Prepared For: Town of York Town Manager 186 York Street York, ME 03909 January 30, 2015 Proposal for Long Sands Beach Masterplan, Design & Construc on Bid Documenta on - Town of York

Transcript of Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long...

Page 1: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Prepared For:

Town of YorkTown Manager186 York StreetYork, ME 03909

January 30, 2015

Proposal for Long Sands Beach

Masterplan, Design & Constructi on

Bid Documentati on - Town of York

Page 2: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

 

 231 Main Street, Biddeford, Maine 04005      TEL 207.283.0193       FAX 207.283.4283       www.oakpoint.com 

 

 

January 30, 2015  Town of York Town Manager 186 York Street York, Maine 03909    Re:  Proposal for Long Sands Beach Masterplan, Design & Construction Bid Documentation  Dear Mr. Burns:  Oak Point Associates is pleased to submit our proposal package for the Long Sands Beach Masterplan, Design & Construction Bid Documentation project.  We are fully capable of completing this project given our current workload and we are excited about the opportunity to work with the Town of York on this project.  Oak  Point  Associates  is  a  full‐service,  interdisciplinary  design  and  consulting  organization founded  in 1979, providing a wide range of engineering, architectural,  landscape architecture, and planning services from our offices  in Biddeford, Maine, and Portsmouth, New Hampshire.  The firm offers civil, mechanical, electrical, fire protection, and structural engineering services, as well as architecture, landscape architecture, and interior design. We have assembled a team for this project comprised of highly qualified professionals, and they will be supported by the balance of our staff of 77. Oak Point Associates has extensive experience with environmental permitting procedures and requirements and  is teaming with GZA GeoEnvironmental,  Inc.  for this proposal to provide wetlands delineation, environmental assessments, and other required environmental  services.  We  are  also  teaming  with  Appledore  Marine  Engineering,  as  our waterfront engineering sub‐consultant.  If chosen  for this project, Oak Point Associates would be able to start work  immediately. Our professional staff would be dedicated to providing outstanding services to the Town of York to ensure  that  your  needs  and  concerns  are  addressed  in  a  timely  manner.    The  team’s commitment to this project, combined with our past experience and professional expertise, will result in a highly successful project.   Please  contact me  if  there  are  any  questions  or  if  you  require  additional  information.  Your consideration of Oak Point Associates for this project is greatly appreciated.  Sincerely, 

 Scott C. Donovan, RA, LEED AP Senior Project Architect  

Page 3: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

  

Table of Contents 

  

PROJECT UNDERSTANDING & TECHNICAL APPROACH  1 

  

PROJECT MANAGEMENT  2 

  

COMPANY QUALIFICATIONS AND EXPERIENCE  3 

  

SCHEDULE  4 

  

COST  5 

  

REFERENCES  6 

  

MISCONDUCT  7 

  

APPENDICES  8 

  

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Page 4: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Section 1 

 

PROJECT UNDERSTANDING & TECHNICAL APPROACH 

Page 5: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Project Understanding & Technical Approach 

It is clear that the vision of the Town of York for the mile‐long design of the Long Sands Beach Area will result in a Master Plan which will provide the Town and visitors alike with a public realm that is not only safe and easily navigable, but a location that is enjoyable and desirable year after year.  It is assumed that this Master Plan will also provide the foundation for other future projects.  This vision can only be achieved through multiple design facets which will ensure a complete and comprehensive approach to developing a Master Plan.  A preliminary draft schedule has been provided and is also the best place to realize design tasks and coordinate efforts.  Refer also to the Schedule section below.  The short history provided has outlined multiple thought processes over that last few years, culminating in the more recent approach to tie the multiple projects together into one comprehensive plan. 

Drainage project just north of the Anchorage Inn – Approved May of 2012. 

Drainage project just north of the Long Sands Bathhouse and the replacement and expansion of the Long Sands Bathhouse – Approved May of 2013. 

Municipal Partnership Initiative (MPI) Grant from Maine DOT to secure the funds for the Long Beach Avenue improvements – grant request approved June of 2014. 

 Master Plan for the Long Sands Beach Area The Master Plan for the Long Sands Beach Area will include but not be limited to the following design strategies and will necessitate an efficient and effective strategy with constant on‐going communication.  

Complete Streets design. 

Municipal Separate Storm Sewer System (MS4) compliance. 

Municipal Partnership Initiative (MPI) Grant guidelines.  With limited space within the proposal format to elaborate on each element of design, and outline has been provided in order to highlight the major design components which will be required.  The design will encompass the following tasks which in many cases will be done concurrently.  Refer also to the Schedule section below for a more comprehensive view of design tasks. 

Initial assessment of existing conditions including; existing survey done by North Easterly Surveyors, Inc., and perfecting of property rights and ownership. 

Investigate utility and property involvements and coordinate with utilities. 

Perform geotechnical investigations. 

Perform field surveys, plot topography and cross sections. 

Perform traffic counts and analyses, including detour planning and mapping and prepare traffic control plans and narrative. 

Develop three alternative conceptual designs for consideration. 

Create preliminary design reports including utility verification and relocation engineering, right‐of‐way plans, drainage reports and geotechnical reports. 

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Page 6: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Project Understanding & Technical Approach 

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Prepare erosion control details and narrative. 

Prepare applications for environmental and other federal, state and municipal permits, including but not limited to Maine DEP and the Maine Historic Preservation Commission. 

Prepare submissions for meetings and attend possible meetings with the following entities: Parks & Recreation, Public Works, Planning Board, Board of Selectmen, York Water District, York Sewer District, Fire Department, Police Department, Town Planner, Code Enforcement, Others. 

Long Sands Beach Bathroom Facility Although the design of the Bathroom Facility will end up a separate set of construction documents, it is really a project within a project.  It should not only be a functional facility, but should also be an integral part of the comprehensive Master Plan and could very well be the anchor point for that area of the Long Sands boardwalk.  Our recent experience with the permitting and review process at the Ellis Park Short Sands Bathroom project has provided insight that will be critical for a fast moving project such as this.  The input from DEP and the establishment of the location of the building with regard to both dune zones and topographical elevation will be important early on in the project.   The design tasks for this project are obviously more focused to the program, coordination, and design of the building itself, but will need to be cross‐coordinated with the concurrent Master Plan project. 

Prepare site plans in conjunction with the Master Plan design. 

Prepare structural, architectural, mechanical, plumbing, and electrical drawings for the rehabilitation or replacement of the Bathroom Facility. 

Concept Selection Process: As indicated, three conceptual plans for roadway and Bathroom Building facilities will be developed and submitted within the framework of the Town of York’s public review process with the goal of selecting and developing a single plan to be brought to fruition.  After a design concept has been selected, construction documents will be developed for the following milestones: 25% Submission, 50% Submission, 95% (Pre‐final submission), Final bid documents submission.  Final Deliverables: The final deliverables will consist of two sets of complete construction bid documents including drawing plans, specifications, supporting documents and estimates of probable cost for the following two project components. 

1. Bathroom Building construction bid documents. (Coordination with Parks and Recreation Director along with a Town appointed Building Committee.) 

2. Roadway, drainage and other infrastructure improvements construction bid documents. (Coordination with the Public Works Director). 

Page 7: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Section 2 

 

PROJECT MANAGEMENT 

Page 8: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Project Management 

PROJECT TEAM 

     Oak Point Associates        GZA GeoEnvironmental Inc.  Appledore Marine Engineering, LLC 

  

A team of professional architects and engineers has been assembled for the Long Sands Beach Masterplan, Design & Construction Bid Documentation project. We feel that these individuals are best suited to meet the needs of the Town of York based on their past experience with similar projects. The proposed project team will be led by:   Scott Donovan, RA, LEED AP, Senior Architect/Project 

Manager  Kerry S. Green, RLA, ASLA, Senior Landscape Architect  Jacques Gagnon, Jr., PE, LEED AP, Associate Civil Engineer  Stephen Towne, PE, Senior Civil Engineer  Matthew Albert, PE, LEED AP, Associate Mechanical Engineer  Dale Lincoln II, PE, Associate Electrical Engineer   Peter J. Williams, Environmental Engineer   Noah J. Elwood, PE, Waterfront Engineer  

Scott Donovan, RA, LEED AP, is a licensed Architect whose 14 years of experience include project design from inception through construction documents, including: site analysis, programming, client interviews, cost estimating, construction administration and overall project management.    Kerry S. Green, RLA, ASLA, is a Registered Landscape Architect with over 20 years of experience in site inventory and analysis, design, preparation of construction and planning documents, construction observation and project management. Project types include school and university campus planning and design, institutional buildings, and recreational facilities. Ms. Green has experience in the facilitation of public meetings and design charrettes.  Jacques Gagnon, Jr., PE, LEED AP, is an Associate Civil Engineer for Oak Point Associates with 27 years of related site engineering design, construction observation, and permitting experience.  Stephen Towne, PE, is a Senior Civil Engineer with over 30 years of civil/site and infrastructure engineering design, construction observation, and permitting experience. He has provided civil design, permitting, and management for a variety of projects ranging from municipal neighborhood streetscape and recreation projects to military base master planning.  

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Page 9: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Project Management 

Matthew Albert, PE, LEED AP, is the head of Oak Point Associates’ Mechanical Engineering Department. He has 24 years of experience with HVAC, plumbing, fire protection and controls, and is a Certified Geoexchange Designer and a Certified Building Commissioning Professional.   Dale Lincoln II, PE, is an Associate Electrical Engineer with 17 years of experience. He has designed the alterations and modernizations to electrical systems for the renovations to office buildings, schools, dormitories, and other buildings.  Peter J. Williams, Senior Project Manager at GZA GeoEnvironmental Inc., has over 33 years of experience in the coastal engineering field.  He has been responsible for a wide range of projects involving seawall repair, revetment stabilization, navigation improvements, granite block seawall, marinas, shore protection structures, boat ramps, and waterfront access.  Noah J. Elwood, PE, President and Waterfront Engineer at Appledore Marine Engineering, LLC, has 22 years experience in the waterfront engineering field. He has been responsible for a wide range of projects involving seawall repair, dock rehabilitation, as well as waterfront infrastructure improvements, to name a few.   

RÉSUMÉS  Training and experience for each team member are further detailed in the résumés which are located in section 8, Appendices.   

CAPABILITY TO UNDERTAKE THIS MULTI‐DIMENSIONAL MUNICIPAL PROJECT 

Oak Point Associates' project team is committed to design excellence and project success. The Long Sands Beach Masterplan, Design & Construction Bid Documentation project would fit nicely into our current workload, and, if selected, our team would be available to start planning immediately. We will work closely with the Town of York to ensure all requirements and expectations are met.   Team members will provide full‐time commitment at required stages within the design process, and remain available throughout the entire project schedule. The project team will be assisted by additional staff as needed throughout each phase to ensure effective project delivery. 

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Page 10: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Section 3 

 

COMPANY QUALIFICATIONS AND EXPERIENCE 

Page 11: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Company Qualifications and Experience 

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

INTRODUCTION 

For over 30 years, Oak Point Associates has been transforming client needs into innovative design solutions. As a full service, interdisciplinary design and consulting organization providing a wide range of architectural, engineering, and planning services, we offer an advantageous integrated design approach. Our clients enjoy the benefits of comprehensive design capabilities merged with broad experience and personalized service.  With locations in Biddeford, Maine, and  Portsmouth, New Hampshire, Oak Point Associates serves the public and private sector throughout New England. Our capabilities have been demonstrated through successful and award‐winning projects for clients that include municipalities, universities and educational institutions, state agencies, and private entities, as well as federal agencies such as the U.S. Navy, U.S. Fish and Wildlife Service, and U.S. General Services Administration.   Exceptional service is a hallmark of our operations; principals of the firm are involved in every project and lead a staff of 77 highly qualified personnel. Under the leadership of Robert C. Tillotson, Architect, PE, President, the team provides a full range of professional services including  civil, structural, mechanical, electrical, and fire protection engineering, architecture, landscape architecture, as well as interior design. 

 Firm Stability  The firm is financially stable with average annual receipts of $10 million for the past four years. This stability is a result of the firm’s high level of service to clients, who have responded with a continuing stream of projects over the years, as well as the solid reputation gained from our consistent dedication to design excellence. Additionally, Oak Point Associates enjoys a high employee retention rate, ensuring service consistency.  Client Service  Our objective is to exceed expectations with every project. We understand that each project has its own unique set of challenges and opportunities, and we are committed to providing each of our clients with an inspired, appropriate design solution within an effective project delivery process. Our level of dedication is proven by the long‐term relationships we maintain, providing many clients with decades of service. They depend on our proven ability to meet their programmatic needs, develop accurate project budgets, and control cost.  Sub‐Consultants  To compliment the Oak Point Associates staff for this project, we have teamed with GZA Environmental, Inc. to provide wetlands delineation, environmental assessments, and other required environmental services. We are also teaming with Appledore Marine Engineering, for any specialized waterfront engineering services that may be required.  

Page 12: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Company Qualifications and Experience 

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

CIVIL ENGINEERING 

Topographic and Property Surveying  Site Design  Stormwater Management  Erosion/Sedimentation Control Planning  Utilities Coordination  Water and Sewer System Design  

Roadway Design  Waterfront Design and Permitting  Campus and Base Master Planning  Federal/State/Local Permitting  Low Impact Development  

ARCHITECTURE 

Architectural Design for Educational Facilities, Government Services, the Private Sector, and the Military  New Builds, Renovations, and Additions  Illustrative Renderings 

Historic Preservation, Restoration, and Reconstruction  Design for LEED   Building Envelope Commissioning  3D Printing and Model Making 

LANDSCAPE ARCHITECTURE 

Site Selection  Site Circulation Planning  Downtown/Urban Redevelopment  Site Perimeter Security  Parks and Recreation Facilities, Playgrounds 

Trail and Greenway Planning  Green Roof Design  Planting Design  Illustrative Renderings  Site Amenities 

MECHANICAL ENGINEERING 

Indoor Air Quality   Air Conditioning Systems  Heat Recovery Systems  Geothermal Systems  Cogeneration Systems  Energy Audits  Building Control Systems Design 

Industrial Ventilation  Process Piping Systems Design  Plumbing Systems Design  Rainwater Harvesting Systems  Central Heating/Cooling Plant Design  Commissioning 

ELECTRICAL ENGINEERING 

Electrical Power Distribution Systems  Grounding Systems  Lightning Protection Systems  Standby Generator Systems  Energy Audits  Security System Design  

Communications Design  Fire Alarm Systems  Indoor/Site/Street Lighting  Wind Power  Solar Power  

Page 13: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Natural Resource Planning & Permitting

Proactive by Design. Our Company Commitment.

For More Information, Contact:

Joseph C. Foglio, CHMM; 267.464.3611 [email protected]

Christopher R. Blackburn; 603.498.5254 [email protected]

G ZA GeoEnvironmental Inc. (GZA) understands the critical importance that our natural resources play in the policy and regulatory processes and decisions that govern project

development. Nearly every project has a footprint that affects our resources in some way. GZA’s scientists, planners and engineers assist our clients by proactively identifying environmental constraints and helping to craft an efficient critical path through the regulatory and permitting maze, reducing project time delays. We help the design team to avoid and reduce environmental impacts. For those unavoidable impacts, GZA is well versed in the creative design of mitigation strategies that have a proven track record of balancing the needs of both clients and regulators, allowing the projects to move forward.

Permitting

Local, State & Federal NPDES Discharge Permitting Wetlands Water Quality Rare Species & Wildlife Floodplain Compliance Certification

Planning

Wetlands Delineation & Mitigation Design Watershed Management Planning & Monitoring Wildlife Habitat & Protected Species Surveys Vernal Pool Identification & Assessment Wetland Function & Value Assessment Environmental Impact Statements Vegetation Management Planning & Monitoring Invasive Species Management Trail Condition Assessment & Design Conservation Management Planning

Page 14: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

GZA GeoEnvironmental, Inc.

Natural Stream Channel Design

Rosgen Stream Classification System Expertise Large Impact Stormwater Treatment Systems Stream Channel Restoration Designs Flood Storage Mitigation Designs Dam Removal Support

Stormwater Pollution Prevention

Low Impact Design Stormwater Treatment Services Stormwater Pollution Prevention Plans (SWPPP) Erosion and Sediment Control Monitoring SWPP Implementation Training NOI and NOT Notifications Regulatory Compliance

Lake & Pond Restoration

Limnological Surveys Aquatic Vegetation Identification Nuisance Wildlife Control Dredging Feasibility Studies Watershed Analysis & Planning

Natural Resource Planning & Permitting

Page 15: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

���������������� ������������������������������������� ��������������� �������������������������������� ���� �� ����� ����� ��������������������� ������ ���������������� ����������� ����������������� ������������������������ ��� ��� ��������� ������� ������� �������������������������� ������� ����������������������������������� ������������ ���������������� ����������� ������������������������������ � ����� ���������������������!������� ��� ��"������!��������������������������������������� ������������� ������#�� ����������� ���� ��������������������������� �������������� ��� ��������������������� ����� ��� �������������������������������� ���� ����� ���� ��������� �������� �������� ��������������� ����� �����������$% &�'������������������� ���� ����� ������ ��� ������ ���� ������������������������� �� �� ������% &������������������� ����������������� �������������� �������%�� �� �������( ����������������� ��)������������������ �����������������*� ���������+������� �������� ��������� ������� ���������,���� ��������������������������� ��������������������������� ��� ��� �������������������������������������� ������������������������ ���������-������������������ ������� �������������� ������� ���� ����������� ������ ������������������ �������� �������� ����� � �������������� ���� ������������������ �� �� ������������������������������������������� ���������������� ������������������� ����������)����������#�� �������� �������� �������������(���� �������� �� ���������� ����������������������������������� (� �������������� ����� ��������� ���������� ����� ����.���� ����������� ���������������������������������*� ���������+������� ��� ����/-������������&����� ��&���� ��� �&� ��$�0&&&'���&..�&� ��������������� ����� �������� ����1-� � ����� ��������� ���������(��� ��������� ����1�� �-�!������ ����� ��������������������������� ����� ��� �2���������� ������������,� ����������������(��� ��� �������������� ������������������������������������������������3 �������� ����������������������������������� ��� ������� � ������������ �-�������������������� ������������ ������"&4+��&������� ����� ��� �����������(������������������������ ��������� ������� ����������������������� �������������� ������ �� ���������������� �� �2���� ������� ������� ��������������� �������� ���� ��������������*� ���������+������� ���� ����������������� �� ������������������� ������������������������������������������� ���������� �������������� ������������������������� ����� ������������ ����� ����������������� ����������������������������� ���������������� ������������,������������������ �������� ���������������������������� ���������� ��� ������������3������ ���������������� ���� ������� ��������� ��������������������������������� ��������������� �� ����������������� ����� ���5678967:8;<=679>?@6<8A6<?>B?CDEFGDHIJKLMNIKOHKPQRSGTKUV4������� ��������������WXY-ZYZ-[\][_abcdefcbgchi_bjhfcekal!��� �m����� ������ZX\-Yn[-n]]obapqercsq_brjhfcekaltttVuvQVUIO w?679x>?:78yz{<:7>|@{@?}~�>{z>?@6<8w:7�@B:�8~�>{z>?@6<8A69�6<:<?��&��-*������������ ����������!��� ����� ����� ������!�����!������!�����������.�� �

Page 16: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

346 Commerce Boulevard | Port Saint Joe Florida 32456

1700 Seventh Avenue | Suite 2100 | Seattle Washington 98101 600 State Street, Suite E | Portsmouth New Hampshire 03801 Seven Waterfront Plaza | 500 Ala Moana Boulevard Suite 400 | Honolulu Hawaii 96813

Ph: 603-766-1870 | www.appledoremarine.com

Company Summary Appledore Marine Engineering (AME) is a small business engineering consulting firm headquartered in Portsmouth, New Hampshire. AME specializes in inspection services, structural design and construction consultation for marine waterfront facilities around the world. Our engineers have expertise with coastal protection, dredging, piers, dry docks, offshore towers, liquid and bulk cargo facilities and bridges. The same senior management has driven consistency and quality for over 20 years. We realized success on a project by project basis staying true to our company’s core values:

Pride in work Exceeding client expectations Delivering value to our clients Maintaining a positive attitude A commitment to safety Employee honesty and character Doing what is right, no matter what Being respectful to our clients, subcontractors, and employees Giving back to the community

Our engineers have provided engineering services for private and government clients around the world. Our vast global experience includes projects in Greenland, Canada, Japan, Mexico, Saudi Arabia, US Territories, the Caribbean and every coast line of the United States including Hawaii and Alaska. AME has completed seawall projects around the world and has direct and relevant local experience. The following projects demonstrate this experience:

Prescott Park Seawall Rehabilitation US Coast Guard Station Southwest Harbor Seawall Rehabilitation US Coast Guard Station Rockland Seawall Rehabilitation Star Island Stone Wharf Replacement, Isles of Shoals Portsmouth Naval Shipyard Berth 3 Historic Seawall Rehabilitation

This local experience includes the inspection, design and construction support services. Mr. Elwood, AME’s President, authored the ASCE stone seawall section of the recently published guide for the inspection and assessment of waterfront facilities.

Page 17: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Section 4 

 

SCHEDULE  

Page 18: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Schedule 

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

The seamless flow of communication will more than likely be the most critical factor for a successful project. A preliminary schedule (Gantt Chart) has been provided as a foundation for the design process. This would be revised at project award and would need to be kept up‐to‐date as the project progresses.  Perhaps the most challenging aspect of the project is the timeframe within which the design is to be completed.  This is an aggressive design schedule with multiple aspects needing to be done simultaneously.  The largest factor that we can anticipate affecting the schedule is the Town review process.  If concept selection and Town review can occur in a timely fashion, then the October deadline may be achievable.  It is worth noting that in regards to schedule, that based on our recent experience with the Ellis Park Short Sands Bathroom project, we are anticipating that a construction period longer then the stated 7‐1/2 months will be required to complete the overall project, especially if this period includes the construction procurement phase of the project and is to be done throughout the winter months.  Oak Point Associates will target the design deadline by using a competent and efficient design team that has the experience with project management and strategic planning to accomplish such goals.  It is anticipated that groups of tasks will be assigned to multiple individuals in order to achieve goals simultaneously and remain on schedule.

Page 19: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

IDT

ask

Nam

eD

urat

ion

Sta

rtF

inis

h

1P

ropo

sal D

ue1

day

Fri

1/30

/15

Fri

1/30

/15

2P

ropo

sal R

evie

w, I

nter

view

s, N

egot

iatio

ns20

day

sM

on 2

/2/1

5F

ri 2/

27/1

53

Con

trac

t Aw

ard

(Ass

umed

)1

day

Mon

3/2

/15

Mon

3/2

/15

4N

otic

e to

Pro

ceed

(A

ssum

ed)

1 da

yM

on 3

/2/1

5M

on 3

/2/1

55 6

PR

OJE

CT

DE

SIG

N D

UR

AT

ION

(T

arge

t Com

plet

ion

Dat

e)16

3 da

ysT

ue 3

/3/1

5T

hu 1

0/15

/15

7 8EX

ISTI

NG

CO

ND

ITIO

NS

ASS

ESSM

ENT

45 d

ays

Mon

3/2

/15

Fri 5

/1/1

59

Exi

stin

g C

ondi

tions

Ass

essm

ent

25 d

ays

Mon

3/2

/15

Fri

4/3/

1510

Fie

ld S

urve

y an

d D

ata

Gat

herin

g45

day

sM

on 3

/2/1

5F

ri 5/

1/15

11T

opog

raph

ical

Sur

vey

45 d

ays

Mon

3/2

/15

Fri

5/1/

1512

Dev

elop

rig

ht-o

f-w

ay p

lans

45 d

ays

Mon

3/2

/15

Fri

5/1/

1513

Geo

tech

nica

l Sur

vey

20 d

ays

Mon

3/2

3/15

Fri

4/17

/15

14U

tility

Ver

ifica

tion

and

Coo

rdin

atio

n30

day

sM

on 3

/16/

15F

ri 4/

24/1

515

Tra

ffic

Ana

lysi

s30

day

sM

on 3

/16/

15F

ri 4/

24/1

516 17

PER

MIT

TIN

G88

day

sFr

i 5/1

/15

Tue

9/1/

1518

Per

mitt

ing/

App

licat

ions

88 d

ays

Fri

5/1/

15T

ue 9

/1/1

519

Mai

ne D

OT

88 d

ays

Fri

5/1/

15T

ue 9

/1/1

520

Mai

ne D

EP

88 d

ays

Fri

5/1/

15T

ue 9

/1/1

521

Mai

ne H

isto

ric P

rese

rvat

ion

Com

mis

sion

45 d

ays

Wed

7/1

/15

Tue

9/1

/15

22U

S A

rmy

Cor

ps o

f Eng

inee

rs88

day

sF

ri 5/

1/15

Tue

9/1

/15

23E

nviro

nmen

tal P

rote

ctio

n A

genc

y88

day

sF

ri 5/

1/15

Tue

9/1

/15

24O

ther

s?88

day

sF

ri 5/

1/15

Tue

9/1

/15

25 26C

ON

CEP

T D

ESIG

N70

day

sM

on 3

/2/1

5Fr

i 6/5

/15

27C

once

pt D

esig

n (T

hree

Con

cept

s)40

day

sM

on 3

/2/1

5F

ri 4/

24/1

528

Choo

se F

inal C

once

pt Pl

an31

days

Fri 4

/24/15

Fri 6

/5/15

29 30ME

ETIN

GS A

ND M

EETI

NG P

REPA

RATI

ON14

5 day

sMo

n 3/2

/15Fr

i 9/18

/1531

Plan

ning B

oard

80 da

ysMo

n 3/2/

15Fr

i 6/19

/1532

Boar

d of S

electm

en70

days

Mon 3

/2/15

Fri 6

/5/15

33To

wn P

lanne

r14

5 day

sMo

n 3/2/

15Fr

i 9/18

/1534

Town

Cod

e Enfo

rceme

nt14

5 day

sMo

n 3/2/

15Fr

i 9/18

/1535

Parks

& R

ecre

ation

145 d

ays

Mon 3

/2/15

Fri 9

/18/15

36Pu

blic W

orks

145 d

ays

Mon 3

/2/15

Fri 9

/18/15

37Se

wer D

istric

t12

0 day

sMo

n 3/2/

15Fr

i 8/14

/1538

Wate

r Dist

rict

120 d

ays

Mon 3

/2/15

Fri 8

/14/15

39Fir

e Dep

artm

ent

70 da

ysW

ed 4/

1/15

Tue 7

/7/15

40Po

lice D

epar

tmen

t70

days

Wed

4/1/1

5Tu

e 7/7/

1541 42

PREL

IMIN

AR

Y D

ESIG

N R

EPO

RTS

55 d

ays

Mon

3/2

/15

Fri 5

/15/

1543

Dra

inag

e R

epor

ts55

day

sM

on 3

/2/1

5F

ri 5/

15/1

544

Ero

sion

Con

trol

Pla

n, d

etai

ls, N

arra

tive

55 d

ays

Mon

3/2

/15

Fri

5/15

/15

45T

opog

raph

ic P

lans

and

Cro

ss S

ectio

ns55

day

sM

on 3

/2/1

5F

ri 5/

15/1

546

Geo

tech

inic

al R

epor

t55

day

sM

on 3

/2/1

5F

ri 5/

15/1

547

Rig

ht-o

f-w

ay p

lans

55 d

ays

Mon

3/2

/15

Fri

5/15

/15

48T

raffi

c C

ontr

ol P

lan,

Nar

rativ

e55

day

sM

on 3

/2/1

5F

ri 5/

15/1

549

Flo

odpr

oofin

g C

ertif

icat

e (D

raft)

55 d

ays

Mon

3/2

/15

Fri

5/15

/15

50T

own

Rev

iew

26 d

ays

Fri

5/15

/15

Fri

6/19

/15

51 52C

ON

STR

UC

TIO

N D

OC

UM

ENTS

160

days

Mon

3/2

/15

Fri 1

0/9/

1553

25%

Sub

mis

sion

80 d

ays

Mon

3/2

/15

Fri

6/19

/15

54T

own

Rev

iew

15

day

sM

on 6

/22/

15F

ri 7/

10/1

555

50%

Sub

mis

sion

26 d

ays

Fri

6/19

/15

Fri

7/24

/15

56T

own

Rev

iew

15 d

ays

Mon

7/2

7/15

Fri

8/14

/15

5795

% S

ubm

issi

on26

day

sF

ri 7/

24/1

5F

ri 8/

28/1

558

Tow

n R

evie

w15

day

sM

on 8

/31/

15F

ri 9/

18/1

559

Fina

l Bid

Doc

umen

ts31

day

sFr

i 8/2

8/15

Fri 1

0/9/

1560

Fin

al B

id D

ocum

ents

31 d

ays

Fri

8/28

/15

Fri

10/9

/15

61F

lood

proo

fing

Cer

tifca

te6

days

Fri

10/2

/15

Fri

10/9

/15

62R

ecor

d of

Flo

odpr

oofin

g E

leva

tion

6 da

ysF

ri 10

/2/1

5F

ri 10

/9/1

563 64

???

CO

NST

RU

CTI

ON

(Pro

ject

ed) ?

??14

0 da

ysM

on 1

0/19

/15

Fri 4

/29/

1665

Adv

ertis

e B

iddi

ng D

ocum

ents

5 da

ysM

on 1

0/19

/15

Fri

10/2

3/15

66S

olic

iatio

n of

Bid

s an

d R

FI R

espo

nses

14 d

ays

Tue

10/

27/1

5F

ri 11

/13/

1567

Rev

iew

of C

ontr

acto

r B

ids

and

Sel

ectio

n P

roce

ss7

days

Mon

11/

16/1

5T

ue 1

1/24

/15

68C

ontr

acto

r S

elec

tion

and

Neg

otia

tions

5 da

ysM

on 1

1/30

/15

Fri

12/4

/15

69N

otic

e to

Pro

ceed

1 da

yM

on 1

2/7/

15M

on 1

2/7/

1570

Con

trac

tor

Mob

iliza

tion

19 d

ays

Tue

12/

8/15

Fri

1/1/

1671

CO

NS

TR

UC

TIO

N P

ER

IOD

(P

ER

IND

ICA

TE

D IN

RF

P)

85 d

ays

Mon

1/4

/16

Fri

4/29

/16

SS

MT

WT

FS

SM

TW

TF

SS

MT

WT

FS

SM

TW

TF

SS

MT

WT

Jan

18, '

15F

eb 2

2, '1

5M

ar 2

9, '1

5M

ay 3

, '15

Jun

7, '1

5Ju

l 12,

'15

Aug

16,

'15

Sep

20,

'15

Oct

25,

'15

Nov

29,

'15

Jan

3, '1

6F

eb 7

, '16

Mar

13,

'16

Apr

17,

'16

Ma

Tas

kS

plit

Pro

gres

sM

ilest

one

Sum

mar

yP

roje

ct S

umm

ary

Ext

erna

l Tas

ksE

xter

nal M

ilest

one

Dea

dlin

e

Pag

e 1

Pro

ject

: L

on

g S

an

ds

Da

te:

Fri

1/3

0/1

5

Page 20: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Section 5 

 

COST  

Page 21: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Cost 

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Long Sands Beach Master Plan 

       

Long Sands Beach Master Plan      $70,400.00

       

Long Sands Beach Master Plan ‐ Construction Administration      $21,110.00

       

Dig Smart Utility Verification      $2,500.00

       

GZA Geotech      $12,500.00

       

Appledore      $7,500.00

       

Traffic Consultant      $12,500.00

       

Topographic Survey      $5,000.00

       

Bathroom Building ‐ Design      $33,990.00

       

Bathroom Building ‐ Construction Administration      $15,475.00

        

       

Total Design & Construction Admin:      $180,975.00

           

           

Total Project Budget (Inclusive of Design and Construction):      $1,787,000.00

       

Construction Budget:      $1,606,025.00

Bathroom Building (Estimated):      $700,000.00

Master Plan and Drainage Project (Estimated):      $906,025.00

  

Job titles and hourly rates for personnel performing under the contract as well as printing and other costs are further detailed in the rate sheet which follows.  

Page 22: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231
Page 23: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Section 6 

 

REFERENCES 

Page 24: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

References 

ELLIS SHORT SANDS PARK 

 

Mr. Rick Boston 207‐363‐2621 [email protected]   

FALMOUTH PUBLIC SCHOOLS 

 

Mr. Dan O’Shea Director of Finance and Operations Falmouth Public Schools 51 Woodville Road Falmouth, ME 04105 207.781.3200 [email protected]    

MAINE ARMY NATIONAL GUARD  LTC Normand Michaud, PE Maine Army National Guard Directorate of Facilities Engineering Building #8 Camp Keyes Augusta, ME  04333 207.626.7887 [email protected]   

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Page 25: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Section 7 

 

MISCONDUCT 

Page 26: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Misconduct 

1)  We were recently served (along with others) by an insurance company seeking money for a 

loss that was due to a sprinkler pipe which froze and broke. The pipe was placed in the wrong 

location and the contractor was directed to move the pipe prior to the loss. 

 

2)  We were involved in litigation (along with others) with a third party for a lab project that we 

designed ten years ago in New Hampshire. This case was dismissed and the dismissal was 

recently repealed. 

 

 

Please note that in 35 years in business, Oak Point Associates has only been a party to a lawsuit two 

times, and never with a client. 

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Page 27: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Section 8 

 

APPENDICES 

Page 28: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Project Experience 

Oak Point Associates is broadly experienced in the engineering and design of projects similar to Long Sands Beach Masterplan, Design & Construction Bid Documentation project, as exemplified by the following projects  Ellis Short Sands Park ‐ Replacement / Reconstruction of Public Restroom Facility | York ME Oak Point Associates was retained by the Ellis Short Sands Park Board of Trustees to perform a site analysis and undertake the design of a new public restroom facility at Ellis Sort Sands Park.  The current 950 square foot restroom, constructed in the late 1970’s, has far surpassed the usage demand put on it by the Park, beach goers, and tourists.  Constructed of precast concrete panels, the existing building is in fair condition, but is dated and interior finishes and fixtures are deteriorating.  Long lines queuing into vehicular traffic in the parking lot creates an unsafe situation for pedestrians. The design intent of the new 2,300 square foot facility is to create a more aesthetically welcoming public restroom facility that meets the overall usage demand of the facility.  An increase in the number of plumbing fixtures will help with reducing wait time and lines.  The proposed floor plan creates a main hallway to establish both a pedestrian and view corridor from Ocean Avenue to the boardwalk and Short Sands Beach beyond.  This inner corridor will also separate pedestrians from vehicular traffic and give a brief reprieve from the summer sun.  After reviewing the original construction drawings provided by the Board of Trustees, Oak Point Associates performed field investigations to survey and evaluate both the site and current building, including the existing structural, architectural, plumbing and electrical systems.  Oak Point Associates has also undertaken efforts to coordinate with the Ellis Park Board of Trustees, Maine Department of Environmental Protection, the Maine Historic Preservation Commission, and the Town of York to establish a basis of design in order to provide a foundation for working Construction Documents. Site work, including the addition of accessible parking spaces and utility upgrades, in coordination with both the York Water and Sewer Departments are included in the project.   Kittery Trading Post Parking and Retail Expansion | Kittery, ME Oak Point Associates provided site design, detailed hardscape and landscape design, and permitting services for traffic and pedestrian circulation, parking improvements, and drainage improvements at a new 20,000 sf retail and office expansion to the existing Kittery Trading Post store. Local site review and MDEP site location permitting was critical to the preservation of abutting tidal Spruce Creek. Storm water quantity analysis included modeling the entire 2,500 acre Spruce Creek watershed above the Route One tidal culvert. Detailed designs included the development of a pedestrian plaza and stairway and the use of native plants arranged to reflect the rustic character of the architectural elements.       

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Page 29: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Project Experience 

    Long Sands Beach Masterplan, Design &                    Construction Bid Documentation‐Town of York 

    January 30, 2015  

Falmouth Elementary School Sidewalk and Intersection Improvements | Falmouth, ME As part of the design and construction of the new Falmouth Elementary School, sidewalks and intersection improvements were required to improve pedestrian safety and improve traffic flow.   The sidewalk and intersection portion of the project consisted of constructing approximately 3,250 linear feet of sidewalk along Woodville Road and constructing a turning lane on Woodville Road at the intersection of Falmouth Road. The design included conversion of an open ditch and culvert system to a closed subsurface system with catch basins and curb inlets.    Oak Point Associates performed a topographic survey to depict existing utilities, natural and man made features, wetlands, and apparent right‐of‐way lines. Conceptual plans and estimates were prepared for review by town, state, and federal agencies and for public comments. The concept plans were developed into construction documents that were publicly bid for construction in the summer of 2011.  Key design features included in the project were drainage design, coordination with utility companies and the U.S. Postal Service, and design review by the town’s Planning and Public Works Departments, Maine DEP, and the School Department.     Borthwick Avenue Extension and Major Intersection | Portsmouth, NH  Worked closely with the City of Portsmouth and N.H.D.O.T. on the design and construction of a 2.5 mile industrial roadway extension with two intersections between Route 101 and U.S. Route 1 Bypass. Project included extensive drainage and environmental design work to mitigate hydrologic and wetland impacts. Major municipal utility improvements consisting of water main and sewer collector system extensions were also associated with this project.   Kittery Foreside: Wallingford Square Streetscape | Kittery, ME Oak Point Associates worked closely with the Kittery Foreside Committee, the Kittery Public Works Department, and sub‐consultant Terra Firma Landscape Architects to develop design and construction documents for the construction of downtown streetscape improvements to the Government Street and Wallingford Square waterfront areas of Kittery, Maine. Improvements were predicated upon a downtown master plan prepared by Sasaki Associates and included removal of existing concrete sidewalks and replacement with brick pavers with enlarged islands for traffic calming, irrigated tree planters with cast iron tree grates, granite curbs, drainage and utility improvements, pedestal‐mounted light standards, sidewalk bench/seating areas, consolidation of pedestrian crosswalks, and vehicle parking. Particular to this project, the design effort included the challenge of developing solutions to the many existing areas of steep, non‐compliant, non‐accessible sidewalk and roadway slopes. Oak Point Associates’ responsibilities included coordination of survey information, coordination of landscape architecture sub‐consultant, meetings with Town officials and the Kittery Foreside Committee, preparation of construction design drawings and specifications, as well as assistance with construction administration and site inspection.   

Page 30: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Scott C. Donovan, RA Senior Architect / Project Manager, NCARB, LEED AP 

 

Mr. Donovan’s 12 years of experience include project design from inception through construction documents, site analysis, programming, client interviews, cost estimating, construction administration and overall project management.  He has been involved with a wide range of projects within the federal, state, municipal, military, commercial, residential and educational sectors.   

REGISTRATION & CERTIFICATION 

Registered Architect: Maine, New Hampshire 

LEED Accredited Professional, USGBC 

 

EDUCATION 

Master of Architecture, Clemson University 

Architectural Studies Abroad: Italy, Europe, Clemson University 

Bachelor of Science, University of New Hampshire  

 

PROFESSIONAL ORGANIZATIONS 

National Council of Architectural Registration Boards (NCARB) 

     

EXPERIENCE 

Historic Lighthouse and Keeper’s House Rehabilitation, Monomoy National Wildlife Refuge, Chatham, MA – Project Architect for the site investigation, condition assessment, and rehabilitation design work for the nationally registered historic landmark lighthouse and associated buildings. This historic site is located on South Monomoy Island on the edge of Nantucket Sound. 

Alternative Energy Evaluation, Monomoy National Wildlife Refuge, Chatham, MA – Project Architect in charge of evaluating the building envelope along with the cost effectiveness of various types of alternative energies including geothermal, wind, photovoltaics, and solar thermal systems to be used at both the headquarters and dormitory buildings. Comparative feasibility studies and life cycle cost analyses, including estimated payback periods, were used to determine applicable systems and facility upgrades.  

Survival, Evasion, Resistance and Escape (SERE) School Barracks, Kittery, ME – Project Architect for the building assessment and renovation design of a 10,000 SF historic building on the Portsmouth Naval Shipyard. The renovation project entailed removing all interior components from inside the building, leaving only the exterior brick walls. A new layout was designed to house 40 students while they attend the SERE school now located at the Portsmouth Naval Shipyard. 

Civil Support Team Facility, Concord, NH – Lead designer and project manager for a new state‐of‐art emergency response facility for the New Hampshire Army National Guard’s Civil Support Team. The 16,500 sf facility is comprised primarily of office and administrative areas that focused on a central operations room. In conjunction with the office space, classrooms, maintenance and storage rooms, an arms room, and locker rooms help facilitate the team’s mission. The team’s response vehicles are housed in the new drive‐through vehicle bays attached to the main facility. The brick and stone façade accentuates the building's connection with the Joint Command Readiness Center to which it is connected and reflects the surrounding vernacular of the military reservation. Earthen berms, bollards, swing gates, perimeter fencing, security cameras, and access control all contribute to the facilities’ security and compliance with antiterrorism and force protection measures. The facility achieved a LEED certified rating. 

Administration Building and Visitor Contact Station, Nulhegan National Wildlife Refuge, Brunswick, VT – Design team member and construction project coordinator for a new 6,100 sf facility. The facility serves as administrative headquarters for refuge staff, as well as a visitor center featuring interpretive and educational displays about the refuge. A full basement provides storage and mechanical spaces. Efforts were made throughout design and construction to use green building products and energy efficient methodologies. The public areas employ timber frame construction and feature locally quarried stone floors and walkways. The facility has since been awarded LEED Silver for Existing Buildings. 

  

Page 31: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Kerry S. Green, RLA Senior Landscape Architect 

 

 

Ms. Green is a Registered Landscape Architect with 22 years of experience in site inventory and analysis, master planning and site design, preparation of construction and planning documents, construction observation and project management. Project types include school planning and design, institutional buildings, office/commercial development, industrial facilities, residential/community design, and park and recreational facilities.    

REGISTRATION & CERTIFICATION 

Registered Landscape Architect: Maine, Massachusetts, Delaware 

 

EDUCATION 

Bachelor of Landscape Architecture, University of Georgia  

 

PROFESSIONAL ORGANIZATIONS 

American Society of Landscape Architects 

 

AWARDS   

2000 American Society of Landscape Architects, Georgia Chapter, Honor Award* Emory University Campus Open Space, Atlanta, GA 

1998 American Institute of Architects, Georgia Chapter, Design Award* Interface, Ray C. Anderson Plant, West Point, GA 

 

*while employed at Hughes, Good, O’Leary & Ryan Landscape Architects 

     

EXPERIENCE 

Falmouth Elementary School, Falmouth, ME – Landscape Architect for a new elementary constructed on the site of existing middle and high schools. Work included site planning for the school facility, bus circulation, parking, pedestrian access, service access, and playgrounds and multi‐purpose fields.  

State Military Reservation Master Plan, New Hampshire National Guard, Concord, NH – Development of master plan for improvements to the NH State Military Reservation, outlining strategies for a 25‐year planning horizon to accommodate training and administration of National Guard troops. Assessment of physical characteristics and regulatory requirements for the 43 acre site, as well as the surrounding area. Programming for phased implementation of Master Plan goals. 

Range Complex Master Plan, New Hampshire National Guard, Center Strafford, NH – Project Manager for an interdisciplinary team tasked with analyzing training missions and identifying the physical space needed to meet training requirements. Existing site and facilities were evaluated to identify opportunities and constraints and plan for future development of range components.  

Visitor Center Site Improvements, Great Swamp National Wildlife Refuge, Harding Township, NJ – Site plan and landscape plan for visitor center located in a restored homesite. Site plan includes parking for private vehicles and buses, and a courtyard garden. The landscape plan utilizes plants native to the region. Plants were selected for butterfly and bird attraction and year‐round interest. 

Armed Forces Reserve Center, Maine Army National Guard, Brunswick, ME – Project Manager and Project Landscape Architect for an interdisciplinary  team tasked with designing a new sustainable 60,000 sf training facility for multiple National Guard Units. The design required the integration of the building and associated training areas into a site with an existing Naval facility and numerous environmental constraints. 

Roadway/Trail Evaluation and Headquarter Building Site Assessment, Lake Umbagog National Wildlife Refuge, Errol, NH – Inventory and analysis, and conceptual design of five potential sites to determine best location for a new headquarters building and visitor contact station. Conceptual design included main building, parking areas, boat launches, and a +/‐ one mile long interpretive trail. A matrix was developed to compare and contrast various sites and aid site selection. 

University of New England Landscape Design, Biddeford, ME — Landscape architect responsible for design of a prototype project for renovations to pedestrian areas within the campus. The project realigned walkways, provided seating areas, landscape areas, and lighting that set design precedents for the style and materials to also be used in future projects at the campus. 

  

Page 32: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Jacques L. Gagnon, Jr., PE Associate Civil Engineer, LEED AP 

 

 

Mr. Gagnon is a civil engineer with over 30 years of site engineering design, permitting, and construction observation experience. Projects include institutional, educational, commercial, and recreational facilities.   

REGISTRATION & CERTIFICATION 

Professional Engineer: Maine, Massachusetts, New Hampshire, Connecticut, Vermont, Rhode Island 

LEED Accredited Professional, USGBC 

 

EDUCATION 

Bachelor of Science, Civil Engineering, University of New Hampshire  

  

      

EXPERIENCE 

Falmouth Public Schools Sidewalk Construction and Intersection Improvements, Falmouth, ME – This project consisted of constructing approximately 3,250 linear feet of sidewalk along Woodville Road and constructing a turning lane on Woodville Road at the intersection of Falmouth Road. The design included conversion of an open ditch and culvert system to a closed subsurface system with catch basins and curb inlets. Key features included in the project were drainage design, coordination with utility companies and the U.S. Postal Service, and design review by the town’s Planning and Public Works Departments, Maine DEP, and the School Department. A Natural Resources Protection Act permit was obtained to address wetland area impacts.  Falmouth Elementary School, Falmouth, ME – Project consists of design and permitting for a 140,000 sf elementary school on the existing middle school/high school campus. Services included Renovation vs. New analysis, site search and selection, budget development, permitting, bidding documents, and construction administration. 

Mount View School, Thorndike, ME – Site selection and site design for a 180,000 sf Pre‐K–12 school on a 70 acre site. Permits obtained include local site plan review, state site location of development, engineered wastewater disposal and public water supply. Key site elements include track, soccer, baseball and softball fields, 400 parking spaces, and drop‐off areas for 20 school buses. The building and site design was integral to effectively utilize a sloping site while maintaining a proper cut/fill balance.  

Alterations and Building Upgrades, Norris Cotton Federal Building, Manchester, NH – Site work improvements included perimeter security bollards, granite entrance stairs, cast‐in‐place concrete planters, and granite plaza alterations to accommodate new entrance vestibule.  

Roadway/Trail Evaluations and Headquarters Assessments, U.S. Fish and Wildlife Service, Lake Umbagog National Wildlife Refuge, Errol, NH – Oak Point Associates was contracted by the United States Department of the Interior, Fish and Wildlife Service to evaluate four pre‐selected sites as possible locations for a proposed headquarters building/visitor contact station. In addition, Oak Point provided assessment of and conceptual designs for a roadway, a snowmobile trail, and a hiking trail. The objective for the headquarters building portion of the project was to find a suitable and economically feasible location for a facility including a building with office space for employees and volunteers, a visitor contact area, and site elements including parking lots, on‐site septic facilities, separate visitor and staff boat docks, a boat launch, and all associated utilities. The goal for the roadway and trials portion of the project was to evaluate the condition of a section of an existing dirt road and assess conceptual options for road improvements. Conceptual design for a snowmobile trail and a hiking trail were assessed to determine preliminary costs and feasibility of construction. 

Page 33: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Stephen J. Towne, PE Senior Civil Engineer 

 

Steve Towne’s more than 30 years of experience includes site engineering design, construction observation, and permitting for the construction of urban redevelopment, site development, floodplain, waterfront, and wetland impact mitigation projects. 

 

REGISTRATION & CERTIFICATION 

Professional Engineer: Maine, Massachusetts, New Hampshire, Vermont 

LEED Accredited Professional, USGBC 

 

EDUCATION 

Bachelor of Science, Civil Engineering, University of Maine 

Associate of Science, Architectural Engineering, Wentworth Institute of Technology  

 

PROFESSIONAL ORGANIZATIONS 

American Society of Civil Engineers 

     

EXPERIENCE 

Renovation of the Interior of Headquarters, Great Meadows National Wildlife Refuge, Sudbury, MA – Site evaluations leading to engineered construction documents were prepared for these two project sites.  Site improvements consisted of traffic and parking improvements with expansion of paved areas, drainage improvements, gate and access control improvements, handicap accessibility ramps and improvements, lighting, and landscaping. 

Master Plan for Installation Development, NH Air National Guard, Pease ANGB, NH – Project includes programming, identification of development constraints and opportunities, and preparation of alternative development concepts leading to a preferred alternative. Preparation of Master Plan report as update to previous Master Plans. Coordinate and perform update to base GIS Common Installation picture. Coordinate and perform Installation property boundary perimeter survey and set corner monumentation for 215 acre parcel. 

New Hampshire National Guard Readiness Center and Civil Support Team Facility, Concord, NH – Design, permitting, and construction of site improvements associated with renovation of existing helicopter hangar and aircraft taxiway into a fully developed State National Guard Readiness Center and Civil Support Team facility including geothermal heating system, bioretention stormwater treatment systems, endangered butterfly mitigation plantings, and guardhouse‐controlled access. 

Construct Military Parking and Reservation Cantonment Perimeter Fence, NH Army National Guard State Military Reservation, Concord, NH – Design, construction documents, and construction administration services for expansion of existing military vehicle parking area, replacement of existing cantonment perimeter fence at Regional Drive Gate entrance, and construction of new ornamental crash‐rated security cantonment perimeter fence at Pembroke Road Gate entrance. 

US Navy Transducer Test Tank, Portsmouth Naval Shipyard, Kittery, ME – Prepared all civil/site aspects of Design‐Build Request for Proposal, 6‐part program document for construction of one million gallon submarine transducer test tank and building facility.  Sachuest Point Visitor Center, Middletown, RI – Site engineering, permitting assistance, construction document preparation, and construction administration were provided for the development of a new visitor center/renovation facility, headquarters area, and maintenance garage facility at Sachuest Point.  Major site features included on‐site domestic sewage disposal system, access road and parking improvements, terraced walkway plaza, interpretive signage, fencing, and landscaping. 

  

Page 34: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Matthew S. Albert, PE Associate Mechanical Engineer, LEED AP 

 

 

Mr. Albert is the head of Oak Point Associates’ Mechanical Engineering Department. He is a Professional Engineer with 24 years of experience with HVAC, plumbing, fire protection, and controls. He is a Certified Geoexchange Designer, a Certified Building Commissioning Professional,  and a  Certified Measurement & Verification Professional.   REGISTRATION & CERTIFICATION 

Professional Engineer: Maine, New Hampshire, Massachusetts, Vermont, Connecticut, Rhode Island, Pennsylvania, Delaware, New York 

Certified Building Commissioning Professional 

Certified Geoexchange Designer 

Certified Measurement & Verification Professional 

LEED Accredited Professional, USGBC  

EDUCATION 

Bachelor of Science, Engineering Physics, University of Maine  

 

PROFESSIONAL ORGANIZATIONS 

Association of Energy Engineers 

ASHRAE 

 

AWARDS 

Energy Star designation; U.S. Department of the Interior 2008 Environmental Achievement Award Administration and Visitor Center, Nulhegan National Wildlife Refuge, Brunswick, VT 

Energy Star designation; 2009 Refuge of the Year Environmental Leadership Award: Administration and Visitor Facility, Ohio River Islands National Wildlife Refuge, Williamstown, WV  

U.S. Department of the Interior 2008 Environmental Achievement Award  Gosnold Laboratory Addition, Woods Hole, MA  

    

EXPERIENCE 

University of New England, Leonard Hall Renovation, Biddeford, ME – Mechanical Engineer for the renovation of Leonard Hall, a single story, approximately 5,000 square foot  structure that was converted from classroom space and offices into a 300‐seat‐capacity,  state‐of‐the‐art learning lab facility for the College of Osteopathy, which can be adapted to host a variety of different academic and social functions.   

Collins Center for the Arts and Hudson Museum, University of Maine, Orono, ME – Designed HVAC system for 40,000 sf university performing arts center and museum. The design incorporated many HVAC improvements to the Hudson Museum, including a dedicated air handling system with full humidity and temperature controls along with energy efficient features such as free cooling for the chilled water and carbon dioxide monitor used in conjunction with demand ventilation control.  Falmouth Elementary School, Falmouth, ME – Mechanical Engineer for a new, 140,000 sf, $46,250,000 Pre‐K to 5 elementary school. Mechanical systems in the new facility include geothermal heating and cooling of the offices, energy recovery ventilation of classrooms, kitchen make‐up and exhaust air system, radiant slab heating, solar water heating, and rain water collection for toilets and urinals. Responsibilities include mechanical design, preparation of construction documents, cost estimating, and construction administration.  Falmouth Public Schools Wood Chip Boiler Plant, Falmouth, ME – Mechanical Engineer for a new 3,000 sf, $1,500,000 central heating plant. This building provides energy efficient heat for the district's existing high school and new elementary school. A 7‐million BTU/hour wood‐fired boiler supplies hot water for both buildings' heating systems. Responsibilities included design of mechanical systems, preparation of construction documents, cost estimating, and construction administration.  Ellsworth Elementary/Middle School, Ellsworth, ME –Mechanical Engineer for a new elementary school and renovation of the existing Ellsworth Middle School totaling 147,000 square feet. This project received LEED Silver certification.   Regional Training Institute (RTI), New Hampshire Army National Guard, Pembroke, NH – Mechanical engineer for a new sustainable 55,590 sf educational facility and associated 48,500 sf barracks. Mechanical systems include high efficiency boilers, chillers, energy recovery ventilation, displacement ventilation, variable air volume systems, solar water heating, and rainwater collection system for toilets and urinals.  Responsibilities include design of mechanical systems, preparation of construction documents, cost estimating, and construction administration.  Admin/Visitor Center, Nulhegan Basin National Wildlife Refuge, Brunswick, VT – Designed HVAC system for 6,000 sf administration and visitor center. The building has been Energy Star certified and rated LEED Silver for Existing Buildings. 

Page 35: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

Dale Lincoln II, PE Associate Electrical Engineer 

 

 

Mr. Lincoln is an electrical engineer with 17 years of experience. He has designed the alterations and modernizations to electrical systems for the renovations to office buildings, schools, dormitories, and other buildings throughout New England.   

REGISTRATION & CERTIFICATION 

Professional Engineer: Maine 

 

EDUCATION 

Bachelor of Science, Electrical Engineering, University of Maine  

 

AWARDS 

AIA Maine Design Awards 2010: Merit Award University of Maine Foster Center for Student Innovation, Orono, Maine 

AIA New Hampshire IDID 2008 Excellence in Sustainable Design and Development Awards: Merit Award University of Maine Foster Center for Student Innovation, Orono, Maine 

2008 Education Design Showcase: Grand Prize Winner/College and University University of Maine Foster Center for Student Innovation, Orono, Maine      

EXPERIENCE 

University of New England, Leonard Hall Renovation, Biddeford, ME – Electrical Engineer for the renovation of Leonard Hall, a single story, approximately 5,000 square foot  structure that was converted from classroom space and offices into a 300‐seat‐capacity,  state‐of‐the‐art learning lab facility for the College of Osteopathy, which can be adapted to host a variety of different academic and social functions.   

Foster Center for Student Innovation, University of Maine, Orono, ME – New building design for a workshop and seminar building that will be used by students and faculty members interested in entrepreneurship and commercialization of their research and design projects. Designed the power distribution, lighting, and fire alarm systems and the telecommunications cabling infrastructure.  Renovate Building 178 for Shop 99, Portsmouth Naval Shipyard, Kittery, ME – Complete renovation of a 34,000 sf portion of the Shipyard's "Ship Ways" to a modern "Temporary Services" shop facility in support of submarine overhaul. Designed the alterations to the power distribution, lighting, and fire alarm systems. Code 980 Office Renovations, Building M‐1, Portsmouth Naval Shipyard, Kittery, ME – Convert existing third floor barracks space to open offices for Code 980. Designed the alterations to the power distribution, lighting, and fire alarm systems. Add/Repair Squadron Operations Command Post, Building 257, Pease Air National Guard Base, Newington NH – Partial building 1,890 sf renovation and an 840 sf building addition for the Squadron Operations Command Post. Designed the alterations to the power distribution, lighting, telecommunications, fire alarm and security systems.  Repair Grounding Systems Base Wide, Pease Air National Guard Base, Newington NH – Repairs and improvements to grounding systems of various buildings throughout the base and to equipment located on the airfield.  Designed new grounding electrode systems for a GCA building and glide scope (located on the airfield). Designed improvements to: aircraft grounding systems in four hangars, telecommunications grounding systems for three buildings and four hangars, and a static protection system for a POL Storage and Pumping Facility.  National Passport Center, Pease International Tradeport, Portsmouth, NH – Renovations to offices, conference rooms, kitchen and other areas throughout the building. Designed the alterations to the power distribution, lighting, telecommunications infrastructure and fire alarm systems.  National Visa Center, Pease International Tradeport, Portsmouth, NH – Renovations to offices, conference rooms, kitchen and other areas throughout the building. Designed the alterations to the power distribution, lighting, telecommunications infrastructure and fire alarm systems. 

 

Page 36: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

GZA GeoEnvironmental, Inc.

Peter J. Williams Senior Project Manager

Summary of Experience Mr. Williams has over 33 years of experience in the coastal engineering field. He has been responsible for a wide range of projects involving seawall repair, revetment stabilization, navigation improvements, granite block seawall, marinas, shore protection structures, boat ramps, and waterfront access. His technical expertise includes planning, alternatives analysis, environmental permitting, condition assessment, development of design conditions; marina design; evaluation and prediction of shoreline erosion rates; and modeling of coastal flooding due to storm surges and wave run-up. Mr. Williams has provided expert testimony and has represented public and private clients at public hearings and presentations. Typical projects that Mr. Williams has been responsible for include:

Relevant Project Experience City of Boston Public Facilities Department Long Island Embankment Stabilization Project, Boston, Massachusetts. Project Manager for project that provided 365 linear feet of steep slope stabilization to an eroding glacial till embankment located adjacent to the Long Island Power Plant. The embankment was stabilized using stone revetment constructed at 1H:1V and 2H:1V slopes. Responsible for overseeing field investigations, design, permitting, cost estimating, bid phase and construction phase services.

Town of Scituate Oceanside Drive Seawall Repair Project, Scituate, Massachusetts. Project Manager for $1,000,000 repair project involving the replacement of failed seawall sections and the rehabilitation of 1,200 feet of deteriorated concrete seawall and toe revetment. Provided preliminary design, permitting, final design and construction period services.

Town of Marshfield Ocean Bluff Revetment Repair Project, Marshfield, Massachusetts. Project Manager for project involving the repair and rehabilitation of approximately 1,600 feet of stone revetment. Provided preliminary design, permitting, final design and construction period services.

Parcel 6 and 7 Waterfront Improvement project at the Charlestown Navy Yard, Charlestown, Massachusetts. Project Manager for project involving the rehabilitation of approximately 1,000 linear feet of steel sheet pile bulkhead and granite block seawall and the development of a water taxi docking float. Services provided included under and above water inspection, material testing, and evaluation of remaining structure life of the waterfront structures. Provided evaluation and design for the reconstruction of stone seawalls, steel sheet pile bulkheads and docking system.

Town of Scituate 2010 Revetment Repair Project, Scituate, Massachusetts. Project Manager for $950,000 repair project involving the repair of damaged stone revetments at nine locations including Minot Beach, Glades Road, Surfside Road, Lighthouse Point, First Cliff, Second Cliff, Third and Fourth Cliff. Provided preliminary design, permitting, final design and construction period services.

RESUME

Education

University of Delaware-Newark, MSCE, 1977

University of Massachusetts-Amherst, BSCE, 1975

Areas of Specialization

Civil Engineering

Waterfront Engineering

Project Management

Municipal Consulting

Stormwater Management System Design

Sub-Surface Sewage Disposal System Design

Page 37: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE

Noah J. Elwood, P.E. / President Waterfront Engineer a. TOTAL b. WITH CURRENT FIRM

22 21 15. FIRM NAME AND LOCATION (City and State)

Appledore Marine Engineering, LLC (Portsmouth, New Hampshire) 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)

AS Civil Engineering Technology/ Vermont Technical College BS Civil Engineering Technology/ University of MassachusettsFundamentals of Arctic Engineering/ University of Alaska

Civil: AL (30928); AK (12908); CA (79413); CT (23340); DE (17387); GA (034731); IN (11300876); MD (40075); ME (10772); NC (037603); NH (10534); NJ (GE51381); NY (0847011); OR (83401); PA (0817948); RI (8990); VA (0402048811); WA (43855); WI (C-43248-6); Structural: MA (47020); NH (10534)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)

Organizations: ASCE, Ports & Harbor Waterfront Task Committee, Officer Society of American Military Engineers, Chapter Officer US Propeller Club, Past Chapter President

Authorized Publications: Ports 2007 & 2010 Conference Papers BSCE Journal, Sea Technology & Civil Engineer Magazine Design of Marine Facilities, Chapter Author ASCE Waterfront Inspection Manual, Chapter Author

Training: ADCI Commercial Dive Supervisor #20538 OSHA 30 Hr Safety Training OSHA 29 CFR 1910.120 HAZWOPER 40 Hr Training OSHA 29 CFR 1910.146 Confined Space Training CPR/AED for Professional Rescuers

American Red Cross First Aid and O2 Administration FHWA-NHI 130055 Safety Inspector of In-Service Bridges STADIUM Certified Service Life Modeling LEED Green Associate Diving Experience = 19 Years

19. RELEVANT PROJECTS

a.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED

Naval Operational Support Center (NOSC) New York, Seawall Rehabilitation Bronx, New York

PROFESSIONAL SERVICES CONSTRUCTION ( i f applicable)

2012 2015 (anticipated)(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

Principal-in-Charge. Performed on-site inspection of a deteriorated concrete seawall and designed subsequent replacement. Project included design of approximately 150 LF steel sheet pile bulkhead, preparation of environmental permit applications, design drawings, and technical specifications.

b.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED

U.S. Coast Guard Station Jones Beach Waterfront Reconstruction Hempstead, New York

PROFESSIONAL SERVICES CONSTRUCTION ( i f applicable)

2013-2014 N/A(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

Principal-in-Charge. Project included development of RFP documents for a design-build effort to rehabilitate the waterfront structures and dredge the boat basin at USCG Station Jones Beach. RFP specifications, drawings, and cost estimates were prepared as well as an Environmental Assessment, completed in accordance with NEPA requirements.

c.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED

U.S. Coast Guard Academy Marine & Shore Infrastructure Improvements New London, Connecticut

PROFESSIONAL SERVICES CONSTRUCTION ( i f applicable)

2008-2013 2011-2013(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

Principal-in-Charge. Awarded multiple task orders at the USCG Academy under an IDIQ contract. The task orders included the design of over 20 million dollars in waterfront improvements, planning proposal documents, above and underwater inspections, structural analysis, assessment of structures.

d.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED

Pease Development Authority Division of Ports and Harbors Portsmouth, New Hampshire

PROFESSIONAL SERVICES CONSTRUCTION ( i f applicable)

2003-Present On-Going(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

Principal-in-Charge. On-call marine engineering services that included future planning and conceptual designs, above and underwater facility inspections, and design work including permitting, preparation of construction documents, and construction administration services. Tasks included successful completion of detailed design work, geotechnical and structural analysis and design, preparation of construction contract drawings and specification, construction inspection and construction administration.

e.

(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED

USS Constitution Dry Dock Portsmouth Naval Shipyard, Charlestown, Massachusetts

PROFESSIONAL SERVICES CONSTRUCTION ( i f applicable)

2013 2014(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

Principal-in-Charge. Provided designs to rehabilitate the USS Constitution Dry Dock. The task order included design of a replacement caisson gate, a new inner seat, resurfacing of the entrance and various repairs. Studies to support this project included environmental, hazardous material testing, geotechnical, and above and underwater surveys. The project resulted in over $17,000,000 of infrastructure improvements.

Page 38: Proposal for Long Sands Beach Masterplan, Design ... Point Associates.pdf · Proposal for Long Sands Beach Masterplan, Design & Constructi on Bid Documentati on - Town of York 231

231 Main Street, Biddeford, ME 04005 TEL 207.283.0193 FAX 207.283.4283 www.oakpoint.com

Printed on 100% post-consumer recycled paper.