Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station & Vikas
Bhawan
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Table of Contents
Salient Project Features
Present - Proposed Facilities
Deliverables - Project Benefits
Financials
Implementation plan
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Features
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Features
Project Sites
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Background
• Govt has decided to decommission IP Power Station & has earmarked 15 acres from this to the DTC – but the land with Power Dept as of now.
• DTC will continue to have 3 acres of land on the western side of the Ring Road, ie the DTC Depot site, even after the East West Corridor.
• Vikas Bhavan complex (with PWD) of 6 acres was developed in 1970s and is worn out from insides.
THERE IS ADMITTED SHORTAGE OF GOVT OFFICE SPACE IN THIS AREA
• The concept is to redevelop all these sites in manageable sequence.
• Avail the entire FAR.• At no cost to Govt.
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Proposal
• Developing an integrated office complex at the existing DTC Depot on the left over land of around 3 acres out of the 6 acres.
• Providing office space within the outer envelope of the existing IP Power Plant by making suitable modifications and providing facilities for bus parking in the low lying area used for coal storage for the Power Plant.
• Re-developing the Vikas Bhavan land to construct an integrated office complex.
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Parameters
• The project to be implemented by DSIIDC on a Self-Sustaining Mode at no cost to the Delhi Government
• The facilities and infrastructure development as per norms of MPD 2021
• DSIIDC to provide the residual value of Vikas Bhawan Complex to PWD (almost Rs 5 cr).
• Residual value calculated @ 100% of the original cost of the buildings.
• The resultant infrastructure will be state of the art and serve the needs of Depts in the immediate foreseeable future.
• DSIIDC can generate resources for this project out of long-term/short-term leasing out of the facilities to Governmental and non-Governmental Organizations/ Corporations etc. in accordance with the land use and Master Plan stipulations.
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Demand for Office Space in Central
Business District, Delhi• MCD at the time of construction of Civic Centre assessed demand for office space from Govt. agencies. The following Govt. agencies requested space from MCD which could not be accommodated by MCD: Ministry of Finance Central Excise & Customs Life Insurance Corporation Ministry of Information Technology Ministry of Home Affairs Ministry of Agriculture Oriental Insurance Delhi Tourism Delhi Finance Commission Public Grievance Commission
• As may be seen from the above that there is huge demand for office space and the current project of DSIIDC could cater to a portion of the demand.
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Implementation Plan
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Implementation Plan
• The Power Department to vacate the Power Plant area within a year
• A detailed report will be got prepared by DSIIDC for the entire project (in 3 months).
• In next 3 months, DSIIDC to finalise agencies for modifying the interiors of the Power Plant that will provide modern office space and develop a semi-basement and open to sky bus parking for almost 600 buses.
• The redeveloped power plant complex will accommodate DTC Headquarters, other Govt Corporations and Bus Depot
• State of the Art Office Complex to be constructed at the current DTC location
• Government Departments currently functioning at Vikas Bhawan to be temporarily accommodated at the redeveloped current DTC depot (or at Metcalf house).
• Thereafter redevelopment of Vikas Bhawan Project to be taken up
• The entire project to be completed within five years from the date of possession of power plant site.
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Present vs. Proposed Facilities
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Present Facilities
Site 1:DTC
Current
Status
Picture showing the entrance to the bus depot
Picture showing the administrative building
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Proposed Facilities
Site 1
Proposed
Facility
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Present Facilities
Site 2:Power Plant
Current
Status
View of the power station structure
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Proposed Facilities
Site 2:New DTC HQ & IP Bus DepotPropos
ed Facility
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Present Facilities
Site 3:Vikas Bhawan
Current
Status
View of office buildings at Vikas Bhawan
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Proposed Facilities
Site 3: Vikas Bhawan 2015
Proposed
Facility
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Financials
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Financials
Total Built-up Area- Site 1: Western Side/DTC Complex
Total area 3AcresTotal area 12,141 SMTFSI 2 #
Basement area (double basement – for cars only)14,000 SMTTotal Built Up Area 24,281 SMTUsable area 24,281 SMTArea leasable 50 %Area leasable 12,141 SMT
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Financials
Total Built-up Area- Site 2: Eastern Side/Power Plant Complex
Total area 15AcresTotal area 60,703 SMTFSI --
Ground floor area (for car parking) 7,284 SMTTotal Built up area (internal modification) SMT
Leasable area ~8,000 SMT
Bus parking (semi basement + open to sky) 51,598 SMT
~16,000
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Financials
Total Built-up Area- Site 3: Vikas Bhavan
Vikas complex existing Built Up Area ~20,500 SMT
Total area 5.95AcresTotal area 24,059 SMTFSI 2 #
Basement area SMTTotal Built up area 48,117
24,000 SMT
Area to be returned to depts ~20,000 SMTArea for commercial exploitation ~28,117 SMT
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Financials
Cost Assumptions
Particulars DataCost of construction of building structure
INR 25,000 per SMT
Cost of construction of Vikas Bhawan INR 30,000 per SMTCost of construction of basement INR 18,000 per SMTCost of construction of bus depot INR 20,000 per SMTCost escalation 6% p.a.Cost of making the building structure environmental friendly
6% of construction cost
Construction period 2 yearsContingency 25% of construction
costPayment to PWD as residual value for Vikas Bhawan
INR 5 croreParticulars
Data
Equity 25%Debt 75%
Proposed Financial Structure
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Financials
Project Cost
Particulars Built up area (SMT)
Cost of Construction (INR / SMT)
Total Cost (In INR Crore)
Site A (Western side) 24,281 25,000 62.52Site B (Eastern side) 16,000 20,000 32.00Site C (Vikas Bhawan)
48,117 30,000 181.97
Bus depot 51,598 20,000 106.29Basement 45,284 18,000 81.51Contingency cost 25% 116.07Green Building Cost 6% 27.86Total construction cost
608.22
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Deliverables and Benefits
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Deliverables
Deliverables
• DTC to get developed bus parking for over 600 buses (covered parking for 300 and open parking for another 300 buses) free of cost, at IP Power Plant site.• DTC to get around 8,000 sq. mtr. of built up office at, DTC IP Depot site free of cost.• DTC to get around 4,000 sq mtr of built up office space at IP Power station site free of cost.• Any increase in the DTC, IP Depot area may be adjusted on pro rata basis between DTC and DSIIDC.• All Deptts at Vikas Bhavan will get modern office with area upto existing usage free (almost 2,00,000 sft)• Remaining area will be leased out to Delhi Govt PSUs, GoI PSUs and other users at Market price.• DSIIDC will maintain the complexes for 30 yrs and charge the users at actuals.
Note: The requirements of the Transport Department/DTC will be accommodated subject to the techno- economic feasibility to be ascertained at the time of completion of Detailed Project Report.
Proposed Redevelopment of DTC Depot-IP Estate, Indraprastha Power Station and Vikas Bhawan
Project Benefits
Optimal utilization of land / asset
Green building
Access to state of art commercial office facilities
A time bound effort by DSIIDC
Construction of bus parking ~ 600 buses
Reduction in pollution levels with decommissioning of the power plantNo financial impact on Govt Deptts