    System Operating Procedures

    Page 1of 156

    Table of Contents

    PROJECT STRUCTURE

    1. Project Structure creation.......51.1. Common Icons & their meanings61.2. Create a Project Structure8

    2. Project Budget................302.1. Create Original Budget..302.2. Release Original Budget33

    3. Man-power hours Confirmation..364. Sales Order Creation.....405. Rebate Agreements....50

    PURCHASEREQUISTION

    6. Purchase Request for Projects..........547. Stock Transport Request for Projects..............568. Service Purchase Request for Projects....58

    PURCHASEREQUISITIONAPPROVAL

    9. Collective Release of PR....609.1.

    To view the PR list Pending for approval.60

    9.2. To view more details....639.3. To view attachment......659.4. To approve the PR...66

    10.Individual Release......67

  • 8/13/2019 Projects Manual 1

    2/156

    System Operating Procedures

    Page 2of 156

    11.To revoke an approval...70PURCHASEORDER

    12.Service POs for Subcontractors / Services.....7113.Service Entry Sheet for Subcontractors / Services.7414.Service POs for Intercompany Services.............8015.Goods Receipt for Intercompany Services......82

    PURCHASEORDERAPPROVAL

    16.Collective Release of PO8516.1. To view PO list pending for approval...8516.2. To view more details8716.3. To view attachments8916.4. To view RFQ90

    17.Individual Release..9318.To revoke an approved PO...94

    NOTIFICATIONS

    19.Equipment Notification.....9620.Project Service Notification..........9921.IT Service Notification.....10222.Stores Service Request.105

    PROJECTEQUIPMENTUTILIZATION

    23.Equipment Utilization Report....108TIME&ATTENDANCE

  • 8/13/2019 Projects Manual 1

    3/156

    System Operating Procedures

    Page 3of 156

    24.Shift Assignment......11325.Time & Attendance Reports...115

    25.1. Web Reports.11525.2. SAP Time Reports...116

    INFORMATION SYSTEM

    Overview of important icons.119

    1. MC$G Material Analysis based on Purchase Value.......1202. ME2N Purchase Orders by PO Number.....1233. ME5J PR List for Projects......1294. ME2K Purchase Orders by Account Assignment...1325. ME2J PO List for Projects......135

    PROJECTINFORMATIONSYSTEM

    1. Overview...........1362. Project Planning and Scheduling.......138

    2.1. Project Structure: CJ20N......1383. Standard Reports

    3.1. CJI3 - Actual Costs / Revenues.1443.2. S_ALR_87013531 - Costs / Revenues / Expenditures / Receipts.....1473.3.

    CN50N - Capacity Requirements.149

    3.4. IH08 - View Equipments allocated to Project...151

  • 8/13/2019 Projects Manual 1

    4/156

    System Operating Procedures

    Page 4of 156

  • 8/13/2019 Projects Manual 1

    5/156

    System Operating Procedures

    Page 5of 156

    Project Structure

    A project is structured:

    According to how it is organized

    According to the processes involved

    1. Project Structure CreationEnter the transaction code CJ20N in the command field and press ENTER or go through the SAP

    menu as highlighted below:

    Project Builder:

  • 8/13/2019 Projects Manual 1

    6/156

    System Operating Procedures

    Page 6of 156

    Project Builder is the method of accessing the Project System, which integrates all the application

    specific functions necessary for processing Projects.

    The Project Definition is the Binding Framework for all Organizational Elements within a Project.

    1. Common Icons & their meaningIcon Meaning Description

    Project DefinitionA Project definition for a standard project contains limited

    information that applies to all projects of a given type.

    WBS Element

    WBS (Work Break down Structure) elements are the

    individual structure elements in the WBS. The term describes a

    concrete task or partial task, which can be subdivided further.

    Network

    A network contains instructions on how to carry out activities

    in a specific way, in a specific order, and in a specific time

    period. The basic elements of a network include activities and

  • 8/13/2019 Projects Manual 1

    7/156

    System Operating Procedures

    Page 7of 156

    Relationships.

    In a project, networks serve as basis of planning, controlling,

    and monitoring of schedules, costs and resources. Data can be

    reconciled with the WBS.

    Activity

    An activity in a network contains following data:

    the work center at which the activity is to be carried out the duration of the activity the start and finish dates for the activity the resources required to carry out the activity texts and documents describing the activity

    Activity Element

    Activities can be broken down to Activity Elements. Three

    types of Activity Elements:

    General Costs Elements External Processing Elements Internal Processing Elements

    Material

    Component

    The allocation of Material component to Network Activities

    determines the assemblies and raw materials that must be

    reserved or ordered for a Project and trigger Procurement via

    MRP or Purchasing.

    MilestoneA point in time defining a level of accomplishment or point of

    required action

    PS TextPS texts are freely defined texts that are maintained in the PS

    text catalog

    Document Information carrier containing information intended either for

  • 8/13/2019 Projects Manual 1

    8/156

    System Operating Procedures

    Page 8of 156

    a Project worker or for exchange between systems. Documents

    can show any kind of storable information, such as Technical

    drawings, graphics, programs, or text, which, taken together,

    describes an object.

    2. Create a Project Structurea. Click on the icon CreateProject

    b. Enter the data in the below mentioned fields: Project Coding Mask Project Definition Description

    c. In the Control Tab, select the Project Profile from the given list.

  • 8/13/2019 Projects Manual 1

    9/156

    System Operating Procedures

    Page 9of 156

    d. Press Enter to go to Basic Tab and enter the data in the below mentioned fields: Person Responsible (Project Manager code) Applicant Number (Operation Manager code) Plant Start and Finish Dates Profit Center

  • 8/13/2019 Projects Manual 1

    10/156

  • 8/13/2019 Projects Manual 1

    11/156

    System Operating Procedures

    Page 11of 156

    1.2.2. Create NetworkA network represents the flow of a Project or of a task within a Project.

    a. Highlight the Project Definition and Drag the Network from Templates to Project Definition orRight click on Project definition and select Create Network.

  • 8/13/2019 Projects Manual 1

    12/156

    System Operating Procedures

    Page 12of 156

    b. Maintain the Project Number in the Description for easy Identification.

  • 8/13/2019 Projects Manual 1

    13/156

    System Operating Procedures

    Page 13of 156

    c. Drag the Network inside the Standard WBS and save the Project to get the unique Networknumber.

  • 8/13/2019 Projects Manual 1

    14/156

    System Operating Procedures

    Page 14of 156

    1.2.3. Creating Sub WBS Elementsa. Drag the WBS Element inside the Standard WBS to create a sub WBS element and give the

    relevant description for the WBS (e.g.: Milestones).

    b. Create Multiple WBS as per the requirement. Sub levels of WBS can be created by dragging intothe Standard Work Breakdown Structure.

  • 8/13/2019 Projects Manual 1

    15/156

    System Operating Procedures

    Page 15of 156

    1.2.4. Creating ActivitiesThe Project System includes 4 Categories of Activities:

    Internal Processing Activity External Processing Activity Costs Activity Service Activities

    1.2.4.1. Creation of Internal ActivityInternal Activities describe the Activities performed inside our Company.

    a. Highlight the Network Header and drag the Internal Processing Activity into the NetworkHeader.

  • 8/13/2019 Projects Manual 1

    16/156

    System Operating Procedures

    Page 16of 156

    b. Give a suitable description for the Internal Processing activity

    c. Drag the Internal Activity Indirect Manpower into the respective WBS Project Management

  • 8/13/2019 Projects Manual 1

    17/156

    System Operating Procedures

    Page 17of 156

    d. In the External tab of the Internal Activity set the status of Res/Purchase Requisition to Neveras shown in the below screenshot.

    The three statuses to create Purchase requisition of an Internal Activity in Structure

    Never : Purchase Requisition would not be created in Structure From Release : Purchase Requisition is created once the Structure is released. Immediately : Purchase Requisition is created immediately on saving the Structure.

  • 8/13/2019 Projects Manual 1

    18/156

    System Operating Procedures

    Page 18of 156

    1.2.4.2. Creating External ActivityExternal Activity is used for the Activities outside the Company

    a. Drag the External Processing Activity into the Highlighted Network Header.

    b. Give a suitable description for the activity and drag it into the relevant WBS element. In theExternal tab of the External Activity set the status of Res/Purchase Requisition to Never as

    shown in the below screenshot.

  • 8/13/2019 Projects Manual 1

    19/156

  • 8/13/2019 Projects Manual 1

    20/156

    System Operating Procedures

    Page 20of 156

    Planned amount for the Cost Activity Corresponding Cost center.

    1.2.4.4. Creating Service ActivityService Activities are created for Procuring External Services. Unlike externally-processed activities,

    service activities contain a service specification containing planned activities and value limits for

    unplanned activities

    a. Drag Service Activity into the Network Header.

  • 8/13/2019 Projects Manual 1

    21/156

    System Operating Procedures

    Page 21of 156

    b. Give a suitable description of the Service Activity & set Res./Purc. Req. to Never and pressEnter.

  • 8/13/2019 Projects Manual 1

    22/156

    System Operating Procedures

    Page 22of 156

    c. A service specification screen is displayed for the Service Activities. Enter the following detailsand press Enter.

    Short Text: Same as description Quantity: 1 Unit of measurement: AU

    d. Drag the Service Activity into the respective WBS.

  • 8/13/2019 Projects Manual 1

    23/156

  • 8/13/2019 Projects Manual 1

    24/156

    System Operating Procedures

    Page 24of 156

    Work Center: A work center is a physical unit within a company where an activity isperformed. For example, a work center may be an individual, a group of people, a single

    machine, or a production line.

    Activity Type: Appears by default on assigning Work center. Activity types are used tocalculate the Internal Labor cost based on the planned hours & Actual hours.

    1.2.6. Creating Material ComponentThere are two types of Material Components assignment:

    Assigning Non stock Material to Project. Assigning Stock Material to Project.

    1.2.6.1. Assigning Non-Stock Material to Projecta. Drag the Material Component into the Permanent Materials Activity.

  • 8/13/2019 Projects Manual 1

    25/156

    System Operating Procedures

    Page 25of 156

    b. Select the required material from the material master.

    c. Enter the following fields and press Enter: Item Category: N for Non-stock item. Requirement Quantity Requirement Date Storage Location

  • 8/13/2019 Projects Manual 1

    26/156

    System Operating Procedures

    Page 26of 156

    d. A pop-up appears as shown below. Click on to continue.

    e. Enter the Requisitioner name & Tracking number. Press Enter to proceed.

  • 8/13/2019 Projects Manual 1

    27/156

    System Operating Procedures

    Page 27of 156

    f. Check if all the below highlighted fields are correct.

  • 8/13/2019 Projects Manual 1

    28/156

    System Operating Procedures

    Page 28of 156

    g. In the Proc Param (Procurement Parameters) Tab, the Purchase Requisition creation forMaterial Component can be controlled.

    h. Purchase requisition number is created on saving the project structure.

  • 8/13/2019 Projects Manual 1

    29/156

    System Operating Procedures

    Page 29of 156

    1.2.6.2. Assigning Stock Material to Projecta. Drag Material Component into the Permanent Materials Activity.

    b. Select the required material from the material master.

    c. Enter the following fields and press Enter: Item Category: L for Stock item. Requirement Quantity

  • 8/13/2019 Projects Manual 1

    30/156

    System Operating Procedures

    Page 30of 156

    Requirement Date Storage Location

    d. A pop-up appears as shown below. Click on to continue

    e. A Reservation number is generated for the Stock Material. Click on to save the projectstructure.

  • 8/13/2019 Projects Manual 1

    31/156

    System Operating Procedures

    Page 31of 156

    2. Project BudgetBudget is the Approved Cost Structure for a Project. A Project is typically budgeted in its Approval

    Phase. Only the WBS Elements can have a Budget in SAP PS. The reference Document to Change the

    Budget is the Job Opening Advice (JOA) of the Project.

    The Transaction Codes for Budget Management are:

    CJ30 Change Project Original Budget CJ31 Display Project Original Budget CJ32 Change Project Release CJ33 Display Project Release

    1. Creating Original BudgetEnter the transaction code CJ30in the command field and press ENTER or go through the SAP Menu

    as highlighted below:

  • 8/13/2019 Projects Manual 1

    32/156

    System Operating Procedures

    Page 32of 156

    a. Enter the Project Number and press Enter.

  • 8/13/2019 Projects Manual 1

    33/156

    System Operating Procedures

    Page 33of 156

    b. Right click anywhere on the screen and select Display Options. Alternatively, you can pressCtrl+Shift+F7.

    c. Select Using Descriptions and click on Continue to view the WBS element description.

    d. Enter the amounts from the JOA against the respective WBS elements.

  • 8/13/2019 Projects Manual 1

    34/156

    System Operating Procedures

    Page 34of 156

    e. Click on to save the Original Budget2. Release Budget

    Enter the transaction code CJ32in the command field and press ENTER or go through the SAP Menu

    as highlighted below:

  • 8/13/2019 Projects Manual 1

    35/156

    System Operating Procedures

    Page 35of 156

    CJ32 serves as a control to allow a certain amount of value to be consumed at a time. Each WBS

    Element is also checked to ensure that the Released budget does not exceed the Current Budget.

    a. Enter the Project Number and press Enter.

  • 8/13/2019 Projects Manual 1

    36/156

    System Operating Procedures

    Page 36of 156

    b.

    Right click anywhere on the screen and select Display Options. Alternatively, you can press

    Ctrl+Shift+F7 and select Using Descriptions to view the description of the WBS element.

    c. Enter the amounts to be released against the WBS in the Release Column and save the ReleaseBudget.

  • 8/13/2019 Projects Manual 1

    37/156

    System Operating Procedures

    Page 37of 156

    Columns in Original/Release Budget:

    Column Name Description

    Current Budget Consists of the Original Budget.

    DistributedThe total of the Current budget for each lower level WBS

    Element.

    DistributableThe Distributable value is the difference between the

    Current Budget and the distributed Value.

    Assigned Consists of the Commitment and Actual Postings.

    Releases Value of the Released Budget.

    3. Man-power Hours ConfirmationThe Pre-requisites for man power confirmation are:

    Activity/Activity Elements are defined in Project structure Activities in Project structure are released. Rate for activity types/Cost center has been maintained in SAP (Applicable for Manpower

    Hrs only)

    1. Individual ConfirmationEnter the transaction code CN25in the command field and press ENTER or go through the SAP Menu

    as highlighted below:

  • 8/13/2019 Projects Manual 1

    38/156

    System Operating Procedures

    Page 38of 156

    a. Select the Network number to confirm the Man-hours.

  • 8/13/2019 Projects Manual 1

    39/156

    System Operating Procedures

    Page 39of 156

    b. The Confirmation Number is taken from the Project Builder of the corresponding Project Select the relevant Activity Element(Project Manager) Select the Additional Data tab to get

    the confirmation number.

    c. Enter the Confirmation number and press Enter.

  • 8/13/2019 Projects Manual 1

    40/156

    System Operating Procedures

    Page 40of 156

    d. Enter the below highlighted fields in the confirmation screen and click on Save.

    e. The Confirmed Man-hours is listed in the Report CN48N

  • 8/13/2019 Projects Manual 1

    41/156

    System Operating Procedures

    Page 41of 156

    Sales Order

    4. Sales Order CreationEnter the transaction code VA01in the command field and press ENTER or go through the SAP

    menu as highlighted below.

  • 8/13/2019 Projects Manual 1

    42/156

  • 8/13/2019 Projects Manual 1

    43/156

  • 8/13/2019 Projects Manual 1

    44/156

    c. Seleneed

    t the Invoic

    to be creat

    Sys

    ing WBS

    d.

    em Ope

    Pa

    lement N

    rating P

    e 44of 156

    mber from

    rocedur

    the Project

    s

    Structure f r which Sa

    es Order

  • 8/13/2019 Projects Manual 1

    45/156

    d. Sele

    e. Sele

    t the first li

    t the condit

    Sys

    e item crea

    on type Pro

    em Ope

    Pa

    ed and clic

    ect Price v

    rating P

    e 45of 156

    on Item C

    lue ZPRV

    rocedur

    onditions i

    and specif

    s

    the Sales

    the amoun

    rder Scree

    t. Press E

    .

    TER.

  • 8/13/2019 Projects Manual 1

    46/156

  • 8/13/2019 Projects Manual 1

    47/156

  • 8/13/2019 Projects Manual 1

    48/156

    h. Next, select Bill

    Sys

    ing Plan T

    em Ope

    Pa

    b and click

    rating P

    e 48of 156

    on to c

    rocedur

    nfirm the c

    s

    hanges.

  • 8/13/2019 Projects Manual 1

    49/156

    i. In thThis

    e Billing Pl

    step should

    Sys

    n Tab, if

    be skipped i

    em Ope

    Pa

    own Paym

    f Down Pa

    rating P

    e 49of 156

    nt is applic

    ment is n

    rocedur

    able, specif

    t applicable

    s

    the fields

    .

    as in the sc

    reenshot.

  • 8/13/2019 Projects Manual 1

    50/156

    j. Sele

    lease Not

    unning Bil

    k. Press

    l. Clic

    t Running

    : Billing T

    .

    Enter. Cl

    on to

    Sys

    ill for the

    pe field s

    ck on .

    go to the i

    em Ope

    Pa

    Monthly Pr

    ould be F

    itial screen

    rating P

    e 50of 156

    ogress Invoi

    AZ for D

    and save th

    rocedur

    ce.

    wn Payme

    e sales orde

    s

    nt Request

    r to get the

    and ZFP

    Sales Order

    for the

    number.

  • 8/13/2019 Projects Manual 1

    51/156

    Sys em Ope

    Pa

    rating P

    e 51of 156

    rocedur s

  • 8/13/2019 Projects Manual 1

    52/156

    5. Creebate Agre

    lease Note:

    nter the tra

    a. Sele

    tion of R

    ements are

    Rebate Ag

    saction co

    t the Agree

    Sys

    ebate Ag

    reated for S

    eements sh

    e VBO1(le

    ent Type

    em Ope

    Pa

    Rebat

    eements

    ales Order

    uld be crea

    tter O) in th

    Z003 and

    rating P

    e 52of 156

    Agree

    ith Retenti

    ted on the s

    e command

    press Ente

    rocedur

    ent

    on.

    me day alo

    field and pr

    r.

    s

    g with the

    ess ENTE

    ales orders

    .

  • 8/13/2019 Projects Manual 1

    53/156

  • 8/13/2019 Projects Manual 1

    54/156

    P

    d. Clic

    e. Clic

    roject Valid

    on the Co

    on Save.

    Sys

    ity Period

    ditions tab

    em Ope

    Pa

    . Enter the

    rating P

    e 54of 156

    Sales Order

    rocedur

    No and th

    s

    Amount o

    f Retention.

  • 8/13/2019 Projects Manual 1

    55/156

    f. On C

    g. Sele

    licking Sav

    t Project S

    Sys

    , an Infor

    rvice Nu

    em Ope

    Pa

    ation win

    ber in the

    rating P

    e 55of 156

    ow is displ

    aterial Settl

    rocedur

    yed. Click

    ement Fiel

    s

    n .

    .

  • 8/13/2019 Projects Manual 1

    56/156

    h. Clic

    verview:

    Purchase

    r service so

    6. Pur

    on Save.

    equisition

    that it is av

    hase Re

    Sys

    Retention N

    is a request

    ailable at a

    uest for P

    em Ope

    Pa

    umber is ge

    urchas

    to Purchasi

    ertain point

    rojects

    rating P

    e 56of 156

    erated at t

    e Requ

    ng Depart

    in time.

    rocedur

    e bottom o

    sition

    ent to proc

    s

    the screen.

    re a certain quantity o

    material

  • 8/13/2019 Projects Manual 1

    57/156

    System Operating Procedures

    Page 57of 156

    1. To create a Purchase Request Permanent materials, General Purchase etc.Enter the transaction code ME51Nin the command field and press ENTER or go through the SAP menu

    as highlighted below:

    a. Select the type of Purchase Request from the available list:

    If the permanent / consumable material is a non-stock item, then a ZPMR Permanent Purchase

    Request (for Permanent Materials) or ZGPR General Purchase Request (for Consumables / Tools) can

    be raised.

    b. Enter the below highlighted fields.

  • 8/13/2019 Projects Manual 1

    58/156

    System Operating Procedures

    Page 58of 156

    c. Click on the Check button to check for errors. At this stage, ensure that the ReleaseStrategy Tab is generated.

    d. Save the Purchase Request to generate the purchase requisition number.

    7. Stock Transport Request for ProjectsFor Projects Permanent, Consumables & Tools are to be obtained through ZSTR Stock Transport

    Request only.

    1. To create a Stock Transport Request

  • 8/13/2019 Projects Manual 1

    59/156

    System Operating Procedures

    Page 59of 156

    Enter the transaction code ME51Nin the command field and press ENTER or go through the SAP menu

    as highlighted below:

    a. Select the Purchase Document type ZSTR.

    b.

    Enter the below highlighted fields

  • 8/13/2019 Projects Manual 1

    60/156

    System Operating Procedures

    Page 60of 156

    c. Click on the Check button to check for errors. At this stage, ensure that the ReleaseStrategy Tab is generated.

    d. Save the Purchase Request to generate the purchase requisition number.Note:

    1. To procure via Inventory: Account Assignment is Blank & Item Category is U StockTransfer. E.g.: Permanent & Consumables.

    2. To procure via Network: Account Assignment is N Network & Item Category is U StockTransfer. E.g.: Tools

    3. If an item / material is not in stock, then stores personnel will check the option To be procuredin the Customer Data tab, after complete release / approval, for procurement. The procurement

    team will then create a purchase order for the material.

    4. Material Numbers must be selected from the material master for ZSTRs. Short text is notallowed by the system.

  • 8/13/2019 Projects Manual 1

    61/156

    System Operating Procedures

    Page 61of 156

    8. Service Purchase Request for Projects1. To create a Service Purchase Request

    Enter the transaction code ME51N in the command field and press ENTER or go through the SAP menu

    as highlighted below:

    a. Select the Purchase Document type ZSPR.

    b. Enter the below highlighted fields.Purchasing Group:

    106 Stores Service Request (Material Group Maintenance Services)

  • 8/13/2019 Projects Manual 1

    62/156

    System Operating Procedures

    Page 62of 156

    140 Project Service Request (Material Group Contruction Services)

    c. Click on the Check button to check for errors. At this stage, ensure that the ReleaseStrategy Tab is generated.

    d. Save the Purchase Request to generate the purchase requisition number.

  • 8/13/2019 Projects Manual 1

    63/156

    s

    verview:

    here are tw

    9. Coll collective

    imultaneou

    ntered in th

    .1. To vnter the tra

    s highlighte

    o methods

    ective Rel

    release o

    ly. Selectio

    e initial scre

    ew PR list

    nsaction co

    d below.

    Orc

    Sys

    Pur

    or approvin

    ease of P

    purchase

    n criteria, s

    en. All purc

    - Pending f

    e ME55in

    hoosefromy

    em Ope

    Pa

    hase R

    a Purchase

    rchase R

    equisitions

    ch as the r

    hase requisi

    r approval

    the comma

    ourfavorites

    rating P

    e 63of 156

    equest

    Requests v

    quest

    allows sev

    lease (App

    tions meeti

    d field and

    listifTcode

    rocedur

    pprov

    iz. Collecti

    eral purcha

    over) code,

    g the select

    press ENT

    issaved

    s

    al

    e release &

    se requisiti

    purchasing

    ion criteria

    R or go th

    Individual r

    ons to be

    group and

    re displaye

    ough the S

    elease.

    approved

    lant, are

    .

    P menu

  • 8/13/2019 Projects Manual 1

    64/156

    a. Ente

    b. Clic

    your Relea

    on Execute

    Sys

    se code and

    button

    em Ope

    Pa

    select the s

    .

    rating P

    e 64of 156

    ope of list a

    Enteryo

    rocedur

    s ALV.

    rreleaseco

    s

    e G1forC O

  • 8/13/2019 Projects Manual 1

    65/156

    he pending

    c. If the

    PR list will

    re are noP

    Sys

    be displaye

    s to be ap

    em Ope

    Pa

    d as below.

    roved, you

    rating P

    e 65of 156

    will get the

    rocedur

    below mess

    s

    age:

  • 8/13/2019 Projects Manual 1

    66/156

    I

    r

    .2. To vn the collec

    equester, fr

    a. To vi

    he PR deta

    ew more d

    ive release

    m which pl

    ew more de

    ls window

    Sys

    tails of PR

    screen, you

    ant etc.

    tails of the

    ill be displ

    em Ope

    Pa

    :

    get to see

    R, double c

    ayed as bel

    rating P

    e 66of 156

    ost of the d

    lick a line it

    w:

    rocedur

    tails of the

    em of that

    s

    PR materi

    R, as highli

    al, quantity

    ghted belo

    name of

    :

  • 8/13/2019 Projects Manual 1

    67/156

  • 8/13/2019 Projects Manual 1

    68/156

  • 8/13/2019 Projects Manual 1

    69/156

  • 8/13/2019 Projects Manual 1

    70/156

    0.Indivia. Ente

    highl

    ual Rele

    the trans

    ighted belo

    Sys

    se of Pur

    ction code

    .

    em Ope

    Pa

    hase Re

    ME54N a

    rating P

    e 70of 156

    uest

    nd press

    rocedur

    NTER or

    s

    go through the SAP menu as

  • 8/13/2019 Projects Manual 1

    71/156

    b. Clic

    EN

    c. Seleyour

    ote:Abov

    d. To aclick

    on Other

    ER.

    ct the Rele

    release cod

    example s

    prove Line

    the arrow-

    Sys

    Purchase

    ase Strate

    ) as highlig

    ows that H

    item 2 or t

    ark butto

    em Ope

    Pa

    equisition

    y tab. Cli

    ted below

    D Admi

    he next lin

    shighlight

    rating P

    e 71of 156

    icon t

    k on the c

    o proceed

    has appro

    item, user

    ed below.

    rocedur

    enter the

    heck mark

    ith the appr

    ed for Line

    has to sele

    s

    specific P

    with pencil

    oval.

    item 1.

    t it from th

    number a

    icon

    e drop do

    nd press

    (next to

    n listor

  • 8/13/2019 Projects Manual 1

    72/156

    e. After ap

    Dro

    List

    roving, Cli

    p down

    Sys

    k on the S

    em Ope

    Pa

    VEbutton

    rating P

    e 72of 156

    (highlighted

    rocedur

    below):

    s

  • 8/13/2019 Projects Manual 1

    73/156

    I

    I

    1. To revof a PR has

    a. Ente

    b. Clic

    c. Go t

    f, for e.g., P

    n the invert

    ME54

    ke an appr

    een approv

    the transac

    on an

    the Relea

    CM wants t

    ed arrow

    N

    Sys

    ved PR:

    d, and the a

    ion code M

    d enter the

    e Strategy

    o revoke his

    to revo

    em Ope

    Pa

    pprover late

    E54N(or /

    R number (

    Tab

    approval fo

    e his appro

    rating P

    e 73of 156

    r wishes to

    ME54N if

    as shown be

    r line item

    val and the

    rocedur

    evoke it, th

    ou are not i

    low). Press

    (Nylon Li

    Save

    s

    en:

    n homepage

    ENTER to

    ting Sling),

    .

    )

    roceed.

    then he has to click

  • 8/13/2019 Projects Manual 1

    74/156

    System Operating Procedures

    Page 74of 156

    Purchase Order

    Overview:

    A purchase order is a formal request or instruction from a purchasing organization to a vendor or a plant

    to supply or provide a certain quantity of goods or services at or by a certain point in time. There are 2

    methods to create a PO:

    11.1. Without reference to a PR (Direct PO)11.2. With reference to a PR

    12.Service POs for Subcontractors / ServicesEnter the transaction code ME21Nin the command field and press ENTER or go through the SAP

    menu as highlighted below:

    a. Select the PO document type ZSPO Service PO

  • 8/13/2019 Projects Manual 1

    75/156

    System Operating Procedures

    Page 75of 156

    b. To create the PO with reference to a PR, select the PR from the Selection variant inDocument Overview.

    c. Select the PR and click on to adopt the PR. This will pick all the relevant fields from thePR directly into the PO.

    d. Enter the relevant Vendor name.

  • 8/13/2019 Projects Manual 1

    76/156

    System Operating Procedures

    Page 76of 156

    e. Check the Price & conditions maintained in the Condition Tab.f. Additional data regarding the PO can be maintained in the Texts tab.g. Click on the Check button to check for errors. At this stage, ensure that the Release

    Strategy Tab is generated.

    h. Save the Purchase Order to generate the purchase order number.

  • 8/13/2019 Projects Manual 1

    77/156

  • 8/13/2019 Projects Manual 1

    78/156

    b. lick on Cr

    Sys

    ate Service

    em Ope

    Pa

    Entry Sheet

    rating P

    e 78of 156

    or press S

    rocedur

    ift+F1.

    s

  • 8/13/2019 Projects Manual 1

    79/156

    c.

    d.

    lick on Ser

    lick on

    Sys

    vice Selecti

    (Continue)

    em Ope

    Pa

    n at the B

    on entering

    rating P

    e 79of 156

    ttom of the

    the details.

    rocedur

    screen.

    s

  • 8/13/2019 Projects Manual 1

    80/156

    e. S

    f.g.

    elect the re

    ervices ta

    n clicking

    nter the Qu

    Sys

    quired line

    .

    ervices, Us

    ntity and c

    em Ope

    Pa

    item and cl

    r is taken b

    eck the Va

    rating P

    e 80of 156

    ick on the

    ack to the

    ls tab for t

    rocedur

    Services

    reate Entry

    e Amount

    s

    ab or Sele

    Sheet Scre

    s in the Inv

    ct All and

    en.

    ice.

    click on

  • 8/13/2019 Projects Manual 1

    81/156

    h.i.

    j.k.

    nter the D

    nter the Inv

    fter enterin

    lick on the

    Sys

    cument dat

    oice No. alo

    all the nec

    Save Butto

    em Ope

    Pa

    and the Po

    ng with the

    ssary data,

    n to get the

    rating P

    e 81of 156

    sting Date i

    date in the

    click on

    Service Ent

    rocedur

    n the Acce

    Short Text

    or Ctrl+F

    ry Sheet nu

    s

    pting Data

    field.

    1 for accept

    ber.

    tab.

    ance.

  • 8/13/2019 Projects Manual 1

    82/156

    Sys em Ope

    Pa

    rating P

    e 82of 156

    rocedur s

  • 8/13/2019 Projects Manual 1

    83/156

    System Operating Procedures

    Page 83of 156

    14.Service POs for Intercompany ServicesEnter the transaction code ME21Nin the command field and press ENTER or go through the SAP menu

    as highlighted below:

    a. Select the PO Document Type ZISO Inter Service PO

    (To create the PO with reference to the PR, follow steps 1.b to 1.h.)

    b. Enter the Purchasing Organization, Purchasing Group & Company code and press Enter.

  • 8/13/2019 Projects Manual 1

    84/156

    System Operating Procedures

    Page 84of 156

    c. Enter the relevant Vendor from the Vendor List.

    d. Enter the below highlighted fields at the Item level and press Enter:

    e. Enter the G/L Account number, the network number of the project & the relevant Activitynumber.

    f. Check the Price & conditions maintained in the Condition Tab.g. Additional data regarding the PO can be maintained in the Texts tab.h. Click on the Check button to check for errors. At this stage, ensure that the Release

    Strategy Tab is generated.

  • 8/13/2019 Projects Manual 1

    85/156

    System Operating Procedures

    Page 85of 156

    i. Save the Purchase Order to generate the purchase order number.

    15.Goods Receipt for Intercompany ServicesEnter the transaction code MIGO the command field and press ENTER or go through the SAP menu as

    highlighted below:

  • 8/13/2019 Projects Manual 1

    86/156

    System Operating Procedures

    Page 86of 156

    a. Select the action Goods Receipt and the document type Purchase Order as shown in thebelow highlighted fields. The movement type for goods receipt will be 101- Goods receipt for

    purchase order into warehouse/stores by default.

    b. Enter the PO number in the below highlighted field and press Enter. The data in the PO will getcaptured to the relevant fields in MIGO.

  • 8/13/2019 Projects Manual 1

    87/156

    System Operating Procedures

    Page 87of 156

    c. Enter the Delivery Note in the highlighted field below:

    d. Once all the relevant details are entered,

    e. Check & Save to generate the document number.

  • 8/13/2019 Projects Manual 1

    88/156

    t

    verview:

    here are tw

    6.Collec6.1. Tonter the tra

    he SAP me

    d. Ente

    e. Clic

    o methods

    ive Relea

    iew PO list

    saction co

    u as highli

    your Relea

    on Execute

    Sys

    Pu

    or approvin

    se of Pur

    - Pending

    e (not requi

    hted below.

    se code and

    button

    em Ope

    Pa

    chase

    a Purchase

    hase Ord

    or approva

    red if it is s

    select the s

    rating P

    e 88of 156

    rder

    order viz. I

    er

    l

    ved in you

    ope of list a

    rocedur

    pprov

    ndividual re

    favorites li

    s ALV.

    s

    l

    lease & Col

    st) and pres

    lective rele

    Enter or g

    se.

    through

  • 8/13/2019 Projects Manual 1

    89/156

    he pending

    f. If the

    PO list will

    re are noP

    Sys

    be displaye

    s to be ap

    em Ope

    Pa

    d as below.

    roved, you

    rating P

    e 89of 156

    will get the

    Enter

    rocedur

    below mess

    yourrelease

    s

    age:

    code

  • 8/13/2019 Projects Manual 1

    90/156

    I

    6.2. To vn the collec

    uantity, fro

    a. To vi

    ew more d

    tive release

    which pla

    ew more de

    Sys

    tails in PO

    screen, you

    nt etc.

    tails regardi

    em Ope

    Pa

    :

    get to see

    g the PO,

    rating P

    e 90of 156

    ost of the

    ouble click

    rocedur

    details of th

    the line ite

    s

    e PO mat

    as highlig

    rial, materi

    ted below:

    al group,

  • 8/13/2019 Projects Manual 1

    91/156

    b. The

    c. Sele

    O details

    t the icon

    Sys

    indow will

    located a

    em Ope

    Pa

    e displaye

    the top rig

    rating P

    e 91of 156

    as below:

    t hand corn

    rocedur

    er (Header l

    s

    evel) to choose various tabs.

  • 8/13/2019 Projects Manual 1

    92/156

    d. The

    6.3. To v

    a. Clic

    ricing cond

    ew Attach

    on the atta

    Sys

    itions can b

    ents

    hment link

    em Ope

    Pa

    viewed un

    as

    rating P

    e 92of 156

    der the tab

    ighlighted

    rocedur

    CONDITIO

    elow and cl

    s

    NS

    ick on Attachment Lis

    .

  • 8/13/2019 Projects Manual 1

    93/156

    I

    s

    b. You

    16.4.f there is a

    hown belo

    a. Dou

    ill now se

    o view the

    RFQ mai

    .

    le click on

    Sys

    the list of

    FQ (Requ

    tained for

    his number.

    em Ope

    Pa

    ttachments

    est for Quo

    he docume

    It will take

    rating P

    e 93of 156

    attached for

    tation)

    t, then the

    you to the b

    rocedur

    that PO.

    RFQ numb

    elow scree

    s

    er will be

    .

    pdated in t

    e PO as

  • 8/13/2019 Projects Manual 1

    94/156

  • 8/13/2019 Projects Manual 1

    95/156

  • 8/13/2019 Projects Manual 1

    96/156

    I

    r

    7. Indivndividual r

    rovides a

    ejecting the

    a. Entebelo

    b. By dscree

    the

    can t

    c. Selerelea

    dual Rel

    lease of Pu

    hance for

    document.

    the transac

    .

    efault the l

    n of PO. If

    'Other

    ke help of '

    t the Rele

    se code) as

    Sys

    ase of Pu

    chase order

    he approve

    tion code M

    st documen

    his is not y

    ocument'

    Document

    se Strateg

    ighlighted

    em Ope

    Pa

    chase Or

    is used for

    to view a

    E29Nand

    t that was c

    ur docume

    but

    verview' w

    y tab. Clic

    elow to pro

    rating P

    e 96of 156

    der

    the Release

    d change

    ress Enter

    hanged / di

    t then you

    on and typ

    ndow to se

    k on the c

    ceed with t

    rocedur

    / approval

    he PO (if

    or go thro

    splayed is s

    can call yo

    e in the Pu

    rch for you

    heck mark

    e approval.

    s

    f a single d

    required so

    gh the SAP

    hown on th

    r Purchase

    chase Orde

    r PO.

    with pencil

    ocument at

    before ap

    menu as hi

    e Individua

    Order by cli

    Number.

    icon (nex

    a time. It

    roving /

    hlighted

    Release

    cking on

    lso, you

    to your

  • 8/13/2019 Projects Manual 1

    97/156

    I

    d. Afte

    8. To ref a PO has

    a. Ente

    ME29

    approving,

    oke an a

    een approv

    the transac

    N

    Sys

    Click on th

    proved

    d, and the a

    ion code M

    em Ope

    Pa

    SAVEbut

    O:

    pprover lat

    E29N(or /

    rating P

    e 97of 156

    on (highlig

    r wishes to

    ME29N if

    rocedur

    ted below):

    revoke it, th

    ou are not i

    s

    en:

    n homepage)

  • 8/13/2019 Projects Manual 1

    98/156

    I

    b. Clic

    c. Go t

    f, for e.g.,

    is approval

    on , e

    the Relea

    D wants to

    and then sa

    Sys

    ter the PO

    e Strategy

    revoke his

    e .

    em Ope

    Pa

    umber (as s

    Tab

    pproval the

    rating P

    e 98of 156

    hown belo

    n he has to

    rocedur

    ) and press

    lick on the

    s

    ENTER

    inverted arr w t

    revoke

  • 8/13/2019 Projects Manual 1

    99/156

    System Operating Procedures

    Page 99of 156

    Notifications

    Overview:

    A notification can be used to intimate the concerned department regarding a requirement / request / task

    to be performed. The concerned department will run the respective report to check the notification

    requests. The SAP T-code for creating a notification is IW21.

    19. Equipment NotificationEnter the transaction code IW21in the command field and press ENTER or go through the SAP menu

    as highlighted below

  • 8/13/2019 Projects Manual 1

    100/156

    System Operating Procedures

    Page 100of 156

    a. Enter the Notification type Z1 Equipment Request and press Enter.

    b. Enter all the highlighted fields as shown below:

  • 8/13/2019 Projects Manual 1

    101/156

    System Operating Procedures

    Page 101of 156

    c. Click on Save to get the Equipment notification number.

  • 8/13/2019 Projects Manual 1

    102/156

    System Operating Procedures

    Page 102of 156

    20. Project Service NotificationProject Notification is used for all services from Scaffolding / FRP.

    Enter the transaction code IW21in the command field and press ENTER or go through the SAP menu

    as highlighted below

    a. Enter the Notification type Z2 Project Service Request and press Enter.

  • 8/13/2019 Projects Manual 1

    103/156

    System Operating Procedures

    Page 103of 156

    b. Enter all the highlighted fields as shown below:

  • 8/13/2019 Projects Manual 1

    104/156

    System Operating Procedures

    Page 104of 156

    c. Click on Save to get the Project Service notification number.

  • 8/13/2019 Projects Manual 1

    105/156

    System Operating Procedures

    Page 105of 156

    21. IT Service NotificationEnter the transaction code IW21 in the command field and press ENTER or go through the SAP menu as

    highlighted below

    a. Enter the Notification type Z3 IT Service Request and press Enter.

  • 8/13/2019 Projects Manual 1

    106/156

    System Operating Procedures

    Page 106of 156

    b. Enter all the highlighted fields as shown below:

  • 8/13/2019 Projects Manual 1

    107/156

    System Operating Procedures

    Page 107of 156

    c. Click on Save to get the IT Service notification number.

  • 8/13/2019 Projects Manual 1

    108/156

    System Operating Procedures

    Page 108of 156

    22. Stores Service NotificationEnter the transaction code IW21in the command field and press ENTER or go through the SAP menu

    as highlighted below

    a. Enter the Notification type Z4 IT Service Request and press Enter.

  • 8/13/2019 Projects Manual 1

    109/156

    System Operating Procedures

    Page 109of 156

    b. Enter all the highlighted fields as shown below and save to get the Store Service notificationnumber.

  • 8/13/2019 Projects Manual 1

    110/156

    System Operating Procedures

    Page 110of 156

    c. Click on Save to get the Store Service notification number.

  • 8/13/2019 Projects Manual 1

    111/156

    System Operating Procedures

    Page 111of 156

    Project Equipment Utilization

    23. Equipment Utilization ReportThe Transaction code for executing the Project Equipment Utilization report or the work center revenue

    report is ZPM_WCREV.

    a. Enter the below highlighted Selection Parameters:Selection Parameter Sample Data Entry Remarks

    Order Type ZSM1 & ZSM2

    Order Type ZSM1 & ZSM2 are to be

    selected.

    ZSM1 - Service order for Projects

    ZSM2 - Service order for Intra Company

    Posting Date 01.08.2013 to 31.08.2013

    Posting date should be put for the entire

    month for which the work center revenue

    report is to be taken. Note that the current

    month's Revenue report will be available

    only in the following month.

    Functional Location KGA-NBTC-PDV-024As highlighted in the screenshot, select

    your respective Project location.

  • 8/13/2019 Projects Manual 1

    112/156

    System Operating Procedures

    Page 112of 156

    b. Execute the report.c. The report for the above selection parameters are as shown below:

    d. Select the variant /WCREV_RENT to get the report as per the required template.

  • 8/13/2019 Projects Manual 1

    113/156

    System Operating Procedures

    Page 113of 156

  • 8/13/2019 Projects Manual 1

    114/156

    System Operating Procedures

    Page 114of 156

    e. The executed report can be downloaded to a Spreadsheet by clicking on .

    The Template for the Equipment Utilization report is as shown below:

  • 8/13/2019 Projects Manual 1

    115/156

    System Operating Procedures

    Page 115of 156

  • 8/13/2019 Projects Manual 1

    116/156

    System Operating Procedures

    Page 116of 156

    Time & Attendance

    24. Shift AssignmentThe Time administrators of various sites are responsible to maintain the shifts of the employees working

    in their site. If an employee is transferred from Site A to Site B or from HO to Site B, the time

    administrator of Site B is to check the existing shift assigned to the employee and assign accordingly.

    25.3. Assign Shift to single / multiple employeesa. Execute the transaction ZHR_TM02

    b. Enter the below highlighted details:Sample Selection Criteria:

    Selection Fields Sample Data Remarks

    Personnel Number 123 Enter file number(s) of employee(s)

    Start Date 01.01.2013Date from when the Shift is to be

    assigned.

    End Date 31.12.9999Always maintain end date as:

    31.12.9999

    Work Schedule rule

    (Shift)RM01

    Shift to be assigned to the

    employee(s). All the shifts under PS

    grouping 99 are used by NBTC.

    Each Department / Division is

    assigned with a unique shift code.

  • 8/13/2019 Projects Manual 1

    117/156

    System Operating Procedures

    Page 117of 156

    c. Click on execute button. Youll get the below confirmation that the record is updatedsuccessfully.

  • 8/13/2019 Projects Manual 1

    118/156

    System Operating Procedures

    Page 118of 156

    25.4. To view / display the Shifta. Execute the transaction ZHR_TM01

    b. Enter the File number(s) for which the shift is to be displayed and click on execute button.

    26.Time & Attendance ReportsTime administrators can view the time reports in 2 ways:

    1. Web report to view the Daily attendance2. SAP report to view the weekly / monthly attendance, absence, late coming & early going.

    26.1. Web ReportThe web report can be viewed through the web address http://192.168.0.64/nbtc/home.aspx. There are

    two types of web report available:

    A. Date Wise Punch ReportB. Employee Wise Punch Report

    Both types of report can be viewed (and saved) in PDF format & Excel format. The pre-requisites to

    view the web report are:

    A User ID & password is required for logging in.

  • 8/13/2019 Projects Manual 1

    119/156

    System Operating Procedures

    Page 119of 156

    Master Records have to be maintained (Employee Master & Location Master) by theWeb Administrator.

    The User ID should be linked to the respective location by the Web Administrator. Timely upload of Time Data from the Site location.

    26.2. SAP Time ReportsThe T-code for viewing SAP Report is ZHR_TM05 Positive Time Reports.

    In this report the Time Administrator can view the Attendance, Late Coming, Absence, Early Going &

    Missing Punch record of the employees (Refer Annexure for Screenshots). The Attendance Report also

    shows the OT generated for OT earning Employees.

    The pre-requisites to view the report are:

    The Time Card Id number of the employee should be maintained in Employee Master The employee should not be marked as a manual card holder. The shift of the employee should be assigned. The employee should have Clock-in and / or Clock-out records. Employee data should be successfully processed by the Time Evaluation Program.

  • 8/13/2019 Projects Manual 1

    120/156

    System Operating Procedures

    Page 120of 156

    The organization unit of the employee should be properly assigned for the Time Administrator toview the report for his site / location.

    a. Execute the T-code ZHR_TM05.

    b. Enter the below highlighted details:Selection Fields Sample Data Remarks

    Reporting Date 01.09.2013 to 15.09.2013The reporting period can be for a

    single day or for an entire month.

    Personnel

    Number123 Enter file number(s) of employee(s)

    Report Type AttendanceChoose from the given list of Report

    types.

  • 8/13/2019 Projects Manual 1

    121/156

    System Operating Procedures

    Page 121of 156

    c. Click on execute button to execute the report.

  • 8/13/2019 Projects Manual 1

    122/156

    System Operating Procedures

    Page 122of 156

    Information System

    There are several standard reports available in material management. Below is a brief description of

    some of the reports that would be useful.

    Overview of important icons:

    S. No. Icon Description

    1. Execute2. Search button3. or Change Layout - Add / remove fields in report4. Save Layout5. Choose Layout6. Print preview

    7. or Save list in Excel8. Sort in Ascending order

  • 8/13/2019 Projects Manual 1

    123/156

    System Operating Procedures

    Page 123of 156

    1. MC$G Material Analysis based on Purchase Valuea. Enter the transaction code or select through SAP menu as highlighted below.

    b. Enter the Purchasing Organization, and the period of analysis in the below screen.

  • 8/13/2019 Projects Manual 1

    124/156

    System Operating Procedures

    Page 124of 156

    c. It will display a report for all the materials as shown below:

    d. If you select the option Switch drilldown and select Plant as shown below:

  • 8/13/2019 Projects Manual 1

    125/156

  • 8/13/2019 Projects Manual 1

    126/156

    System Operating Procedures

    Page 126of 156

    2. ME2N - Purchase Orders by PO NumberTo display a list of Purchase Orders with outstanding goods receipts (goods still be delivered) or

    invoice receipts (invoices to be paid).

    a. Enter the transaction code or select through SAP menu as highlighted below.

    b. Enter the selection criterias in the below screen.

  • 8/13/2019 Projects Manual 1

    127/156

    System Operating Procedures

    Page 127of 156

    For E.g.:

    S. NO. Field Description

    1. Scope of List ALV

    2. Plant To view open POs for a specific plant

    3. Material To view open POs for a specific material

    4. Document Date Specify the time period

  • 8/13/2019 Projects Manual 1

    128/156

    System Operating Procedures

    Page 128of 156

    For example:Upon executing the below search criteria,

    We get the below report.

  • 8/13/2019 Projects Manual 1

    129/156

    System Operating Procedures

    Page 129of 156

    Please note:

    1. The unwanted fields can be removed by right-clicking the field and hiding it.

    2. Alternatively, additional fields can be added / removed by selecting the Change Layout tab.

  • 8/13/2019 Projects Manual 1

    130/156

    System Operating Procedures

    Page 130of 156

    If you click on the tab Column Name under Column Set, the list will appear in alphabeticalorder.

    3. Once you have selected the fields that you want whenever you select this report, click on theTick mark button to go back to the report.

    4. Layout ZPO_V1 has been created for usage. When you run this report, simply select the optionChoose Layout .

  • 8/13/2019 Projects Manual 1

    131/156

  • 8/13/2019 Projects Manual 1

    132/156

    System Operating Procedures

    Page 132of 156

    3. ME5J PR List for Projectsa. Enter the transaction code or select through SAP menu as highlighted below.

    b. Press enter to get the below screen.

    c. Enter the Database profile as 000000000001 and press enter to get the below screen.

  • 8/13/2019 Projects Manual 1

    133/156

    System Operating Procedures

    Page 133of 156

    d. Enter the project number as shown above or click on to search for the project, select Scopeof List as ALV and click on execute to get the below report.

  • 8/13/2019 Projects Manual 1

    134/156

    System Operating Procedures

    Page 134of 156

    e. As explained earlier, the fields can be added / removed by selecting the icon or choose froman existing layout.

  • 8/13/2019 Projects Manual 1

    135/156

    System Operating Procedures

    Page 135of 156

    4. ME2K Purchase Orders by Account Assignmenta. Enter the transaction code or select through SAP menu as highlighted below.

    b. In the below screen, enter a cost center, e.g.: 2101031000 HR Corporate, select scope of listas ALV and execute.

  • 8/13/2019 Projects Manual 1

    136/156

    System Operating Procedures

    Page 136of 156

    Youll get a report in the below format with the below details.

  • 8/13/2019 Projects Manual 1

    137/156

    System Operating Procedures

    Page 137of 156

    The search period can be specified under Document Date.

    c. Layout ZPO_V2 has been created for usage. When you run this report, simply select the optionChoose Layout .

  • 8/13/2019 Projects Manual 1

    138/156

    System Operating Procedures

    Page 138of 156

    5. ME2J PO List for Projectsa. Enter the transaction code or select through SAP menu as highlighted below.

    b. Enter / Select the project number, select the scope of list as ALV and execute.

  • 8/13/2019 Projects Manual 1

    139/156

    System Operating Procedures

    Page 139of 156

    c. The below details can be viewed. Additional fields / columns can be selected from the changelayout option .

  • 8/13/2019 Projects Manual 1

    140/156

    System Operating Procedures

    Page 140of 156

    Project Information System

    1. Overview:The Project Information System is a flexible, comprehensive information system you can use to monitor

    and control your project data. You can evaluate individual projects, partial projects or multiple projects.

    The system includes overview reports and reports offering various degrees of detail. It is designed to

    meet the needs of both Project management and ordinary Project Personnel.

    In the SAP Easy Access menu, choose Logistics Project System Information System as shown

    below.

  • 8/13/2019 Projects Manual 1

    141/156

    System Operating Procedures

    Page 141of 156

    The system offers a number of report options as follows:

    1. Structures: Here you can access the structure overview, individual overview, where-usedlists and change documents.

    2. Financials: Includes reports on cost, revenues and payments. You can also access thedocument display, line item displays and summarization reports.

    3. Progress: Includes reports on progress analysis, milestone trend analysis andconfirmation.

    4. Resources: Includes reports on capacities and workforce planning.5. Material: Includes reports on stock, purchasing and production.

    2. Project Planning & SchedulingPre-requisites:

    1. Project structure should be defined2. Rates for Cost center / Activity types are maintained for manpower, equipments, FRP,

    Scaffolding

    2.1. Project Structure: CJ20Na. Enter the transaction code in the command field and press Enter or select from the SAP Easy

    Access Menu as highlighted below.

  • 8/13/2019 Projects Manual 1

    142/156

    System Operating Procedures

    Page 142of 156

    b. Click on the open icon and enter a project number to open the project as shown below.

    Enter the T-code

    here

  • 8/13/2019 Projects Manual 1

    143/156

    System Operating Procedures

    Page 143of 156

    c. The below screen appears with details of the project. Upon clicking the icon , the whole list will beexpanded.

  • 8/13/2019 Projects Manual 1

    144/156

    System Operating Procedures

    Page 144of 156

    (Expanded form):

    The below screen explains the meaning of each icon.

  • 8/13/2019 Projects Manual 1

    145/156

    System Operating Procedures

    Page 145of 156

    d. Upon selecting the Network Header Icon , click on overview button to view the below detailson the right hand side of the screen.

    i. Click on the Primary costs tab , to view the below details:

  • 8/13/2019 Projects Manual 1

    146/156

    System Operating Procedures

    Page 146of 156

  • 8/13/2019 Projects Manual 1

    147/156

    System Operating Procedures

    Page 147of 156

    3. Standard Reports3.1. CJI3 Actual Costs / Revenues

    a. Enter the transaction code in the command field and press Enter or select from the SAP EasyAccess Menu (SAP Menu Logistics Project System Information System

    Financials Line Items CJI3) as highlighted below:

  • 8/13/2019 Projects Manual 1

    148/156

    System Operating Procedures

    Page 148of 156

    b. Enter the Project definition, choose a layout (if saved, else system will run the default layout) and click onthe execute button .

    c. The report can be viewed with the below details.

  • 8/13/2019 Projects Manual 1

    149/156

    System Operating Procedures

    Page 149of 156

  • 8/13/2019 Projects Manual 1

    150/156

    System Operating Procedures

    Page 150of 156

    3.2.S_ALR_87013531 Costs / Revenues / Expenditures / Receipts

    a. Enter the transaction code in the command field and press Enter or select from the SAP Easy AccessMenu (SAP Menu Logistics Project System Information System Financials

    S_ALR_87013531) as highlighted below:

  • 8/13/2019 Projects Manual 1

    151/156

    System Operating Procedures

    Page 151of 156

    b. Enter the project number as shown below and execute.

    c. The report with the below details can be viewed.

  • 8/13/2019 Projects Manual 1

    152/156

    System Operating Procedures

    Page 152of 156

    3.3.CN50N Capacity Requirements

    a. Enter the transaction code in the command field and press Enter or select from the SAP EasyAccess Menu (SAP Menu Logistics Project System Information System

    Resources Capacity Requirements) as highlighted below:

    b. Choose / Enter the profile as shown below and press enter:

  • 8/13/2019 Projects Manual 1

    153/156

    System Operating Procedures

    Page 153of 156

    c. Enter the Project number and execute:

    d. The report can be viewed with the below details. Additional details / columns can be selected by choosing/ changing the layout .

  • 8/13/2019 Projects Manual 1

    154/156

    System Operating Procedures

    Page 154of 156

    3.4.IH08 - View Equipments allocated to Project

    a. Enter the transaction code in the command field and press Enter or select from the SAP Easy AccessMenu as highlighted below:

  • 8/13/2019 Projects Manual 1

    155/156

    System Operating Procedures

    Page 155of 156

    3.5.Select the functional location by clicking on to select your project and execute.

  • 8/13/2019 Projects Manual 1

    156/156

    System Operating Procedures

    3.6.The report can be viewed with the below details. Additional fields / columns can be selected by clicking

    on the icon .