Project Name: Date Prepared: SELMA HYUNDAI...
Transcript of Project Name: Date Prepared: SELMA HYUNDAI...
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 1 of 5) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
Climate Zone: Conditioned Floor Area :
Unconditioned Floor Area :
General Information Building Type: �� Nonresidential �� High-Rise Residential �� Hotel/Motel �� Schools �� Relocatable Public Schools �� Conditioned Spaces �� Unconditioned Spaces
Phase of Construction: �� New Construction �� Addition �� Alteration
Method of Compliance: �� Complete Building �� Area Category �� Tailored
LIGHTING COMPLIANCE DOCUMENTS (select yes for each document included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission.
YES NO FORM TITLE
NRCC-LIT-01-E Certificate of Compliance. All Pages required on plans for all submittals.
NRCC-LIT-02-E Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals.
NRCC-LIT-03-E Indoor Lighting Power Allowance
NRCC-LIT-04-E Tailored Method Worksheets
NRCC-LIT-05-E Line Voltage Track Lighting Worksheets
Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance
Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces
1. Installed Lighting
NRCC-LTI-01-E, page 4
Watts Installed Lighting
NRCC-LTI-01-E, page 4
Watts
+ +
2. PORTABLE ONLY FOR OFFICES
NRCC-LTI-01-E, page 3 +
3. Minus Lighting Control Credits
NRCC-LTI-02-E, page 2 -
Minus Lighting Control Credits NRCC-LTI-02-E, page 2
-
4. Adjusted Installed Lighting Power
(row 1 plus row 2 minus row 3) =
Adjusted Installed Lighting Power (row 1 minus row 3)
=
SELMA HYUNDAI 9-11-2015
135635 SF
1855 SF
XX
X
X
X
X
X
X
X
5997
0
0
5997
0
X
1354
1354
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 2 of 5) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
5. Complies ONLY if Installed ≤ Allowed Complies ONLY if Installed ≤ Allowed
6. Allowed Lighting Power
Conditioned NRCC-LTI-03-E, page 1
Allowed Lighting Power
Unconditioned NRCC-LTI-03-E, page 1
Declaration of Required Installation Certificates – Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.)
YES NO Form/Title
NRCI-LTI-01-E - Must be submitted for all buildings � Field Inspector
NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to be recognized for compliance.
� Field Inspector
NRCI-LTI-03-E - Must be submitted for a line-voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to energize only line-voltage track lighting, to be recognized for compliance.
� Field Inspector
NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference room, a multipurpose room, or a theater to be recognized for compliance.
� Field Inspector
NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. � Field Inspector
NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for compliance.
� Field Inspector
Declaration of Required Certificates of Acceptance – Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.)
YES NO Form/Title
NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. � Field Inspector
NRCA-LTI-03-A - Must be submitted for automatic daylight controls. � Field Inspector
NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. � Field Inspector
SELMA HYUNDAI 9-11-2015
5982 1784
X
X
X
X
X
X
X
X
X
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 3 of 5) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: � CONDITIONED SPACE � UNCONDITIONED SPACE
A. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST � The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. � When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. � When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines � Also include track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line-voltage track lighting is installed.
B. Installed Portable Luminaires in Offices – Exception to Section 140.6(a)
� This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of this compliance form.
� This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office
� Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance shall not be traded between offices having different lighting systems.
Office Portable Luminaire Schedule
Office Installed Portable Luminaire Watts Per Square Foot
Accountable Watts
Office Location Field
Inspector A B C D E F G H I J
Complete Luminaire Description (i.e., LED, under cabinet, furniture mounted
direct/indirect) Watts per Luminaire
Num
ber of
Luminaires
Installed portable luminaire
watts in this office
(B x C )
Square feet
of this office Watts
per square
foot (D
If F ≤ 0.3, enter zero;
if F > 0.3,
(F-0.3)
E x G Identify Office area in which
these portable luminaires are installed
Pass
Fail
� �
� � � �
� �
� �
Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office: Enter sum total of all pages into NRCC-
LTI-01-E; Page 1
SELMA HYUNDAI 9-11-2015
X
X
0
X
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 4 of 5) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: � CONDITIONED SPACE � UNCONDITIONED SPACE
C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Luminaire Schedule Installed Watts Location Field Inspector 1 A B C D E F G H
Nam
e o
r
Item
Tag
Complete Luminaire Description (i.e, 3 lamp fluorescent troffer,
F32T8, one dimmable electronic ballast)
Watts per
Luminaire
How wattage was determined
Num
ber
Luminaires
Total Installed
Watts in this area
(C x E )
Primary Function area in which these luminaires are installed Pass Fail
CEC Default
from N
A8
According to
§130.0(c)
� � � �
� � � �
� � � � � � � �
� � � �
� � � � � � � �
� � � �
� � � �
INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages into NRCC-LTI-01-E; Page 2
SELMA HYUNDAI 9-11-2015
A
B
C
D
F
2X4 recess troffer LED dimming ballast
4ft wraparound LED ballast
recess down LED dimming ballast
high bay LED dimming ballast
12 ft track light via 3A current limit
30
3
15
20
2
x
x
x
1080
29
18
192
360
5997
office
storage
toilet
showroom
showroom
5997
X
x
X
36
29
18
192
360
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 5 of 5) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
SELMA HYUNDAI 9-11-2015
JOHN CHONG, PE
JOHN CHONG, PE
JOHN CHONG ENGINEERING
JOHN CHONG ENGINEERING
2027 E. DECATURE AVE.
2027 E, DECATURE AVE. E 14419
FRESNO, CA 93720
FRESNO, CA 93720 (559) 325-9988
(559) 325-9988
9-11-2015
9-11-2015
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 4 of 5) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: � CONDITIONED SPACE � UNCONDITIONED SPACE
C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Luminaire Schedule Installed Watts Location Field Inspector 1 A B C D E F G H
Nam
e o
r
Item
Tag
Complete Luminaire Description (i.e, 3 lamp fluorescent troffer,
F32T8, one dimmable electronic ballast)
Watts per
Luminaire
How wattage was determined
Num
ber
Luminaires
Total Installed
Watts in this area
(C x E )
Primary Function area in which these luminaires are installed Pass Fail
CEC Default
from N
A8
According to
§130.0(c)
� � � �
� � � �
� � � � � � � �
� � � �
� � � � � � � �
� � � �
� � � �
INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages into NRCC-LTI-01-E; Page 2
SELMA HYUNDAI 9-11-2015
B
D
E
4 ft wraparound LED ballast
high bay dimmable LED ballast
8 ft strip LED ballast
2
4
6
x
x
x
29
192
88
58
768
528
1354
warehouse
1354
X
STATE OF CALIFORNIA
INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 1 of 3) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are applicable to the project.
Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.)
YES NO Control Requirements
Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance Efficiency Regulations in accordance with Section 110.9.
Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate shall be submitted in accordance with Section 130.4(b).
One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b).
A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an Installation Certificate shall be installed in accordance with Section 130.4(b).
All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's instructions in accordance with Section 130.1.
All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a).
General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4.
The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the multi-level lighting control requirements in accordance with Section 130.1(b).
All installed indoor lighting shall be equipped with controls that meet the applicable Shut-OFF control requirements in Section 130.1(c).
Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans.
Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in accordance with Section 130.1(e).
Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut-OFF controls, and demand responsive controls.
SELMA HYUNDAI 9-11-2015
X
X
X
X
X
X
X
X
X
X
X
X
STATE OF CALIFORNIA
INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: � CONDITIONED SPACES � UNCONDITIONED SPACES
MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST
Lighting Control Schedule Standards Complying With 1
(� all that apply, or enter ‘E’ if Exempted)
PAF Credit Calculation 2 � if A
cceptance
Test Required
Field Inspector
Watts of
Controlled Lighting
PAF
Control Credit (K x L)
A B C D E F G H I J K L M N O
Location in Building
Type/ Description of Lighting Control (i.e.: occupancy sensor,
automatic time switch, dimmer, automatic daylight,
etc…)
# of
Units
§130.1(a)
§130.0(b)
§130.1(c)
§130.1(d)
§130.1(e)
§140.6(a)2
§140.6(d)
Pass
Fail
� �
� � � �
� �
� �
� � � �
Control Credit PAGE TOTAL (Sum of Column M):
IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):
Enter Control Credit total into NRCC-LTI-01-E; Page 1.
1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut-Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted.
SELMA HYUNDAI 9-11-2015
X
all rooms
mech roomOccupancy sensor
Lighting control panel
17
1
x
x
n/a
n/a
n/a
x
xx
x
STATE OF CALIFORNIA
INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 3 of 3) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
SELMA HYUNDAI 9-11-2015
JOHN CHONG, PE
JOHN CHONG, PE
JOHN CHONG ENGINEERING
JOHN CHONG ENGINEERING
2027 E DECATUR AVE.
2027 E. DECATUR AVE E 14419
Fresno CA 93720
Fresno CA 93720 (559) 325-9988
(559) 325-9988
9-11-2015
9-11-2015
STAT
E O
F C
ALIF
OR
NIA
IND
OO
R L
IGH
TIN
G P
OW
ER A
LLO
WA
NC
E C
EC-N
RC
C-L
TI-0
3-E
(Rev
ised
06/
14)
CAL
IFO
RN
IA E
NER
GY
CO
MM
ISSI
ON
CERT
IFIC
ATE
OF
COM
PLIA
NCE
N
RCC-
LTI-0
3-E
Cert
ifica
te o
f Com
plia
nce
- Ind
oor
Ligh
ting
Pow
er A
llow
ance
(P
age
1 of
4)
Proj
ect N
ame:
D
ate
Prep
ared
:
CA B
uild
ing
Ener
gy E
ffic
ienc
y St
anda
rds
- 201
3 N
onre
side
ntia
l Com
plia
nce
Ju
ne 2
014
ALL
OW
ED L
IGH
TIN
G P
OW
ER
A s
epar
ate
page
mus
t be
fille
d ou
t for
Con
ditio
ned
and
Unc
ondi
tione
d Sp
aces
. Th
is p
age
is o
nly
for:
�
CON
DIT
ION
ED s
pace
s
�
U
NCO
ND
ITIO
NED
spa
ces
A.
SU
MM
ARY
TO
TALS
OF
LIG
HTI
NG
PO
WER
ALL
OW
AN
CES
�
If u
sing
Com
plet
e Bu
ildin
g M
etho
d fo
r com
plia
nce,
use
onl
y th
e to
tal i
n co
lum
n (a
) as
tota
l allo
wed
bui
ldin
g w
atts
.
�
If u
sing
Are
a Ca
tego
ry M
etho
d, T
ailo
red
Met
hod,
or a
com
bina
tion
of A
rea
Cate
gory
and
Tai
lore
d M
etho
d fo
r com
plia
nce,
use
onl
y th
e to
tal i
n co
lum
n (b
) as
the
tota
l al
low
ed b
uild
ing
wat
ts
(a)
(b
) 1.
Com
plet
e Bu
ildin
g M
etho
d A
llow
ed W
atts
. Doc
umen
ted
in s
ectio
n B
of N
RCC-
LTI-0
3-E
(bel
ow o
n th
is p
age)
2. A
rea
Cate
gory
Met
hod
Allo
wed
Wat
ts. D
ocum
ente
d in
sec
tion
C-1
of N
RCC-
LTI-0
3-E
(bel
ow o
n th
is p
age)
3. T
ailo
red
Met
hod
Allo
wed
Wat
ts. D
ocum
ente
d in
sec
tion
A o
f NRC
C-LT
I-04-
E
TOTA
L A
LLO
WED
BU
ILD
ING
WA
TTS.
Ent
er n
umbe
r in
to c
orre
ct c
ell o
n N
RCC-
LTI-0
1, P
age
2, R
ow 1
�
Chec
k he
re if
bui
ldin
g co
ntai
ns b
oth
cond
ition
ed a
nd u
ncon
ditio
ned
area
s.
B.
COM
PLET
E BU
ILD
ING
MET
HO
D L
IGH
TIN
G P
OW
ER A
LLO
WA
NCE
A
B
C
D
TYPE
OF
BUIL
DIN
G (F
rom
§14
0.6
Tabl
e 14
0.6-
B)
W
ATT
S PE
R (f
t2 )
COM
PLET
E BL
DG
. ARE
A
A
LLO
WED
W
ATT
S
X =
Tota
l Are
a:
Tota
l Wat
ts. E
nter
Tot
al W
atts
into
sec
tion
A, r
ow 1
(Abo
ve o
n th
is p
age)
C -1
A
REA
CA
TEG
ORY
MET
HO
D T
OTA
L LI
GH
TIN
G P
OW
ER A
LLO
WA
NCE
S (C
-2 p
lus
C-3)
W
atts
To
tal f
rom
sec
tion
C-2
.
Tota
l fro
m s
ectio
n C-
3 .
Tota
l Wat
ts. E
nter
Tot
al W
atts
into
sec
tion
A, r
ow 2
(Abo
ve o
n th
is p
age)
.
SELM
A H
YUN
DA
I9-1
1-2
015
X X
5982
0
5982
5982
0
5982
STAT
E O
F C
ALIF
OR
NIA
IND
OO
R L
IGH
TIN
G P
OW
ER A
LLO
WA
NC
E C
EC-N
RC
C-L
TI-0
3-E
(Rev
ised
06/
14)
CAL
IFO
RN
IA E
NER
GY
CO
MM
ISSI
ON
CERT
IFIC
ATE
OF
COM
PLIA
NCE
N
RCC-
LTI-0
3-E
Cert
ifica
te o
f Com
plia
nce
- Ind
oor
Ligh
ting
Pow
er A
llow
ance
(P
age
2 of
4)
Proj
ect N
ame:
D
ate
Prep
ared
:
CA B
uild
ing
Ener
gy E
ffic
ienc
y St
anda
rds
- 201
3 N
onre
side
ntia
l Com
plia
nce
Ju
ne 2
014
A s
epar
ate
page
mus
t be
fille
d ou
t for
Con
ditio
ned
and
Unc
ondi
tione
d Sp
aces
. Th
is p
age
is o
nly
for:
�
CO
ND
ITIO
NED
spa
ces
�
UN
CON
DIT
ION
ED s
pace
s
C -2
ARE
A C
ATE
GO
RY M
ETH
OD
GEN
ERA
L LI
GH
TIN
G P
OW
ER A
LLO
WA
NCE
�
D
o no
t inc
lude
por
tabl
e lig
htin
g fo
r off
ices
. Por
tabl
e lig
htin
g fo
r off
ices
sha
ll be
doc
umen
ted
only
in s
ectio
n B
of N
RCC-
LTI-0
1-E.
�
Sep
arat
ely
list l
ight
ing
for
each
pri
mar
y fu
nctio
n ar
ea a
s de
fined
in §
100.
1 of
the
Stan
dard
s.
A
B
C
D
ARE
A C
ATE
GO
RY (F
rom
§14
0.6
Tabl
e 14
0.6-
C)
W
ATT
S PE
R (f
t2 ) X
ARE
A (f
t2 )
A
LLO
WED
W
ATT
S Lo
cati
on in
Bui
ldin
g Pr
imar
y Fu
ncti
on A
rea
per
Tabl
e 14
0.6-
C
=
TOTA
LS
Ente
r su
m to
tal A
rea
Cate
gory
allo
wed
wat
ts in
to s
ectio
n C-
1 of
NRC
C-LT
I-03-
E (t
his
com
plia
nce
form
)
WA
TTS
SELM
A H
YUN
DA
I9-1
1-2
015
X
show
room
ca
shie
r se
rvic
e w
riter
ki
d's
play
w
aitin
g
reta
il
wom
en
men
fil
es
jani
tor
stor
age
sa
les
man
ager
G
M o
ffice
co
nfer
enec
e
hall
F&
I offi
ce
F&I o
ffice
in
tern
et o
ffice
2700
10
0
320
70
22
0
380
15
0
150
50
40
40
30
0
160
40
0
100
11
0
110
23
0 5630
5982
5982
show
room
of
fice
offic
e w
aitin
g w
aitin
g
reta
il
toile
t to
ilet
stor
age
ja
nito
r st
orag
e
offic
e of
fice
co
nfer
ence
co
rrido
r of
fice
of
fice
of
fice
3240
10
0
240
70
22
0
456
90
90
30
24
24
22
5
160
56
0
60
110
11
0
173
1.20
1.
00
0.75
1.
00
1.00
1.
20
0.60
0.
60
0.60
0.
60
0.60
0.
75
1.00
1.
40
0.60
1.
00
1.00
0.
75
STAT
E O
F C
ALIF
OR
NIA
IND
OO
R L
IGH
TIN
G P
OW
ER A
LLO
WA
NC
E C
EC-N
RC
C-L
TI-0
3-E
(Rev
ised
06/
14)
CAL
IFO
RN
IA E
NER
GY
CO
MM
ISSI
ON
CERT
IFIC
ATE
OF
COM
PLIA
NCE
N
RCC-
LTI-0
3-E
Cert
ifica
te o
f Com
plia
nce
- Ind
oor
Ligh
ting
Pow
er A
llow
ance
(P
age
3 of
4)
Proj
ect N
ame:
D
ate
Prep
ared
:
CA B
uild
ing
Ener
gy E
ffic
ienc
y St
anda
rds
- 201
3 N
onre
side
ntia
l Com
plia
nce
Ju
ne 2
014
A s
epar
ate
page
mus
t be
fille
d ou
t for
Con
ditio
ned
and
Unc
ondi
tione
d Sp
aces
. Th
is p
age
is o
nly
for:
�
CO
ND
ITIO
NED
spa
ces
�
UN
CON
DIT
ION
ED s
pace
s C-
3 A
REA
CA
TEG
ORY
MET
HO
D
Add
itio
nal L
ight
ing
Wat
tage
Allo
wan
ce (f
rom
Tab
le 1
40.6
-C F
ootn
otes
) A
B
C 2
D
E
F
G
Prim
ary
Func
tion
Sq
Ft o
r lin
ear
ft 1
Add
ition
al
Wat
ts
Allo
wed
Wat
tage
A
llow
ance
(B
x C
)
Des
crip
tion(
s) a
nd Q
uant
ity o
f Spe
cial
Lu
min
aire
Type
s in
eac
h Pr
imar
y Fu
nctio
n A
rea
Tota
l Des
ign
Wat
ts 3
A
LLO
WED
W
ATT
S
Smal
ler
of
D o
r F
TOTA
LS –
Ent
er in
to T
OTA
L A
REA
CA
TEG
ORY
MET
HO
D A
DD
ITIO
NA
L A
LLO
WA
NCE
S –
Sect
ion
C-1
.
1. U
se li
near
feet
onl
y fo
r ad
ditio
nal a
llow
ance
for
whi
te b
oard
or
chal
k bo
ard.
All
othe
r add
ition
al A
rea
Cate
gory
allo
wan
ces
shal
l use
wat
ts p
er s
quar
e fo
ot.
2 . A
dditi
onal
wat
ts a
re a
vaila
ble
only
whe
n al
low
ed a
ccor
ding
to th
e fo
otno
tes
on b
otto
m o
f Tab
le 1
46-C
, whi
ch in
clud
e: S
peci
aliz
ed ta
sk w
ork;
Orn
amen
tal l
ight
ing;
Pr
ecis
ion
com
mer
cial
and
indu
stri
al w
ork;
Per
line
ar fo
ot o
f whi
te b
oard
or
chal
k bo
ard;
Acc
ent,
dis
play
and
feat
ure
light
ing;
and
Vid
eoco
nfer
enci
ng S
tudi
o lig
htin
g..
3. L
umin
aire
cla
ssifi
catio
n an
d w
atta
ge s
hall
be d
eter
min
ed in
acc
orda
nce
with
§13
0.0(
c) o
f the
Sta
ndar
ds.
SELM
A H
YUN
DA
I9-1
1-2
015
X
0
STAT
E O
F C
ALIF
OR
NIA
IND
OO
R L
IGH
TIN
G P
OW
ER A
LLO
WA
NC
E C
EC-N
RC
C-L
TI-0
3-E
(Rev
ised
06/
14)
CAL
IFO
RN
IA E
NER
GY
CO
MM
ISSI
ON
CERT
IFIC
ATE
OF
COM
PLIA
NCE
N
RCC-
LTI-0
3-E
Cert
ifica
te o
f Com
plia
nce
- Ind
oor
Ligh
ting
Pow
er A
llow
ance
(P
age
4 of
4)
Proj
ect N
ame:
D
ate
Prep
ared
:
CA B
uild
ing
Ener
gy E
ffic
ienc
y St
anda
rds
- 201
3 N
onre
side
ntia
l Com
plia
nce
Ju
ne 2
014
DO
CUM
ENTA
TIO
N A
UTH
OR'
S D
ECLA
RATI
ON
STA
TEM
ENT
1.
I cer
tify
that
this
Cer
tific
ate
of C
ompl
ianc
e do
cum
enta
tion
is a
ccur
ate
and
com
plet
e.
Doc
umen
tatio
n A
utho
r N
ame:
D
ocum
enta
tion
Aut
hor S
igna
ture
:
Com
pany
: Si
gnat
ure
Dat
e:
Add
ress
: CE
A/
HER
S Ce
rtifi
catio
n Id
entif
icat
ion
(if a
pplic
able
):
City
/Sta
te/Z
ip:
Phon
e:
RESP
ON
SIBL
E PE
RSO
N'S
DEC
LARA
TIO
N S
TATE
MEN
T
I cer
tify
the
follo
win
g un
der
pena
lty o
f per
jury
, und
er th
e la
ws
of th
e St
ate
of C
alifo
rnia
: 1.
Th
e in
form
atio
n pr
ovid
ed o
n th
is C
ertif
icat
e of
Com
plia
nce
is tr
ue a
nd c
orre
ct.
2.
I am
elig
ible
und
er D
ivis
ion
3 of
the
Busi
ness
and
Pro
fess
ions
Cod
e to
acc
ept r
espo
nsib
ility
for
the
build
ing
desi
gn o
r sy
stem
des
ign
iden
tifie
d on
this
Cer
tific
ate
of C
ompl
ianc
e (r
espo
nsib
le d
esig
ner)
. 3.
Th
e en
ergy
feat
ures
and
per
form
ance
spe
cific
atio
ns, m
ater
ials
, com
pone
nts,
and
man
ufac
ture
d de
vice
s fo
r th
e bu
ildin
g de
sign
or s
yste
m d
esig
n id
entif
ied
on th
is C
ertif
icat
e of
Co
mpl
ianc
e co
nfor
m to
the
requ
irem
ents
of T
itle
24, P
art 1
and
Par
t 6 o
f the
Cal
iforn
ia C
ode
of R
egul
atio
ns.
4.
The
build
ing
desi
gn fe
atur
es o
r sy
stem
des
ign
feat
ures
iden
tifie
d on
this
Cer
tific
ate
of C
ompl
ianc
e ar
e co
nsis
tent
with
the
info
rmat
ion
prov
ided
on
othe
r ap
plic
able
com
plia
nce
docu
men
ts, w
orks
heet
s, c
alcu
latio
ns, p
lans
and
spe
cific
atio
ns s
ubm
itted
to th
e en
forc
emen
t age
ncy
for
appr
oval
with
this
bui
ldin
g pe
rmit
appl
icat
ion.
5.
I w
ill e
nsur
e th
at a
com
plet
ed s
igne
d co
py o
f thi
s Ce
rtifi
cate
of C
ompl
ianc
e sh
all b
e m
ade
avai
labl
e w
ith th
e bu
ildin
g pe
rmit
(s) i
ssue
d fo
r th
e bu
ildin
g, a
nd m
ade
avai
labl
e to
the
enfo
rcem
ent a
genc
y fo
r al
l app
licab
le in
spec
tions
. I u
nder
stan
d th
at a
com
plet
ed s
igne
d co
py o
f thi
s Ce
rtifi
cate
of C
ompl
ianc
e is
req
uire
d to
be
incl
uded
with
the
docu
men
tatio
n th
e bu
ilder
pro
vide
s to
the
build
ing
owne
r at
occ
upan
cy.
Re
spon
sibl
e D
esig
ner N
ame:
Re
spon
sibl
e D
esig
ner S
igna
ture
:
Com
pany
: D
ate
Sign
ed:
Add
ress
: Li
cens
e:
City
/Sta
te/Z
ip:
Phon
e:
SELM
A H
YUN
DA
I9-1
1-2
015
John C
hong,
PE
John C
hong E
ngin
eeri
ng
2027 E
. D
ecat
ur
Ave
Fre
sno,
CA
93720
9-1
1-2
015
(559)
325-9
988
John C
hong,
PE
John C
hong E
ngin
eeri
ng
2027 E
. D
ecat
ure
Ave
Fre
sno,
CA
93720
9-1
1-2
015
E 1
4419
(559)
325-9
988
STAT
E O
F C
ALIF
OR
NIA
IND
OO
R L
IGH
TIN
G P
OW
ER A
LLO
WA
NC
E C
EC-N
RC
C-L
TI-0
3-E
(Rev
ised
06/
14)
CAL
IFO
RN
IA E
NER
GY
CO
MM
ISSI
ON
CERT
IFIC
ATE
OF
COM
PLIA
NCE
N
RCC-
LTI-0
3-E
Cert
ifica
te o
f Com
plia
nce
- Ind
oor
Ligh
ting
Pow
er A
llow
ance
(P
age
1 of
4)
Proj
ect N
ame:
D
ate
Prep
ared
:
CA B
uild
ing
Ener
gy E
ffic
ienc
y St
anda
rds
- 201
3 N
onre
side
ntia
l Com
plia
nce
Ju
ne 2
014
ALL
OW
ED L
IGH
TIN
G P
OW
ER
A s
epar
ate
page
mus
t be
fille
d ou
t for
Con
ditio
ned
and
Unc
ondi
tione
d Sp
aces
. Th
is p
age
is o
nly
for:
�
CON
DIT
ION
ED s
pace
s
�
U
NCO
ND
ITIO
NED
spa
ces
A.
SU
MM
ARY
TO
TALS
OF
LIG
HTI
NG
PO
WER
ALL
OW
AN
CES
�
If u
sing
Com
plet
e Bu
ildin
g M
etho
d fo
r com
plia
nce,
use
onl
y th
e to
tal i
n co
lum
n (a
) as
tota
l allo
wed
bui
ldin
g w
atts
.
�
If u
sing
Are
a Ca
tego
ry M
etho
d, T
ailo
red
Met
hod,
or a
com
bina
tion
of A
rea
Cate
gory
and
Tai
lore
d M
etho
d fo
r com
plia
nce,
use
onl
y th
e to
tal i
n co
lum
n (b
) as
the
tota
l al
low
ed b
uild
ing
wat
ts
(a)
(b
) 1.
Com
plet
e Bu
ildin
g M
etho
d A
llow
ed W
atts
. Doc
umen
ted
in s
ectio
n B
of N
RCC-
LTI-0
3-E
(bel
ow o
n th
is p
age)
2. A
rea
Cate
gory
Met
hod
Allo
wed
Wat
ts. D
ocum
ente
d in
sec
tion
C-1
of N
RCC-
LTI-0
3-E
(bel
ow o
n th
is p
age)
3. T
ailo
red
Met
hod
Allo
wed
Wat
ts. D
ocum
ente
d in
sec
tion
A o
f NRC
C-LT
I-04-
E
TOTA
L A
LLO
WED
BU
ILD
ING
WA
TTS.
Ent
er n
umbe
r in
to c
orre
ct c
ell o
n N
RCC-
LTI-0
1, P
age
2, R
ow 1
�
Chec
k he
re if
bui
ldin
g co
ntai
ns b
oth
cond
ition
ed a
nd u
ncon
ditio
ned
area
s.
B.
COM
PLET
E BU
ILD
ING
MET
HO
D L
IGH
TIN
G P
OW
ER A
LLO
WA
NCE
A
B
C
D
TYPE
OF
BUIL
DIN
G (F
rom
§14
0.6
Tabl
e 14
0.6-
B)
W
ATT
S PE
R (f
t2 )
COM
PLET
E BL
DG
. ARE
A
A
LLO
WED
W
ATT
S
X =
Tota
l Are
a:
Tota
l Wat
ts. E
nter
Tot
al W
atts
into
sec
tion
A, r
ow 1
(Abo
ve o
n th
is p
age)
C -1
A
REA
CA
TEG
ORY
MET
HO
D T
OTA
L LI
GH
TIN
G P
OW
ER A
LLO
WA
NCE
S (C
-2 p
lus
C-3)
W
atts
To
tal f
rom
sec
tion
C-2
.
Tota
l fro
m s
ectio
n C-
3 .
Tota
l Wat
ts. E
nter
Tot
al W
atts
into
sec
tion
A, r
ow 2
(Abo
ve o
n th
is p
age)
.
SELM
A H
YUN
DA
I9-1
1-2
015
X
X
1784
war
ehouse
1784 0
0 1784
17840
STAT
E O
F C
ALIF
OR
NIA
IND
OO
R L
IGH
TIN
G P
OW
ER A
LLO
WA
NC
E C
EC-N
RC
C-L
TI-0
3-E
(Rev
ised
06/
14)
CAL
IFO
RN
IA E
NER
GY
CO
MM
ISSI
ON
CERT
IFIC
ATE
OF
COM
PLIA
NCE
N
RCC-
LTI-0
3-E
Cert
ifica
te o
f Com
plia
nce
- Ind
oor
Ligh
ting
Pow
er A
llow
ance
(P
age
2 of
4)
Proj
ect N
ame:
D
ate
Prep
ared
:
CA B
uild
ing
Ener
gy E
ffic
ienc
y St
anda
rds
- 201
3 N
onre
side
ntia
l Com
plia
nce
Ju
ne 2
014
A s
epar
ate
page
mus
t be
fille
d ou
t for
Con
ditio
ned
and
Unc
ondi
tione
d Sp
aces
. Th
is p
age
is o
nly
for:
�
CO
ND
ITIO
NED
spa
ces
�
UN
CON
DIT
ION
ED s
pace
s
C -2
ARE
A C
ATE
GO
RY M
ETH
OD
GEN
ERA
L LI
GH
TIN
G P
OW
ER A
LLO
WA
NCE
�
D
o no
t inc
lude
por
tabl
e lig
htin
g fo
r off
ices
. Por
tabl
e lig
htin
g fo
r off
ices
sha
ll be
doc
umen
ted
only
in s
ectio
n B
of N
RCC-
LTI-0
1-E.
�
Sep
arat
ely
list l
ight
ing
for
each
pri
mar
y fu
nctio
n ar
ea a
s de
fined
in §
100.
1 of
the
Stan
dard
s.
A
B
C
D
ARE
A C
ATE
GO
RY (F
rom
§14
0.6
Tabl
e 14
0.6-
C)
W
ATT
S PE
R (f
t2 ) X
ARE
A (f
t2 )
A
LLO
WED
W
ATT
S Lo
cati
on in
Bui
ldin
g Pr
imar
y Fu
ncti
on A
rea
per
Tabl
e 14
0.6-
C
=
TOTA
LS
Ente
r su
m to
tal A
rea
Cate
gory
allo
wed
wat
ts in
to s
ectio
n C-
1 of
NRC
C-LT
I-03-
E (t
his
com
plia
nce
form
)
WA
TTS
SELM
A H
YUN
DA
I9-1
1-2
015
X
fluid
s/co
mp
m
ech
se
rvic
e
serv
ice
rece
ptio
n
mec
h
mec
h
wor
k sh
op
rece
ptio
n
0.60
0.
70
1.00
1.
00
110
90
94
5
710
66
63
945
71
0
1855
1784
17
84
STATE OF CALIFORNIA
LINE-VOLTAGE TRACK LIGHTING WORKSHEET CEC-NRCC-LTI-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-05-E Indoor Lighting – Line-Voltage Track Lighting Worksheet (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
� There are four different methods available for determining how many watts of line-voltage track or line-voltage busway has been installed. One or more methods may be used to determine how many watts of line-voltage track or line-voltage busway has been installed. Use this worksheet to separately calculate the input wattage for each system.
� Separately enter each row of this worksheet into the Luminaire Schedule in section C of NRCC-LTI-01-E � Method 1 is the only option available for determining wattage for track or busway rated for more than 20 amperes
� METHOD 1 – VOLT-AMPERE (VA) RATING OF THE BRANCH CIRCUIT(S)
A B
BRANCH CIRCUIT NAME OR ID VOLT-AMPERE (VA) RATING OF THE
BRANCH CIRCUIT
� METHOD 2 – USE THE HIGHER OF 45 WATTS PER LINEAR FOOT OF TRACK OR TOTAL RATED WATTAGE OF ALL LUMINAIRES
A B C D E F
Track or Name # Linear Feet of
Track (W/LF)
B x C (W)
TOTAL RATED WATTAGE OF ALL LUMINAIRES
LARGER OF (D or E)
45
45
45
� METHOD 3 – USE THE HIGHER OF: 12.5 WATTS / LINEAR FOOT OF TRACK – OR VA RATING OF INTEGRAL CURRENT LIMITER
� Only integral current limiters which are certified to the Energy Commission shall be recognized by the Standards. � This method shall not be recognized if an Installation Certificate is not submitted.
A B C D E F
Track or Name # Linear Feet of
Track (W/LF) B x C (W)
VA Rating of Integral Current Limiter
Larger of (D or E)
12.5
12.5
12.5
� METHOD 4 - DEDICATED TRACK LIGHTING SUPPLIMENTARY OVERCURRENT PROTECTION PANEL � This method shall not be recognized if an Installation Certificate is not submitted. � This method shall be used only for line-voltage track lighting, and shall not be recognized for any other lighting systems. If any other lighting
systems or devices are installed, the supplementary overcurrent protection panel shall not be recognized for compliance with the Standards
A B C D
NAME OR ID Voltage of the Branch Circuit
Sum of the Ampere Rating of all Devices installed in the Panel
Wattage = Sum of the Ampere Ratings of all of the Devices Times The Branch Circuit Voltage (B x C)
9-11-2015SELMA HYUNDAI
x
x
x
360 F 24 300 360
STATE OF CALIFORNIA
LINE-VOLTAGE TRACK LIGHTING WORKSHEET CEC-NRCC-LTI-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-05-E Indoor Lighting – Line-Voltage Track Lighting Worksheet (Page 2 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
JOHN CHONG JOHN CHONG ENGINEERING 2027 E. DECATURE AVE FRESNO CA 93720
JOHN CHONG JOHN CHONG ENGINEERING 2027 E. DECATURE AVE FRESNO CA 93720
SELMA HYUNDAI 9-11-2015
(559) 325-9988
(559) 325-9988
E 14419
E 14419
9-11-2015
9-11-2015
STATE OF CALIFORNIA
Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 1 of 9) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
Project Address: Climate Zone: Conditioned Floor Area :
Unconditioned Floor Area :
General Information
Building Type: � Nonresidential � High-Rise Residential � Hotel/Motel
� Schools � Relocatable Public Schools � Conditioned Spaces � Unconditioned Spaces
Phase of Construction: � New Construction � Addition � Alteration
A. Electrical Service Metering
� Each newly installed electrical service (in both existing and newly constructed buildings) is required to be metered, as set out in Table 130.5-A, which is reproduced below.
� Fill out a separate line for each electrical service that is connected to the building.
Electrical Service Schedule
Electrical Service Rating
Metering Capabilities (check all that are present) Field
Inspector
A B C D E F G
Designation/location in building/description kVA
Instantaneous
(at the time)
kW dem
and
Historical peak
demand (kW
)
Resettable
kWh
kWh per rate
period
Pass
Fail
9-11-2015SELMA HYUNDAI
2525 HIGHLAND AVE, SELMA, CALIFORNIA 135630 SF
1855 SF
X
X
X
x
X
STATE OF CALIFORNIA
Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 2 of 9) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
� � � � � �
� � � � � �
� � � � � �
� � � � � �
� � � � � �
� � � � � �
� � � � � �
� � � � � �
� � � � � �
� � � � � �
� � � � � �
� � � � � �
Table 130.5-A - MINIMUM REQUIREMENTS FOR METERING OF ELECTRICAL LOAD
Meter Rating (kVA) 50 kVA or less
More than 50kVA and less than or
equal to 250 kVA
More than 250 kVA and less than or
equal to 1000kVA
Services rated more than 1000kVA
Instantaneous (at the time) kW demand
Required Required Required Required
Historical peak demand (kW)
Not required Not required Required Required
Resettable kWh Required Required Required Required
kWh per rate period Not required Not required Not required Required
360KVA 1000A Main Switchboard
9-11-2015SELMA HYUNDAI
X X X
STATE OF CALIFORNIA
Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 3 of 9) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
B. Disaggregation of Electrical Circuits
� Each newly installed switchboard, panel, and motor control center (in both existing and newly constructed buildings) is required to be disaggregated according to the requirements of Table 130.5-B, shown on the next page.
� Individual branch circuits, taps or disconnects that require overcurrent protection devices rated 60A or greater are exempt.
� As an alternative, current transformers can be added for individual branch circuits and loads throughout the building, and a permanent measurement system can be installed. In this case, disaggregated wiring would not be required as long as the metering system allows the equivalent disaggregated measurements.
� Fill out a separate line for each switchboard, motor control center, panelboard and subpanel.
Switchboard, motor control center, panelboard or subpanel
Electrical Service that supplies that switchboard or panel Electrical Service Rating
Field Inspector
Pass
Fail
SELMA HYUNDAI 9-11-2015
X
X
STATE OF CALIFORNIA
Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 4 of 9) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
A B C D
Designation/location in building/description Designation/location in
building/description kVA � �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
� �
OR
Current transformers have been attached to individual branch circuits and loads throughout the building, and a permanent
measurement system is installed that allows an equivalent degree of disaggregated measurement as required by the Standards.. � �
SELMA HYUNDAI 9-11-2015
Panel AC
Panel A
Panel B
Main switchboard outdoor
Main switchboard outdoor
Panel A
144 KVA
144 KVA
36 KVA Panel C
Panel D
Panel L
Panel A
Panel A
Panel AC
36 KVA
72 KVA
36 KVA
STATE OF CALIFORNIA
Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 5 of 9) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
B. Disaggregation of Electrical Circuits (continued)
Table 130.5-B - MINIMUM REQUIREMENTS FOR SEPARATION OF ELECTRICAL LOAD
Table 130.5 – B sets the upper limit on how many load(s) of each type can be supplied by each feeder. A feeder may not supply loads of more than one type unless the service is rated at 50 kVA or less. For instance, on the fifth row of the table, one feeder on a service >50 kVA could be used to supply all the plug loads on a floor of a building, provided that there are no areas in which more than 25kVA of plug load is supplied to a space less
than 5000sf
Load Type Services rated 50 kVA or less
Services rated more than 50kVA and less than or
equal to 250 kVA
Services rated more than 250 kVA and less than or
equal to 1000kVA Services rated more
than 1000kVA
Lighting including exit and egress lighting and exterior lighting
Not required All lighting in aggregate All lighting disaggregated
by floor, type or area
All lighting disaggregated by floor,
type or area
HVAC systems and components including chillers, fans, heaters, furnaces, package units, cooling towers, and circulation pumps associated with HVAC
Not required All HVAC in aggregate All HVAC in aggregate and each HVAC load rated at least 50 kVA
All HVAC in aggregate and each HVAC load rated at least 50kVA
Domestic and service water system pumps and related systems and components
Not required All loads in aggregate All loads in aggregate All loads in aggregate
Plug load including appliances rated less than 25 kVA
Not required
All plug load in aggregate Groups of plug loads
exceeding 25 kVA connected load in an area
less than 5000 sf
All plug load separated by floor, type or area
Groups of plug loads exceeding 25 kVA
connected load in an area less than 5000 sf
All plug loads separated by floor, type or area.
All groups of plug loads exceeding 25 kVA
connected load in an area less than 5000 sf
Elevators, escalators, moving walks, and transit systems
Not required All loads in aggregate All loads in aggregate All loads in aggregate
Other individual non-HVAC loads or appliances rated 25kVA or greater
Not required All Each Each
Industrial and commercial load centers 25 kVA or greater including theatrical lighting installations and commercial kitchens
Not required All Each Each
Renewable power source (net or total)
Each group Each group Each group Each group
Loads associated with renewable power source
Not required All loads in aggregate All loads in aggregate All loads in aggregate
Charging stations for electric vehicles
All loads in aggregate
All loads in aggregate All loads in aggregate All loads in aggregate
SELMA HYUNDAI 9-11-2015
STATE OF CALIFORNIA
Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 6 of 9) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
C. Voltage Drop
� Attach voltage drop worksheet to this form,
� Field inspector has discretion to approve the worksheets; the tables shown below in this section are advisory only
� Feeder conductors and branch circuits that are dedicated to emergency services are exempt from these requirements.
� An advisory table of typical power factors is shown below
Field Inspector
Pass
Fail
Feeders. Feeder conductors shall be sized for a maximum voltage drop of 2 percent at design load. � �
Branch Circuits. Branch circuit conductors shall be sized for a maximum voltage drop of 3 percent at design load. � �
SELMA HYUNDAI 9-11-2015
X
X
X
STATE OF CALIFORNIA
Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 7 of 9) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
Compliance Manual, Chapter 8, Table 8 2: Typical Power Factors for Voltage Drop Calculations
Load Type Default Power Factor
at 120 volts Default Power Factor
at 277 volts Clarifying Notes
Fluorescent lighting 0.95 0.95
Compact fluorescent lighting
0.9 (hardwired)
0.5 (GU-24)
0.9 (hardwired)
0.3 (GU-24) NPF magnetic ballasts use GU-24 values
LED lighting 0.7 0.5 May be higher if specifications call for high
power factor drivers
Incandescent lighting
1.0 1.0
HID lighting 0.9 0.9 May be lower if NPF ballasts are specified
HVAC packages 0.85 0.9
Other motors <5 HP 0.8 0.8
Other motors >5 HP 0.85 0.85
Kitchen equipment 0.9 N/A
Receptacles 0.6 N/A For dedicated receptacles, may be rated
according to the load
Electric heating including hot water
1.0 1.0
Other 0.85 0.85
SELMA HYUNDAI 9-11-2015
STATE OF CALIFORNIA
Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 8 of 9) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
D. Circuit Controls for 120-Volt Receptacles
� Controlled 120 volt receptacles shall be provided, as required by Section 130.5(d) of the Standards.
� In open office areas, controlled circuit receptacles are not required if, at time of final permit, workstations are installed, and each workstation is equipped with an occupant sensing control that is permanently mounted in each workstation, and which controls a hardwired, nonresidential-rated power strip. Plug-in strips and other plug-in devices that incorporate an occupant sensor shall not be used for this exception.
� Receptacles that are only for the following purposes are exempt:
-Receptacles specifically for refrigerators and water dispensers in kitchenettes. -Receptacles located a minimum of six feet above the floor that are specifically for clocks. -Receptacles for network copiers, fax machines, A/V and data equipment other than personal computers in copy rooms.
Field Inspector
Pass
Fail
1. At least one controlled receptacle is installed within 6 feet of each uncontrolled receptacle, or split-wired duplex receptacles are installed, that have one controlled and one uncontrolled receptacle. This applies in all of the following spaces:
Private offices, open office areas
Receptions and lobbies
Conference rooms
Kitchenettes in office spaces
Copy room
� �
2. Electric circuits serving controlled receptacles are equipped with automatic shut-OFF controls following the requirements prescribed in Section 130.1(c)1 through 5 (in many cases this will mean that the receptacles are connected to the same automatic shut-OFF system as the general lighting of the space).
� �
3. Controlled receptacles shall have a permanent marking to differentiate them from uncontrolled receptacles. � �
4. For open office areas, controlled circuits shall be provided and marked to support installation and configuration of office furniture with receptacles that comply with Section 130.1(a)130.5(d) 1, 2, and 3. � �
5. For hotel and motel guest rooms at least one-half of the 120-volt receptacles in each guest room are controlled receptacles that comply with Section 130.5(d)1, 2, and 3 (see numbers 1,2 and 3 above). Electric circuits serving controlled receptacles have captive card key controls, occupancy sensing controls, or automatic controls such that, no longer than 30 minutes after the guest room has been vacated, power is switched off.
� �
6. Plug-in strips and other plug-in devices that incorporate an occupant sensor are not used to comply with any of these requirements. � �
SELMA HYUNDAI 9-11-2015
X
X
STATE OF CALIFORNIA
Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 9 of 9) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
DOCUMENTATION AUTHOR’S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
SELMA HYUNDAI 9-11-2015
John Chong, PE
John Chong Engineering
2027 E. Decatur Ave
Fresno CA 93720 (559) 325-9988
John Chong, PE
John Chong Engineering
2027 E. Decatur Ave
Fresno CA 93720 (559) 325-9988
E 14419
9-11-2015