Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility...

108
Project Feasibility Report for Mopar Limestone Mine (13.25ha) PRE FEASIBILITY REPORT 1. Executive summary 2. Introduction 1. Identification of project and project proponent The Mopar Limestone deposit project is located at village –Mopar, Taluka – Bhatapara, Raipur District (CG). 13.25 Ha mining lease area with production of 200212MTPA is being operated by the lessee Shri Sanjay Kumar Sehgal having office at Panjabi Colony, Katora Talab, Byran Bazar, PO & Dist. Raipur (CG). The applicant is a Private individual. This lease was earlier sanction to Shri Sanjay Kumar Sehgal for 20 years from 3 rd October, 2002 to 2 nd October, 2022. Working permission was issued on 4.10.2002 by the collector Raipur. The date of opening of mining operation is 3 rd January, 2004. 2. Brief description of nature of the project Limestone mining will be done by opencast other than fully mechanised method. Presently mining activity has been closed for want of the Environmental clearance from MoEF/SEIAA. During the life of mine total 8.6085 hect areas will be excavated. During lease period about 3.5ha area will be afforested. During the first five year about 852672Tonnes limestone will be excavated and about 1215cum soil and 44878t mine reject and mine waste will be generated. 3. Need for the project and its importance to the country and or region Mineral resources of any country are the “TREASURE-TROVE” of its national economy; Chhattisgarh is one of the richest states in the country with its sparkling mineral wealth. The State is blessed with deposits of Diamond, Copper, Dolomite, Rock Phosphate, Manganese, Coal, Limestone, Pyrophillite/ Diaspore, Limestone, Iron and Granite. The rich mineral wealth provides ample scope for the development mineral based industry in the State. The Chhattisgarh State has enormous reserves of Limestone & its variety of varies grade spread over mainly in Raipur districts. Limestone is basic raw material of cement production. Many cement industry has been located vicinity of mining lease area.

Transcript of Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility...

Page 1: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

PRE FEASIBILITY REPORT1. Executive summary2. Introduction

1. Identification of project and project proponentThe Mopar Limestone deposit project is located at village Mopar, TalukaBhatapara, Raipur District (CG). 13.25 Ha mining lease area with production of200212MTPA is being operated by the lessee Shri Sanjay Kumar Sehgal havingoffice at Panjabi Colony, Katora Talab, Byran Bazar, PO & Dist. Raipur (CG). Theapplicant is a Private individual. This lease was earlier sanction to Shri SanjayKumar Sehgal for 20 years from 3rd October, 2002 to 2nd October, 2022. Workingpermission was issued on 4.10.2002 by the collector Raipur. The date of openingof mining operation is 3rd January, 2004.

2. Brief description of nature of the projectLimestone mining will be done by opencast other than fully mechanised method.Presently mining activity has been closed for want of the Environmentalclearance from MoEF/SEIAA. During the life of mine total 8.6085 hect areas willbe excavated. During lease period about 3.5ha area will be afforested. During thefirst five year about 852672Tonnes limestone will be excavated and about1215cum soil and 44878t mine reject and mine waste will be generated.

3. Need for the project and its importance to the country and or regionMineral resources of any country are the TREASURE-TROVE of its nationaleconomy; Chhattisgarh is one of the richest states in the country with itssparkling mineral wealth. The State is blessed with deposits of Diamond, Copper,Dolomite, Rock Phosphate, Manganese, Coal, Limestone, Pyrophillite/ Diaspore,Limestone, Iron and Granite. The rich mineral wealth provides ample scope forthe development mineral based industry in the State. The Chhattisgarh State hasenormous reserves of Limestone & its variety of varies grade spread over mainlyin Raipur districts. Limestone is basic raw material of cement production. Manycement industry has been located vicinity of mining lease area.

Page 2: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

2

4. Demand Supply gapIndia is endowed with significant mineral resources. India produces 89 mineralsout of which 4 are fuel minerals, 11 metallic, 52 non-metallic and 22 minorminerals.The total value of mineral production was Rs. 568070 million in 2000-2001, ofwhich the value of minerals other than petroleum and natural gas was Rs.306751 million. The metallic production is accounted for by Iron-ore, Copper-ore, Chromites and/or Zinc concentrates, Gold, Manganese ore, Bauxite and Leadconcentrates. Amongst the non-metallic minerals, more than 90 percent of theaggregate value is shared by Limestone, Magnesite, Dolomite, Barytes, Kaolin,Gypsum, Apatite & Phosphorite, Steatite and Fluorite.The aggregate mineral production in 1999- 2000 was about 550 million tonnes,contributed by over 3,100 mines (reporting mines) producing coal, lignite,limestone, iron ore, bauxite, copper, lead, zinc etc. The aggregate value of themineral production in 1999-2000 was more than Rs. 452.3 billion. The value ofmineral production during 1999-2000 was estimated at Rs.452.3 billion towhich contribution from public sector was Rs.378.4 billion (84%). In the totalvalue of mineral production, fuel minerals accounted for Rs.372.3 billion (82%),metallic minerals at Rs.34.2 billion (8%) nonmetallic minerals Rs.18.3 billion(4%) and minor minerals Rs.27.6 billion (6%). The share of the mineral sector inthe gross domestic product (GDP) of the country is around 3.5 per cent whileaccounting for 10 per cent share in the index of industrial production. Though 80% of the mines are in the private sector, yet 91% of the production in terms ofsize comes from the government owned mining ventures. Mining employs over8,00,000 persons.

Life Indices: Some Important non-fuel MineralsSL.No.

Minerals Unit Total Resources as per UNFC,1.4.2005

Life Index*(Years)

1. Bauxite 000 tonnes 3289817 2042. Copper 000 tonnes Ore : 1394426

Metal: 11417.72220**

Page 3: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

3

3. Lead & Zinc 000 tonnes Ore : 522580Lead Metal: 7207.25Zinc Metal: 24259.68Lead & Zinc Metal: 118.45

82**

4. Gold Tonnes Ore (Primary) 90289237Metal(Primary) 491.12Ore (Placer) 6121000Metal(Placer) 5.86

240**

5. Iron Ore 000 tonnes Haematite 14630388Magnetite 10619481

104

6 Chromite 000 tonnes 213063 477. Magnesite 000 tonnes 337882 6038. Manganese

Ore000 tonnes 378569 113

9. Lime Stone 000 tonnes 175328914 36410 Rock

PhosphateTonnes 305308576 94

11 Sillimanite Tonnes 74339869 Very large12 Garnet Tonnes 57655633 6113 Kyanite Tonnes 102613223 Very large14. Dolomite 000 tonnes 7533108 52215 Diamond Carats 4581913 41

Around 9,244 mining leases are spread over 21 States occupying about 0.7million hectares which is 0.21% of the total geographic area of the country. Morethan 80 percent of the mineral production comes from open cast mines andtherefore, one must add the quantity of overburden to that of the mineralproduction in order to assess the total amount of annual excavation in India smining sector.

India is the world s largest producer of mica blocks and mica splittings. With therecent spurt in world demand for chromite. India has stepped up its productionto rech the second rank among the chromite producers of the world.

Besides, India ranks, 3rd in production of coal & lignite, 2nd in barites, 4th in ironore, 5th in bauxite and crude steel, 7th in manganese ore and 8th in aluminium.

Page 4: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

4

Minor minerals are divided in two categories, schedule-I & Schedule-II. Detailsare given below:

SCHEDULE I (See Rule 6) SPECIFIED MINERALS1 Dimensional stone- granite, dolerite and other igneous and metamorphic

rocks which are used for cutting & polishing purpose for making blocks, slabs,tiles of specific dimension.

2 Marble which is used for cutting & polishing purpose for making blocks, slabs,tiles of specific dimension.

3 Marble stone for other purposes.4 Limestone when used in kilns for manufacture of lime used as building

material.5 Flagstone- Natural sedimentary rock which is used for flooring, roof top etc

and used in cutting and polishing industry.6 Stone for making gitti by mechanical crushing (i.e. use of crusher)7 Bentonite/ Fuller's earth.

SCHEDULE II (See Rule 6&7) OTHER MINERALS1 Ordinary Sand, Bajri2 Ordinary clay for making bricks, pots, tiles etc.3 Stone, Boulder, Road Metal, Gitti, Dhoka, Khanda, Dressed Stones, Rubbles,

Chips4 Murrum5 Lime kankar when used in kilns for manufacture of lime used as building

material6 Gravel7 Lime shell when used in kilns for manufacture of lime used as building

material8 Reh Mitti9 Slate when used for building material

10 Shale when used for building material11 Quartzite and quartzitic sand when used for purpose of building or for making

road metal or house- hold utensils12 Salt petre

5. Imports vs. Indigenous productionNo imports has been proposed for the lime stone production as state as well ascountry has enough reserve of lime stone, which is required mainly in cementindustry.

6. Export possibility

Page 5: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

5

The vicinity is having number of cement plant and lime stone is the basic rawmaterial for them, hence no export has been envisaged for the production at thisstage.

7. Domestic/export marketsCentury Cement, Ultratech cements and other cement plants located in the areawithin 100 km are the domestic market for the production of lime stone.

8. Employment generation (direct and indirect) due to the projectDuring mining operation skilled, semi-skilled and un-skilled labours will berequired for drilling, blasting, sizing, loading etc. following will be the manpowerrequirement directly:Mines manage-1Part time mining eng.-1Mining mat-2Supervisor-2Skilled labours-3Unskilled labours-25Indirect employment- Driver, cleaner for loader & dumper, loading andunloading points where labours are required.

3. Project description1. Types of project: Mining project of Lime Stone2. Location of the ProjectDistrict/State Taluka Village Khasara No Area in acresRaipur (CG) Bhatapara Mopar 571/1 & 1219/1 13.25 Hect

The mining lease area is located in survey of India Toposheet no. 64K/2 liesbetween the longitude 82o03 8.36 to 82o03 25.39 East & Latitude 21o38 18.98 to21o38 34.39 North. The location of all boundary pillars also shown in below table:

Boundary pillar Longitude LatitudeA 82o03 23.74 21o38 18.03B 82o03 8.36 21o38 18.98C 82o03 11.29 21o38 23.37D 82o03 12.47 21o38 34.39

Page 6: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

6

E 82o03 16.03 21o38 31.22F 82o03 16.79 21o38 29.27G 82o03 22.14 21o38 29.27H 82o03 22.47 21o38 26.47I 82o03 25.09 21o38 25.49

3. Details of alternate site: Mining is site specific project. And Mineral deposit hasbeen identified by certifying agency; hence alternative site is not applicable.

4. Size or magnitude of operation: The total lease area is 13.25ha area and totalproduction is proposed 200212TPA through opencast method other than fullymechanized mining method.

5. Project description with process details:Earlier the mining operation was carried out by manual opencast miningmethod. It is proposed to carried out mining operation by Other than fullymechanized (OTFM) method of mining. The height of working bench will beproposed 6m with 12m spacing for safety and transportation. The slope ofworking face will be not more than 60o . Adequate slope and water sump will beat gradually developed towards south east of the working pit. As there is nooverburden hence no overburden bench will be proposed for 2009-2014. Duringthe 2009 to 2010 only one working bench will be developed. Medium levelintensity blasting proposed to be carried out for production of limestone. Largesize of limestone boulders manually sized in to 4 to 6 inches or as per thedemand. During the mining some quantity of soil generated from intercalatedpocket as normally found in limestone. A very small quantity of weatheredlimestone waste will be generated during mining. Under size mineral reject willbe of 10% of the production and generated during blasting, mining and sizing oflimestone. Drilling will be done with the help of compressed air compressor andjack hammers and helco etc. excavation and loading will be done with the help ofexcavator and J.C.B and the transporting will be done by 20tonnes tipper. Theproposed year wise generation top soil and waste for the next five year isestimated as follows:

Page 7: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

7

Year Soil in cubicmeter

Waste inTonnes(intercalated)

Reject inTonnes

Limestoneproduction intones

1st 215 50 7845 1500052nd 215 50 7845 1500053rd 250 75 9200 1762254th 250 75 9200 1762255th 285 100 10438 200212Total 1215 350 44528 852672

Proposed Rate of Production When The Mine Is Fully Developed:It will be 200212Tonnes of saleable ore.Proposed Method of Mining:The proposed method of mining is by open cast OTFM method.ReservesCategory wise updated reserves with grade as on 31.03.2010

Category Geologicalreserves in T

UNFC code Mineablereserves in T

UNFC code Averagegrade

Proved 23,18,7504306250

111 18400673319288

111 CaO-45.17%MgO-0.95%SiO2-11.51%Probable 662500 122

Possible 331250 333Total 7618750 5159355

Anticipated life of mine will be:-Updated balance reserve of Limestone reserve at Mopar Limestone mine standsat 5159355 T.First five year production is about 852672TThus Balance reserve = 5159355-852672 = 4306683TTherefore 4306683/200212=21.53yearThus total life of mine is 21.53+5= 26.53year say 27 yearsBlastingThe blasting will be done with the help of 100mm crawler mounted heloc andjack hammer (34mm) by compressed air. The blast hole will be drilled by usingBurn cut or Coromant cut pattern of drilling. Small 34mm hole will be charged

Page 8: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

8

with 250gms each and 100mm holes will be charged 0.75 to 2.5km per holes.About 45 tonnes of explosives will be required per year. The blasting will bedone on contract basis, therefore no need to install magazine at mine site.Reclamation/Backfilling: - no backfilling will be done during mining schemeperiod.

6 Raw Material Requirement: No raw material is required for the mining of limestone

7 Recycling and ReuseSub grade lime stone shall be stacked and will be sold off to retail end usersinstead of creating as dumps. To soil shall be utilized for afforestation andmining overburden shall be used for backfilling/ maintenance of roads.

8 Water source: One water Chanel-11 passing throughout lease area. Noexcavation will be done 50m both side of the water distrybutary-11. No water isrequired for the mining process. Water will be made available from mine pitwhich is accumulated during the rainy season and shall be collected in settlingtank for utilization in green belt and dust suppression. & nearest village Sarkiparthrough handpumps. It is expected that 12.0 KL water will be required fordrinking, dust suppression and green belt development activity.Electric SystemThe power requirement for the project has been met by CG State ElectricityBoard, which is available at near village

9 Solid waste management: Most of the limestone formation is already exposed.Soil cover is only few centimeters and seen in very small portion falling underthe mining limit, rest other part is completely uncovered. The generated quantityof soil and intercalated waste mineral rejects can be called as waste. During thefirst five year 1215cum soil & 44878tonnes mineral reject will be generated. Topsoil sprayed over the lease boundary for plantation purpose and mine waste andmineral reject will be stack along the 50meters mining limit left parallel to thewater distributaries and secure from washing with water during rainy seasonsby garland drain and plantation of grass and bushes over the dump.

Page 9: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

9

4 Site analysisi. Connectivity

The Mopar Limestone mine is located at a distance of 65kms from distheadquarter Raipur and falling in jurisdiction of Village Mopar. Sarkipar nearestvillage is situated to the eastern direction is about 1.0km. The area isapproachable by an all weather main road from Baloda Bazar to Suleha. NearestRailway Station is Bhatapara (BG) on Raipur-Bilaspur sector (S-E railway), about15 kms from the area. Drinking water is available in dug well and tubewell invillage Sarkipar near the area is potable and it is pure and clean. The groundwater table is about 20 to 25 m below the ground level. Approach map andtopographical base map is enclosed.

ii. Land form, land use & land ownership: Land use of the area is govt. grazingland and stony waste land.

District/State Taluka Village Khasara No Area in acresRaipur (CG) Bhatapara Mopar 571/1 & 1219/1 13.25 Hect

iii. Topography :-Mining lease area is in a form of flat ground. Mazimum height of the lease area is258meters above MSL and minimums height of the area is 257meters from theabove MSL. Top soil or overburden above the limestone formation is almost nilor negligible. The proposed lease area is gently sloping towards south.

iv. Existing land use pattern: existing land use pattern of the mining lease area isgovt. grazing & stony waste land.

Existing village wise land use pattern of the 10km radius (ha)

Name of villageArea of Village

(Hectares)Forest (by

Source)Total

IrrigatedArea

UnirrigatedArea

CulturableWaste

Area notavailable forcultivation

0.0km to 2.0km REDIUS VILLAGESKarmadih 240 0 53 119 57 11Sarkipar 159 0 3 131 18 7Piprahi 260 0 152 12 50 46Mopar 805 0 621 53 99 32

2.0km to 5.0km REDIUS VILLAGESAmakoni 537 0 246 165 93 33

Page 10: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

10

Karhi(Chandi) 391 0 84 113 128 66Chandi 596 0 202 89 161 144Parsadih 248 0 171 24 17 36Jethani 168 7 4 126 18 13Deorani 286 0 238 10 24 14Maldi 690 0 521 40 76 53Khairtal 371 0 288 4 66 13Bhadrapali 277 0 69 10 187 11Mudhipur 307 0 0 221 46 40Khairwardih 95 0 0 69 18 8Dhandheni 447 0 0 276 82 89Semaradih 596 0 122 285 149 40

5.0km to 10.0km REDIUS VILLAGESMatiya 321 0 66 190 32 33Farhada 830 0 9 732 52 37Tekari 373 0 57 292 5 19Diggi 279 0 2 222 51 4Khapri 100 0 22 73 3 2Jaraud R.N. 554 0 145 181 210 18Suhela 832 0 180 522 58 72Basin 346 0 126 149 45 26Padkidih 420 0 107 255 33 25Khapradih 866 0 7 704 127 28Jhipan 576 0 90 368 86 32Raweli 310 0 25 249 22 14Rawan 1233 0 25 501 666 41Gogiya 267 0 0 224 27 16Khamhriya(Khamriya) 371 0 24 188 116 43Gurra 568 0 33 428 78 29Chamari 282 0 0 239 31 12Khairi 290 0 1 196 79 14Topa 280 0 204 5 64 7Godhi 342 0 10 262 58 12Amlidih 281 0 3 208 58 12Tonatar 709 0 590 28 66 25Mirgi 522 0 280 114 63 65Turma 448 0 8 394 22 24Purena 140 0 114 2 22 2Parsabhadar 151 0 117 2 21 11Pausari 406 0 231 74 81 20Bharsela 560 15 187 264 42 52Karmada 880 66 651 28 87 48Bhathagaon 515 22 140 235 96 22Gaitara 562 35 269 181 52 25Arjuni 889 0 571 66 191 61Magarway 115 0 86 2 21 6Rawan 502 0 202 8 262 30Kukurdih 909 21 366 190 225 107Parsabhadar 234 0 126 36 53 19Kokadi 469 0 339 79 30 21

Page 11: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

11

Dhabadih 151 0 111 19 12 9Risda 965 0 557 158 200 50Puran 355 8 228 57 31 31Bharuwadih 405 0 230 108 47 20Pausari 351 36 207 52 37 19Champa 301 0 162 88 37 14Thelki 281 12 182 49 23 15Khamhariya 312 33 237 18 8 16Chicholi 136 0 89 26 10 11Guma 786 0 480 132 138 36Saiha 453 0 356 14 51 32Belha 286 0 212 9 47 18Parsadih 171 0 123 6 33 9Gitkera 522 0 424 12 59 27Gadabhata 512 0 382 15 83 32Aurasi 144 0 114 5 14 11

Details of nearest environmental setting of the lease areaS. No. Particulars Details

1 Latitude 21o38 18.98 to 21o38 34.39 North2 Longitude 82o03 8.36 to 82o03 25.39 East3 Height above mean sea level 258-257 AMSL4 Nearest City Baloda Bazar -11Km5 Nearest Railway Station Bhatapara-15Km6 Nearest Airport Raipur-65km7 Nearest state Highway Baloda Bazar to Suhela-2.5km- S8 Nearest Village Sarkipar- 0.4km9 Hills/Valley None in 10km radius10 Ecological Sensitive Zone No national parks and sanctuary in

10km radius11 Reserve Forest None in 10km radius12 Historical Place None within 10 km radius13 Pipelines No in 10 km radius14 Nearest River/ Nalla Baloda Branch Canal-0.330km-SE

water distrybutary-11-within leaseareaKhorri nalla-8.5km-SEBanjari Nalla-3.0km-WJamuniya Nadi-8.5km-NW

15 Industries None within 1km radius16 Mines None within 1km radius16 Annual Climatic Conditions Max. Temperature 44.8oC

Minm Temperature 10 oC

v. Existing infrastructure: No infrastructure has been exist within lease area.

Page 12: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

12

vi. Soil classification:Local Geology:Lithological succession observed in the area can be summarized as follows:Recent Alluvial Soil/lateriteRaipur series light to dark grey stromatloitic limestone found onlyThe area comprises of calcareous rocks of Raipur series of Chhattisgarh supergroup of upper middle proterozoic age. Limestone found in this area includegray to buff colored limestone with feeble greenish tinage at places. Thelimestone of the area exhibits stromatiloitic structure and showing the elephantskin weathering. Limestone formation is almost horizontal. The general strike ofthe limestone formation is N30oE to S30oW and showing very low dip 3o to 5o

dip. Detached sizeable outcrops of limestone are noted in mining lease area. Thelimestone of the area is thickly bedded. The thickness of overburden that ismainly soil and laterite varying between 0.0 to 0.3m on regional scale, howeverlease area having extensive limestone outcrops, therefore the thickness ofoverburden of soil is almost nil.Physical characteristics of Limestone:Limestone of this area is gray in dark to light in colour, fine grained, mediumhard, thickly bedded and stromatolitic.

vii.Climate data from secondary sources:Meteorological data recorded at the nearest IMD station Raipur was collectedfrom India Meteorological Department (IMD), Nagpur.The climate of this region may be considered as extreme being intensely hot insummer and moderately cold in winter. The climate of the area is alsocharacterized by a hot dry summer and well distributed rains in the monsoonseason. The cold season commences from December and lasts till the end ofFebruary. The hot season follows thereafter and continues till about the secondweak of June. The south west monsoon season is from the middle of June to theend of September.

Page 13: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

13

• Temperature: The temperature rises steadily from the beginning of March tillMay, which is usually the hottest month of the year. The mean maximumtemperature in May is 41.89°C. May and the early part of June, prior to onset ofthe south west monsoon are rather hot and the dust raising scorching winds addto the discomfort. The arrival of the monsoon air during second week of Junebrings relief, and the weather remains pleasant throughout the south westmonsoon season. The day temperature increases slightly towards the close ofthe monsoon season, and the rise is maintained in October after the withdrawalof the monsoon. However, the night temperature begins to drop from Octoberonwards. The day temperatures also begin to drop rapidly from the middle ofNovember. December is usually the coldest month while the mean dailyminimum temperature at 12.55°C. Cold waves sometimes affect the area inassociation with the passage of western disturbances across northern India inthe cold season. Average yearly temperature varies between 32.94°C to 20.85°C.

• Relative Humidity: The relative humidity is high during the southwestmonsoon, being generally over 80%. After the monsoon season, humiditydecreases, and during the winter season, the air is fairly dry. The driest part ofthe year is the summer season, with the afternoon humidity is generally about25% or even less

• Rainfall: Monsoon in the area comes from south-westerly winds. The averageannual rainfall is reported as 1134.7 mm, and about 87% of this is received inthe monsoon season. Rainfall during July and August is highest in the year, andconstitutes more than half of the total annual rainfall. The variation in therainfall from year to year is not large.

• Wind PatternWinds are generally light to moderate, with some increase in force in latesummer and the southwest monsoon seasons. In the post monsoon and wintermonths, winds are mainly from directions between north and east. In March,winds are variable in direction. By April, winds from the west and southwest

Page 14: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

14

begin to appear and these predominant during the period May to September.Average annual wind speed is 5.3 Km/hr. The windroses at IMD, Raipur for theperiod 1979-1990 is given in Fig at 8.30 hrs and 17.30 hrs, respectively.

Page 15: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

15

Page 16: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

16

Page 17: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

17

viii. Social infrastructure available:The mining lease area is mostly surrounded by Devrani, Maldi, Murhipar,Karmadih, Serkipar and Piprahi villages in scattered fashion. The nearestvillage is serkipar at 1km distance. The village mopar is at a distance of 2kmsnorth west of mine site. Power line, telephone line, high school, bank, govt.office, hospital etc. at Mopar. The police station is at Hirmi.

Human Settlements: - Locations of villages within 10km of the area are as under:Name ofvillage

HouseHold

TotalPopulation

Total PopulationMales

Total PopulationFemales

Total SCPopulation

Total STPopulation

0.0km to 2.0km REDIUS VILLAGESKarmadih 102 487 241 246 472 0Sarkipar 74 365 182 183 148 64Piprahi 90 408 207 201 36 48Mopar 805 0 621 53 99 32

2.0km to 5.0km REDIUS VILLAGESAmakoni 154 698 332 366 91 94Karhi(Chandi) 92 401 190 211 26 162Chandi 163 700 318 382 17 180Parsadih 72 432 212 220 0 394Jethani 48 332 171 161 75 19Deorani 173 787 403 384 167 149Maldi 363 1955 940 1015 99 629Khairtal 236 1144 561 583 279 258Bhadrapali 251 1359 731 628 20 106Mudhipur 68 311 157 154 33 71Khairwardih 17 100 50 50 0 1Dhandheni 134 652 326 326 72 118Semaradih 191 875 458 417 39 195

5.0km to 10.0km REDIUS VILLAGESMatiya 202 868 433 435 62 1Farhada 197 820 408 412 0 0Tekari 125 636 313 323 2 124Diggi 106 517 267 250 507 1Khapri 29 168 89 79 161 0Jaraud R.N. 170 678 335 343 251 112Suhela 372 1867 907 960 235 76Basin 160 664 320 344 206 29Padkidih 148 813 398 415 203 91Khapradih 215 1171 592 579 81 0Jhipan 266 1441 742 699 211 84Raweli 148 862 447 415 249 37Rawan 1108 4712 2495 2217 282 93Gogiya 166 1013 474 539 825 0Khamhriya(Khamriya) 177 950 492 458 422 71Gurra 248 1223 612 611 297 363

Page 18: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

18

Chamari 75 328 172 156 321 0Khairi 88 432 219 213 0 246Topa 110 571 270 301 0 232Godhi 152 748 388 360 136 136Amlidih 134 664 327 337 130 206Tonatar 318 1454 687 767 161 482Mirgi 185 842 401 441 15 151Turma 181 836 412 424 224 113Purena 60 261 131 130 0 215Parsabhadar 97 526 244 282 4 208Pausari 242 1276 638 638 217 163Bharsela 174 902 463 439 130 334Karmada 455 2202 1064 1138 174 356Bhathagaon 99 440 213 227 18 53Gaitara 216 1029 525 504 85 223Arjuni 739 3808 1891 1917 91 394Magarway 48 222 112 110 0 32Rawan 982 4780 2484 2296 270 350Kukurdih 249 1282 644 638 143 563Parsabhadar 131 628 327 301 466 6Kokadi 245 1266 622 644 374 171Dhabadih 36 92 47 45 81 0Risda 473 2374 1158 1216 679 223Puran 62 275 125 150 6 67Bharuwadih 109 508 255 253 159 30Pausari 89 404 204 200 22 93Champa 137 595 269 326 64 82Thelki 161 749 373 376 48 78Khamhariya 133 632 313 319 165 59Chicholi 52 229 109 120 0 92Guma 236 1113 569 544 24 167Saiha 198 897 433 464 29 25Belha 74 394 192 202 181 0Parsadih 42 154 75 79 93 0Gitkera 192 837 415 422 149 188Gadabhata 173 759 344 415 227 10Aurasi 106 454 216 238 0 50

5 Planning brief:a. Planning concept: It is a mining project, and planning for excavation shall be

governed by the approved mining plan.b. Population projection: The project is small in magnitude. No influx of

population is expected as labour shall be deployed from the local villages.

Page 19: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

19

c. Land use planning (breakup along with green belt etc.)Items Existing At the end of 5th year end

Total Mineable area 13.25 haUltimate depth of mining 2 mt ( 255 AMSL) 6 mt ( 251 AMSL)Ultimate pit slope 450 450Area under dumps 0.0ha 0.575haArea under pits 0.150ha 5.984haArea to be reclaimed Nil NilInfrastructure & Road Nil 0.037haMineral storage Nil nilPlantation 0.1ha 1.0ha

Programme of afforestation:-Year No of trees Area in sqm Survival rate in %1st 300 2000 802nd 300 2000 803rd 300 2000 804th 300 2000 805th 300 2000 80Total 1500 10000

d. Assessment of infrastructure demand (physical and social)Mining Machineries like loaders, dumpers, jack hammers etc will be requiredfor the lime stone mining.

e. Amenities/facilitiesRest shelters, Toilets, drinking water facilities, first aid facilities , regularmedical checkup facilities shall be provided for labours and their families.

6 Proposed infrastructurea. Industrial area (processing area)

The project is mining project and hence site office shall be required. Noprocessing of lime stone is proposed in the lease area.

b. Residential area (non processing area)No residential area is proposed for the subject project

Page 20: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

20

c. Green beltTotal hact area shall be developed a green belt with 1500 number of trees inthe barrier zone of the lease area.

d. Social infrastructure5% of the royalty per year shall be provided to the local gram panchayat forthe social developmental programmes on the need base assessment, whichshall be incurred as per the requirement .

e. Connectivity (traffic and transportation road/rail/metro/water waysetc): The Mopar Limestone mine is located at a distance of 65kms from distheadquarter Raipur and falling in jurisdiction of Village Mopar. Sarkiparnearest village is situated to the eastern direction is about 0.4km. The area isapproachable by an all weather main road from Baloda Bazar to Suleha.Nearest Railway Station is Bhatapara (BG) on Raipur-Bilaspur sector (S-Erailway), about 15 kms from the area.

f. Drinking water management (source & supply of water):Drinking water is available in dug well and tubewell in village Sarkipar nearthe area is potable and it is pure and clean. It is also proposed to providehand pump in the lease area.

g. Sewerage system: No construction or sewage waste is expected from themining process. However the domestic waste from the toilets shlla be giventreatment through septic tank and soak pit arrangement.

h. Industrial waste management: No industrial waste will be generated.i. Solid waste management: Most of the limestone formation is already

exposed. Soil cover is only few centimeters and seen in very small portionfalling under the mining limit, rest other part is completely uncovered. Thegenerated quantity of soil and intercalated waste mineral rejects can becalled as waste. During the first five year 1215cum soil & 44878tonnesmineral reject will be generated. Top soil sprayed over the lease boundaryfor plantation purpose and mine waste and mineral reject will be stack alongthe 50meters mining limit left parallel to the water distributaries and secure

Page 21: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making

Project Feasibility Report for Mopar Limestone Mine (13.25ha)

21

from washing with water during rainy seasons by garland drain andplantation of grass and bushes over the dump.

j. Power requirement & supply/source: The power requirement for theproject has been met by CG State Electricity Board, which is available at nearvillage.

7 Rehabilitation and Resettlement (R & R) Plan: No R&R plan is required as nodisplacement of people is proposed for the mining project

8 Project Schedule and Cost estimatesa. Likely date of start of construction and likely date of completion (time

schedule for the project to be given)The subject mining project was earlier in operation and it will start again assoon as environmental clearance will be obtained.

b. Estimated project cost along with analysis in terms of economic viability ofthe projectThe cost benefit analysis is enclosed as Annexure-1 with feasibility report.

9 Analysis10 is of proposal (final recommendations)

i. Financial and social benefits with special emphasis on the benefit to thelocal people including tribal population, if any, in the area.The mining project will create local employment to the villagers and they willget employment in non agricultural season. Further royalty shall be paid to theGovt, which will create revenue generation for the Govt. Further projectproponent shall provide 5% of the royalty every year to the local panchayat, andnumber of developmental work which will be need based can be executedthrough the same fund.

Page 22: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 23: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 24: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 25: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 26: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 27: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 28: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 29: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 30: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 31: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 32: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 33: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 34: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 35: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 36: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 37: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 38: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 39: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 40: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 41: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 42: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 43: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 44: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 45: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 46: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 47: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 48: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 49: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 50: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 51: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 52: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 53: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 54: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 55: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 56: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 57: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 58: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 59: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 60: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 61: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 62: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 63: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 64: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 65: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 66: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 67: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 68: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 69: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 70: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 71: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 72: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 73: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 74: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 75: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 76: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 77: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 78: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 79: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 80: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 81: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 82: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 83: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 84: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 85: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 86: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 87: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 88: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 89: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 90: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 91: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 92: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 93: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 94: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 95: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 96: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 97: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 98: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 99: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 100: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 101: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 102: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 103: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 104: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 105: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 106: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 107: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making
Page 108: Project Feasibility Report for Mopar Limestone Mine … Lime Stone Mine... · Project Feasibility Report for Mopar ... and used in cutting and polishing industry. 6 Stone for making