System Operating Procedures
Page 1of 156
Table of Contents
PROJECT STRUCTURE
1. Project Structure creation.......51.1. Common Icons & their meanings61.2. Create a Project Structure8
2. Project Budget................302.1. Create Original Budget..302.2. Release Original Budget33
3. Man-power hours Confirmation..364. Sales Order Creation.....405. Rebate Agreements....50
PURCHASEREQUISTION
6. Purchase Request for Projects..........547. Stock Transport Request for Projects..............568. Service Purchase Request for Projects....58
PURCHASEREQUISITIONAPPROVAL
9. Collective Release of PR....609.1.
To view the PR list Pending for approval.60
9.2. To view more details....639.3. To view attachment......659.4. To approve the PR...66
10.Individual Release......67
-
8/13/2019 Projects Manual 1
2/156
System Operating Procedures
Page 2of 156
11.To revoke an approval...70PURCHASEORDER
12.Service POs for Subcontractors / Services.....7113.Service Entry Sheet for Subcontractors / Services.7414.Service POs for Intercompany Services.............8015.Goods Receipt for Intercompany Services......82
PURCHASEORDERAPPROVAL
16.Collective Release of PO8516.1. To view PO list pending for approval...8516.2. To view more details8716.3. To view attachments8916.4. To view RFQ90
17.Individual Release..9318.To revoke an approved PO...94
NOTIFICATIONS
19.Equipment Notification.....9620.Project Service Notification..........9921.IT Service Notification.....10222.Stores Service Request.105
PROJECTEQUIPMENTUTILIZATION
23.Equipment Utilization Report....108TIME&ATTENDANCE
-
8/13/2019 Projects Manual 1
3/156
System Operating Procedures
Page 3of 156
24.Shift Assignment......11325.Time & Attendance Reports...115
25.1. Web Reports.11525.2. SAP Time Reports...116
INFORMATION SYSTEM
Overview of important icons.119
1. MC$G Material Analysis based on Purchase Value.......1202. ME2N Purchase Orders by PO Number.....1233. ME5J PR List for Projects......1294. ME2K Purchase Orders by Account Assignment...1325. ME2J PO List for Projects......135
PROJECTINFORMATIONSYSTEM
1. Overview...........1362. Project Planning and Scheduling.......138
2.1. Project Structure: CJ20N......1383. Standard Reports
3.1. CJI3 - Actual Costs / Revenues.1443.2. S_ALR_87013531 - Costs / Revenues / Expenditures / Receipts.....1473.3.
CN50N - Capacity Requirements.149
3.4. IH08 - View Equipments allocated to Project...151
-
8/13/2019 Projects Manual 1
4/156
System Operating Procedures
Page 4of 156
-
8/13/2019 Projects Manual 1
5/156
System Operating Procedures
Page 5of 156
Project Structure
A project is structured:
According to how it is organized
According to the processes involved
1. Project Structure CreationEnter the transaction code CJ20N in the command field and press ENTER or go through the SAP
menu as highlighted below:
Project Builder:
-
8/13/2019 Projects Manual 1
6/156
System Operating Procedures
Page 6of 156
Project Builder is the method of accessing the Project System, which integrates all the application
specific functions necessary for processing Projects.
The Project Definition is the Binding Framework for all Organizational Elements within a Project.
1. Common Icons & their meaningIcon Meaning Description
Project DefinitionA Project definition for a standard project contains limited
information that applies to all projects of a given type.
WBS Element
WBS (Work Break down Structure) elements are the
individual structure elements in the WBS. The term describes a
concrete task or partial task, which can be subdivided further.
Network
A network contains instructions on how to carry out activities
in a specific way, in a specific order, and in a specific time
period. The basic elements of a network include activities and
-
8/13/2019 Projects Manual 1
7/156
System Operating Procedures
Page 7of 156
Relationships.
In a project, networks serve as basis of planning, controlling,
and monitoring of schedules, costs and resources. Data can be
reconciled with the WBS.
Activity
An activity in a network contains following data:
the work center at which the activity is to be carried out the duration of the activity the start and finish dates for the activity the resources required to carry out the activity texts and documents describing the activity
Activity Element
Activities can be broken down to Activity Elements. Three
types of Activity Elements:
General Costs Elements External Processing Elements Internal Processing Elements
Material
Component
The allocation of Material component to Network Activities
determines the assemblies and raw materials that must be
reserved or ordered for a Project and trigger Procurement via
MRP or Purchasing.
MilestoneA point in time defining a level of accomplishment or point of
required action
PS TextPS texts are freely defined texts that are maintained in the PS
text catalog
Document Information carrier containing information intended either for
-
8/13/2019 Projects Manual 1
8/156
System Operating Procedures
Page 8of 156
a Project worker or for exchange between systems. Documents
can show any kind of storable information, such as Technical
drawings, graphics, programs, or text, which, taken together,
describes an object.
2. Create a Project Structurea. Click on the icon CreateProject
b. Enter the data in the below mentioned fields: Project Coding Mask Project Definition Description
c. In the Control Tab, select the Project Profile from the given list.
-
8/13/2019 Projects Manual 1
9/156
System Operating Procedures
Page 9of 156
d. Press Enter to go to Basic Tab and enter the data in the below mentioned fields: Person Responsible (Project Manager code) Applicant Number (Operation Manager code) Plant Start and Finish Dates Profit Center
-
8/13/2019 Projects Manual 1
10/156
-
8/13/2019 Projects Manual 1
11/156
System Operating Procedures
Page 11of 156
1.2.2. Create NetworkA network represents the flow of a Project or of a task within a Project.
a. Highlight the Project Definition and Drag the Network from Templates to Project Definition orRight click on Project definition and select Create Network.
-
8/13/2019 Projects Manual 1
12/156
System Operating Procedures
Page 12of 156
b. Maintain the Project Number in the Description for easy Identification.
-
8/13/2019 Projects Manual 1
13/156
System Operating Procedures
Page 13of 156
c. Drag the Network inside the Standard WBS and save the Project to get the unique Networknumber.
-
8/13/2019 Projects Manual 1
14/156
System Operating Procedures
Page 14of 156
1.2.3. Creating Sub WBS Elementsa. Drag the WBS Element inside the Standard WBS to create a sub WBS element and give the
relevant description for the WBS (e.g.: Milestones).
b. Create Multiple WBS as per the requirement. Sub levels of WBS can be created by dragging intothe Standard Work Breakdown Structure.
-
8/13/2019 Projects Manual 1
15/156
System Operating Procedures
Page 15of 156
1.2.4. Creating ActivitiesThe Project System includes 4 Categories of Activities:
Internal Processing Activity External Processing Activity Costs Activity Service Activities
1.2.4.1. Creation of Internal ActivityInternal Activities describe the Activities performed inside our Company.
a. Highlight the Network Header and drag the Internal Processing Activity into the NetworkHeader.
-
8/13/2019 Projects Manual 1
16/156
System Operating Procedures
Page 16of 156
b. Give a suitable description for the Internal Processing activity
c. Drag the Internal Activity Indirect Manpower into the respective WBS Project Management
-
8/13/2019 Projects Manual 1
17/156
System Operating Procedures
Page 17of 156
d. In the External tab of the Internal Activity set the status of Res/Purchase Requisition to Neveras shown in the below screenshot.
The three statuses to create Purchase requisition of an Internal Activity in Structure
Never : Purchase Requisition would not be created in Structure From Release : Purchase Requisition is created once the Structure is released. Immediately : Purchase Requisition is created immediately on saving the Structure.
-
8/13/2019 Projects Manual 1
18/156
System Operating Procedures
Page 18of 156
1.2.4.2. Creating External ActivityExternal Activity is used for the Activities outside the Company
a. Drag the External Processing Activity into the Highlighted Network Header.
b. Give a suitable description for the activity and drag it into the relevant WBS element. In theExternal tab of the External Activity set the status of Res/Purchase Requisition to Never as
shown in the below screenshot.
-
8/13/2019 Projects Manual 1
19/156
-
8/13/2019 Projects Manual 1
20/156
System Operating Procedures
Page 20of 156
Planned amount for the Cost Activity Corresponding Cost center.
1.2.4.4. Creating Service ActivityService Activities are created for Procuring External Services. Unlike externally-processed activities,
service activities contain a service specification containing planned activities and value limits for
unplanned activities
a. Drag Service Activity into the Network Header.
-
8/13/2019 Projects Manual 1
21/156
System Operating Procedures
Page 21of 156
b. Give a suitable description of the Service Activity & set Res./Purc. Req. to Never and pressEnter.
-
8/13/2019 Projects Manual 1
22/156
System Operating Procedures
Page 22of 156
c. A service specification screen is displayed for the Service Activities. Enter the following detailsand press Enter.
Short Text: Same as description Quantity: 1 Unit of measurement: AU
d. Drag the Service Activity into the respective WBS.
-
8/13/2019 Projects Manual 1
23/156
-
8/13/2019 Projects Manual 1
24/156
System Operating Procedures
Page 24of 156
Work Center: A work center is a physical unit within a company where an activity isperformed. For example, a work center may be an individual, a group of people, a single
machine, or a production line.
Activity Type: Appears by default on assigning Work center. Activity types are used tocalculate the Internal Labor cost based on the planned hours & Actual hours.
1.2.6. Creating Material ComponentThere are two types of Material Components assignment:
Assigning Non stock Material to Project. Assigning Stock Material to Project.
1.2.6.1. Assigning Non-Stock Material to Projecta. Drag the Material Component into the Permanent Materials Activity.
-
8/13/2019 Projects Manual 1
25/156
System Operating Procedures
Page 25of 156
b. Select the required material from the material master.
c. Enter the following fields and press Enter: Item Category: N for Non-stock item. Requirement Quantity Requirement Date Storage Location
-
8/13/2019 Projects Manual 1
26/156
System Operating Procedures
Page 26of 156
d. A pop-up appears as shown below. Click on to continue.
e. Enter the Requisitioner name & Tracking number. Press Enter to proceed.
-
8/13/2019 Projects Manual 1
27/156
System Operating Procedures
Page 27of 156
f. Check if all the below highlighted fields are correct.
-
8/13/2019 Projects Manual 1
28/156
System Operating Procedures
Page 28of 156
g. In the Proc Param (Procurement Parameters) Tab, the Purchase Requisition creation forMaterial Component can be controlled.
h. Purchase requisition number is created on saving the project structure.
-
8/13/2019 Projects Manual 1
29/156
System Operating Procedures
Page 29of 156
1.2.6.2. Assigning Stock Material to Projecta. Drag Material Component into the Permanent Materials Activity.
b. Select the required material from the material master.
c. Enter the following fields and press Enter: Item Category: L for Stock item. Requirement Quantity
-
8/13/2019 Projects Manual 1
30/156
System Operating Procedures
Page 30of 156
Requirement Date Storage Location
d. A pop-up appears as shown below. Click on to continue
e. A Reservation number is generated for the Stock Material. Click on to save the projectstructure.
-
8/13/2019 Projects Manual 1
31/156
System Operating Procedures
Page 31of 156
2. Project BudgetBudget is the Approved Cost Structure for a Project. A Project is typically budgeted in its Approval
Phase. Only the WBS Elements can have a Budget in SAP PS. The reference Document to Change the
Budget is the Job Opening Advice (JOA) of the Project.
The Transaction Codes for Budget Management are:
CJ30 Change Project Original Budget CJ31 Display Project Original Budget CJ32 Change Project Release CJ33 Display Project Release
1. Creating Original BudgetEnter the transaction code CJ30in the command field and press ENTER or go through the SAP Menu
as highlighted below:
-
8/13/2019 Projects Manual 1
32/156
System Operating Procedures
Page 32of 156
a. Enter the Project Number and press Enter.
-
8/13/2019 Projects Manual 1
33/156
System Operating Procedures
Page 33of 156
b. Right click anywhere on the screen and select Display Options. Alternatively, you can pressCtrl+Shift+F7.
c. Select Using Descriptions and click on Continue to view the WBS element description.
d. Enter the amounts from the JOA against the respective WBS elements.
-
8/13/2019 Projects Manual 1
34/156
System Operating Procedures
Page 34of 156
e. Click on to save the Original Budget2. Release Budget
Enter the transaction code CJ32in the command field and press ENTER or go through the SAP Menu
as highlighted below:
-
8/13/2019 Projects Manual 1
35/156
System Operating Procedures
Page 35of 156
CJ32 serves as a control to allow a certain amount of value to be consumed at a time. Each WBS
Element is also checked to ensure that the Released budget does not exceed the Current Budget.
a. Enter the Project Number and press Enter.
-
8/13/2019 Projects Manual 1
36/156
System Operating Procedures
Page 36of 156
b.
Right click anywhere on the screen and select Display Options. Alternatively, you can press
Ctrl+Shift+F7 and select Using Descriptions to view the description of the WBS element.
c. Enter the amounts to be released against the WBS in the Release Column and save the ReleaseBudget.
-
8/13/2019 Projects Manual 1
37/156
System Operating Procedures
Page 37of 156
Columns in Original/Release Budget:
Column Name Description
Current Budget Consists of the Original Budget.
DistributedThe total of the Current budget for each lower level WBS
Element.
DistributableThe Distributable value is the difference between the
Current Budget and the distributed Value.
Assigned Consists of the Commitment and Actual Postings.
Releases Value of the Released Budget.
3. Man-power Hours ConfirmationThe Pre-requisites for man power confirmation are:
Activity/Activity Elements are defined in Project structure Activities in Project structure are released. Rate for activity types/Cost center has been maintained in SAP (Applicable for Manpower
Hrs only)
1. Individual ConfirmationEnter the transaction code CN25in the command field and press ENTER or go through the SAP Menu
as highlighted below:
-
8/13/2019 Projects Manual 1
38/156
System Operating Procedures
Page 38of 156
a. Select the Network number to confirm the Man-hours.
-
8/13/2019 Projects Manual 1
39/156
System Operating Procedures
Page 39of 156
b. The Confirmation Number is taken from the Project Builder of the corresponding Project Select the relevant Activity Element(Project Manager) Select the Additional Data tab to get
the confirmation number.
c. Enter the Confirmation number and press Enter.
-
8/13/2019 Projects Manual 1
40/156
System Operating Procedures
Page 40of 156
d. Enter the below highlighted fields in the confirmation screen and click on Save.
e. The Confirmed Man-hours is listed in the Report CN48N
-
8/13/2019 Projects Manual 1
41/156
System Operating Procedures
Page 41of 156
Sales Order
4. Sales Order CreationEnter the transaction code VA01in the command field and press ENTER or go through the SAP
menu as highlighted below.
-
8/13/2019 Projects Manual 1
42/156
-
8/13/2019 Projects Manual 1
43/156
-
8/13/2019 Projects Manual 1
44/156
c. Seleneed
t the Invoic
to be creat
Sys
ing WBS
d.
em Ope
Pa
lement N
rating P
e 44of 156
mber from
rocedur
the Project
s
Structure f r which Sa
es Order
-
8/13/2019 Projects Manual 1
45/156
d. Sele
e. Sele
t the first li
t the condit
Sys
e item crea
on type Pro
em Ope
Pa
ed and clic
ect Price v
rating P
e 45of 156
on Item C
lue ZPRV
rocedur
onditions i
and specif
s
the Sales
the amoun
rder Scree
t. Press E
.
TER.
-
8/13/2019 Projects Manual 1
46/156
-
8/13/2019 Projects Manual 1
47/156
-
8/13/2019 Projects Manual 1
48/156
h. Next, select Bill
Sys
ing Plan T
em Ope
Pa
b and click
rating P
e 48of 156
on to c
rocedur
nfirm the c
s
hanges.
-
8/13/2019 Projects Manual 1
49/156
i. In thThis
e Billing Pl
step should
Sys
n Tab, if
be skipped i
em Ope
Pa
own Paym
f Down Pa
rating P
e 49of 156
nt is applic
ment is n
rocedur
able, specif
t applicable
s
the fields
.
as in the sc
reenshot.
-
8/13/2019 Projects Manual 1
50/156
j. Sele
lease Not
unning Bil
k. Press
l. Clic
t Running
: Billing T
.
Enter. Cl
on to
Sys
ill for the
pe field s
ck on .
go to the i
em Ope
Pa
Monthly Pr
ould be F
itial screen
rating P
e 50of 156
ogress Invoi
AZ for D
and save th
rocedur
ce.
wn Payme
e sales orde
s
nt Request
r to get the
and ZFP
Sales Order
for the
number.
-
8/13/2019 Projects Manual 1
51/156
Sys em Ope
Pa
rating P
e 51of 156
rocedur s
-
8/13/2019 Projects Manual 1
52/156
5. Creebate Agre
lease Note:
nter the tra
a. Sele
tion of R
ements are
Rebate Ag
saction co
t the Agree
Sys
ebate Ag
reated for S
eements sh
e VBO1(le
ent Type
em Ope
Pa
Rebat
eements
ales Order
uld be crea
tter O) in th
Z003 and
rating P
e 52of 156
Agree
ith Retenti
ted on the s
e command
press Ente
rocedur
ent
on.
me day alo
field and pr
r.
s
g with the
ess ENTE
ales orders
.
-
8/13/2019 Projects Manual 1
53/156
-
8/13/2019 Projects Manual 1
54/156
P
d. Clic
e. Clic
roject Valid
on the Co
on Save.
Sys
ity Period
ditions tab
em Ope
Pa
. Enter the
rating P
e 54of 156
Sales Order
rocedur
No and th
s
Amount o
f Retention.
-
8/13/2019 Projects Manual 1
55/156
f. On C
g. Sele
licking Sav
t Project S
Sys
, an Infor
rvice Nu
em Ope
Pa
ation win
ber in the
rating P
e 55of 156
ow is displ
aterial Settl
rocedur
yed. Click
ement Fiel
s
n .
.
-
8/13/2019 Projects Manual 1
56/156
h. Clic
verview:
Purchase
r service so
6. Pur
on Save.
equisition
that it is av
hase Re
Sys
Retention N
is a request
ailable at a
uest for P
em Ope
Pa
umber is ge
urchas
to Purchasi
ertain point
rojects
rating P
e 56of 156
erated at t
e Requ
ng Depart
in time.
rocedur
e bottom o
sition
ent to proc
s
the screen.
re a certain quantity o
material
-
8/13/2019 Projects Manual 1
57/156
System Operating Procedures
Page 57of 156
1. To create a Purchase Request Permanent materials, General Purchase etc.Enter the transaction code ME51Nin the command field and press ENTER or go through the SAP menu
as highlighted below:
a. Select the type of Purchase Request from the available list:
If the permanent / consumable material is a non-stock item, then a ZPMR Permanent Purchase
Request (for Permanent Materials) or ZGPR General Purchase Request (for Consumables / Tools) can
be raised.
b. Enter the below highlighted fields.
-
8/13/2019 Projects Manual 1
58/156
System Operating Procedures
Page 58of 156
c. Click on the Check button to check for errors. At this stage, ensure that the ReleaseStrategy Tab is generated.
d. Save the Purchase Request to generate the purchase requisition number.
7. Stock Transport Request for ProjectsFor Projects Permanent, Consumables & Tools are to be obtained through ZSTR Stock Transport
Request only.
1. To create a Stock Transport Request
-
8/13/2019 Projects Manual 1
59/156
System Operating Procedures
Page 59of 156
Enter the transaction code ME51Nin the command field and press ENTER or go through the SAP menu
as highlighted below:
a. Select the Purchase Document type ZSTR.
b.
Enter the below highlighted fields
-
8/13/2019 Projects Manual 1
60/156
System Operating Procedures
Page 60of 156
c. Click on the Check button to check for errors. At this stage, ensure that the ReleaseStrategy Tab is generated.
d. Save the Purchase Request to generate the purchase requisition number.Note:
1. To procure via Inventory: Account Assignment is Blank & Item Category is U StockTransfer. E.g.: Permanent & Consumables.
2. To procure via Network: Account Assignment is N Network & Item Category is U StockTransfer. E.g.: Tools
3. If an item / material is not in stock, then stores personnel will check the option To be procuredin the Customer Data tab, after complete release / approval, for procurement. The procurement
team will then create a purchase order for the material.
4. Material Numbers must be selected from the material master for ZSTRs. Short text is notallowed by the system.
-
8/13/2019 Projects Manual 1
61/156
System Operating Procedures
Page 61of 156
8. Service Purchase Request for Projects1. To create a Service Purchase Request
Enter the transaction code ME51N in the command field and press ENTER or go through the SAP menu
as highlighted below:
a. Select the Purchase Document type ZSPR.
b. Enter the below highlighted fields.Purchasing Group:
106 Stores Service Request (Material Group Maintenance Services)
-
8/13/2019 Projects Manual 1
62/156
System Operating Procedures
Page 62of 156
140 Project Service Request (Material Group Contruction Services)
c. Click on the Check button to check for errors. At this stage, ensure that the ReleaseStrategy Tab is generated.
d. Save the Purchase Request to generate the purchase requisition number.
-
8/13/2019 Projects Manual 1
63/156
s
verview:
here are tw
9. Coll collective
imultaneou
ntered in th
.1. To vnter the tra
s highlighte
o methods
ective Rel
release o
ly. Selectio
e initial scre
ew PR list
nsaction co
d below.
Orc
Sys
Pur
or approvin
ease of P
purchase
n criteria, s
en. All purc
- Pending f
e ME55in
hoosefromy
em Ope
Pa
hase R
a Purchase
rchase R
equisitions
ch as the r
hase requisi
r approval
the comma
ourfavorites
rating P
e 63of 156
equest
Requests v
quest
allows sev
lease (App
tions meeti
d field and
listifTcode
rocedur
pprov
iz. Collecti
eral purcha
over) code,
g the select
press ENT
issaved
s
al
e release &
se requisiti
purchasing
ion criteria
R or go th
Individual r
ons to be
group and
re displaye
ough the S
elease.
approved
lant, are
.
P menu
-
8/13/2019 Projects Manual 1
64/156
a. Ente
b. Clic
your Relea
on Execute
Sys
se code and
button
em Ope
Pa
select the s
.
rating P
e 64of 156
ope of list a
Enteryo
rocedur
s ALV.
rreleaseco
s
e G1forC O
-
8/13/2019 Projects Manual 1
65/156
he pending
c. If the
PR list will
re are noP
Sys
be displaye
s to be ap
em Ope
Pa
d as below.
roved, you
rating P
e 65of 156
will get the
rocedur
below mess
s
age:
-
8/13/2019 Projects Manual 1
66/156
I
r
.2. To vn the collec
equester, fr
a. To vi
he PR deta
ew more d
ive release
m which pl
ew more de
ls window
Sys
tails of PR
screen, you
ant etc.
tails of the
ill be displ
em Ope
Pa
:
get to see
R, double c
ayed as bel
rating P
e 66of 156
ost of the d
lick a line it
w:
rocedur
tails of the
em of that
s
PR materi
R, as highli
al, quantity
ghted belo
name of
:
-
8/13/2019 Projects Manual 1
67/156
-
8/13/2019 Projects Manual 1
68/156
-
8/13/2019 Projects Manual 1
69/156
-
8/13/2019 Projects Manual 1
70/156
0.Indivia. Ente
highl
ual Rele
the trans
ighted belo
Sys
se of Pur
ction code
.
em Ope
Pa
hase Re
ME54N a
rating P
e 70of 156
uest
nd press
rocedur
NTER or
s
go through the SAP menu as
-
8/13/2019 Projects Manual 1
71/156
b. Clic
EN
c. Seleyour
ote:Abov
d. To aclick
on Other
ER.
ct the Rele
release cod
example s
prove Line
the arrow-
Sys
Purchase
ase Strate
) as highlig
ows that H
item 2 or t
ark butto
em Ope
Pa
equisition
y tab. Cli
ted below
D Admi
he next lin
shighlight
rating P
e 71of 156
icon t
k on the c
o proceed
has appro
item, user
ed below.
rocedur
enter the
heck mark
ith the appr
ed for Line
has to sele
s
specific P
with pencil
oval.
item 1.
t it from th
number a
icon
e drop do
nd press
(next to
n listor
-
8/13/2019 Projects Manual 1
72/156
e. After ap
Dro
List
roving, Cli
p down
Sys
k on the S
em Ope
Pa
VEbutton
rating P
e 72of 156
(highlighted
rocedur
below):
s
-
8/13/2019 Projects Manual 1
73/156
I
I
1. To revof a PR has
a. Ente
b. Clic
c. Go t
f, for e.g., P
n the invert
ME54
ke an appr
een approv
the transac
on an
the Relea
CM wants t
ed arrow
N
Sys
ved PR:
d, and the a
ion code M
d enter the
e Strategy
o revoke his
to revo
em Ope
Pa
pprover late
E54N(or /
R number (
Tab
approval fo
e his appro
rating P
e 73of 156
r wishes to
ME54N if
as shown be
r line item
val and the
rocedur
evoke it, th
ou are not i
low). Press
(Nylon Li
Save
s
en:
n homepage
ENTER to
ting Sling),
.
)
roceed.
then he has to click
-
8/13/2019 Projects Manual 1
74/156
System Operating Procedures
Page 74of 156
Purchase Order
Overview:
A purchase order is a formal request or instruction from a purchasing organization to a vendor or a plant
to supply or provide a certain quantity of goods or services at or by a certain point in time. There are 2
methods to create a PO:
11.1. Without reference to a PR (Direct PO)11.2. With reference to a PR
12.Service POs for Subcontractors / ServicesEnter the transaction code ME21Nin the command field and press ENTER or go through the SAP
menu as highlighted below:
a. Select the PO document type ZSPO Service PO
-
8/13/2019 Projects Manual 1
75/156
System Operating Procedures
Page 75of 156
b. To create the PO with reference to a PR, select the PR from the Selection variant inDocument Overview.
c. Select the PR and click on to adopt the PR. This will pick all the relevant fields from thePR directly into the PO.
d. Enter the relevant Vendor name.
-
8/13/2019 Projects Manual 1
76/156
System Operating Procedures
Page 76of 156
e. Check the Price & conditions maintained in the Condition Tab.f. Additional data regarding the PO can be maintained in the Texts tab.g. Click on the Check button to check for errors. At this stage, ensure that the Release
Strategy Tab is generated.
h. Save the Purchase Order to generate the purchase order number.
-
8/13/2019 Projects Manual 1
77/156
-
8/13/2019 Projects Manual 1
78/156
b. lick on Cr
Sys
ate Service
em Ope
Pa
Entry Sheet
rating P
e 78of 156
or press S
rocedur
ift+F1.
s
-
8/13/2019 Projects Manual 1
79/156
c.
d.
lick on Ser
lick on
Sys
vice Selecti
(Continue)
em Ope
Pa
n at the B
on entering
rating P
e 79of 156
ttom of the
the details.
rocedur
screen.
s
-
8/13/2019 Projects Manual 1
80/156
e. S
f.g.
elect the re
ervices ta
n clicking
nter the Qu
Sys
quired line
.
ervices, Us
ntity and c
em Ope
Pa
item and cl
r is taken b
eck the Va
rating P
e 80of 156
ick on the
ack to the
ls tab for t
rocedur
Services
reate Entry
e Amount
s
ab or Sele
Sheet Scre
s in the Inv
ct All and
en.
ice.
click on
-
8/13/2019 Projects Manual 1
81/156
h.i.
j.k.
nter the D
nter the Inv
fter enterin
lick on the
Sys
cument dat
oice No. alo
all the nec
Save Butto
em Ope
Pa
and the Po
ng with the
ssary data,
n to get the
rating P
e 81of 156
sting Date i
date in the
click on
Service Ent
rocedur
n the Acce
Short Text
or Ctrl+F
ry Sheet nu
s
pting Data
field.
1 for accept
ber.
tab.
ance.
-
8/13/2019 Projects Manual 1
82/156
Sys em Ope
Pa
rating P
e 82of 156
rocedur s
-
8/13/2019 Projects Manual 1
83/156
System Operating Procedures
Page 83of 156
14.Service POs for Intercompany ServicesEnter the transaction code ME21Nin the command field and press ENTER or go through the SAP menu
as highlighted below:
a. Select the PO Document Type ZISO Inter Service PO
(To create the PO with reference to the PR, follow steps 1.b to 1.h.)
b. Enter the Purchasing Organization, Purchasing Group & Company code and press Enter.
-
8/13/2019 Projects Manual 1
84/156
System Operating Procedures
Page 84of 156
c. Enter the relevant Vendor from the Vendor List.
d. Enter the below highlighted fields at the Item level and press Enter:
e. Enter the G/L Account number, the network number of the project & the relevant Activitynumber.
f. Check the Price & conditions maintained in the Condition Tab.g. Additional data regarding the PO can be maintained in the Texts tab.h. Click on the Check button to check for errors. At this stage, ensure that the Release
Strategy Tab is generated.
-
8/13/2019 Projects Manual 1
85/156
System Operating Procedures
Page 85of 156
i. Save the Purchase Order to generate the purchase order number.
15.Goods Receipt for Intercompany ServicesEnter the transaction code MIGO the command field and press ENTER or go through the SAP menu as
highlighted below:
-
8/13/2019 Projects Manual 1
86/156
System Operating Procedures
Page 86of 156
a. Select the action Goods Receipt and the document type Purchase Order as shown in thebelow highlighted fields. The movement type for goods receipt will be 101- Goods receipt for
purchase order into warehouse/stores by default.
b. Enter the PO number in the below highlighted field and press Enter. The data in the PO will getcaptured to the relevant fields in MIGO.
-
8/13/2019 Projects Manual 1
87/156
System Operating Procedures
Page 87of 156
c. Enter the Delivery Note in the highlighted field below:
d. Once all the relevant details are entered,
e. Check & Save to generate the document number.
-
8/13/2019 Projects Manual 1
88/156
t
verview:
here are tw
6.Collec6.1. Tonter the tra
he SAP me
d. Ente
e. Clic
o methods
ive Relea
iew PO list
saction co
u as highli
your Relea
on Execute
Sys
Pu
or approvin
se of Pur
- Pending
e (not requi
hted below.
se code and
button
em Ope
Pa
chase
a Purchase
hase Ord
or approva
red if it is s
select the s
rating P
e 88of 156
rder
order viz. I
er
l
ved in you
ope of list a
rocedur
pprov
ndividual re
favorites li
s ALV.
s
l
lease & Col
st) and pres
lective rele
Enter or g
se.
through
-
8/13/2019 Projects Manual 1
89/156
he pending
f. If the
PO list will
re are noP
Sys
be displaye
s to be ap
em Ope
Pa
d as below.
roved, you
rating P
e 89of 156
will get the
Enter
rocedur
below mess
yourrelease
s
age:
code
-
8/13/2019 Projects Manual 1
90/156
I
6.2. To vn the collec
uantity, fro
a. To vi
ew more d
tive release
which pla
ew more de
Sys
tails in PO
screen, you
nt etc.
tails regardi
em Ope
Pa
:
get to see
g the PO,
rating P
e 90of 156
ost of the
ouble click
rocedur
details of th
the line ite
s
e PO mat
as highlig
rial, materi
ted below:
al group,
-
8/13/2019 Projects Manual 1
91/156
b. The
c. Sele
O details
t the icon
Sys
indow will
located a
em Ope
Pa
e displaye
the top rig
rating P
e 91of 156
as below:
t hand corn
rocedur
er (Header l
s
evel) to choose various tabs.
-
8/13/2019 Projects Manual 1
92/156
d. The
6.3. To v
a. Clic
ricing cond
ew Attach
on the atta
Sys
itions can b
ents
hment link
em Ope
Pa
viewed un
as
rating P
e 92of 156
der the tab
ighlighted
rocedur
CONDITIO
elow and cl
s
NS
ick on Attachment Lis
.
-
8/13/2019 Projects Manual 1
93/156
I
s
b. You
16.4.f there is a
hown belo
a. Dou
ill now se
o view the
RFQ mai
.
le click on
Sys
the list of
FQ (Requ
tained for
his number.
em Ope
Pa
ttachments
est for Quo
he docume
It will take
rating P
e 93of 156
attached for
tation)
t, then the
you to the b
rocedur
that PO.
RFQ numb
elow scree
s
er will be
.
pdated in t
e PO as
-
8/13/2019 Projects Manual 1
94/156
-
8/13/2019 Projects Manual 1
95/156
-
8/13/2019 Projects Manual 1
96/156
I
r
7. Indivndividual r
rovides a
ejecting the
a. Entebelo
b. By dscree
the
can t
c. Selerelea
dual Rel
lease of Pu
hance for
document.
the transac
.
efault the l
n of PO. If
'Other
ke help of '
t the Rele
se code) as
Sys
ase of Pu
chase order
he approve
tion code M
st documen
his is not y
ocument'
Document
se Strateg
ighlighted
em Ope
Pa
chase Or
is used for
to view a
E29Nand
t that was c
ur docume
but
verview' w
y tab. Clic
elow to pro
rating P
e 96of 156
der
the Release
d change
ress Enter
hanged / di
t then you
on and typ
ndow to se
k on the c
ceed with t
rocedur
/ approval
he PO (if
or go thro
splayed is s
can call yo
e in the Pu
rch for you
heck mark
e approval.
s
f a single d
required so
gh the SAP
hown on th
r Purchase
chase Orde
r PO.
with pencil
ocument at
before ap
menu as hi
e Individua
Order by cli
Number.
icon (nex
a time. It
roving /
hlighted
Release
cking on
lso, you
to your
-
8/13/2019 Projects Manual 1
97/156
I
d. Afte
8. To ref a PO has
a. Ente
ME29
approving,
oke an a
een approv
the transac
N
Sys
Click on th
proved
d, and the a
ion code M
em Ope
Pa
SAVEbut
O:
pprover lat
E29N(or /
rating P
e 97of 156
on (highlig
r wishes to
ME29N if
rocedur
ted below):
revoke it, th
ou are not i
s
en:
n homepage)
-
8/13/2019 Projects Manual 1
98/156
I
b. Clic
c. Go t
f, for e.g.,
is approval
on , e
the Relea
D wants to
and then sa
Sys
ter the PO
e Strategy
revoke his
e .
em Ope
Pa
umber (as s
Tab
pproval the
rating P
e 98of 156
hown belo
n he has to
rocedur
) and press
lick on the
s
ENTER
inverted arr w t
revoke
-
8/13/2019 Projects Manual 1
99/156
System Operating Procedures
Page 99of 156
Notifications
Overview:
A notification can be used to intimate the concerned department regarding a requirement / request / task
to be performed. The concerned department will run the respective report to check the notification
requests. The SAP T-code for creating a notification is IW21.
19. Equipment NotificationEnter the transaction code IW21in the command field and press ENTER or go through the SAP menu
as highlighted below
-
8/13/2019 Projects Manual 1
100/156
System Operating Procedures
Page 100of 156
a. Enter the Notification type Z1 Equipment Request and press Enter.
b. Enter all the highlighted fields as shown below:
-
8/13/2019 Projects Manual 1
101/156
System Operating Procedures
Page 101of 156
c. Click on Save to get the Equipment notification number.
-
8/13/2019 Projects Manual 1
102/156
System Operating Procedures
Page 102of 156
20. Project Service NotificationProject Notification is used for all services from Scaffolding / FRP.
Enter the transaction code IW21in the command field and press ENTER or go through the SAP menu
as highlighted below
a. Enter the Notification type Z2 Project Service Request and press Enter.
-
8/13/2019 Projects Manual 1
103/156
System Operating Procedures
Page 103of 156
b. Enter all the highlighted fields as shown below:
-
8/13/2019 Projects Manual 1
104/156
System Operating Procedures
Page 104of 156
c. Click on Save to get the Project Service notification number.
-
8/13/2019 Projects Manual 1
105/156
System Operating Procedures
Page 105of 156
21. IT Service NotificationEnter the transaction code IW21 in the command field and press ENTER or go through the SAP menu as
highlighted below
a. Enter the Notification type Z3 IT Service Request and press Enter.
-
8/13/2019 Projects Manual 1
106/156
System Operating Procedures
Page 106of 156
b. Enter all the highlighted fields as shown below:
-
8/13/2019 Projects Manual 1
107/156
System Operating Procedures
Page 107of 156
c. Click on Save to get the IT Service notification number.
-
8/13/2019 Projects Manual 1
108/156
System Operating Procedures
Page 108of 156
22. Stores Service NotificationEnter the transaction code IW21in the command field and press ENTER or go through the SAP menu
as highlighted below
a. Enter the Notification type Z4 IT Service Request and press Enter.
-
8/13/2019 Projects Manual 1
109/156
System Operating Procedures
Page 109of 156
b. Enter all the highlighted fields as shown below and save to get the Store Service notificationnumber.
-
8/13/2019 Projects Manual 1
110/156
System Operating Procedures
Page 110of 156
c. Click on Save to get the Store Service notification number.
-
8/13/2019 Projects Manual 1
111/156
System Operating Procedures
Page 111of 156
Project Equipment Utilization
23. Equipment Utilization ReportThe Transaction code for executing the Project Equipment Utilization report or the work center revenue
report is ZPM_WCREV.
a. Enter the below highlighted Selection Parameters:Selection Parameter Sample Data Entry Remarks
Order Type ZSM1 & ZSM2
Order Type ZSM1 & ZSM2 are to be
selected.
ZSM1 - Service order for Projects
ZSM2 - Service order for Intra Company
Posting Date 01.08.2013 to 31.08.2013
Posting date should be put for the entire
month for which the work center revenue
report is to be taken. Note that the current
month's Revenue report will be available
only in the following month.
Functional Location KGA-NBTC-PDV-024As highlighted in the screenshot, select
your respective Project location.
-
8/13/2019 Projects Manual 1
112/156
System Operating Procedures
Page 112of 156
b. Execute the report.c. The report for the above selection parameters are as shown below:
d. Select the variant /WCREV_RENT to get the report as per the required template.
-
8/13/2019 Projects Manual 1
113/156
System Operating Procedures
Page 113of 156
-
8/13/2019 Projects Manual 1
114/156
System Operating Procedures
Page 114of 156
e. The executed report can be downloaded to a Spreadsheet by clicking on .
The Template for the Equipment Utilization report is as shown below:
-
8/13/2019 Projects Manual 1
115/156
System Operating Procedures
Page 115of 156
-
8/13/2019 Projects Manual 1
116/156
System Operating Procedures
Page 116of 156
Time & Attendance
24. Shift AssignmentThe Time administrators of various sites are responsible to maintain the shifts of the employees working
in their site. If an employee is transferred from Site A to Site B or from HO to Site B, the time
administrator of Site B is to check the existing shift assigned to the employee and assign accordingly.
25.3. Assign Shift to single / multiple employeesa. Execute the transaction ZHR_TM02
b. Enter the below highlighted details:Sample Selection Criteria:
Selection Fields Sample Data Remarks
Personnel Number 123 Enter file number(s) of employee(s)
Start Date 01.01.2013Date from when the Shift is to be
assigned.
End Date 31.12.9999Always maintain end date as:
31.12.9999
Work Schedule rule
(Shift)RM01
Shift to be assigned to the
employee(s). All the shifts under PS
grouping 99 are used by NBTC.
Each Department / Division is
assigned with a unique shift code.
-
8/13/2019 Projects Manual 1
117/156
System Operating Procedures
Page 117of 156
c. Click on execute button. Youll get the below confirmation that the record is updatedsuccessfully.
-
8/13/2019 Projects Manual 1
118/156
System Operating Procedures
Page 118of 156
25.4. To view / display the Shifta. Execute the transaction ZHR_TM01
b. Enter the File number(s) for which the shift is to be displayed and click on execute button.
26.Time & Attendance ReportsTime administrators can view the time reports in 2 ways:
1. Web report to view the Daily attendance2. SAP report to view the weekly / monthly attendance, absence, late coming & early going.
26.1. Web ReportThe web report can be viewed through the web address http://192.168.0.64/nbtc/home.aspx. There are
two types of web report available:
A. Date Wise Punch ReportB. Employee Wise Punch Report
Both types of report can be viewed (and saved) in PDF format & Excel format. The pre-requisites to
view the web report are:
A User ID & password is required for logging in.
-
8/13/2019 Projects Manual 1
119/156
System Operating Procedures
Page 119of 156
Master Records have to be maintained (Employee Master & Location Master) by theWeb Administrator.
The User ID should be linked to the respective location by the Web Administrator. Timely upload of Time Data from the Site location.
26.2. SAP Time ReportsThe T-code for viewing SAP Report is ZHR_TM05 Positive Time Reports.
In this report the Time Administrator can view the Attendance, Late Coming, Absence, Early Going &
Missing Punch record of the employees (Refer Annexure for Screenshots). The Attendance Report also
shows the OT generated for OT earning Employees.
The pre-requisites to view the report are:
The Time Card Id number of the employee should be maintained in Employee Master The employee should not be marked as a manual card holder. The shift of the employee should be assigned. The employee should have Clock-in and / or Clock-out records. Employee data should be successfully processed by the Time Evaluation Program.
-
8/13/2019 Projects Manual 1
120/156
System Operating Procedures
Page 120of 156
The organization unit of the employee should be properly assigned for the Time Administrator toview the report for his site / location.
a. Execute the T-code ZHR_TM05.
b. Enter the below highlighted details:Selection Fields Sample Data Remarks
Reporting Date 01.09.2013 to 15.09.2013The reporting period can be for a
single day or for an entire month.
Personnel
Number123 Enter file number(s) of employee(s)
Report Type AttendanceChoose from the given list of Report
types.
-
8/13/2019 Projects Manual 1
121/156
System Operating Procedures
Page 121of 156
c. Click on execute button to execute the report.
-
8/13/2019 Projects Manual 1
122/156
System Operating Procedures
Page 122of 156
Information System
There are several standard reports available in material management. Below is a brief description of
some of the reports that would be useful.
Overview of important icons:
S. No. Icon Description
1. Execute2. Search button3. or Change Layout - Add / remove fields in report4. Save Layout5. Choose Layout6. Print preview
7. or Save list in Excel8. Sort in Ascending order
-
8/13/2019 Projects Manual 1
123/156
System Operating Procedures
Page 123of 156
1. MC$G Material Analysis based on Purchase Valuea. Enter the transaction code or select through SAP menu as highlighted below.
b. Enter the Purchasing Organization, and the period of analysis in the below screen.
-
8/13/2019 Projects Manual 1
124/156
System Operating Procedures
Page 124of 156
c. It will display a report for all the materials as shown below:
d. If you select the option Switch drilldown and select Plant as shown below:
-
8/13/2019 Projects Manual 1
125/156
-
8/13/2019 Projects Manual 1
126/156
System Operating Procedures
Page 126of 156
2. ME2N - Purchase Orders by PO NumberTo display a list of Purchase Orders with outstanding goods receipts (goods still be delivered) or
invoice receipts (invoices to be paid).
a. Enter the transaction code or select through SAP menu as highlighted below.
b. Enter the selection criterias in the below screen.
-
8/13/2019 Projects Manual 1
127/156
System Operating Procedures
Page 127of 156
For E.g.:
S. NO. Field Description
1. Scope of List ALV
2. Plant To view open POs for a specific plant
3. Material To view open POs for a specific material
4. Document Date Specify the time period
-
8/13/2019 Projects Manual 1
128/156
System Operating Procedures
Page 128of 156
For example:Upon executing the below search criteria,
We get the below report.
-
8/13/2019 Projects Manual 1
129/156
System Operating Procedures
Page 129of 156
Please note:
1. The unwanted fields can be removed by right-clicking the field and hiding it.
2. Alternatively, additional fields can be added / removed by selecting the Change Layout tab.
-
8/13/2019 Projects Manual 1
130/156
System Operating Procedures
Page 130of 156
If you click on the tab Column Name under Column Set, the list will appear in alphabeticalorder.
3. Once you have selected the fields that you want whenever you select this report, click on theTick mark button to go back to the report.
4. Layout ZPO_V1 has been created for usage. When you run this report, simply select the optionChoose Layout .
-
8/13/2019 Projects Manual 1
131/156
-
8/13/2019 Projects Manual 1
132/156
System Operating Procedures
Page 132of 156
3. ME5J PR List for Projectsa. Enter the transaction code or select through SAP menu as highlighted below.
b. Press enter to get the below screen.
c. Enter the Database profile as 000000000001 and press enter to get the below screen.
-
8/13/2019 Projects Manual 1
133/156
System Operating Procedures
Page 133of 156
d. Enter the project number as shown above or click on to search for the project, select Scopeof List as ALV and click on execute to get the below report.
-
8/13/2019 Projects Manual 1
134/156
System Operating Procedures
Page 134of 156
e. As explained earlier, the fields can be added / removed by selecting the icon or choose froman existing layout.
-
8/13/2019 Projects Manual 1
135/156
System Operating Procedures
Page 135of 156
4. ME2K Purchase Orders by Account Assignmenta. Enter the transaction code or select through SAP menu as highlighted below.
b. In the below screen, enter a cost center, e.g.: 2101031000 HR Corporate, select scope of listas ALV and execute.
-
8/13/2019 Projects Manual 1
136/156
System Operating Procedures
Page 136of 156
Youll get a report in the below format with the below details.
-
8/13/2019 Projects Manual 1
137/156
System Operating Procedures
Page 137of 156
The search period can be specified under Document Date.
c. Layout ZPO_V2 has been created for usage. When you run this report, simply select the optionChoose Layout .
-
8/13/2019 Projects Manual 1
138/156
System Operating Procedures
Page 138of 156
5. ME2J PO List for Projectsa. Enter the transaction code or select through SAP menu as highlighted below.
b. Enter / Select the project number, select the scope of list as ALV and execute.
-
8/13/2019 Projects Manual 1
139/156
System Operating Procedures
Page 139of 156
c. The below details can be viewed. Additional fields / columns can be selected from the changelayout option .
-
8/13/2019 Projects Manual 1
140/156
System Operating Procedures
Page 140of 156
Project Information System
1. Overview:The Project Information System is a flexible, comprehensive information system you can use to monitor
and control your project data. You can evaluate individual projects, partial projects or multiple projects.
The system includes overview reports and reports offering various degrees of detail. It is designed to
meet the needs of both Project management and ordinary Project Personnel.
In the SAP Easy Access menu, choose Logistics Project System Information System as shown
below.
-
8/13/2019 Projects Manual 1
141/156
System Operating Procedures
Page 141of 156
The system offers a number of report options as follows:
1. Structures: Here you can access the structure overview, individual overview, where-usedlists and change documents.
2. Financials: Includes reports on cost, revenues and payments. You can also access thedocument display, line item displays and summarization reports.
3. Progress: Includes reports on progress analysis, milestone trend analysis andconfirmation.
4. Resources: Includes reports on capacities and workforce planning.5. Material: Includes reports on stock, purchasing and production.
2. Project Planning & SchedulingPre-requisites:
1. Project structure should be defined2. Rates for Cost center / Activity types are maintained for manpower, equipments, FRP,
Scaffolding
2.1. Project Structure: CJ20Na. Enter the transaction code in the command field and press Enter or select from the SAP Easy
Access Menu as highlighted below.
-
8/13/2019 Projects Manual 1
142/156
System Operating Procedures
Page 142of 156
b. Click on the open icon and enter a project number to open the project as shown below.
Enter the T-code
here
-
8/13/2019 Projects Manual 1
143/156
System Operating Procedures
Page 143of 156
c. The below screen appears with details of the project. Upon clicking the icon , the whole list will beexpanded.
-
8/13/2019 Projects Manual 1
144/156
System Operating Procedures
Page 144of 156
(Expanded form):
The below screen explains the meaning of each icon.
-
8/13/2019 Projects Manual 1
145/156
System Operating Procedures
Page 145of 156
d. Upon selecting the Network Header Icon , click on overview button to view the below detailson the right hand side of the screen.
i. Click on the Primary costs tab , to view the below details:
-
8/13/2019 Projects Manual 1
146/156
System Operating Procedures
Page 146of 156
-
8/13/2019 Projects Manual 1
147/156
System Operating Procedures
Page 147of 156
3. Standard Reports3.1. CJI3 Actual Costs / Revenues
a. Enter the transaction code in the command field and press Enter or select from the SAP EasyAccess Menu (SAP Menu Logistics Project System Information System
Financials Line Items CJI3) as highlighted below:
-
8/13/2019 Projects Manual 1
148/156
System Operating Procedures
Page 148of 156
b. Enter the Project definition, choose a layout (if saved, else system will run the default layout) and click onthe execute button .
c. The report can be viewed with the below details.
-
8/13/2019 Projects Manual 1
149/156
System Operating Procedures
Page 149of 156
-
8/13/2019 Projects Manual 1
150/156
System Operating Procedures
Page 150of 156
3.2.S_ALR_87013531 Costs / Revenues / Expenditures / Receipts
a. Enter the transaction code in the command field and press Enter or select from the SAP Easy AccessMenu (SAP Menu Logistics Project System Information System Financials
S_ALR_87013531) as highlighted below:
-
8/13/2019 Projects Manual 1
151/156
System Operating Procedures
Page 151of 156
b. Enter the project number as shown below and execute.
c. The report with the below details can be viewed.
-
8/13/2019 Projects Manual 1
152/156
System Operating Procedures
Page 152of 156
3.3.CN50N Capacity Requirements
a. Enter the transaction code in the command field and press Enter or select from the SAP EasyAccess Menu (SAP Menu Logistics Project System Information System
Resources Capacity Requirements) as highlighted below:
b. Choose / Enter the profile as shown below and press enter:
-
8/13/2019 Projects Manual 1
153/156
System Operating Procedures
Page 153of 156
c. Enter the Project number and execute:
d. The report can be viewed with the below details. Additional details / columns can be selected by choosing/ changing the layout .
-
8/13/2019 Projects Manual 1
154/156
System Operating Procedures
Page 154of 156
3.4.IH08 - View Equipments allocated to Project
a. Enter the transaction code in the command field and press Enter or select from the SAP Easy AccessMenu as highlighted below:
-
8/13/2019 Projects Manual 1
155/156
System Operating Procedures
Page 155of 156
3.5.Select the functional location by clicking on to select your project and execute.
-
8/13/2019 Projects Manual 1
156/156
System Operating Procedures
3.6.The report can be viewed with the below details. Additional fields / columns can be selected by clicking
on the icon .