PROSPECT ROAD AND CENTER AVENUE UNDERPASS PROGRAM PLAN COLORADO STATE UNIVERSITY FORT COLLINS, COLORADO Aug 11, 2015 Summary of Information: Name of Project: Prospect Rd and Center Ave Underpass Program Plan Applicant: Colorado State University, Facilities Management Department Contacts: Shelly Carroll, Fred Haberecht File Location: K:\Planning\Program Plans\ Rev. Date A 8/11/2015

Transcript of PROSPECT ROAD AND CENTER AVENUE UNDERPASS … · PROSPECT ROAD AND CENTER AVENUE UNDERPASS PROGRAM...

PROSPECT ROAD AND CENTER AVENUE UNDERPASS PROGRAM PLAN

COLORADO STATE UNIVERSITY

FORT COLLINS, COLORADO

Aug 11, 2015

Summary of Information: Name of Project: Prospect Rd and Center Ave Underpass Program Plan

Applicant: Colorado State University, Facilities Management Department

Contacts: Shelly Carroll, Fred Haberecht File Location: K:\Planning\Program Plans\

Rev. Date A 8/11/2015

TABLE OF CONTENTS Page No.

1.0 EXECUTIVE SUMMARY .......................................................................................... 2

2.0 JUSTIFICATION....................................................................................................... 3

3.0 PROJECT DESCRIPTION………………………………………………………………….3

4.0 BENEFITS ................................................................................................................. 3

5.0 FACILITIES NEEDS ................................................................................................. 3

5.1 Conceptual Plan ............................................................................................. 3

5.2 Existing Site Analysis ..................................................................................... 3

5.3 Floodplain Analysis ........................................................................................ 3

5.5 LEED Goal/Sustainability ............................................................................... 4

5.6 Acquisition of Real Estate .............................................................................. 4

6.0 PROJECT BUDGET.............................................................................................................. 5

7.0 PROJECT SCHEDULE ............................................................................................. 5

8.0 RELATION TO MASTER PLAN AND OTHER PROJECTS ...................................... 5

APPENDICES

APPENDIX A –Underpass Conceptual Plan

APPENDIX B – Project Budget

1

PROSPECT ROAD AND CENTER AVENUE UNDERPASS PROGRAM PLAN

COLORADO STATE UNIVERSITY FORT COLLINS, COLORADO

Aug 11, 2015 Prepared by:

Colorado State University Facilities Management Department

1.0 EXECUTIVE SUMMARY

This document provides planning information for a proposed pedestrian and bicycle underpass at Prospect Rd and Center Ave in Fort Collins, Colorado. Prospect Rd is a major arterial running along the south edge of CSU’s main campus. In recent years a large amount of student housing has been built off of Center Ave and the volume of bicycles and pedestrians crossing at Prospect and Center has increased. CSU and the City of Fort Collins have also evaluated the intersection in light of the new stadium and have found that a grade separated crossing provides the highest level of pedestrian and bicycle safety. The overall schedule to complete project is 10 months. The estimated cost of the project is $6.0M, to be financed by excess proceeds from bonds issued under the Intercept program for the South Campus Parking Lot and the University Square Parking Garage. Favorable Design Build cost proposals on the above projects resulted in significant savings to the university, and the underpass project can be completed within the existing bond debt.

2

2.0 JUSTIFICATION Prospect Rd is a major arterial running along the south edge of CSU’s main campus. In recent years a large amount of student housing has been built off of Center Ave and the volume of bicycles and pedestrians crossing at Prospect and Center has increased. CSU and the City of Fort Collins have also evaluated the intersection in light of the new stadium and have found that a grade separated crossing provides the highest level of pedestrian and bicycle safety. 3.0 PROJECT DESCRIPTION The underpass will cross Prospect Road West of Center Avenue and will require demolition of one of the Aggie Village South apartment units. The redevelopment of Aggie Village North planned for this underpass and the project will not impact any of the new buildings. 4.0 BENEFITS

The benefits of this project include:

• Provide a safe bicycle and pedestrian crossing at Prospect Road • Provide better connectivity between Main and South campuses

5.0 FACILITIES NEEDS

5.1 Conceptual Plan A conceptual plan is included in Appendix A. The briding documents for the Design Build procurement have been developed.

5.2 Existing Site Analysis Site constraints include the following:

• Aggie Village South apartment building #19 will need to be deconstructed in order to provide adequate ramp length to the tunnel. Aggie Village North redevelopment (currently underway) will provide adequate room for the entrance ramp.

5.3 Floodplain Analysis

The site does not reside in the floodplain, as shown on the diagram below.

3

5.4 LEED Goal/Sustainability

Not applicable.

5.5 Acquisition of Real Estate No Land acquisition is required, the land within the project area is owned by the CSU Board of Governors. 4

6.0 PROJECT COST

The estimated cost of the project is $6.0M, to be financed by excess proceeds from bonds issued under the Intercept program for the South Campus Parking Lot and the University Square Parking Garage. Favorable Design Build cost proposals on the above projects resulted in significant savings to the university, and the underpass project can be completed within the existing bond debt. The project budget is included in Appendix B.

7.0 PROJECT SCHEDULE

The overall schedule is estimated at 10 months.

8.0 RELATION TO MASTER PLAN AND OTHER PROJECTS

Grade separated crossings are identified as desired Bicycle and Pedestrian Improvements in the CSU Master Plan approved April 2015.

5

Sheet Number:

Sheet Title:

PE

DE

ST

RIA

N U

ND

ER

PA

SS

Project # 150226F

3.02.15

R0

Project Information

00SW

K:\W

OR

KIN

G P

RO

JE

CT

\B

LD

G #\00-99\0-B

LD

G\\.D

WG

Remodel &

Construction

Services

PR

EL

IM

IN

AR

Y N

OT

F

OR

CO

NS

TR

UC

TIO

N

Sheet Information

Rev. No. Date By Checked By

A0.0

SITE

PLAN

SCALE: 3/64" = 1'-0"

SITE PROFILE

SCALE: 3/64" = 1'-0"

SITE UTILITY PLAN

129'-2

15

16

" 68'-0

13

16

"

10'-0"

1'-6

11

16

"

200'-0"

10'-0"

15'-0"

Project Title: Prospect Ave UnderpassBudget

11-Aug-15 Estimated Costs Remarks

Site Survey, Geotechnical $ 35,000

Consultants - Architects, Engineers, Vibration, Acoustics $ 160,000 10.0% Advertisements $ 2,000

CSU Facilities Project Management $ 102,000

Independent Code Review $ 10,000

Construction code inspections $ 8,000

Construction materials inspections $ 40,000

City Permits and Fees $ 105,000

PFA review $ 24,000

Total Professional Services $ 486,000

New Space -

Renovation Space - _____@$____/sqft $ -

Site Work Service/Utilities $ 3,855,000

Site Improvements/Landscaping

Demolition-Aggie South Building 19 $ 360,000

Asbestos abatement $ 25,000

Subtotal Construction Costs $ 4,240,000

Fixed Equipment

Moveable Equipment

CSU Communications (estimate from telecom) $ 80,000 security cameras and communication

Total Equipment and Furnishings Costs $ 80,000

Relocation Costs- Custodial Equipment

Total Miscellaneous Costs $ -

$ 4,806,000

Project Contingency 5% for New

Project Contingency 10% for Renovation $ 480,600

Total Contingency $ 480,600

5,286,600$

5,286,600$

Total Project Cost / sqft 292$

COLORADO STATE UNIVERSITYFacilities Planning Design and Construction

Project Budget-

Subtotal Project Cost

Subtotal Budget- FY 2015

Project Budget

Professional Services

Project Contingency

Miscellaneous

Equipment & Furnishings

Construction