PROSPECT ROAD AND CENTER AVENUE UNDERPASS PROGRAM PLAN
COLORADO STATE UNIVERSITY
FORT COLLINS, COLORADO
Aug 11, 2015
Summary of Information: Name of Project: Prospect Rd and Center Ave Underpass Program Plan
Applicant: Colorado State University, Facilities Management Department
Contacts: Shelly Carroll, Fred Haberecht File Location: K:\Planning\Program Plans\
Rev. Date A 8/11/2015
TABLE OF CONTENTS Page No.
1.0 EXECUTIVE SUMMARY .......................................................................................... 2
2.0 JUSTIFICATION....................................................................................................... 3
3.0 PROJECT DESCRIPTION………………………………………………………………….3
4.0 BENEFITS ................................................................................................................. 3
5.0 FACILITIES NEEDS ................................................................................................. 3
5.1 Conceptual Plan ............................................................................................. 3
5.2 Existing Site Analysis ..................................................................................... 3
5.3 Floodplain Analysis ........................................................................................ 3
5.5 LEED Goal/Sustainability ............................................................................... 4
5.6 Acquisition of Real Estate .............................................................................. 4
6.0 PROJECT BUDGET.............................................................................................................. 5
7.0 PROJECT SCHEDULE ............................................................................................. 5
8.0 RELATION TO MASTER PLAN AND OTHER PROJECTS ...................................... 5
APPENDICES
APPENDIX A –Underpass Conceptual Plan
APPENDIX B – Project Budget
1
PROSPECT ROAD AND CENTER AVENUE UNDERPASS PROGRAM PLAN
COLORADO STATE UNIVERSITY FORT COLLINS, COLORADO
Aug 11, 2015 Prepared by:
Colorado State University Facilities Management Department
1.0 EXECUTIVE SUMMARY
This document provides planning information for a proposed pedestrian and bicycle underpass at Prospect Rd and Center Ave in Fort Collins, Colorado. Prospect Rd is a major arterial running along the south edge of CSU’s main campus. In recent years a large amount of student housing has been built off of Center Ave and the volume of bicycles and pedestrians crossing at Prospect and Center has increased. CSU and the City of Fort Collins have also evaluated the intersection in light of the new stadium and have found that a grade separated crossing provides the highest level of pedestrian and bicycle safety. The overall schedule to complete project is 10 months. The estimated cost of the project is $6.0M, to be financed by excess proceeds from bonds issued under the Intercept program for the South Campus Parking Lot and the University Square Parking Garage. Favorable Design Build cost proposals on the above projects resulted in significant savings to the university, and the underpass project can be completed within the existing bond debt.
2
2.0 JUSTIFICATION Prospect Rd is a major arterial running along the south edge of CSU’s main campus. In recent years a large amount of student housing has been built off of Center Ave and the volume of bicycles and pedestrians crossing at Prospect and Center has increased. CSU and the City of Fort Collins have also evaluated the intersection in light of the new stadium and have found that a grade separated crossing provides the highest level of pedestrian and bicycle safety. 3.0 PROJECT DESCRIPTION The underpass will cross Prospect Road West of Center Avenue and will require demolition of one of the Aggie Village South apartment units. The redevelopment of Aggie Village North planned for this underpass and the project will not impact any of the new buildings. 4.0 BENEFITS
The benefits of this project include:
• Provide a safe bicycle and pedestrian crossing at Prospect Road • Provide better connectivity between Main and South campuses
5.0 FACILITIES NEEDS
5.1 Conceptual Plan A conceptual plan is included in Appendix A. The briding documents for the Design Build procurement have been developed.
5.2 Existing Site Analysis Site constraints include the following:
• Aggie Village South apartment building #19 will need to be deconstructed in order to provide adequate ramp length to the tunnel. Aggie Village North redevelopment (currently underway) will provide adequate room for the entrance ramp.
5.3 Floodplain Analysis
The site does not reside in the floodplain, as shown on the diagram below.
3
5.4 LEED Goal/Sustainability
Not applicable.
5.5 Acquisition of Real Estate No Land acquisition is required, the land within the project area is owned by the CSU Board of Governors. 4
6.0 PROJECT COST
The estimated cost of the project is $6.0M, to be financed by excess proceeds from bonds issued under the Intercept program for the South Campus Parking Lot and the University Square Parking Garage. Favorable Design Build cost proposals on the above projects resulted in significant savings to the university, and the underpass project can be completed within the existing bond debt. The project budget is included in Appendix B.
7.0 PROJECT SCHEDULE
The overall schedule is estimated at 10 months.
8.0 RELATION TO MASTER PLAN AND OTHER PROJECTS
Grade separated crossings are identified as desired Bicycle and Pedestrian Improvements in the CSU Master Plan approved April 2015.
5
Sheet Number:
Sheet Title:
PE
DE
ST
RIA
N U
ND
ER
PA
SS
Project # 150226F
3.02.15
R0
Project Information
00SW
K:\W
OR
KIN
G P
RO
JE
CT
\B
LD
G #\00-99\0-B
LD
G\\.D
WG
Remodel &
Construction
Services
PR
EL
IM
IN
AR
Y N
OT
F
OR
CO
NS
TR
UC
TIO
N
Sheet Information
Rev. No. Date By Checked By
A0.0
SITE
PLAN
SCALE: 3/64" = 1'-0"
SITE PROFILE
SCALE: 3/64" = 1'-0"
SITE UTILITY PLAN
129'-2
15
16
" 68'-0
13
16
"
10'-0"
1'-6
11
16
"
200'-0"
10'-0"
15'-0"
Project Title: Prospect Ave UnderpassBudget
11-Aug-15 Estimated Costs Remarks
Site Survey, Geotechnical $ 35,000
Consultants - Architects, Engineers, Vibration, Acoustics $ 160,000 10.0% Advertisements $ 2,000
CSU Facilities Project Management $ 102,000
Independent Code Review $ 10,000
Construction code inspections $ 8,000
Construction materials inspections $ 40,000
City Permits and Fees $ 105,000
PFA review $ 24,000
Total Professional Services $ 486,000
New Space -
Renovation Space - _____@$____/sqft $ -
Site Work Service/Utilities $ 3,855,000
Site Improvements/Landscaping
Demolition-Aggie South Building 19 $ 360,000
Asbestos abatement $ 25,000
Subtotal Construction Costs $ 4,240,000
Fixed Equipment
Moveable Equipment
CSU Communications (estimate from telecom) $ 80,000 security cameras and communication
Total Equipment and Furnishings Costs $ 80,000
Relocation Costs- Custodial Equipment
Total Miscellaneous Costs $ -
$ 4,806,000
Project Contingency 5% for New
Project Contingency 10% for Renovation $ 480,600
Total Contingency $ 480,600
5,286,600$
5,286,600$
Total Project Cost / sqft 292$
COLORADO STATE UNIVERSITYFacilities Planning Design and Construction
Project Budget-
Subtotal Project Cost
Subtotal Budget- FY 2015
Project Budget
Professional Services
Project Contingency
Miscellaneous
Equipment & Furnishings
Construction