Project: Project Scope: Highlights: • Total Demolition of one half existing parking structure while other half was still in use. • 4 story post tension concrete removal • Project required extensive engineering for safe demolition of post tension structure. • Demo makes way for future Sound transit tunnel • Total demolition of 80,000+ SF • Extensive engineering for safe demo • 3 week timetable over 2 major holiday breaks • Project completed on time on budget. • Zero injury’s • Completed without any incidents on site and surrounding businesses. •Recycled 6,000+ tons of material •Peak crew size of 10 •Installed Ascendent shoring system •100% completed with Ascendant assets. Bellevue E340 Garage- Bellevue, WA (253) 939-4375 ascendentdemo.com

Transcript of Project: Project Scope: Highlights - ascendentdemolition.com...Project: Project Scope: Highlights:...

Page 1: Project: Project Scope: Highlights - ascendentdemolition.com...Project: Project Scope: Highlights: • Total Demolition of one half existing parking structure while other half was

Project:

Project Scope:

Highlights:

• Total D em olition of one half existing parking structure

w hile other half w as still in use.

• 4 story post tension concrete rem oval

• Project required extensive engineering for safe dem olition

of post tension structure.

• D em o m akes w ay for future Sound transit tunnel

• Total dem olition of 80 ,000+ SF

• Extensive engineering for safe dem o

• 3 w eek tim etable over 2 m ajor holiday breaks

• Project com pleted on tim e on budget.

• Zero in jury’s • Com pleted w ithout any incidents on site and surrounding

businesses.

•Recycled 6 ,000+ tons of m aterial

•Peak crew size of 10

•Installed A scendent shoring system

•100% com pleted w ith A scendant assets.