltd., Bhubaneshwar II Sem. 2011 01

746 LEA Associates South Asia Pvt. Ltd., Delhi II-Sem. 2007 09

747 LEA Associates, Kolkata II Sem. 2018 01

748 Leap Consulting, Trivandrum I-Sem. 2015 04

749 Lexinnova, Gurgaon I-Sem. 2015 03

750 Lexinnova, Noida II Sem 2014 02

751 LG Soft India Pvt. Ltd., Bangalore II-Sem. 2004 02

752 LHD INDIA, Bhopal I Sem 2017 02

753 Linde India Limited, Kolkata II Sem 2014 01

754 Lisle Tech. Partners (P) Ltd., Bangalore I-Sem. 2007 01

755 Logica, Bangalore I-Sem. 2011 02

756 LOREAL India Pvt. Ltd., Pune II Sem. 2013 01

757 Lowes India , Bangalore I Sem 2018 01

758 LSI Research & Development Pvt. Ltd., Bangalore II-Sem. 2004 16

Page 39: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

25

759 LSI Research & Development Pvt. Ltd., Pune II-Sem. 2007 09

760 Lucas-TVS Ltd., Chennai II-Sem. 1992 36

761 Lupin Research Park, Pune II-Sem. 2007 12

762 Lupin Research, Goa II Sem. 2011 04

763 M M Imagine Technologies Pvt. Ltd., Chennai II Sem. 2013 01

764 M/s M. Arunachalam & Co., Chennai I-Sem. 2010 01

765 Maarga Systems Pvt. Ltd., Chennai II-Sem. 2007 04

766 MaaS360, Bangalore II-Sem. 2010 02

767 Magnet Works., Bangalore II-Sem 2014 01

768 Mahindra & Mahindra Ltd. Mumbai II Sem. 2009 05

769 Mahindra & Mahindra Ltd., Nagpur II Sem. 2013 01

770 Mahle Beher India Pvt Ltd,Pune I-Sem.2016 02

771 Mahle Behr India Engineering Services, Pune II Sem. 2015 02

772 Mahle Behr, Greater noida I Sem 2018 01

773 Mahle Filters India Ltd., Gurgaon I Sem. 2013 07

774 Mahle Filters India Ltd., Pune I Sem. 2013 06

775 Makemytrip.com. Gurgaon (Delhi) I-Sem. 2007 03

776 Man Infraconstruction Ltd II Sem. 2015 01

777 Market Data Forecast, Hyderabad II Sem 2017 03

778 MarketShare Infotech India Pvt. Ltd. , Bangalore II-Sem 2014 02

779 Market Forecast, Hyderabad I-Sem.2016 01

780 Marvel India, Pune II Sem. 2015 01

781 Marvell India Pvt. Ltd., Bangalore I-Sem. 2010 01

782 Mastek Ltd., Mumbai I- Sem 2005 01

783 MathWorks India Private Limited , Bangalore II –Sem 2016 03

784 MaxHeap Technologies Pvt. Ltd., Bangalore II Sem. 2013 01

785 Maytas Infra Ltd., Chennai II-Sem. 2007 02

786 Maytas Infra Ltd., Hyderabad II-Sem. 2007 01

787 Mayuresh Group,Mumbai I-Sem 2014 02

788 Media Iq Digital, Bangalore II Sem. 2013 12

789 Mediology Software Pvt. Ltd., Gurgaon I-Sem. 2010 07

790 MediaTek Bangalore Pvt. Ltd., Bangalore II Sem 2018 01

791 Mentor Graphics, Noida II Sem 2017 04

792 Megatech Power Equipments Pvt. Ltd., Pune II Sem. 2013 01

793 Mercedes Benz, Bangalore II-Sem 1996 44

794 Merilytics, Hyderabad II Sem 2017 01

795 Micro Labs Limited,Mumbai II-Sem. 2015 01

796 Microchip, Bangalore I-Sem. 2009 02

797 Microsemi India Pvt Ltd., Hyderabad II-Sem 2014 01

798 Microsoft india Development center, Bangalore II-Sem 2018 01

799 Microsoft India Development Center, Hyderabad II-Sem 2018 01

800 Microsoft Corporation (I) Pvt. Ltd., Hyderabad I-Sem. 2004 05

801 Microsoft Research India Pvt. Ltd., Bangalore II-Sem. 2004 09

802 Mila Software Systems Pvt. Ltd., Hyderabad II-Sem. 2007 01

803 Milaap, Bangalore II Sem. 2011 02

Page 40: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

26

804 Milk or Water, Hyderabad I-Sem. 2010 02

805 Minda Corporation, Pune I Sem 2018 01

806 Mindfire Solutions, Bhubaneshwar I-Sem.2016 01

807 Mindshare, Mumbai II Sem. 2011 01

808 Modelytics India Pvt. Ltd., Bangalore II-Sem. 2003 10

809 Modern Insulator Ltd., Abu Road II Sem. 2012 01

810 MoEngage India Pvt. Ltd, Bangalore II Sem. 2018 01

811 Moldtek India, Hyderabad I-Sem. 2015 01

812 Mol De Analytics, Hyderabad II Sem 2017 02

813 Mordor Intelligence, Hyderabad I-Sem. 2015 05

814 Morgan Stanley Advantage Services, Mumbai II-Sem. 2004 12

815 Morgan Stanley Advantage Services., Bangalore II-Sem. 2015 01

816 Morgan Stanley Capital International, Mumbai II-Sem. 2006 05

817 Morningstar, Mumbai II Sem 2014 10

818 Mother Dairy Fruit & Vegetable Pvt. Ltd., Delhi II-Sem. 2010 04

819 Motorola India Electronics Pvt. Ltd., Bangalore I-Sem. 1994 27

820 Motorola India Electronics, Hyderabad II-Sem 1999 17

821 Motorola Mobility Pvt. Ltd., Bangalore I-Sem. 2011 01

822 MoveableCode India Pvt. Ltd., Bangalore I Sem. 2012 01

823 MSCI, Mumbai II Sem 2017 01

824 MSCI Barra Client Services, Mumbai II Sem. 2011 06

825 MSCI Barra, Data Management, Mumbai I-Sem. 2010 10

826 MSCI Barra, Quantitative Equity Research, Mumbai I-Sem. 2010 13

827 MSCI CDP, Mumbai I Sem. 2012 01

828 MSCI Financial Planning & Analysis, Mumbai II Sem. 2013 03

829 MSCI Index and Research, Mumbai II Sem. 2015 01

830 MSCI International Shareholder Services, Mumbai I Sem. 2012 02

831 MSCI (Global Implementation Services), Mumbai I Sem 2017 03

832 MSCI (IMR), Mumbai I Sem 2017 03

833 MSCI (NPD – Index Research), Mumbai I Sem 2017 03

834 MSCI (Solution Management), Mumbai I Sem 2017 01

835 Mu Sigma Business Solutions, Bangalore, Mumbai II-Sem. 2010 08

836 Multi Commodity Exchange of India Ltd. , Mumbai I Sem 2017 02

837 MXIT, Hyderabad II Sem 2014 01

838 MunshiG Pvt Ltd, Udaipur I Sem 2018 01

839 MXV Consulting, Bangalore II-Sem. 2007 04

840 My Parichay Services Pvt. Ltd., Bangalore II Sem. 2013 02

841 My POS Technologies Pvt. Ltd., Mumbai II Sem 2017 03

842 My Smart Price, Hyderabad I Sem. 2013 08

843 Mylan Labs Ltd. (Formerly Matrix Labs. Ltd.), Hyderabad I-Sem. 2007 14

844 Myntra.com, Bangalore I-Sem. 2015 03

845 Mytrah Energy (India) Private Limited, Hyderabad II Sem 2017 04

846 Nabler Websolutions Pvt. Ltd., Bangalore I Sem. 2013 01

847 Nadhi Information Technologies Pvt. Ltd., Chennai I Sem. 2012 01

848 Nagarjuna Constructions Co. Ltd., Hyderabad I-Sem. 2005 06

Page 41: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

27

849 Nagarjuna Constructions Co. Ltd., Mumbai II Sem. 2009 02

850 Nagravision India Pvt. Ltd., Bangalore II Sem. 2011 02

851 Nash Industries, Bangalore I-Sem. 2011 01

852 National Aerospace Laboratories, Bangalore I-Sem. 1984 65

853 National Agri-Food Biotechnology Institute, Mohali II-Sem. 2010 02

854 National Centre for Biological Science, Bangalore II-Sem. 2000 31

855 National Chemical Laboratory, Pune II-Sem. 2015 07

856 National Consultancy for Planning & Engineering, Hyderabad II-Sem. 2008 09

857 National Council of Applied Economic Research, Delhi I-Sem. 1976 79

858 National e-Governance Division, Delhi I-Sem. 2011 05

859 National Entrepreneurshop Network, Bangalore II-Sem. 2010 15

860 National Institute of Science and Tech. Dev. Studies, Delhi I-Sem. 1982 56

861 National Instruments Systems (India) Pvt. Ltd. , Bangalore II-Sem 2014 06

862 National Metallurgical Lab., Chennai I Sem. 2013 01

863 National Rural Health Mission, Jaipur II Sem. 2009 03

864 National Stock Exchange of India Ltd., Mumbai I-Sem. 1995 34

865 National Stock Exchange, Delhi I-Sem. 2003 01

866 Navanidhi Electronics Ltd., Hyderabad I-Sem. 2011 01

867 Navatar Group, Noida II-Sem. 2010 01

868 Navyug Infosolutions Pvt. Ltd., Noida I Sem. 2012 02

869 NBC Bearings, Jaipur II-Sem. 2010 10

870 Neomagic Semiconductor India Pvt. Ltd., Noida (Delhi) I-Sem. 2006 01

871 Net Customer Inc II-Sem. 2010 01

872 Net Scaler Pvt. Ltd., Bangalore I- Sem 2005 01

873 Net Scout Systems (I) Pvt. Ltd., Pune I-Sem. 2007 01

874 NetApp (formerly Networks Appliance Systems India Pvt. Ltd.), Bangalore II-Sem. 2006 22

875 Netskope Software India Pvt. Ltd., Bangalore I Sem. 2013 07

876 New Break India Pvt. Ltd., Chennai II-Sem. 2004 03

877 Next Education India Pvt. Ltd, Hyderabad I Sem 2017 02

878 Next First Engineering Technologies Pvt. Ltd, Bangalore I-Sem. 2008 02

879 NextGen Pvt. Ltd., Bangalore I-Sem. 2009 10

880 nextLeap Career Solutions Pvt. Ltd., Pune I-Sem. 2011 01

881 Neyveli Lignite Corporation Ltd., Neyveli I-Sem. 1988 30

882 Nicco Group, Kolkata II-Sem. 2008 04

883 NICMAR Construction Industry Staff College, Hyd. I-Sem. 2005 05

884 Nielsen India, Kolkata II-Sem. 2008 01

885 NIIT-GIS Ltd., Chennai II-Sem. 2006 01

886 NIIT-GIS Ltd., Delhi II-Sem. 2006 02

887 NIIT-GIS, Hyderabad I-Sem. 2007 01

888 NK Buildcon, Jaipur II Sem 2014 01

889 nLeague Software Solutions, Hyderabad II-Sem. 2007 03

890 Nogle Technologies, Noida I-Sem. 2011 02

891 NOKIA – Location & Commerce (Formerly Navteq India Pvt. Ltd.), Mumbai I-Sem. 2011 06

892 Nokia India Pvt. Ltd., Bangalore II-Sem. 2007 02

893 Nomura Global Markets & Global Finance Analyst Division, Mumbai I-Sem.2016 03

Page 42: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

28

894 Nomura Information Technology Division, Mumbai I-Sem.2016 01

895 Nomura Global Risk, Mumbai I Sem 2017 03

896 Nomura – FinTech,Mumbai II Sem 2018 02

897 Nomura Services India Pvt., Mumbai I-Sem. 2015 02

898 Nomura Global Finance, Mumbai II Sem 2018 02

899 Nomura Global Markets, Mumbai II Sem 2018 02

900 Nomura - Wholesale Strategy, Mumbai II Sem 2018 01

901 North Delhi Power Ltd., Delhi I-Sem. 2007 04

902 Novartis, Hyderabad I-Sem. 2008 14

903 Novell Software Development (I) Pvt. Ltd., Bangalore I-Sem 1996 17

904 Novozymes South Asia Pvt. Ltd., Bangalore II Sem. 2011 02

905 NR Equipments, Hyderabad I Sem 2017 01

906 Nucleus Software Export Ltd., Noida I Sem. 2013 06

907 Nuevosol Energy Pvt. Ltd., Hyderabad II Sem. 2013 02

908 Nvidia Graphics – Hardware, Bangalore I Sem 2017 03

909 Nutanix Technologies India Pvt. Ltd. , Bangalore II Sem 2014 07

910 Nutanix Technologies India Pvt Ltd - Data Science , Bangalore I Sem 2018 01

911 Nutanix Technologies India Pvt Ltd – MTS , Bangalore I Sem 2018 01

912 Nvidia Graphics India Pvt. Ltd., Bangalore II-Sem. 2005 19

913 Nvidia Graphics India Pvt. Ltd., Hyderabad II-Sem. 2010 11

914 Nvidia Graphics India Pvt. Ltd., Pune II Sem. 2013 07

915 Nvidia Graphics - Software Systems, Pune I Sem 2017 03

916 Nvidia Graphics -Software division, Bangalore I-Sem.2016 04

917 Nvidia Graphics – Hardware, Hyderabad II Sem 2018 02

918 Nvidia Graphics – Software, Hyderabad II Sem 2018 02

919 Nvidia Graphics – Hardware, Pune II Sem 2018 01

920 Nykaa, Gurgaon I Sem 2018 01

921 Of Business.com, Gurgaon I Sem 2017 01

922 O3 Capital, Bangalore II Sem. 2011 01

923 Oil Country Tubular Ltd., Narketpally (A.P.) I-Sem. 2011 07

924 On-Graph Technologies Pvt. Ltd., Noida(Delhi) II-Sem. 2008 02

925 OnMobile, Bangalore II-Sem. 2010 01

926 Opera Solutions, Noida I-Sem. 2011 07

927 Optumsoft Research Pvt. Ltd., Bangalore I Sem. 2013 02

928 Oracle Financial Services Soft. Ltd.(formerly i-flex Solutions) Bangalore I-Sem. 1998 26

929 Oracle Financial Services Software Ltd., Mumbai I-Sem. 2011 07

930 Oracle Financial Services Software Ltd., Pune I Sem. 2012 02

931 Oracle India Pvt. Ltd., Bangalore I-Sem. 2006 22

932 Oracle India Pvt. Ltd., Hyderabad I-Sem. 2008 16

933 Oracle India Pvt. Ltd., Noida(Delhi) II-Sem. 2008 01

934 Oracle India Pvt. Ltd., Trivandrum II Sem. 2011 01

935 Orange Business Services, Gurgaon I Sem 2017 01

936 Orbees Infolabs (India) Pvt. Ltd., Hyderabad II Sem. 2009 04

937 Orvito Inc., Hyderabad II Sem. 2013 01

938 Oswal Industries, Kalool (Gandhinagar) I-Sem. 2007 02

Page 43: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

29

939 OYO Rooms , Gurgaon I Sem 2018 01

940 OYO Rooms ., Hyderabad I Sem 2018 01

941 Pantaloons Fashion & Retail Ltd, Bangalore II-Sem. 2015 01

942 Pantaloons Fashion & Retail Ltd. Gurgaon II Sem 2014 01

943 Pantaloons Fashion & Retail Ltd., Kolkata II Sem. 2015 01

944 Pantaloons Fashion &Retail Ltd, New Delhi II Sem. 2015 01

945 Pantaloons Fashion &Retail Ltd., Mumbai II Sem. 2015 01

946 Paramatrix, Austria II-Sem. 2006 01

947 Parexel, Chandigarh II-Sem. 2015 01

948 Parsons Brinckerhoff, Gurgaon(Delhi) II-Sem. 2008 03

949 Parsons Brinckerhoff., Bangalore II Sem 2014 02

950 Patni Computer Systems Ltd., Mumbai II-Sem 1999 15

951 Paxcel Technologies Pvt. Ltd. II Sem. 2009 01

952 PAYPAL , Bangalore II - Sem 2016 05

953 Paypal, Chennai II-Sem. 2010 13

954 PaySense, Mumbai I Sem 2018 01

955 Pennywise Solutions, Hyderabad II-Sem. 2005 10

956 Pentair Water India Pvt. Ltd., Goa I-Sem. 2007 14

957 Perot Systems, Hyderabad I-Sem. 2009 02

958 Persistant System,Goa I-Sem 2014 01

959 Persistent Systems Ltd., Pune I Sem. 2012 02

960 Petasense - Embedded Software, Bangalore I Sem 2017 02

961 Petasense - Machine Learning, Bangalore I Sem 2017 02

962 Petasense - Services & App Development, Bangalore I Sem 2017 03

963 Perceptive Analytics, Hyderabad II Sem 2018 02

964 Pfizer Ltd, Chennai II Sem 2018 01

965 PharmARC Analytic Solutions, Bangalore I-Sem. 2008 01

966 Philips Research Asia, Bangalore I Sem. 2012 04

967 Pilani Experts Technology Labs Pvt Ltd, Bangalore I-Sem 2016 01

968 Pilani Soft Labs Pvt. Ltd., Bangalore II-Sem. 2007 01

969 Pipal Research, Bangalore I-Sem. 2007 05

970 Pitney Bowes Software India Pvt. Ltd. Noida II Sem 2017 01

971 Pivotal Bangalore Software Dev. Pvt. Ltd. Bangalore II-Sem. 2004 03

972 Playdom India Pvt. Ltd., Bangalore II Sem. 2013 01

973 Pluss Advanced Technologies Pvt. Ltd. , Gurgaon II - Sem 2016 05

974 Piramal Group, Mumbai II Sem 2018 02

975 Pocket Gems, USA I Sem. 2012 02

976 Polaris Software Lab Ltd., Chennai II-Sem. 1997 09

977 Polaris Software Lab. Ltd., Mumbai I-Sem. 2003 08

978 Polmon, Hyderabad I Sem. 2012 06

979 Polycom Technology (R&D) Centre Pvt. Ltd., Bangalore II Sem. 2013 02

980 Polycom Technology (R&D) Centre Pvt. Ltd., Hyderabad I Sem. 2012 05

981 Porwal Auto Components, Pithampur I-Sem. 2009 01

982 Postman, Bangalore II Sem 2018 02

983 Practo Technologies Pvt. Ltd., Bangalore II Sem. 2013 07

Page 44: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

30

984 Precision Tech. Enterprises, Chennai I Sem. 2012 01

985 Precision Tech. Enterprises, Gurgaon (Delhi) I-Sem. 2007 11

986 Prestige Feed Mills Ltd., Devas (Near Indore) I-Sem. 2009 01

987 Price waterhouse Coopers (PWC) , Bangalore II - Sem 2016 03

988 Price waterhouse Coopers (PWC) , Chennai II - Sem 2016 04

989 Price waterhouse Coopers (PWC) , Delhi II - Sem 2016 02

990 Price waterhouse Coopers (PWC) , Hyderabad II - Sem 2016 04

991 Price waterhouse Coopers (PWC) , Mumbai II - Sem 2016 05

992 Price waterhouse Coopers (PWC) , Gurgaon II Sem 2017 02

993 Price WaterHouse Coopers, Kolkata II Sem 2018 01

994 Pristine, Mumbai II Sem. 2013 02

995 Probe Equity Research Pvt. Ltd., Bangalore II Sem. 2011 04

996 Protechsoft Systems Pvt. Ltd., Chennai I-Sem. 2004 02

997 Propeluss, Pune II Sem 2018 01

998 Purpletalk, Hyderabad II- Sem. 2015 03

999 Puzzolana Heavy Machineries, Hyderabad II-Sem. 2008 11

1000 Pyramid IT Consulting, Noida(Delhi) II-Sem. 2008 09

1001 Q Construction, Dubai I-Sem. 2011 02

1002 QA Infotech, Noida(Delhi) II-Sem. 2007 02

1003 Qualcomm India Pvt Limited., Chennai II Sem 2017 02

1004 Qualcomm India Pvt. Ltd., Bangalore II-Sem. 2005 15

1005 Qualcomm India Pvt. Ltd., Hyderabad II-Sem. 2005 14

1006 Quality Council of India , Delhi II - Sem 2016 03

1007 Qubole., Bangalore II- Sem. 2015 08

1008 QUANTIPHI, Mumbai I Sem 2018 01

1009 Reliance Jio, Banglore I Sem 2018 01

1010 Reliance Jio, Mumbai I Sem 2018 01

1011 Rajputana Constructions , Jaipur II - Sem 2016 01

1012 Rajputana Constructions, Kapurthala I-Sem.2016 01

1013 Rajputana Constructions, Patiala I-Sem.2016 01

1014 Rakuten- Artificial Intelligence, Bangalore II Sem 2018 01

1015 Rakuten Inc, Bangalore II Sem 2018 01

1016 Rakuten-Human resources& operations and recruitment , Bangalore II Sem 2018 01

1017 Rakuten-Mobile App , Bangalore II Sem 2018 01

1018 Rambus Chip Tech. India (P) Ltd., Bangalore II-Sem. 2006 01

1019 Ramco Systems, Chennai I Sem. 2012 05

1020 Rane Madras Ltd,Mysore I-Sem 2014 01

1021 Rane Madras Ltd. , Chennai II Sem 2014 01

1022 RBJ Technologies Pvt Ltd ,Hyderabad I Sem 2018 01

1023 RBJ Technologies Pvt Ltd, Pune I Sem 2018 01

1024 Raxa Security Services Ltd., Bangalore I Sem. 2013 01

1025 Reametrix, Bangalore II-Sem. 2008 10

1026 Reckitt Benckiser, Gurgaon II Sem. 2011 09

1027 Redpine Signal, Hyderabad I-Sem. 2011 03

1028 RedSeer Consulting, Bangalore II Sem. 2013 02

Page 45: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

31

1029 Reflexis Systems India Pvt. Ltd., Chennai I-Sem. 2009 05

1030 Reflexis Systems India Pvt. Ltd., Pune II-Sem. 2006 25

1031 Religare Technologies Ltd., Mumbai II Sem. 2011 01

1032 ReportGarden Technologies Pvt. LTd., Hyderabad I-Sem.2016 05

1033 Researchwire, Mumbai I-Sem. 2011 02

1034 Rite Infotech Pvt Ltd., Faridabad I Sem. 2013 04

1035 Rivigo Services Pvt Ltd, Gurgaon II Sem 2017 03

1036 Robert Bosch Center for Cyber Physical Systems, Bangalore II Sem 2017 04

1037 Rotary Mechanical Engineering Pvt. Ltd., Bangalore I-Sem. 2009 02

1038 Rovi Corporation, Bangalore I-Sem. 2015 02

1039 Royal Institute of Technology (KTH)-Stockholm, Sweden II-Sem. 2006 01

1040 RSV Construction Pvt. Ltd. Secunderabad II Sem 2014 02

1041 Rubamin Pharmaceuticals Ltd., Baroda II-Sem. 2004 01

1042 Rupeetalk Financial Services Pvt. Ltd., Mumbai II Sem. 2009 02

1043 S cubes Technologies Pvt. Ltd., Hyderabad II-Sem. 2008 05

1044 S.R. BATLIBOI & CO. LLP, Bangalore II Sem 2017 04

1045 S.R. BATLIBOI & CO. LLP, Mumbai I Sem 2017 02

1046 S.R. BATLIBOI & CO. LLP,Chennai I Sem 2018 01

1047 Saavn Media Pvt. Ltd., Mumbai I Sem. 2013 01

1048 Sabre Holdings (Formerly Sabre Travel Technologies Pvt. Ltd.), Bangalore I-Sem. 2008 18

1049 Sagacious Research, Gurgaon I Sem. 2013 04

1050 Sage Design Systems (I) Pvt. Ltd., Bangalore I-Sem. 2003 04

1051 Saha Software Solutions Pvt. Ltd.,Hyderabad I-Sem. 2010 02

1052 Saharsa Solutions Pvt. Ltd., Chennai II-Sem. 2006 01

1053 Sales Force, Hyderabad I Sem. 2013 02

1054 Samhita Social Ventures, Mumbai I Sem 2018 01

1055 Samson and Sons builders and developers, Trivandrum II Sem. 2015 01

1056 SAMSUNG India Software Operations, Bangalore II Sem. 2013 04

1057 Samsung R & D Institute, Bangalore I-Sem.2016 03

1058 Samsung R &D Institute - CP (Communication Protocol) II Sem 2018 01

1059 Samsung R &D Institute - Image & Video Processing, Bangalore I Sem 2017 03

1060 Samsung R &D Institute - Intelligent Services , Bangalore II Sem 2018 02

1061 Samsung R &D Institute - Networks , Bangalore II Sem 2018 01

1062 Samsung R &D Institute - Software Systems, Bangalore I Sem 2017 01

1063 Samsung Semiconductor India R&D Center, Bangalore II Sem 2018 02

1064 Sandilya Consulting Engineers, Hyderabad I Sem. 2013 02

1065 Sandvik Asia Ltd., Mehsana (Gujarat) I-Sem. 2008 04

1066 SanDisk, Bangalore II Sem 2018 01

1067 Sankara Netralaya, Chennai I-Sem. 2007 08

1068 Sanyo LSI Technologies Pvt. Ltd., Bangalore I-Sem. 2004 02

1069 Sap Lab India Pvt. Ltd., Bangalore II-Sem. 2005 15

1070 Sargur Powercon Systems, Mumbai II Sem. 2011 02

1071 Sattva Media & Consulting Pvt. Ltd., Bangalore I Sem. 2013 10

1072 Sattva Media and Consulting Pvt Ltd,Delhi I Sem 2018 01

1073 Satyam Computer Sercices Ltd., Bangalore II-Sem. 2001 06

Page 46: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

32

1074 Satyam Computer Services Ltd., Chennai II-Sem. 2001 09

1075 Satyam Computer Services Ltd., Hyderabad I-Sem. 2001 14

1076 Satyam Computer Services Ltd., Pune I-Sem. 2006 01

1077 SCOPE International Pvt. Ltd., Chennai II-Sem. 2008 06

1078 Seagate Technology HDD (India) Pvt. Ltd., Bangalore II Sem 2017 01

1079 Searce, Pune I Sem 2017 01

1080 Sellerworx Online Services Limited I-Sem. 2015 02

1081 Senes Consultants India Pvt. Ltd., Noida (Delhi) II-Sem. 2006 01

1082 Servicenow Software Development India, Hyderabad II Sem 2018 01

1083 Sevenion Software Systems Pvt. Ltd. , Bangalore II Sem 2014 01

1084 Sew Infrastructure, Hyderabad I Sem. 2012 01

1085 SHArP Edge Learning Pvt. Ltd., Jaipur I Sem. 2012 03

1086 Shell, Bangalore II Sem. 2013 09

1087 Shipra Estate Ltd., Ghaziabad (Delhi) II-Sem. 2004 01

1088 Shri Krishna Urja Project Ltd., Jaipur I-Sem. 2010 01

1089 Siemens Corporate Tech., Bangalore II-Sem. 2006 09

1090 Siemens Ltd,Goa I Sem 2018 01

1091 Sierra Atlantic Software Services Ltd., Hyderabad I-Sem. 2004 14

1092 Siftery, Bangalore I Sem 2017 01

1093 Signode India Ltd.,Rudraram., Hyderabad II Sem 2014 01

1094 Silicon Image R&D Pvt. Ltd., Hyderabad I Sem. 2013 05

1095 Silvan Innovation Labs, Bangalore I-Sem. 2010 04

1096 Sipera Systems Pvt. Ltd., Hyderabad II-Sem. 2007 01

1097 SiRF Tech., Bangalore I-Sem. 2007 02

1098 SiRF Tech., Noida (Delhi) I-Sem. 2007 02

1099 SiRIUS Embedded Software (P) Ltd., Bangalore I-Sem. 2009 11

1100 SKF India Ltd. Ahmedabad I Sem 2017 01

1101 SKF India Ltd., Bangalore I Sem 2017 03

1102 SKF India Ltd., Pune I-Sem. 2010 10

1103 SKF, Haridwar II Sem 2018 01

1104 Skoda Auto India Pvt Ltd.(Chakan), Pune I Sem. 2013 03

1105 Skoda Auto India Pvt Ltd., Gurgaon II Sem. 2013 03

1106 Skoda Auto India Pvt Ltd., Aurangabad I Sem. 2013 10

1107 Skoda Auto India Pvt Ltd., Bangalore II Sem. 2013 03

1108 Skoda Auto India Pvt Ltd., Mumbai II Sem. 2013 07

1109 Skoda Auto India Pvt Ltd., Pune II Sem. 2013 04

1110 Skumars Online , Mumbai II- Sem 2016 01

1111 Skyline Consulting Engineers Pvt. Ltd., Nagpur I Sem. 2012 06

1112 Skyquest Technology Consulting Pvt. Ltd. Ahmedabad II Sem 2014 03

1113 Slave Technologies Pvt. Ltd., Hyderabad I Sem. 2012 02

1114 SM Silicon India Pvt Ltd., Hyderabad II Sem. 2015 01

1115 SmartLivez , Bangalore II– Sem 2016 01

1116 Smartrak, Hyderabad II Sem. 2015 02

1117 SocialAppsHQ, Noida II Sem. 2011 01

1118 Sokrati Technologies Pvt. Ltd., Pune I-Sem. 2015 06

Page 47: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

33

1119 Solairedirect Energy India Pvt. Ltd., Pune I Sem. 2011 04

1120 Solar Integration Systems India Pvt. LLd., Hyderabad II Sem. 2013 01

1121 Solon India Pvt Ltd, Hyderabad II-Sem. 2015 01

1122 Source Pilani, Pilani II Sem. 2009 02

1123 Spice Digital Ltd., Noida II Sem. 2011 01

1124 Spicer India Ltd. (Formerly Gabriel India Ltd. ), Pune II Sem. 2005 20

1125 Spicer India Ltd., Hosur II Sem. 2008 01

1126 Spicer India Ltd., Jodali II Sem. 2010 04

1127 Spicer India Ltd., Satara II Sem. 2010 09

1128 Spicer India Ltd., Pune II Sem 2018 02

1129 Sprinklr, Gurgaon II Sem. 2015 01

1130 SRF Ltd., Gurgaon I Sem. 2010 16

1131 SRF, Dahej (Gujarat) I Sem. 2011 01

1132 ST Ericsson, Bangalore I Sem. 2010 06

1133 ST Ericsson, Greater Noida I Sem. 2010 04

1134 ST Microelectronics(I) Pvt.Ltd., Greater Noida I Sem 2018 01

1135 ST Microelectronics (I) Pvt. Ltd., Bangalore I Sem. 2004 11

1136 ST Microelectronics (I) Pvt. Ltd., Noida II Sem 1995 39

1137 ST Microelectronics (I) Pvt. Ltd., Pilani I Sem. 2010 04

1138 Studypad , Gurgaon I Sem 2018 01

1139 STAR TV, Bangalore II Sem 2018 01

1140 Star TV, Mumbai I Sem 2017 01

1141 Starflex Sealing India Pvt. Ltd., Goa I Sem. 2012 03

1142 StateStreet Global Advisors, Bangalore I Sem 2017 03

1143 Stayzilla - Inasra Technologies, Bangalore I Sem. 2015 01

1144 Steel Wedge Technologies Pvt. Ltd., Hyderabad I Sem. 2013 02

1145 Stellar Software Technologies Pvt Ltd., Hyderabad I Sem. 2015 02

1146 Stellarix Consulting Services Pvt. Ltd., Jaipur I Sem. 2011 06

1147 Stenvy Technology Pvt. Ltd., Bangalore I Sem. 2011 01

1148 Sterling Biotech Ltd., Baroda I Sem. 2009 02

1149 Sterling Commerce India Solutions Pvt. Ltd., Bangalore I Sem. 2007 07

1150 Strides Arcolab Ltd., Bangalore I Sem. 2004 10

1151 Structural Engg. Research Center, Chennai II Sem.1995 40

1152 Sun Mobility, Bangalore I Sem 2018 01

1153 Subex Technologies Ltd., Bangalore II Sem. 2005 01

1154 Success Factors Business Solutions, Bangalore I Sem. 2011 02

1155 Sukam Power Systems Ltd., Gurgaon (Delhi) II Sem. 2007 09

1156 Sun Microsystems (I) Pvt. Ltd., Bangalore I Sem 2000 11

1157 Sundaram Clayton Ltd., Chennai I Sem. 1988 46

1158 Sundaram Clayton Ltd., Hosur II Sem. 2002 02

1159 SunTec Business Solutions Pvt. Ltd., Trivandrum I Sem. 2011 06

1160 Supply Basics – Business, Bangalore II Sem 2018 02

1161 SupplyBasics - E-Commerce, Bangalore II Sem 2018 01

1162 SureWaves, Bangalore II Sem. 2008 01

1163 Sybase Software (India) Pvt. Ltd., Pune II Sem. 2007 01

Page 48: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

34

1164 Symantec Corp. R&D Division, Pune II Sem 1999 23

1165 Symantec Corporation R&D Division, Chennai I Sem. 2008 05

1166 Symantec Software India Pvt. Ltd., Bangalore II Sem. 2010 10

1167 Symantec Software Solutions Pvt. Ltd - Data Analytics., Bangalore I Sem 2017 01

1168 Symantec Software Solutions Pvt. Ltd - Data Analytics, Pune II Sem 2018 01

1169 Symantec Software Solutions Pvt. Ltd. - App Development., Bangalore I Sem 2017 01

1170 Symantec Software Solutions Pvt. Ltd. - Data Structures and Algorithms, Pune

I Sem 2017 03

1171 Symantec Software Solutions Pvt. Ltd., Pune I-Sem.2016 03

1172 Symphony, Bangalore I Sem. 2007 12

1173 Symphony, Pune I Sem. 2009 01

1174 Synergiz Global, Hyderabad II Sem 2017 04

1175 Syngene International Ltd., Bangalore II Sem. 2008 02

1176 Syniverse Technologies, Bangalore I-Sem 2014 02

1177 Synopsis, Bangalore II Sem. 2011 01

1178 Synopsis, Noida II Sem. 2013 02

1179 Synopsys India Pvt. Ltd, Hyderabad I Sem 2017 03

1180 Taco Sasken Automotive Electronics, Bangalore II-Sem. 2007 02

1181 Takata ndPvt Ltd., Chennai I Sem. 2013 01

1182 Tangoe India Softek Pvt. Ltd., Bangalore I Sem. 2013 05

1183 TapChief., Bangalore II Sem 2017 04

1184 TAS Analytic Services, Bangalore II Sem. 2013 06

1185 Tata Advanced Materials Ltd , Bangalore II Sem 2016 01

1186 Tata Autocomp Systems Ltd., Pune II Sem. 2007 19

1187 Tata Chemical Innovation Center, Chennai I-Sem.2016 01

1188 Tata Chemical Innovation Center, Pune II Sem. 2015 07

1189 Tata Chemicals Ltd., Babrala (UP) II Sem. 2007 10

1190 Tata Consultancy Services, Bangalore I-Sem.2016 01

1191 Tata Digital Health, Bangalore II Sem 2017 01

1192 Tata Institute of Fundamental Research, Mumbai I Sem. 2001 07

1193 Tata Motors Ltd. Sanand I Sem 2017 01

1194 Tata Motors Ltd., Dharwad I Sem. 2015 05

1195 Tata Motors Ltd., Pune I Sem. 2004 27

1196 Tata Motors, Pantnagar I Sem.2016 04

1197 Tata Motors., Jamshedpur II Sem. 2015 07

1198 Tata Motors., Lucknow I Sem. 2015 06

1199 Tata Power, Mumbai I Sem. 2010 04

1200 Tata Power, Noida II Sem. 2010 01

1201 Tata Projects, Hyderabad I Sem. 2008 04

1202 Tata Quality Management Services (Div. of Tata Sons Ltd.), Pune I Sem. 2012 01

1203 Tata Technologies Ltd., Pune I Sem. 2013 07

1204 Tata Teleservices, Hyderabad II Sem. 2008 04

1205 Tau Films India Pvt. Ltd, Hyderabad II Sem 2017 04

1206 Tech Mahindra, Mumbai I Sem. 2003 18

1207 Tech Mahindra, Pune I Sem. 2003 05

1208 Tech Vedika Software Pvt. Ltd. Hyderabad II Sem 2014 01

Page 49: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

35

1209 Techlead Software Systems Engg. (I) Pvt. Ltd., Pune II Sem. 1993 20

1210 Techniforge, Hyderabad II Sem. 2008 01

1211 Technip India Ltd., Chennai I Sem. 2008 06

1212 Technotree Covergence Ltd., Bangalore I Sem. 2011 02

1213 Techture Structures Pvt. Ltd., Nagpur I Sem 2014 07

1214 Tega Industries Ltd., Dahej II Sem. 2013 02

1215 Tega Industries Ltd., Kolkata II Sem. 2011 09

1216 Tejas Networks, Bangalore II Sem. 2010 08

1217 Tekriti Software, Gurgaon (Delhi) I Sem. 2008 04

1218 Tensilica, Pune I Sem. 2008 13

1219 TESCO Hindustan Service Centre, Bangalore I Sem 2017 03

1220 TESCO, Bangalore II Sem. 2010 13

1221 Tetcos, Bangalore II Sem. 2014 01

1222 Texas Instruments (I) Pvt. Ltd., Bangalore II Sem. 1991 50

1223 Texas Instruments (I) Pvt. Ltd – Systems , Bangalore I Sem 2018 02

1224 Texas Instruments (I) Pvt. Ltd. -Analog , Bangalore II Sem 2018 02

1225 Texas Instruments (I) Pvt. Ltd. -Digital , Bangalore II Sem 2018 02

1226 Texmaco, Kolkata I Sem. 2009 12

1227 Texmaco Rail & Engineering Ltd.,Kolkata I Sem 2018 01

1228 The Childrens Hospital of Philadelphia, USA II Sem. 2005 02

1229 Thinkerbell Labs – Electronics , Bangalore I Sem 2018 01

1230 Thinkerbell Labs - People Operations, Bangalore I Sem 2018 01

1231 Thorogood, Bangalore I Sem 2018 01

1232 Thermax Ltd., Pune II Sem 1992 28

1233 Think and learn , Bangalore II Sem 2016 01

1234 Thomas & Betts India Pvt. Ltd., Hyderabad II Sem. 2011 04

1235 Thomas Weisel Int. Pvt. Ltd., Mumbai II Sem. 2006 02

1236 Thomason Reuters, Bangalore II Sem. 2010 01

1237 Thomson Reuters, Hyderabad II Sem 2017 01

1238 Thornton Tomasetti, Mumbai II Sem 2017 03

1239 Time Analytics Services, Bangalore II Sem. 2011 01

1240 TimeInc.(Time Analytic & Shared Services Private Limited), Bangalore II Sem 2017 03

1241 Tiny Owl Technology Pvt. Ltd., Mumbai I Sem. 2015 01

1242 Titan Industries Ltd., Hosur II Sem 1996 24

1243 TNT India Pvt. Ltd., Bangalore II Sem. 2009 02

1244 Tolexo Online Pvt Ltd , Noida II Sem 2016 02

1245 Tolexo Online Pvt Ltd, Bangalore II Sem. 2015 01

1246 Tonbo Imaging Pvt Ltd. - Embedded Systems, Bangalore I Sem 2017 02

1247 Tonbo Imaging Pvt Ltd. - Image & Video Processing, Bangalore I Sem 2017 02

1248 Tonbo Imaging Pvt Ltd. Bangalore II Sem. 2014 07

1249 Torrent Research Centre, Ahmedabad II Sem 1996 19

1250 Toshiba Software (India) Pvt Ltd, Bangalore II Sem 2017 02

1251 Toshniwal Industries Pvt. Ltd., Industrial , Ajmer II Sem 2016 01

1252 Total Environment Building Systems Pvt. Ltd., Bangalore I Sem. 2012 01

1253 Transgraph Consulting Pvt Ltd., Hyderabad II Sem. 2008 06

Page 50: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

36

1254 Travel Boutique Online, Gurgaon I-Sem. 2010 05

1255 Tribalfusion RnD Pvt. Ltd. (Formerly Exponential), Noida II Sem. 2010 02

1256 Trilogy E-Business Software India Pvt. Ltd., Bangalore I Sem. 2005 06

1257 Trivitron Health Services, Chennai I Sem. 2009 01

1258 True Sparrow, Pune II Sem 2013 03

1259 Truecaller, Bangalore II Sem. 2018 01

1260 Tube Investments of India Limited, Chennai I-Sem.2016 01

1261 Tune Patrol Media Labs Pvt. Ltd., Bangalore II Sem. 2013 01

1262 TVS Motor Company, Hosur I Sem 1999 16

1263 TYCO International Ltd , Bangalore II Sem 2016 01

1264 Tyco Valves and Control India Pvt. Ltd., Halol (Baroda) I Sem. 2008 01

1265 UBS, Pune II Sem 2018 01

1266 UBS Business Solutions (India) Private Limited - Group Operations,Hyderabad

I Sem 2018 01

1267 UBS Business Solutions (India) Private Limited – GRC,Mumbai I Sem 2018 01

1268 UBS Business Solutions (India) Private Limited - Group Operations,Mumbai I Sem 2018 01

1269 UBS Business Solutions (India) Private Limited - Group Operations, Pune I Sem 2018 01

1270 UBS Business Solutions (India) Pvt. Ltd. – IMT,Mumbai I Sem 2018 01

1271 UBS Business Solutions (India) Private Limited – IMT, Pune I Sem 2018 01

1272 UBS Business Solutions (India) Private Limited - RAS FINANCE, Pune I Sem 2018 01

1273 Udhyam Learning Foundatation, Bangalore I Sem 2018 01

1274 Ultratech (Grasim) Cement, Tadipatri I Sem. 2009 09

1275 Ultratech Cement, Mumbai I Sem. 2012 03

1276 UltraTech Cement Limited (Ahura Centre), Mumbai I Sem 2018 01

1277 Uniliver, Bangalore II Sem. 2011 05

1278 Unisys Global Services India, Bangalore I Sem. 2011 02

1279 United Online Software Dev. (India) Pvt. Ltd. (Formerly Juno Online Services), Hyd.

II Sem. 2000 15

1280 United Airlines Business Services Pvt. Ltd., Gurgaon II Sem 2018 02

1281 University of Louisiana at Lafayette, Lafayette, LA, USA I Sem. 2009 02

1282 UOP India Pvt Ltd (A Honeywell company), Gurgaon II Sem 2014 02

1283 UPGRAD, Mumbai II Sem 2017 03

1284 Urban Clap , Gurgaon II Sem 2016 02

1285 Urban Mass Transit Company Ltd., Delhi II Sem. 2011 01

1286 UST Global Infinity Lab -Social Networks, Thiruvananthapuram II Sem 2018 01

1287 UST Global Infinity labs- Cyber security , Thiruvananthapuram II Sem 2018 01

1288 UST Global Infinity lAbs- Machine learning , Thiruvananthapuram II Sem 2018 01

1289 USt Global Infinity Labs-Block Chain , Thiruvananthapuram II Sem 2018 01

1290 USt Global Infinity labs-Internet of Things , Thiruvananthapuram II Sem 2018 01

1291 UST Global Infinity Labs-Robotics , Thiruvananthapuram II Sem 2018 01

1292 UST Global- Infinity Research- 3D printing , Thiruvananthapuram II Sem 2018 01

1293 UST Global Infinity-Cloud Computing , Thiruvananthapuram II Sem 2018 01

1294 UST Global-Infinity lab-Artificial Intelligence , Thiruvananthapuram II Sem 2018 01

1295 UST Global-Infinity Labs- Augmented Reality , Thiruvananthapuram II Sem 2018 01

1296 UST Global Infiniy Labs, Trivandrum I Sem 2017 01

1297 UST Global, Chennai II Sem 2018 02

Page 51: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

37

1298 UST Global , Trivandrum I Sem 2018 01

1299 Uurmi Systems, Hyderabad I Sem. 2011 01

1300 Vakilmehtasheth, Mumbai II Sem 2014 03

1301 Valtech India Systems Pvt. Ltd., Bangalore I Sem. 2005 03

1302 Value Edge India, Delhi II Sem. 2013 07

1303 ValueFirst Connect, Gurgaon(Delhi) I Sem. 2009 03

1304 Vasant Chimicals & Organics Ltd., Hyderabad I Sem. 2002 22

1305 vConstruct Private Limited , Pune II Sem 2016 02

1306 Vendio Technologies India Pvt. Ltd. (Formerly Andale India (P) Ltd.), Bangalore

I Sem. 2004 11

1307 Venture Inteligence, Chennai II Sem. 2011 02

1308 Vergo Pharma Research Laboratories Pvt. Ltd., Goa I Sem. 2011 02

1309 Verisign Services (I) Pvt. Ltd., Bangalore I Sem. 2005 14

1310 Veritas Software (I) Pvt. Ltd., Pune II Sem 1999 20

1311 VERVE CONSULTING PVT LTD , Bhubaneshwar II Sem 2016 01

1312 Vestas R&D, Chennai I Sem. 2009 08

1313 VESTAS TECHNOLOGY LTD, Chennai II Sem 2018 01

1314 Viacom 18 Pvt Ltd, Bangalore I Sem 2017 01

1315 Viacom18 Media Pvt. Ltd. Mumbai II Sem 2017 02

1316 Viacom18 Media Pvt. Ltd - Corporate Strategy, Mumbai II Sem. 2018 01

1317 Viacom18 Media Pvt. Ltd - Digital Ventures, Mumbai II Sem. 2018 02

1318 Victor Gaskets India Ltd., Pune I Sem. 2005 02

1319 Vidcentum R&D Pvt. Ltd., Hyderabad I Sem. 2013 01

1320 Vision India Foundation, Delhi II Sem. 2018 01

1321 Vita Beans Neucal Solutions, Bangalore II Sem. 2008 01

1322 Vitacloud, Bangalore I-Sem.2016 01

1323 Vizury Interactive Solutions, Bangalore II Sem 2017 01

1324 VMS (Vakil Mehta Seth) Consultants Private Limited , Mumbai II Sem 2016 06

1325 VMware Software India Pvt. Ltd., Bangalore I Sem 2017 03

1326 VMWare, Bangalore II Sem. 2007 13

1327 VMware, Pune I Sem. 2009 02

1328 Voxta, Hyderabad I Sem. 2010 01

1329 Vrindi India Pvt. Ltd., Anand I Sem. 2009 02

1330 Vrindi India Pvt. Ltd., Delhi I Sem. 2009 02

1331 Vymo , Bangalore II Sem 2016 03

1332 Wadhani Foundation, Bangalore I Sem. 2013 01

1333 Walmart Global Technology Services, Bangalore II Sem. 2013 10

1334 Wavelet Tech. Pvt. Ltd., Pune I Sem. 2007 05

1335 WCG Robotics, Gurgaon I Sem. 2013 01

1336 Wealth India Financial Services Pvt. Ltd., Chennai II Sem. 2018 01

1337 Wealth India Financial Services Pvt. Ltd, Bangalore I Sem 2018 01

1338 Weir Engineering Services India Ltd. Hubli II Sem. 2009 07

1339 Weir Engineering Services India Ltd., Bangalore I Sem. 2012 02

1340 wheels Eye , Gurgaon I Sem 2018 01

1341 Wipro Infotech., Bangalore II Sem. 1984 31

1342 Wipro Tech., Hyderabad II Sem. 2004 04

Page 52: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

38

1343 Wockhardt Ltd., Aurangabad II-Sem. 2005 03

1344 Wockhardt Ltd., Mumbai II Sem. 2005 03

1345 Wootify,Mumbai I Sem 2014 01

1346 Work Monk Solutions, Bangalore I Sem. 2012 01

1347 Worley Parsons India, Hyderabad I Sem 2014 07

1348 Worley Parsons,Mumbai I Sem 2014 06

1349 Xilinx India Technology Services Pvt. Ltd., Hyderabad I Sem 2017 03

1350 Xora Software Systems Pvt. Ltd., Bangalore II Sem. 2007 01

1351 Yahoo Software Development (I) Pvt. Ltd., Bangalore II Sem. 2003 15

1352 Yardstic, Hyderabad I Sem. 2013 01

1353 YoruStory.in, Bangalore II Sem. 2011 03

1354 Yrals Digital India Pvt.Ltd. Mumbai I Sem 2017 01

1355 YUPPTV,Hyderabad II-Sem. 2016 01

1356 Zapr, Gurgaon I Sem. 2013 01

1357 Zendrive India Pvt Ltd, Bangalore I Sem 2017 02

1358 Zeotap India Pvt. Ltd., Bangalore II Sem 2017 03

1359 Zinnov Management Consulting Pvt. Ltd., Bangalore II Sem. 2011 11

1360 Zinnov Management Consulting Pvt. Ltd (IT Project) , Bangalore I Sem 2018 01

1361 Zinnov Management Consulting Pvt. Ltd., Gurgaon I-Sem.2016 04

1362 ZOHO corporation , Chennai II Sem. 2016 01

1363 ZOMATO, Gurgaon II Sem. 2010 03

1364 Zoomcar India Pvt. Ltd., Bangalore I Sem 2014 07

1365 ZS Associates, Gurgaon II Sem. 2015 02

1366 ZS Associates, Pune I Sem. 2011 06

1367 Zynga India, Bangalore I Sem. 2011 05

1368 Zynga Game Network India Pvt. Ltd, Bangalore II Sem 2018 01

1369 [24]7 iLabs, Bangalore I Sem. 2015 02

Page 53: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

39

Practice School Division, In-charges & Nucleus Members

Dean, Practice School

S.No. Name of Faculty Member Office Res. / Mobile E-mail Address 1 Prof. S.Gurunarayanan 1596- 515274 9414082472 [email protected]

Associate Deans, Practice School

1 Prof. Anil B. Gaikwad (Quality Assessment & Assurant cell )

1596-515274 9772063831 [email protected], [email protected]

2 Prof. K.R. Anupama (Publication Cell)

8322580317 0832-2580388 [email protected]

3 Prof. P Sankar Ganesh (Instruction Cell)

040-66303547

9652345167 [email protected]

4 Prof. Annapoorna Gopal (Planning & Development Cell)

9845943564 [email protected]

University Wide Manager-Operation (PSD, BITS Pilani) 1 Mr.Varun Singh 040-

66303713 9010200768 [email protected]

pilani.ac.in Nucleus Members, Pilani Campus 1 Dr. G.Muthukumar 1596515821 9413150035 [email protected] 2 Dr. S. Murugesan 01596515717 9413489684 [email protected]

Nucleus Members, BITS Pilani –K.K. Birla Goa Campus

1 Dr. Narayan Manjarekar 8322580194 8805141077 [email protected] Manager - Off campus Operations, BITS Pilani – K.K. Birla Goa Campus

1 Mr. Atul Sankaw 0832-2580273

[email protected]

Nucleus Members, Hyderabad Campus

1 Dr. Sashideep Gutti 4066303590 09951861932 [email protected]

Page 54: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

40

Off - Campus Faculty

Sr. No

Name Contact Details Email Id

Bangalore 1 Prof. S. Sindhu 9986248640 [email protected]

2 Dr. Lucy J. Gudino 9422740023 [email protected] 3 Dr. SatyaSudhakarYedlapalli 9845900118 [email protected]

4 Dr. Annapoorna Gopal 9845943564 [email protected]

5 Ms. Akanksha Bharadwaj 9972688558 / 9582589098

[email protected]

6 Ms. Anita Ramachandran 9900519195 [email protected]

7 Mr. Brajabandhu Mishra 9535143205 [email protected]

8 Mr. Chandrasekhar RK 9986489685 [email protected]

9 Mr.MohammadSaleem.J.Bagewadi 9986601090 [email protected]

10 Ms. Manda Saisekhar Das 9740188113 [email protected]

11 Ms. Preeti N G 9035867577 [email protected]

12 Ms. Raja Vadhana 9972908510 [email protected]

13 Ms. RekhaAnandarao 9480703518 [email protected]

14 Ms. Rita Gopalan 9886378429 [email protected]

15 Ms. SwapnaKulkarni 9886672265 [email protected]

16 Mr. Srinivas Kota 9414935853 [email protected]

17 Mr. S.P.Vimal 9983526379 [email protected]

18 Mr. Vineet Garg 9845015640 [email protected]

19 Mr. Viswanathan Hariharan 9880416418 [email protected]

Chennai

20 Ms. R. Bharathi 9094322706 [email protected]

21 Dr. P.R. Deepa 9840755264 [email protected]

22 Dr. Pradheep Kumar 9791031776 [email protected]

23 Dr. Padma Murali 8754439440 [email protected]

24 Mr. Akshaya Ganesan 9791034200 [email protected]

25 Mr. G Venkiteswaran 9840140018 [email protected]

26 Mr. S. Raghuraman 8939080025 [email protected]

Delhi

27 Mr. R.K. Tiwary 9871482697 [email protected]

28 Mr. Ashish Narang 7838222009 [email protected]

29 Mr. M.K. Hamirwasia 85868 14104, 09449020120

[email protected]

30 Ms. Ritu Arora 9811439331 [email protected]

31 Ms.Shailja Singhdev Sodhi 9871260167, 9818520310 [email protected]

Goa 32 Dr. Narayan Suresh Manjarekar 0 8322580194 [email protected]

Hyderabad

33 Mr. Anjani Srikanth Koka 9492686869 [email protected]

34 Prof. K.G. Krishna 9849171224 [email protected]

Page 55: PS – I (STUDENTS ALLOTMENT) DETAILS FOR SUMMER 2018 · cosmos infra engineering (india) pvt. ltd. 7 g.m.r. varalakshmi foundation 5 . gail (india) limited 5 indian council for research

41

35 Dr. Shekhar Rajagopalan 9949473675 [email protected]

36 Dr. YVK Ravi Kumar 9430233116 [email protected]

37 Mr. Akula Sashikanth 9848184814 [email protected]

38 Mr. Chennupati R Prasanna 9491126992 [email protected]

39 Mr. Krishnamurthy

Bindumadhaan

9966204390 [email protected]

40 Dr. Naga Vamsi Krishna Jasti 9158042090/ 9373740561 [email protected]

41 Mr. Sandeep Kayastha 80089 44226 [email protected]

42 Mr. Samir R. Kale 9030279063 [email protected]

43 Ms. B. Radhika 9966408329 [email protected]

44 Mr. T.V. Rao 9849314331 [email protected] 45 Mr. Vinay Balde 9652829338 [email protected]

46 Mr. P.B.Venkatraman 9036091967 [email protected]

Kolkata

47 Dr. Arun Maity 9748821168, 9903523835 [email protected]

Mumbai

48 Mr. Pavan Kumar Potdar 9869771853 / 9594891045

[email protected]

49 Dr.Mahalakshmi R. Mudliar 9004145421 [email protected]

50 Dr. Rambir Bhadouriya 9920062438 [email protected]

51 Ms. Swarna Chaudhary 9769591626 [email protected]

52 Ms. Uma Maheswari Natarajan 9930877332 [email protected]

Pune

53 Dr. B.V. Prasad 9422392108 [email protected]

54 Dr. Ankur Pachauri 9927590910 [email protected]

55 Dr. Sudeep Kumar Pradhan 7875294390 [email protected]

56 Mr. Dinesh W. Wagh 7798887073 [email protected]

57 Mr.Manoj s. Kakade 9822479950 [email protected]

58 Mr.P. Vijaya Bhaskar Reddy 9619105795 [email protected]

59 Mr. Ravi S. Reosekar 9822326534 [email protected]

60 Ms. A.Vijayalakshmi 9922585427 [email protected]

61 Mr. Santosh Khandgave 7798245575 [email protected]

62 Ms. Sonika C Rathi 8237032252 [email protected]

63 Ms.Samata Satish Mujumdar 9421006627 [email protected]

Pilani

64 Mr. Pawan Sharma 9829652832 [email protected]

65 Prof. Srikanta Routroy 09694096456 [email protected]

Vijayanagar

66 Mr. S.S. Gupta 9449598319 [email protected]