Project Development & Environment Public Hearing Presentation 836 Improvements from 17th Ave… ·...
Transcript of Project Development & Environment Public Hearing Presentation 836 Improvements from 17th Ave… ·...
1
Project Description• From the NW 17th Ave Interchange to the SR 836/ I-95/ I-395
Interchange (Midtown Interchange) or approximately 1.4 miles• Part of the FIHS/SIS System• Urban Principal Arterial Expressway• Posted Speed Limit 55 mph
• From the NW 17th Ave Interchange to the SR 836/ I-95/ I-395 Interchange (Midtown Interchange) or approximately 1.4 miles
• Part of the FIHS/SIS System• Urban Principal Arterial Expressway• Posted Speed Limit 55 mph
N
2
Engineering Analysis Alternative 11-AAlternative 11-A
N
New elevated C-D road with stop controlled off-ramp at NW N River Dr
(same as Alternative 1, 11)
New elevated EB C-D facility exclusively for NW 12 Ave traffic destined to
I95 NB and SB
EB movements to I-395 is provided on new C-D
facility
3
Engineering Analysis Preferred Alternative-Alternative 11-A
Preferred Alternative-Alternative 11-A
N
•New off-ramp at NW N River Dr
•Least Right-of-Way and socio-economic impacts
•Preferred option for MDX and FDOT
EB movements to I-395 is provided on new C-D
facility
New elevated EB C-D facility exclusively for NW 12 Ave traffic destined to
I95 NB and SB
New elevated C-D road with stop controlled off-ramp at NW N River Dr
•New eastbound and westbound C-D facilities
4
Alternative 11-A Right of Way ImpactsAlternative 11-A Right of Way ImpactsEngineering Analysis
N
5
Alternative 11-A Cost EstimateAlternative 11-A Cost EstimateEngineering Analysis
PROJECT COST
Construction (LRE) $233.3 million
Right of Way Impacts $6.2 million
Total $239.5 million