Proposed Layouts for Signal, LV and HV cables in YB+1
description
Transcript of Proposed Layouts for Signal, LV and HV cables in YB+1
![Page 1: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/1.jpg)
1
Proposed Layouts for Signal, LV and HV cables in YB+1
Piyush VermaTIFR, India
![Page 2: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/2.jpg)
2
• All the Services of Muons as well as HO on +Z side.
• Three options shown.
• In all the options – Signal Cables from Sector 6 and Sector 4 go
through the megatile covers and exit on sector 2.
– Signal Cables from Sector 8 and Sector 10 go through the megatile covers and exit on sector 12.
![Page 3: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/3.jpg)
3Full View of YB+1 from +Z side.
![Page 4: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/4.jpg)
4
Option1
![Page 5: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/5.jpg)
5
Option1• Signal Cables go under MAB between sector 1 and sector 12 for
lower half and under MAB between sector 2 and sector 3 for upper half.
• Cross section required for signal cables under each MAB
= 27mm x 27mm.• HV cables go along the Copper tubes along radial support for each
sector having RBX.• HV cable cross section = 12 dia.• 2 LV cables and Slow control cable routed on the face of sector
having RBX.• 2 LV + 1 Slow control c/s = 20 dia. + 2 mm tolerance => 22 mm.• No extra length looped and kept on frame considered. LV +slow
control to have disconnect box.
![Page 6: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/6.jpg)
6
Option1 (remarks)• Signal Cables :
– Space under MAB only 21 mm under present scenario.
– Also signal cables have to pass over Yoke cooling pipe under the MAB.
– May be possible if we spread out the signal cables.
• HV Cables:– As these run along copper tubes, there are some tight points.
– HV cables require minimum of 150 mm bending radius. Routing along copper tubes is having a lot of Zig-Zag. Achieving the min. bend radius may be difficult.
– Is routing of HV line along with Copper tubing advisable?
• LV Cables :– Extra cost for disconnect box.
![Page 7: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/7.jpg)
7
Option2
![Page 8: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/8.jpg)
8
Option2• Signal Cables go on the face of sector 12 for lower half and on
sector 2 for upper half (same as YB+2). Extra length of ~2 M looped and kept on structure outside Yoke iron.
• Cross section required for signal cables
= 27mm x 27mm.• 2 LV cables and Slow control cable routed on the face of sector
having RBX.• 2 LV + 1 Slow control c/s = 20 dia. + 2 mm tolerance => 22 mm.• 2M extra length looped and kept on Structure along with Signal
Cables. No disconnect box.• Total c/s on face of Sectors 2 and 12 = 49 mm wide x 27 mm high.• HV cables go along the Copper tubes along radial support for each
sector having RBX.• HV cable cross section = 12 dia.
![Page 9: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/9.jpg)
9
Option2 (remarks)• Signal Cables and LV+Slow Control Cables :
– No effect of MAB location for routing from sector to patch panel.
– Fixing of signal cables less complicated as the go on existing cable trays fixed for muon services. (No extra drilling of holes on Yoke Iron).
– No extra cost for disconnect box.
– Due to extra length HO System and Muon System will be disconnected for maintenance.
![Page 10: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/10.jpg)
10
Option3
![Page 11: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/11.jpg)
11
Option3• Signal Cables go on the face of sector 12 for lower half and on
sector 2 for upper half (same as YB+2). Extra length of ~2 M looped and kept on structure outside Yoke iron.
• Cross section required for signal cables = 27mm x 27mm.• 2 LV cables and Slow control cable routed on the face of sector
having RBX.• 2 LV + 1 Slow control c/s = 20 dia. + 2 mm tolerance => 22 mm.• HV cables also routed on the face of sector having RBX along with
LV Cables and Signal Cables.• HV cable cross section = 12 dia.• 2M extra length looped and kept on Structure along with Signal
Cables. No disconnect box.• Total c/s on face of Sectors 2 and 12 = 61 mm wide x 27 mm high.• Total c/s on face of Sectors 4, 6, 8 and 10 = 35 mm wide x 22 mm
high.
![Page 12: Proposed Layouts for Signal, LV and HV cables in YB+1](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815a9b550346895dc8196d/html5/thumbnails/12.jpg)
12
Option3 (remarks)• Signal Cables, HV and LV+Slow control Cables :
– No effect of MAB location for routing from sector to patch panel.
– Fixing of signal cables less complicated as the go on existing cable trays fixed for muon services. (No extra drilling of holes on Yoke Iron).
– No extra cost for disconnect box.
– Fixing of HV cables also becomes very simple.
– Due to extra length HO System and Muon System will be disconnected for maintenance.