Project History & Design Experience
Bruce J Uhernik, PE
-AutoCAD/Skills/Design Standards
-Shoenberg Farms
-Lincoln Station
-Eagle’s Nest Village Center
-Walgreens at Smoky Hill
-Walgreens at Broadway & Belleview
-Walnut Creek (MTC)
-Country Club Village
-Denver Zoo Entry Complex/Master Plan
-Denver Seminary
-Platte Valley Medical Center
-DMN&S Parking Structure
3
4-6
7-8
9-11
12
13
CONTENTS
14
15
16-17
18
19
20
AutoCAD LDD 2008Terrain Model Explorer/SurfacesCut/Fill and Earthwork CalculationsPoints/Import/Export/Groups/Tables3d Breaklines/DaylightingHydrology/Pond Volume PipeworksAutoTurnAlignments/ProfilesVertical CurvesLine & Curve TablesCross SectionsSheet Set ManagerPlotting/Batch Plots
ExcelWordPowerpointAdobe Acrobat WriterStormCADWaterCADNEO UD Sewer
AutoCAD and Other Computer Skills Applied Design Standards & Codes
City of AuroraCity of BrightonCity and County of DenverCity of EnglewoodCity of LakewoodCity of LittletonCity of Lone TreeCity of ThorntonCity of WestminsterTown of ParkerDouglas CountyCDOTUDFCD (Vol. 1/2/3)Denver WaterSouthgate Sewer and Water DistrictsAASHTOADA site development standardsAWWA (Meter Sizing Tables)IFC (Appendix B)MUTCDState Highway Access CodeFEMA (Firm Maps)USGS MapsColorado Soils Surveys
DUTIESLead project engineer/designer for 25-acre commercial redevelopment of 1911 dairy farm into modern commercial/retail center
PLANNING DOCUMENTSCreated ODP & ODP Amendment submittals/approvals with City of Westminster
Coordinated design changes, cadd files with Owner, building architect & landscape architect
Established/assisted Owner in lot layouts, alternatives & final parking counts per City of Westminster standards
Wrote Drainage and Utility Studies
GRADING/DRAINAGEMaintained historic drainage patterns & established earthwork balance for site
Overlot grading of entire site and fine grading of individual lots
Analyzed existing storm sewer in 72nd Ave. and established flood/inlet surcharge conditions (StormCAD)
SHOENBERG FARMS COMMERCIAL
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
Designated basins, calculated hydrologic characteristics per city and UDFCD criteria
Sized ponds using FAA method and historic flood conditions
Designed outlet control structures with water quality, minor & major storm orifice controls
Profiled storm lines (Pipeworks), minimized pipe sizes using HGL calculations
Analyzed pipe cost alternatives (HDPE vs. PVC) and inlet cost alternatives (Type R vs. Type 13)
ROADWAY DESIGNDesigned layout of Sheridan widening and new access improvement from 72nd Avenue to 75th Avenue
Met State Highway Access Code, AASHTO & traffic study criteria for acceleration/deceleration lanes, turn lane stacking/tapers, redirects and median widths/configurations
Created CDOT plans including horiztonal control, pavement milling and patchback limits, cross sections, final striping and signage (MUTCD)
UTILITIESCreated multi-phase water model (WaterCAD) with multiple demand scenarios and fire flow conditions (IFC)
Calculated peak sanitary sewer demands & designed/sized internal sewer system
Designed 900’ length storm outfall to Big Dry Creek including Sheridan roadway crossing, offsite easements & outfall design
Coordinated grease traps, roof drain outfalls, water meter locations and other plumbing items with building architects/plumbing engineers
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
CONSTRUCTION ASSISTANCEReviewed product submittal data sheets
Responded to all contractor requests for information (RFIs) in timely manner
Coordinated temporary parking and lane configurations for internal cell tower obstruction prior to relocation
Met specific criteria of Advance Auto Parts, including design and coordination of service yard
Received survey shots of overlot pond grading and analyzed for accuracy
Coordinated screen wall heights and base grades with adjacent residential property Owner
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
DUTIESLead Project Engineer/Designer for dense mixed-used commercial/multi-family residential development
SITE DESIGN & LAYOUTEngineered site plan with internal roadways featuring pedestrian friendly pathways combined with diagonal street and parallel parking
Provided layouts and fine grading for accesses off Park Meadows Drive
Designed emergency access vehicle turning movements per South Metro Fire requirements (AutoTurn) including hammerhead design
Designed dock/service yard access movements for individual buildings with vehicles up to WB-50
DRAINAGE/WATER QUALITYDesigned Underground Detention Vault
Met Douglas County, UDFCD & Cherry Creek Basin Authority water quality requirements with Sand Filter Basin and Porous Landscape Basins
Layout of site storm sewer with multiple drop manholes and deep mains
Pipeworks profiles and HGL calculations
LINCOLN STATION T.O.D.
UTILITY STUDYAnalyzed water system internal to site (WaterCAD)
Model included proposed and future buildout of entire Heritage Hills property (50 acres)
Building fire flows per expected building types and IFC code
Provided up to eight (8) alternatives of building fire conditions and fire hydrant coverages, including valve closures per Douglas County criteria
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
CONSTRUCTION DOCUMENTSCoordinated improvements along property lines with new RTD parking structure and light rail
Created Denver Water Plans and assisted in easement documentation
Created Southgate Sewer Construction Plans
Created civil site and grading sheets for SIP, including itemized cost estimate (SIPIA)
Approval of Park Meadows Drive improvements through City of Lone Tree and Douglas county
UTILITY STUDY (cont.)Analyzed proposed and future loads on 1-mile stretch of sewer main in Park Meadows Drive down to the interceptor
Created demand and pipe capacity spreadsheets for sewer runs for various phases
Identified undersized mains, and provided pipe upsizing alternatives to Owner
Revised study quickly and easily per Owner’s requests upon changes to potential future users
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
Lead Project Engineer/Designer for new 20-acre commercial center located in eastern Aurora
Engineered site with multiple lots (7), parking fields, internal drives & utilities in a phased manner per client’s needs
Developed overall planning documents, overall construction documents and individual lot planning & construction documents
Accommodated specific requests of developer & landscape architect during site design including pedestrian friendly intersection design, meandering sidewalks & intricate plaza layout
Produced overlot grading plans and earthwork cut/fill maps per geotechnical recommendations
Created overall site’s erosion control plans, with BMPs internal to site and along perimeter roads
Wrote Erosion & Sediment Control Reports for overall site and individual lots
Calculated utility demands for full site buildout, wrote overall Utilty Study per City criteria and Utility Conformance Letters for outparcels
EAGLE’S NEST VILLAGE CENTER
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
Developed drainage basins, calculated pipe sizes/HGLs with NEO UD Sewer & wrote overall Drainage Report and Drainage Conformance Letters for outparcels
Created Aurora Parkway improvements with new accesses, flowline, centerline & PCR profiles, cross sections, striping, signage & median improvements up to Smoky Hill Road intersection
Coordinated utility, traffic & drainage easements with project’s surveyor
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
CLEARED SITE AT EAGLE’S NEST VILLAGE CENTER SPRING 2007
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
FINAL CONCEPTUAL SITE (CENTER OPENED SUMMER 2008)
Lead Project Engineer/Designer for new store at Eagle’s Nest Village Center
Worked directly with Walgreens’ development manager to meet specific criteria for new store development
Incorporated Walgreens’ details for curb & gutter, accessible parking layout & crosswalks
Created ADA grading plan featuring proposed spot elevations along ADA routes at 10-15’ maximum intervals - could quickly manage plan by snapping points to proposed surface and recreating Point Tables with Northings/Eastings/Elevations
WALGREENS AT SMOKY HILL
Direct point of contact with Contractor during construction
Answered all questions in timely and efficient manner
Led detailed construction coordination of proposed utility revisions to existing stub-outs connections
Responsible for communication of revisions with the City, revising Construction Document mylars and coordinating new sheets with the contractor and subconsultants
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
Lead Project Engineer/Designer for the redevelopment of a 15-acre site with proposed demolition of four (4) existing buildings and development of new bank and new Walgreens
Responsible for all site layout, grading, utilities, drainage & team coordination
Worked closely with Walgreens’ development manager for non-traditional specific needs, including special layout requirements, accessible parking, pathways, ramps other WG specific details
Met strict Walgreens grading criteria requirements
Graded site for proper drainage and earthwork balance
Performed historic drainage analysis on site
Performed proposed drainage analysis with all hydrologic and hydraulic supporting calculations
Designed underground ground detention system using 60” HDPE buried pipes and pump system
Transformed proposed parking median into Porous Landscape Detention Basin for above ground water quality
WALGREENS/VECTRA BANK AT BROADWAY & BELLEVIEW
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
BELLEVIEW PLANS
Created initial CDOT plans for Belleview (SH XX) access, new turn lanes & road widening
Defined extents of removals, new asphalt and patchbacks to existing
Engineered cross sections, redirects, tapers, signage & striping per Colorado State Highway Access Code, site traffic study & CDOT standard
Lead project engineer in development of junior anchors & outparcels for new commercial center at US-36 & Church Ranch Blvd in the City of Westminster
Created Planning Documents (ODP) & Construction Documents for City of Westminster
Worked with developer’s tenants to determine individual lot’s parking requirements and schedule/location of shared parking spaces
Designed lot layouts, limits of new pavement & patchbacks, fine grading, steps & ramps around buildings
Coordinated utility connections, grease traps, sewer main re-routing, new water taps, meter sizings/locations, new storm sewer layout & connections to existing system
Analyzed drainage report for conformance with cross basin transfer of stormwater - revised/reran HGL calculations from approved report
Wrote Utility and Drainage Conformance Letters with supporting calculations
Designed individual building docks with concrete retaining walls & adequate truck turning movements per AutoTurn templates
WALNUT CREEK
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
Lead project engineer in development of small shops & outparcels for commercial center located at 120th & Federal in the City of Westminster
Created planning documents (ODP) & construction documents for bank tenant
Created planning documents & construction documents for two-story fitness center
Designed emergency egress ramps - switchbacks, handrails & landings per ADA requirements
Created internal roadway plans & with centerline profiles, vertical curves, PCR & curb cut designs
Designed tiered modular block retaining walls
Detailed fine grading for steps in front of small shop buildings
Profiled water mains, sanitary and storm sewer lines
Wrote Utility and Drainage Conformance Letters & provided supporting documentation for City approval
COUNTRY CLUB VILLAGE
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
DUTIESLead Design/Project Engineer for the Zoo’s Phase 1 development (Entry Complex) & Master Plan
LION & PREDATOR RIDGE EXHIBITSLead designer/engineer responsible for creation and approval of construction documents, including grading, erosion control, storm and sewer profiles
Created plans for Denver Water Department and easement exhibits and legal descriptions
Design of reuse water loop with booster pump station and variable frequency design pump system
Designed moat detention system with perforated pipe sand filter base for water quality treatment
Design of stormwater lift station with duel pumps, float elevations, alarms, etc.
Responsible for all drainage calculations and written report in conformance with City of Denver and UDFCD standards
Reviewed all product data submittals including water, sewer & storm products
Responsible for all RFI’s and general contractor questions during construction
Observed construction on bi-weekly basis including grading, pipe installations abd pavement installation
DENVER ZOO ENTRY COMPLEX, LION & PREDATOR RIDGE EXHIBITS
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
SEWER/WATER MISC/OTHERAPPLICATIONS BREAKDOWN
MASTER PLANNINGCreated multi-phase water, sewer & storm layouts with written summaries in Master Plan report format
Developed time based water usage schedule including large tank fills, daily exhibit clean ups & irrigation
Assembled average day, peak day & peak hour water demands for input into WaterCAD model for existing, proposed and full buildout conditions
Modeled building fire demand scenarios based upon construction types
Developed plan to remove Zoo from master water meters and implement individual building meters
Worked with Zoo in determination of recycled water users, future potential usage, and new system layout
GRADING/DRAINAGE ROADWAY DESIGN
Lead design engineer; three (3) campus building, four (4) multi-family units, parking, internal roadways, irrigation pond & detention pond
Engineered RI/RO access and accel/decel lanes off Santa Fe (SH 85) per CDOT standards
Provided balanced earthwork calculations and fine grading around structures, in parking lots & along sidewalk/plaza areas
Frequent field visits for perimeter drain, pavement installation and other utility observations throughout construction
DENVER SEMINARY
STORM DESIGN & PLATTE OUTFALLDesigned drainage pond containing trickle channels, water quality controls, maintenance access & minor/major storm release(s) into Platte River
Provided storm outfall design into Platte River with supporting headwall, wingwall & rip rap sizing & calculations
Created easement documents with closures for offsite storm sewer
Designed stand alone irrigation pond based upon strict demand criteria and head based controls
Wrote drainage and utility reports for campus
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
Lead design engineer for new hospital in the City of Brighton - Main Hospital Building, Central Utility Plant (CUP), helipad, internal drives/sidewalks & parking
Created construction documents - overlot grading, earthwork, site layout, erosion control, water, storm & sanitary profiles & details
Provided horizontal control to construction surveyor for buildings and outlying site
Coordinated with architects on main entrance/dropoff area featuring median curb to flush curb transitions
PLATTE VALLEY MEDICAL CENTER
Developed building foundation drain & canopy drain designs for groundwater control - required reading & understanding of architectural, structural & plumbing plans
Fine grading in parking lots and along sidewalks that met ADA criteria
Wrote drainage & utility reports including supporting calculations per City criteria
Engineered loading dock entrance, ran AutoTurn for vehicle clearances & designed 20’+ concrete retaining walls where required
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN
Lead design engineer for new tri-level underground parking structure, existing parking lot removal & greenspace improvements
Designed re-routing of utilities around structure including storm lines in close proximity (<3’) to foundations and pillars
Collaborated with contractor and arborist during sewer installation near historic evergreens - established pipe jacking limits for portions of installation to protect trees
Observed sewer construction, including 20’+ deep sewer installation with night shut off and reconnection
DENVER MUSEUM OF NATURE & SCIENCE PARKING STRUCTURE
Designed water quality porous landscape basins (total of 3) for new pavement where direct conveyance to pond was not feasible
Created multi-stage detention/water quality pond with forebay, trickle channels, outfall structure & emergency overflow channel
Wrote drainage and utility studies with supporting calculations
Worked with Fire Dept & Denver Water for proper hydrant placements, building coverages & emergency vehicle access routes
GRADING/DRAINAGE SEWER/WATER ROADWAY DESIGN MISC/OTHERAPPLICATIONS BREAKDOWN